Problem Containment:
Project Y
Steps 1. Define & Contain the Problem 2. Measure the Problem 3. Perform Root Cause Analysis 4. Plan & Implement Improvement 5. Assess Effectiveness
Responsible Manager:
Thomas A. Little Consulting 2002
Metric Name: Measurement Frequency: Date: 1 11/16/2001 2 11/17/2001 3 11/18/2001 4 11/19/2001 5 11/20/2001 6 11/21/2001 7 11/22/2001 8 11/23/2001 9 11/24/2001 10 11/25/2001 11 11/26/2001 12 11/27/2001 13 11/28/2001 14 11/29/2001 15 11/30/2001 16 12/1/2001 17 12/2/2001 18 12/3/2001 19 12/4/2001 20 12/5/2001 21 12/6/2001 22 12/7/2001 23 12/8/2001 24 12/9/2001 25 12/10/2001
Measure 15 16 14 15 16.5 14.8 15.2 13.8 12.9 13.4 12.5 6.5 5.4 5.3 4.3 3.3 4.5 4.8 3.7 3.8 2.9 3.5 3.8 2.7 2.5
Number:
Assigned to:
Start Date:
End Date:
Status:
Review Date
On Plan/On Schedule Behind Plan, with effort can return to schedule Behind Plan and unable to meet schedule Change of Plan Task Completed
What must my Who are the suppliers for our product suppliers provide to or service? How capable are they in my process to meet meeting our process requirements? my needs?
Determine the start and end points of the process associated with the problem and the major steps in the process.
Suppliers
1 2
Input
1 2 3 1 2 3 1 2 3 1 2 3
Process
Start Point:
(High Level)
What is the most appropriate end point for the process? What termine the start and end points of the process product or service does sociated with the problem and the major steps the process deliver to he process. the customer? (High Level)
Who are the customers for our product or service? What are their requirements for performance
rocess
Output
1 2
Customers
1 2 1 2 1 2 1 2 1 2 1 2
Operation or Activity
3 4 5 6
Start Date: Use lines and or color bars to in Start Date End Date Assigned to: 11/16/2001
3. Perform Root Cause Analysis 4. Plan and Implement Improvement 5. Assess Effectiveness of Improvement 6. Standardize and Control
11/16/2001 Use lines and or color bars to indicate start and stop dates for each activity 11/17/2001 11/18/2001 11/19/2001 11/20/2001 11/21/2001 11/22/2001 11/23/2001 11/24/2001
Rank
Source?
*Common types of data and analysis 1 Detailed Process Review 2 Process Mapping 3 Visual Analysis 4 Cause and Effect (Event) Analysis 5 Data Collection and Analysis 6 Additional Tests and Experiments
Analysis description: Careful walkthrough of the process step by step to determine the s Detailed process flow analysis to understand all the steps of the pro Visual examination of the problem and visual documentation such Examination of the potential relationship of factors and or event con Measurement of performance from the product or process and an a Additional tests or experiments designed to understand the current
Who?
When?
tep by step to determine the source, nature and frequency of the problem derstand all the steps of the process, how the problem occurs and to document the process flow nd visual documentation such as digital photos and videos ship of factors and or event conditions on the problem he product or process and an analysis of current data and associated factor effects gned to understand the current situation and determine the root cause
Measure
Responses or Outputs (Ys) Dependent Variable Factors (Xs) USL LSL Target Independent Variable(s) USL
LSL Target
Start or End
Operation
Start
Organization 2
Operation 2 Correct?
Yes
No Organization 3
Operation 2
Operation 2
End
Clear definition of Visual the measurement inspection defined in such a or automated way as to achieve test? repeatable results Test instruments from multiple are defined. observers Procedures for data collection are defined.
w to Measure
Data Collection Method
Sample Plan
Where? When? How Many?
Manual? State What Spreadsheet? who has measure is Computer based? the being etc. responsibility? collected
How The number often of data the points data collected is per sample collected
Measurement
Poor repeatability Poor reproducibility Poor accuracy Poor stability Poor linearity Invalid measurement or test method Excessive test or measurement Other (state potential cause) Incorrect definition Incorrect sequence Missing definitions, implicit rules Poor process controls Poor measurement controls Lack of critical information Incorrect information Excessive queues or out-time Handling Orientation Poor management of change Incorrect revision Other (state potential cause)
Materials
Defective Off-specification Contaminated Improper storage conditions Labeling or identification Incorrect amount or quantity Improper transportation or handling Expiration date exceeded or unknown Problem with product design Wrong materials Other (state potential cause)
Machine (Proce
Method
Environment
People
Level of staffing Training Competency or experience Supervision Conflicting goals Compliance with procedures Personality issues Physical ability or function Cognitive ability and function Knowledge deficit Communication with peers or supervisor Other (state potential cause) x
Environment
Physical environment (ESD, lighting, etc.) Security or safety systems Distractions in the environment Particulates Contamination Other (state potential cause)
Process Review
Priority 3 Priority 5
Potential Factor Factor 1 Factor 2 Factor 3 Factor 4 Factor 5 Factor 6 Factor 7 Factor 8 NC - Non Contributor PC - Partial Contributor ID - Insufficient Data
Who?
Process Map
Priority 1 Priority 2
Visual Analysis
Priority 6
Analysis of Data
Priority 7 Priority 8 Priority 4
Thomas A. Little Consulting 2002
IDX - Data not available RC - Root Cause RCX - Root Cause Not Controllable
*Common types of data and analysis 1 Detailed Process Review 2 Process Mapping 3 Visual Analysis 4 Cause and Effect (Event) Analysis 5 Data Collection and Analysis 6 Additional Tests and Experiments
Analysis description: Careful walkthrough of the process step by step to determine th Detailed process flow analysis to understand all the steps of the Visual examination of the problem and visual documentation su Examination of the potential relationship of factors and or event Measurement of performance from the product or process and Additional tests or experiments designed to understand the curr
Investigation Method
Result
Validation Date
Validation Results
% Unexplained
he process step by step to determine the source, nature and frequency of the problem nalysis to understand all the steps of the process, how the problem occurs and to document the process flow e problem and visual documentation such as digital photos and videos ntial relationship of factors and or event conditions on the problem mance from the product or process and an analysis of current data and associated factor effects iments designed to understand the current situation and determine the root cause
Root Cause 2
2. Solution
a) b) c)
3. Solution
a) b)
Action Plan
Owner
Due Date