BASIC FLOW CHART FOR POWER PLANT

CUSTOMERS REQUEST FOR PROPOSAL

PREPARATION FOR BIDDING PROPOSAL/CONTRACT NEGOCIATION

EPC CONTRACT SIGNING

PROJECT PLANNING / PRELIMINARY SURVEY

PRELIMINARY DESIGN

DETAILED SURVEY & SURVEY REPORT

CONSTRUCTION DRAWING DESIGN

DESIGN APPROVAL

PROCUREMENT & ORDERING

EQUIPMENT SUPPLY

THREE MAIN UNITS PROCUREMENT BOILER, TURBINE & GENERATOR SUPPLY CONTRACT A A BOILER, TURBINE & GENERATOR MANUFACTURE

AUXILIARY EQUIPMENT PROCUREMENT

PROCUREMENT OF RAW MATERIALS

CHP & AUXILIARIES E

AHP & AUXILIARIES

WATER SYSTEM EQUIPMENT & AUXILIARIES

BALANCE OF PLANT

CONSTRUCTION MOBILIZATION OF SITE STAFF ESTABLISHMENT OF SITE OFFICE & ACCOMODATION CONSTRUCTION OF WATER & POWER AVALIBILITY CONSTRUCTION SUBCONTRACT

PREPARATION WORK BEFORE CONSTRUCTION

MAIN PROJECT

B B BOILER TURBINE MAIN BOLIER BOLIER STEEL STRUCTURE BODY FOUNDATION CONSTRUCTION PLANT TURBINE MAIN PLANT FOUNDATION CONSTRUCTION & BUILDINGSTRUCTURE TURBINE MAIN PLANT STRUCTURE FOUNDATION INSTALLATION C B CONSTRUCTION IN POSITION CONSTRUCTIONACID CLEANING SURFACE EQUIPMENT ERECTION TURBINE GENERATOR PLATON INSTALLATIONLIGHTUP BOLIER BOILERBOLIER WALL HEAT INSULATION DRUM LIFTING HEATING HYDROSTATIC BOILER TURBINE BOILER BOILER TEST

TURBINE BODY EQUIPMENT ERECTION ELECTRICAL C&I {DCS} GENERATOR STATOR LIFTING SYSTEMS & WATER SYSTEM CIVIL & SYSTEMS & STRUCTURAL WORKS & FOR AHP CIVIL & STRUCTURAL ACCESSORIES FOR ACCESSORIES CONNECTING EQUIPEMENT WITH WORKS & EQUIPMENT WITH BTG BTG GRID POWER AUXILIARIES TURBINE COVER OIL CIRCULATION AUXILIARIES

SWITCH YARD CIVIL & STRUCTURAL WORKS & EQUIPEMENT WITH AUXILIARIES

CHP CIVIL & STRUCTURAL WORKS & EQUIPMENT WITH AUXILIARIES

B+C+E

TEST RUN ON LOAD

PERFORMACE OF TEST

COMMISSIONING ACTIVITIES: - TRIAL & FULL LOAD OPERATION

HAND OVER THE PLANT