PRELIMINARY DESIGN
DESIGN APPROVAL
EQUIPMENT SUPPLY
THREE MAIN UNITS PROCUREMENT BOILER, TURBINE & GENERATOR SUPPLY CONTRACT A A BOILER, TURBINE & GENERATOR MANUFACTURE
BALANCE OF PLANT
CONSTRUCTION MOBILIZATION OF SITE STAFF ESTABLISHMENT OF SITE OFFICE & ACCOMODATION CONSTRUCTION OF WATER & POWER AVALIBILITY CONSTRUCTION SUBCONTRACT
MAIN PROJECT
B B BOILER TURBINE MAIN BOLIER BOLIER STEEL STRUCTURE BODY FOUNDATION CONSTRUCTION PLANT TURBINE MAIN PLANT FOUNDATION CONSTRUCTION & BUILDINGSTRUCTURE TURBINE MAIN PLANT STRUCTURE FOUNDATION INSTALLATION C B CONSTRUCTION IN POSITION CONSTRUCTIONACID CLEANING SURFACE EQUIPMENT ERECTION TURBINE GENERATOR PLATON INSTALLATIONLIGHTUP BOLIER BOILERBOLIER WALL HEAT INSULATION DRUM LIFTING HEATING HYDROSTATIC BOILER TURBINE BOILER BOILER TEST
TURBINE BODY EQUIPMENT ERECTION ELECTRICAL C&I {DCS} GENERATOR STATOR LIFTING SYSTEMS & WATER SYSTEM CIVIL & SYSTEMS & STRUCTURAL WORKS & FOR AHP CIVIL & STRUCTURAL ACCESSORIES FOR ACCESSORIES CONNECTING EQUIPEMENT WITH WORKS & EQUIPMENT WITH BTG BTG GRID POWER AUXILIARIES TURBINE COVER OIL CIRCULATION AUXILIARIES
SWITCH YARD CIVIL & STRUCTURAL WORKS & EQUIPEMENT WITH AUXILIARIES
B+C+E
PERFORMACE OF TEST