Longitud
Superficie
Km
Ancho
Estado
P endiente
ml
15.626
Material Suelto
10.60
Material Suelto
Herradura
16.20
Material Suelto
Herradura
3.00
%
Malo
tado
P endiente
Obras de arte
Malo
3
Herradura
Herradura
NO EXISTE
2009(AO 0)
ENE FEB
MAR
ABR
2010
ESTUDIOS
Estudio definitivo
100%
INFRAESTRUCTURA
40.0%
30.0%
30.0%
50.0%
50%
100.0%
IMPACTO AMBIENTAL
Impacto Ambiental
100.0%
CAPACITACION
Talleres
OPERACIN Y MANTENIMIENTO
Operacin y Mantenimiento
100.0%
2012
2013
2014
2015
2016
2017
2018
2019
10
Expediente
Tcnico
Obras de
Infraestructura
Impacto
ambiental
Capacitacin
Gastos
generales(10%)
Supervisin(3%)
Imprevistos(5%)
INVERSION TOTAL
ALTERNATIVA 01
83,666.00
4,743,081.59
21,916.96
10,000.00
485,866.46
145,759.94
242,933.23
5,733,224.17
ALTERNATIVA 02
83,666.00
4,961,339.88
21,977.80
10,000.00
507,698.37
152,309.51
253,849.18
5,990,840.74
Expediente
Tcnico
Obras de
Infraestructura
Capacitacin
Impacto
ambiental
Gastos
generales(10%)
Supervisin(3%)
Imprevistos(5%)
INVERSION TOTAL
ALTERNATIVA 01
66,096.14
3,747,034.46
17,314.40
7,900.00
383,834.50
115,150.35
191,917.25
4,529,247.09
ALTERNATIVA 02
66,096.14
3,919,458.51
17,362.46
7,900.00
401,081.71
120,324.51
200,540.86
4,732,764.19
COSTOS DE MANTENIMIENTO
EN LA SITUACION SIN PROYECTO
A PRECIOS PRIVADOS
COSTOS DE MANTENIMIENTO RUTINARIO CADA 01 AO
PARTIDAS
unidad
CANTIDAD
COSTO
COSTO DE MERCADO
(S/.)
COSTO DE MANTENIMIENTO
22,300.80
CAMINO DE HERRADURA
4,200.00
Jornal
160.00
20.00
Jornal
50
20.00
3,200.00
1,000.00
18,100.80
Jornal
280.00
20.00
5,600.00
Km
15.626
800.00
12,500.80
Costo Directo
22,300.80
Gastos Generales(10%)
2,230.08
PRESUPUESTO TOTAL
24,530.88
unidad
CANTIDAD
COSTO
COSTO DE MERCADO
(S/.)
COSTO DE MANTENIMIENTO
74,085.45
4,455.25
Km
50.026
32.58
1,629.85
M3
500
4.10
2,050.00
M2
250.13
3.10
Ml
Limpieza de cunetas
775.40
64,330.20
50026
1.20
60,031.20
Limpieza de alcantarillas
UNID
38
100.50
3,819.00
Limpieza de badenes
UNID
16
30.00
480.00
5,300.00
Glb
1,800.00
Glb
3,500.00
Costo Directo
1,800.00
3,500.00
74,085.45
Gastos Generales(10%)
7,408.55
PRESUPUESTO TOTAL
81,494.00
unidad
CANTIDAD
COSTO
COSTO DE MERCADO
(S/.)
Mantenimiento
109,842.61
27,212.41
Km
50.026
32.58
1,629.85
M3
990
4.10
4,059.00
M2
689
3.10
2,135.90
Bacheo
M3
185
9.50
1,757.50
Desencalaminado
Km
50.026
85.00
4,252.21
Roce
M2
50026
0.30
15,007.80
Ml
50026
1.20
60,031.20
3,819.00
76,530.20
Limpieza de alcantarillas
UNID
38
100.50
Limpieza de badenes
UNID
16
30.00
480.00
6,100.00
Glb
500.00
500.00
Glb
1,600.00
1,600.00
Glb
4,000.00
Costo Directo
4,000.00
109,842.61
Gastos Generales(10%)
10,984.26
PRESUPUESTO TOTAL
120,826.87
unidad
CANTIDAD
COSTO
COSTO DE MERCADO
(S/.)
COSTO DE MANTENIMIENTO
74,585.71
4,955.51
Km
50.026
42.58
2,130.11
M3
500
4.10
2,050.00
M2
250.13
3.10
Ml
Limpieza de cunetas
775.40
64,330.20
50026
1.20
60,031.20
Limpieza de alcantarillas
UNID
38
100.50
3,819.00
Limpieza de badenes
UNID
16
30.00
480.00
5,300.00
Glb
1,800.00
Glb
3,500.00
Costo Directo
1,800.00
3,500.00
74,585.71
Gastos Generales(10%)
7,458.57
PRESUPUESTO TOTAL
82,044.28
unidad
CANTIDAD
COSTO
COSTO DE MERCADO
(S/.)
Mantenimiento
110,325.19
27,694.99
Km
50.026
42.58
2,130.11
M3
990
4.10
4,059.00
M2
689
3.10
2,135.90
Bacheo
M3
220
9.50
2,090.00
Desencalaminado
Km
50.026
88.00
4,402.29
Roce
M2
50026
0.30
15,007.80
Ml
50026
1.20
60,031.20
3,819.00
76,530.20
Limpieza de alcantarillas
UNID
38
100.50
Limpieza de badenes
UNID
16
30.00
480.00
6,100.00
Glb
500.00
500.00
Glb
1,600.00
1,600.00
Glb
4,000.00
Costo Directo
4,000.00
110,325.19
Gastos Generales(10%)
11,032.52
PRESUPUESTO TOTAL
121,357.71
Descripcin
Unida
d
Metrado
Precio
ESTUDIO DEFINITIVO
1.0.0
Glb
Glb
Glb
1 31,500.00
1 5,026.00
1 47,140.00
TOTAL
Parcial
83,666.00
31500.00
5026.00
47140.00
83,666.00
DESCRIPCION
UND
METRADO P. UNITARIO
OBRAS PROVISIONALES
Cartel de Obra
und
1.00
1,000.00
Campamento (Almacen y Guardiania)
m2
200.00
35.00
OBRAS PRELIMINARES
Traslado de Materiales y Herramientas
Kg
55,254.21
0.18
Transporte y custodio de material explosivo
glb
1.00
35,125.00
Limpieza y deforestacin de Terreno Natural
m2
110,057.20
0.05
Trazo y Replanteo
km
50.03
666.96
Movilizacin y Desmovilizacin
glb
1.00
35,000.00
MOVIMIENTO DE TIERRAS
Corte en Material Suelto c/maq (plataforma y talud)
m3
307,172.15
3.94
Corte de Roca Suelta (plataforma y talud)
m3
34,130.24
6.95
Corte de Roca Dura (plataforma y talud)
m3
60,406.40
8.58
Relleno con material propio
m3
59,355.85
3.15
Perfilado y Compactacion de Sub-Rasante
m2
225,117.00
0.55
PAVIMENTO
Afirmado de tierra mejorada con grava
m3
30,015.60
12.00
DRENAJE Y OBRAS DE ARTE
CUNETAS
Corte en Material Suelto
m3
2,626.36
3.94
Corte de Roca Suelta
m3
750.39
6.95
Corte de Roca Dura
m3
375.20
8.58
Conformacion de Cunetas
ml
50,026.00
0.85
ALCANTARILLAS TMC (38 Unid)
Excavacion para Estructuras de obras de arte
m3
380.00
11.55
Alcantarilla TMC =36"
ml
433.20
217.84
Encofrado y Desencofrado
m2
121.60
47.60
Concreto Ciclopeo f'c=140Kg/cm2 + 30% P Grande
m3
de 8" 153.90
199.58
Aliviaderos de Emboquillados de Piedra
m2
153.90
35.09
MUROS(02 Unid.)
Excavacion para Estructuras de obras de arte
m3
38.28
11.55
Encofrado y Desencofrado
m2
10.44
26.78
Concreto Ciclopeo f'c=175Kg/cm2 + 30% P Grande
m3
de 8" 24.36
225.36
Relleno para Estructuras
m3
24.36
25.00
BADEN TIPO I (11 Und.)
Excavacion para Estructuras de obras de arte
m3
246.40
11.55
Relleno de Afirmado e=0.20
m3
151.80
24.27
Encofrado y Desencofrado
m2
203.50
47.60
Acero de Refuerzo fy=4200 kg/cm2
Kg
221.76
4.75
Concreto Ciclopeo f'c=140Kg/cm2 + 30% P Grande
m3
de 8" 110.88
199.58
Concreto Simple f'c=210Kg/cm2
m3
36.96
333.25
Relleno para Estructuras
m3
36.96
25.00
BADEN TIPO II (05 Und.)
Excavacion para Estructuras de obras de arte
m3
128.80
11.55
Relleno de Afirmado e=0.20
m3
79.35
24.27
Encofrado y Desencofrado
m2
106.38
47.60
Acero de Refuerzo fy=4200 kg/cm2
Kg
115.92
4.75
Concreto Ciclopeo f'c=140Kg/cm2 + 30% P Grande
m3
de 8" 57.96
199.58
Concreto Simple f'c=210Kg/cm2
m3
19.32
333.25
Relleno para Estructuras
m3
19.32
25.00
P. PARCIAL
SUB TOTAL
1,000.00
7,000.00
1,000.00
7,000.00
9,945.76
35,125.00
5,502.86
33,365.34
35,000.00
9,945.76
35,125.00
5,502.86
33,365.34
35,000.00
1,210,258.27
237,205.17
518,286.91
186,970.93
123,814.35
1,210,258.27
237,205.17
518,286.91
186,970.93
123,814.35
360,187.20
360,187.20
TOTAL
8,000.00
118,938.96
2,276,535.63
360,187.20
288,943.03
61,304.38
10,347.86
5,215.21
3,219.22
42,522.10
140,661.16
4,389.00
94,368.29
5,788.16
30,715.36
5,400.35
6,820.49
442.13
279.58
5,489.77
609.00
52,640.42
2,845.92
3,684.19
9,686.60
1,053.36
22,129.43
12,316.92
924.00
27,516.58
1,487.64
1,925.82
5,063.45
550.62
11,567.66
6,438.39
483.00
ITEM
06.00.00
06.01.00
06.01.01
06.01.02
06.01.03
DESCRIPCION
UND
METRADO
PUENTE URABAMBA L=46.40.00 mt.
OBRAS PROVISIONALES
Movilizacin y desmovilizacin de equipo pesado GLB
1.00
Campamento de obra
m2
120.00
Encauzamiento de cursos de agua rendimiento=450
m3
m3/dia+ 595.00
06.02.00
TRABAJOS PRELIMINARES
06.02.01
06.02.02
06.03.00
07.01.01
07.01.02
07.01.03
07.01.04
06.04.00
06.04.01
06.04.02
06.05.00
06.05.01
06.05.02
06.06.00
06.06.01
06.06.02
06.06.03
06.06.04
06.06.05
06.06.06
06.07.00
06.07.01
06.07.02
06.07.03
06.07.04
06.07.05
06.07.06
06.07.07
06.07.08
06.07.09
06.07.10
06.08.00
06.08.01
06.08.02
06.08.03
06.08.04
06.08.05
06.09.00
06.09.01
06.09.02
06.10.00
06.10.01
06.10.02
06.10.03
06.10.04
06.10.05
06.10.06
06.11.00
06.11.01
06.12.00
06.12.01
07.00.00
07.01.00
OBRAS PROVISIONALES
TRABAJOS PRELIMINARES
07.02.01
07.02.02
07.03.00
07.03.01
07.03.02
07.04.00
07.04.01
07.04.02
P. PARCIAL
11,550.35
83.62
3.84
11,550.35
10,034.40
2,284.80
0.82
1.74
409.00
867.88
4.59
9.95
12.01
14.56
9,183.72
11,944.78
9,611.84
41,611.61
24.27
4.48
58,044.86
16,004.44
133.44
36.38
95,556.38
10,093.27
303.32
37.60
3.64
303.32
37.60
3.65
12,416.71
5,856.58
22,979.87
4,620.17
3,149.98
6,162.11
314.93
355.36
41.42
47.45
3.84
314.93
355.36
41.42
47.45
3.84
23,976.06
36,442.03
20,203.52
2,814.16
75,017.74
34,137.15
57,239.97
30,822.11
6,125.23
104,268.02
9,132.58
3,700.00
573,617.35
33,798.06
5,137.43
49,354.21
3,700.00
10.81
6.70
977.66
127.57
98.84
30.96
558.47
21.89
492.85
3,222.89
4,546.64
2,947.39
3,350.82
459.69
3,548.52
3,222.89
359.94
359.94
2,000.00
2,000.00
SUB TOTAL
TOTAL
1,410,576.89
23,869.55
1,276.88
72,351.94
74,049.30
105,649.65
55,185.41
391,045.99
665,607.06
538.10
30.90
785.77
1,105.22
18,075.95
359.94
2,000.00
487,823.87
13,287.12
P. UNITARIO
4,850.32
83.62
3.84
4,850.32
6,689.60
1,747.20
498.78
498.78
0.82
1.74
0.00
409.00
867.88
2,263.64
923.20
4.59
14.56
10,390.10
13,441.79
642.80
923.20
7.11
2.24
4,570.31
2,067.97
1,276.88
23,831.89
6,638.28
ITEM
07.05.00
07.05.01
07.05.02
07.06.00
07.06.01
07.06.02
07.06.03
07.06.04
07.06.05
07.06.06
07.07.00
07.07.01
07.07.02
07.07.03
07.07.04
07.07.05
07.07.06
07.07.07
07.07.08
07.07.09
07.07.10
07.08.00
07.08.01
07.08.02
07.08.03
07.08.04
07.08.05
07.09.00
07.09.01
07.09.02
07.10.00
07.10.01
07.10.02
07.10.03
07.10.04
07.10.05
07.10.06
07.11.00
07.11.01
07.12.00
07.12.01
08.00.00
08.01.00
08.02.00
09.00.00
09.01.00
09.02.00
DESCRIPCION
UND
METRADO P. UNITARIO
OBRAS DE CONCRETO SIMPLE
Falza zapata de CC 1:10 + 30% P.G.
m3
37.19
133.44
Encofrado y desencofrado para zapatas
m2
33.26
36.38
SUPERESTRUCTURA DEL PUENTE
ConcretoFc=210Kg/cm2- losa
m3
22.96
314.93
Encofrado y desencofrado-Losa
m2
83.24
37.60
Acero Fy=4200 Kg/cm2-losa
kg
1,955.25
3.64
Concreto Fc=210Kg/cm2- vereda
m3
8.54
314.93
Encofrado y desencofrado-vereda
m2
46.99
37.60
Acero Fy=4200 Kg/cm2-vereda
kg
750.25
3.64
SUBESTRUCTURA DEL PUENTE
Concreto Fc=210Kg/cm2- estribo
m3
44.97
314.93
Concreto FC=210 KG/CM2- estribo (bajo agua)
m3
38.03
355.36
Encofrado Y desencofrado-estribo
m2
131.07
41.42
Encofrado y desencofrado - estrobos (bajo agua) m2
40.09
47.45
Acero Fy=4200 Kg/cm2-estribo
kg
5,650.00
3.64
Concreto Fc=210Kg/cm2- aletas
m3
40.30
314.93
Concreto FC=210 KG/CM2 alas (bajo agua)
m3
38.48
355.36
Encofrado y desencofrado-aletas
m2
99.69
41.42
Encofrado y desencofrado -aletas (bajo agua)
m2
79.73
47.45
Acero Fy=4200 Kg/cm2-aletas
kg
6,752.25
3.64
ESTRUCTURA METALICA
Fabricacin de vigas, diafragma, atiesadores y conectores
ton
de acero
26.81 A-36 9,132.58
Transporte de estructura metalica
ton
26.81
538.10
Ensambalje de estructura metalica
kg
47.01
30.90
Montaje lanzamiento de estructura metalica
ton
26.81
785.77
Control de calidad de estructura metalica
GLB
1.00
3,700.00
PINTURA
Pintura en baranda metalica
m2
50.73
10.81
Pintura en vereda lateral
m2
10.68
6.70
VARIOS
Columnetas pre-fabricadas de 0.20x0.20m
und
12.00
98.84
Tubo de FG para baranda
ML
53.40
30.96
Adquisicin y colocacin de plancha neofreno
pza
4.00
558.47
Tubo de drenaje en losa con Tub. PVC 3"
ML
2.00
21.89
Junta de dilatacin metalica ( apoyo fijo y movil) ML
7.20
325.48
Seal, cartel informatico = puente
GLB
1.00
1,500.28
OBRAS COMPLEMENTARIAS
Limpieza final de obra
GLB
1.00
395.68
PRUEBAS DE LABORATORIO
Prueba en laboratorio de agregado, concreto, etc. GLB
1.00
2,000.00
SEALIZACION
Fabricacion de Postes Kilometricos.
Und
50.00
31.75
Excavacion y colocacion de postes kilometricos Und
50.00
17.01
SEAL, PREVENTIVA, INFORMATIVA Y REGLAMENTARIA
Fabricacion de seales
Und
30.00
250.00
Excavacion y colocacion de seales
Und
30.00
13.21
COSTO DIRECTO
P. PARCIAL
SUB TOTAL
6,172.72
TOTAL
4,962.58
1,210.14
24,666.93
7,231.42
3,129.82
7,117.11
2,690.76
1,766.90
2,730.91
114,431.79
14,163.75
13,514.51
5,428.94
1,902.04
20,566.00
12,690.42
13,675.67
4,129.16
3,783.09
24,578.19
285,541.90
244,889.77
14,429.13
1,452.61
21,070.39
3,700.00
619.95
548.39
71.56
8,960.74
1,186.08
1,653.26
2,233.88
43.78
2,343.46
1,500.28
395.68
395.68
2,000.00
2,000.00
2,438.00
1,587.50
850.50
2,438.00
7,896.30
7,500.00
396.30
7,896.30
4,961,339.88
ITEM
DESCRIPCION
cios Unitarios tomados de proyectos similares en la regin y recomendaciones del MTC
UND
METRADO
P. UNITARIO
P. PARCIAL
SUB TOTAL
DESCRIPCION
UND
TOTAL
21,977.80
m3
230
0.86
198
m2
m2
Ha
70
500
21
25.00
2.26
900.00
1,750
1,130
18,900
21,977.80
ALTERNATIVA II
ITEM
DESCRIPCION
UND
01.00.00 CAPACITACIONES
organizacin de comision de mantenimiento de puenteGLB
vehicular
1
organizacin de comision de mantenimiento de carretera
GLBde acceso
1
capacitacion en mantenimiento y uso adecuadoGLB
del puente
1
capacitacion en mantenimiento y uso adecuadoGLB
dela carretera de acceso
1
COSTO DIRECTO
Nota: Precios Unitarios tomados de proyectos similares en la regin
TOTAL
10,000.00
1,000.00
6,000.00
1,000.00
2,000.00
1,000
6,000
1,000
2,000
0
10,000.00
TOTAL
Descripcin
Unid
ad
Metrado
Precio
ESTUDIO DEFINITIVO
1.0.0
Glb
Glb
1 31,500.00
1 5,026.00
1 47,140.00
Glb
TOTAL
Parcial
83,666.00
31500.00
5026.00
47140.00
83,666.00
DESCRIPCION
UND
OBRAS PROVISIONALES
Cartel de Obra
und
Campamento (Almacen y Guardiania)
m2
OBRAS PRELIMINARES
Traslado de Materiales y Herramientas
Kg
Transporte y custodio de material explosivo
glb
Limpieza y deforestacin de Terreno Natural
m2
Trazo y Replanteo
km
Movilizacin y Desmovilizacin
glb
MOVIMIENTO DE TIERRAS
Corte en Material Suelto c/maq (plataforma y talud) m3
Corte de Roca Suelta (plataforma y talud)
m3
Corte de Roca Dura (plataforma y talud)
m3
Relleno con material propio
m3
Perfilado y Compactacion de Sub-Rasante
m2
PAVIMENTO
Afirmado de tierra mejorada con grava
m3
DRENAJE Y OBRAS DE ARTE
CUNETAS
Corte en Material Suelto
m3
Corte de Roca Suelta
m3
Corte de Roca Dura
m3
Conformacion de Cunetas
ml
ALCANTARILLAS TMC (38 Unid)
Excavacion para Estructuras de obras de arte
m3
Alcantarilla TMC =36"
ml
Encofrado y Desencofrado
m2
Concreto Ciclopeo f'c=140Kg/cm2 + 30% P Grandem3
de 8"
Aliviaderos de Emboquillados de Piedra
m2
MUROS(02 Unid.)
Excavacion para Estructuras de obras de arte
m3
Encofrado y Desencofrado
m2
Concreto Ciclopeo f'c=175Kg/cm2 + 30% P Grandem3
de 8"
Relleno para Estructuras
m3
BADEN TIPO I (11 Und.)
Excavacion para Estructuras de obras de arte
m3
Relleno de Afirmado e=0.20
m3
Encofrado y Desencofrado
m2
Acero de Refuerzo fy=4200 kg/cm2
Kg
Concreto Ciclopeo f'c=140Kg/cm2 + 30% P Grandem3
de 8"
Concreto Simple f'c=210Kg/cm2
m3
Relleno para Estructuras
m3
BADEN TIPO II (05 Und.)
Excavacion para Estructuras de obras de arte
m3
Relleno de Afirmado e=0.20
m3
Encofrado y Desencofrado
m2
Acero de Refuerzo fy=4200 kg/cm2
Kg
Concreto Ciclopeo f'c=140Kg/cm2 + 30% P Grandem3
de 8"
Concreto Simple f'c=210Kg/cm2
m3
Relleno para Estructuras
m3
METRADO
P. UNITARIO
P. PARCIAL
SUB TOTAL
1.00
200.00
1,000.00
35.00
1,000.00
7,000.00
1,000.00
7,000.00
55,254.21
1.00
110,057.20
50.03
1.00
0.18
35,125.00
0.05
666.96
35,000.00
9,945.76
35,125.00
5,502.86
33,365.34
35,000.00
9,945.76
35,125.00
5,502.86
33,365.34
35,000.00
269,329.98
29,925.55
56,504.37
53,802.96
200,104.00
3.94
6.95
8.58
3.15
0.55
1,061,160.12
207,982.57
484,807.49
169,479.32
110,057.20
1,061,160.12
207,982.57
484,807.49
169,479.32
110,057.20
26,263.65
12.00
315,163.80
315,163.80
TOTAL
8,000.00
118,938.96
2,033,486.71
315,163.80
358,757.06
61,304.38
2,626.36
750.39
375.20
50,026.00
3.94
6.95
8.58
0.85
10,347.86
5,215.21
3,219.22
42,522.10
592.80
380.00
433.20
121.60
153.90
11.55
217.84
47.60
199.58
35.09
6,846.84
82,779.20
20,620.32
24,268.93
5,400.35
34.80
38.28
10.44
24.36
11.55
26.78
225.36
25.00
401.94
1,025.14
2,352.76
609.00
369.60
246.40
151.80
203.50
221.76
110.88
36.96
11.55
24.27
47.60
4.75
199.58
333.25
25.00
4,268.88
5,980.13
7,225.68
966.63
44,258.86
36,950.76
924.00
193.20
128.80
79.35
106.38
115.92
57.96
19.32
11.55
24.27
47.60
4.75
199.58
333.25
25.00
2,231.46
3,125.98
3,777.06
505.28
23,135.31
19,315.17
483.00
139,915.64
4,388.84
100,574.93
52,573.26
ITEM
06.00.00
DESCRIPCION
UND
PUENTE URABAMBA L=46.40.00 mt.
06.01.00 OBRAS PROVISIONALES
GLB
06.01.01 Movilizacin y desmovilizacin de equipo pesado
06.01.02 Campamento de obra
m2
06.01.03 Encauzamiento de cursos de agua rendimiento=450 m3/dia+
m3
METRADO
P. UNITARIO
P. PARCIAL
1.00
120.00
595.00
11,550.35
83.62
3.84
11,550.35
10,034.40
2,284.80
0.82
1.74
409.00
867.88
4.59
9.95
12.01
14.56
9,183.72
11,944.78
9,611.84
41,611.61
24.27
4.48
58,044.86
16,004.44
133.44
36.38
95,556.38
10,093.27
303.32
37.60
3.64
303.32
37.60
3.65
12,416.71
5,856.58
22,979.87
4,620.17
3,149.98
6,162.11
314.93
355.36
41.42
47.45
3.84
314.93
355.36
41.42
47.45
3.84
23,976.06
36,442.03
20,203.52
2,814.16
75,017.74
34,137.15
57,239.97
30,822.11
6,125.23
104,268.02
9,132.58
3,700.00
573,617.35
33,798.06
5,137.43
49,354.21
3,700.00
10.81
6.70
977.66
127.57
98.84
30.96
558.47
21.89
492.85
3,222.89
4,546.64
2,947.39
3,350.82
459.69
3,548.52
3,222.89
359.94
359.94
2,000.00
2,000.00
SUB TOTAL
TOTAL
1,410,576.89
23,869.55
06.02.00
TRABAJOS PRELIMINARES
06.02.01
06.02.02
06.03.00
07.01.01
07.01.02
07.01.03
07.01.04
06.04.00
06.04.01
06.04.02
06.05.00
06.05.01
06.05.02
06.06.00
06.06.01
06.06.02
06.06.03
06.06.04
06.06.05
06.06.06
06.07.00
06.07.01
06.07.02
06.07.03
06.07.04
06.07.05
06.07.06
06.07.07
06.07.08
06.07.09
06.07.10
06.08.00
06.08.01
06.08.02
06.08.03
06.08.04
06.08.05
06.09.00
06.09.01
06.09.02
06.10.00
06.10.01
06.10.02
06.10.03
06.10.04
06.10.05
06.10.06
06.11.00
06.11.01
06.12.00
06.12.01
07.00.00
07.01.00
OBRAS PROVISIONALES
07.01.01
07.01.02
07.01.03
07.02.00
07.02.01
07.02.02
07.03.00
07.03.01
07.03.02
07.04.00
07.04.01
07.04.02
1,276.88
72,351.94
74,049.30
105,649.65
55,185.41
391,045.99
665,607.06
538.10
30.90
785.77
1,105.22
18,075.95
359.94
2,000.00
487,823.87
13,287.12
1.00
80.00
455.00
4,850.32
83.62
3.84
4,850.32
6,689.60
1,747.20
498.78
498.78
0.82
1.74
409.00
867.88
2,263.64
923.20
4.59
14.56
10,390.10
13,441.79
642.80
923.20
7.11
2.24
4,570.31
2,067.97
0.00
1,276.88
23,831.89
6,638.28
ITEM
07.05.00
07.05.01
07.05.02
07.06.00
07.06.01
07.06.02
07.06.03
07.06.04
07.06.05
07.06.06
07.07.00
07.07.01
07.07.02
07.07.03
07.07.04
07.07.05
07.07.06
07.07.07
07.07.08
07.07.09
07.07.10
07.08.00
07.08.01
07.08.02
07.08.03
07.08.04
07.08.05
07.09.00
07.09.01
07.09.02
07.10.00
07.10.01
07.10.02
07.10.03
07.10.04
07.10.05
07.10.06
07.11.00
07.11.01
07.12.00
07.12.01
08.00.00
08.01.00
08.02.00
09.00.00
09.01.00
09.02.00
DESCRIPCION
UND
METRADO P. UNITARIO
OBRAS DE CONCRETO SIMPLE
Falza zapata de CC 1:10 + 30% P.G.
m3
37.19
133.44
Encofrado y desencofrado para zapatas
m2
33.26
36.38
SUPERESTRUCTURA DEL PUENTE
ConcretoFc=210Kg/cm2- losa
m3
22.96
314.93
Encofrado y desencofrado-Losa
m2
83.24
37.60
Acero Fy=4200 Kg/cm2-losa
kg
1,955.25
3.64
Concreto Fc=210Kg/cm2- vereda
m3
8.54
314.93
Encofrado y desencofrado-vereda
m2
46.99
37.60
Acero Fy=4200 Kg/cm2-vereda
kg
750.25
3.64
SUBESTRUCTURA DEL PUENTE
Concreto Fc=210Kg/cm2- estribo
m3
44.97
314.93
Concreto FC=210 KG/CM2- estribo (bajo agua)
m3
38.03
355.36
Encofrado Y desencofrado-estribo
m2
131.07
41.42
Encofrado y desencofrado - estrobos (bajo agua)
m2
40.09
47.45
Acero Fy=4200 Kg/cm2-estribo
kg
5,650.00
3.64
Concreto Fc=210Kg/cm2- aletas
m3
40.30
314.93
Concreto FC=210 KG/CM2 alas (bajo agua)
m3
38.48
355.36
Encofrado y desencofrado-aletas
m2
99.69
41.42
Encofrado y desencofrado -aletas (bajo agua)
m2
79.73
47.45
Acero Fy=4200 Kg/cm2-aletas
kg
6,752.25
3.64
ESTRUCTURA METALICA
Fabricacin de vigas, diafragma, atiesadores y conectoreston
de acero 26.81
A-36
9,132.58
Transporte de estructura metalica
ton
26.81
538.10
Ensambalje de estructura metalica
kg
47.01
30.90
Montaje lanzamiento de estructura metalica
ton
26.81
785.77
Control de calidad de estructura metalica
GLB
1.00
3,700.00
PINTURA
Pintura en baranda metalica
m2
50.73
10.81
Pintura en vereda lateral
m2
10.68
6.70
VARIOS
Columnetas pre-fabricadas de 0.20x0.20m
und
12.00
98.84
Tubo de FG para baranda
ML
53.40
30.96
Adquisicin y colocacin de plancha neofreno
pza
4.00
558.47
Tubo de drenaje en losa con Tub. PVC 3"
ML
2.00
21.89
Junta de dilatacin metalica ( apoyo fijo y movil)
ML
7.20
325.48
Seal, cartel informatico = puente
GLB
1.00
1,500.28
OBRAS COMPLEMENTARIAS
Limpieza final de obra
GLB
1.00
395.68
PRUEBAS DE LABORATORIO
Prueba en laboratorio de agregado, concreto, etc.
GLB
1.00
2,000.00
SEALIZACION
Fabricacion de Postes Kilometricos.
Und
50.00
31.75
Excavacion y colocacion de postes kilometricos
Und
50.00
17.01
SEAL, PREVENTIVA, INFORMATIVA Y REGLAMENTARIA
Fabricacion de seales
Und
30.00
250.00
Excavacion y colocacion de seales
Und
30.00
13.21
COSTO DIRECTO
P. PARCIAL
SUB TOTAL
6,172.72
TOTAL
4,962.58
1,210.14
24,666.93
7,231.42
3,129.82
7,117.11
2,690.76
1,766.90
2,730.91
114,431.79
14,163.75
13,514.51
5,428.94
1,902.04
20,566.00
12,690.42
13,675.67
4,129.16
3,783.09
24,578.19
285,541.90
244,889.77
14,429.13
1,452.61
21,070.39
3,700.00
619.95
548.39
71.56
8,960.74
1,186.08
1,653.26
2,233.88
43.78
2,343.46
1,500.28
395.68
395.68
2,000.00
2,000.00
2,438.00
2,438.00
7,896.30
7,896.30
1,587.50
850.50
7,500.00
396.30
4,743,081.59
ITEM
DESCRIPCION
UND
METRADO
P. UNITARIO
P. PARCIAL
SUB TOTAL
DESCRIPCION
TOTAL
21,916.96
01.00.00
160
0.86
137
70
500
21
25.00
2.26
900.00
1,750
1,130
18,900
21,916.96
DESCRIPCION
17.00.00 CAPACITACIONES
organizacin de comision de mantenimiento de puente vehicular
GLB
organizacin de comision de mantenimiento de carretera de GLB
acceso
capacitacion en mantenimiento y uso adecuado del puente
GLB
capacitacion en mantenimiento y uso adecuado dela carretera
GLB
de acceso
COSTO DIRECTO
Nota: Precios Unitarios tomados de proyectos similares en la regin
TOTAL
10,000.00
1
1
1
1
1,000.00
6,000.00
1,000.00
2,000.00
1,000
6,000
1,000
2,000
0
10,000.00
TOTAL
EXPEDIENTE TECNICO
02.00.00
OBRAS PROVISIONALES
03.00.00
OBRAS PRELIMINARES
04.00.00
MOVIMIENTO DE TIERRAS
05.00.00
PAVIMENTO
06.00.00
07.00.00
08.00.00
PUENTE
TOTAL
83,666.00
8,000.00
118,938.96
2,033,486.71
315,163.80
358,757.06
1,410,576.89
487,823.87
09.00.00
SEALIZACION
10,334.30
10.00.00
MITIGACION AMBIENTAL
21,916.96
11.00.00
CAPACITACION
10,000.00
485,866.46
SUPERVISION(3%)
145,759.94
IMPREVISTOS (5%)
242,933.23
5,733,224.17
1er trimestre
2do trimestre
3er trimestre
tiva I Y II
4to trimestre
5to trimestre
PARTIDA
UNIDAD
CANTIDAD
P.U
COSTO
PARCIAL
TOTAL
A.
TARIFAS DE PERSONAL
GLB
31500
31500
31500
B.
GASTOS REEMBOLSABLES
GLB
5026
5026
5026
C.
SERVICIOS ESPECIALES
GLB
47140
47140
47140
TOTAL
83,666.00
ESTUDIO DEFINITIVO
A PRECIOS PRIVADOS
A. TARIFA DE PERSONAL
PARTIDA
PERSONAL PROFESIONAL
Ing. Civil - Especialista en Carreteras
Ing. Civil - Especialista en Puentes
PERSONAL TECNICO
Dibujante en Autocad
COSTO
PARCIAL
UNIDAD
CANTIDAD
GLB
GLB
1.0
1.0
13,000.00
10,000.00
13,000.00
10,000.00
GLB
1.0
8,500.00
8,500.00
P.U
TOTAL
23,000.00
8,500.00
TOTAL
31,500.00
ESTUDIO DEFINITIVO
A PRECIOS PRIVADOS
B. GASTOS REEMBOLSALES
1.
2.
3.
COSTO
PARCIAL
UNIDAD
CANTIDAD
CANTIDAD
Materiales de Oficina
1.1 Utiles de Oficina y dibujo
1.2 Fotocopia y Anillados
GLB
GLB
1.0
1.0
1,200.00
250.00
1,200.00
250.00
Pasajes
2.1 Pasajes Terrestres Ayacucho- Huancasancos
2.2 Viticos
GLB
GLB
1.0
1.0
276.00
1,800.00
276.00
1,800.00
Alquiler
3.1 Alquiler de Movilidad
GLB
1.0
1,500.00
1,500.00
PARTIDA
P.U
TOTAL
1,450.00
2,076.00
1,500.00
TOTAL
5,026.00
ESTUDIO DEFINITIVO
A PRECIOS PRIVADOS
C. SERVICIOS ESPECIALES
PARTIDA
1.
TOTAL
INVESTIGACIONES BSICAS
1.1 Estudios
1.1.1 Estudios de Suelos
1.1.1 Estudios de canteras
1.1.2 Estudio Geolgico
1.1.3 Estudios de Hidrologa
1.1.4 Otros
UNIDAD
CANTIDAD
P.U
COSTO
PARCIAL
TOTAL
47,140.00
Km
GLB
GLB
GLB
GLB
34.4
1.0
1.0
1.0
1.0
600.0
4,000.0
8,000.0
11,000.0
3,500.00
20,640.0
4,000.0
8,000.0
11,000.0
3,500.00
47,140.00
Longitud Total
Ancho de la Superficie de Rodadura
Cunetas
Espesor de Afirmado
Pendiente Promedio
Bombeo
50.03
3.50
0.5x0.30
0.15
4.50
2.00
km
m
m
m
%
%
ALTERNATIVA 2
CONSTRUCCION DE TROCHA CARROZABLE PUMASAPO - MANZANAYOCC - URABAMBA - SAN ANDRES - ESPINOZAYOCC - TACCRA.
Longitud Total
Ancho de la Superficie de Rodadura
Cunetas
Pendiente Promedio
Espesor de Afirmado
Bombeo
50.03
4.00
0.5x0.30
4.50
0.15
2.00
km
m
m
%
m
%
METRADOS REFERENCIALES
ALTERNATIVA 2
CONSTRUCCION DE TROCHA CARROZABLE PUMASAPO - MANZANAYOCC - URABAMBA - SAN ANDRES - ESPINOZAYOCC - TACCRA.
ITEM
DESCRIPCION
UND
VECES
1.00
1.00
LARGO
20.00
ANCHO
ALTURA
10.00
SUB- TOTAL
TOTAL
1.00
200.00
1.00
200.00
55,254.21
1.00
110,057.20
50.03
1.00
55,254.21
1.00
110,057.20
50.03
1.00
1.00
1.00
1.00
1.00
1.00
55,254.21
50,026.00
50.03
2.20
1.00
1.00
1.00
20,260.53
6,753.51
11,255.85
AREA=
AREA=
AREA=
10.50
9.10
2.93
212,735.57
61,456.94
32,979.64
1.00
1.00
1.00
1.00
2,251.17
750.39
1,250.65
7,503.90
AREA=
AREA=
AREA=
AREA=
10.50
9.10
2.93
8.05
23,637.29
6,828.55
3,664.40
60,406.40
1.00
1.00
1.00
1.00
1.00
22,511.70
7,503.90
12,506.50
7,503.90
50,026.00
AREA=
AREA=
AREA=
AREA=
4.50
1.45
0.83
0.72
1.53
32,641.97
6,228.24
9,004.68
11,480.97
225,117.00
225,117.00
m3
1.00
50,026.00
4.00
0.15
30,015.60
30,015.60
m3
m3
m3
ml
1.00
1.00
1.00
1.00
7,503.90
-
0.80
0.80
0.80
0.40
0.40
0.40
1,200.62
-
1,200.62
-
m3
ml
m2
m3
m2
38.00
38.00
38.00
38.00
38.00
15.60
10.00
11.40
3.20
4.05
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
592.80
380.00
433.20
121.60
153.90
592.80
380.00
433.20
121.60
153.90
m3
m2
m3
m3
2.00
2.00
2.00
2.00
17.40
19.14
5.22
12.18
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
34.80
38.28
10.44
24.36
34.80
38.28
10.44
24.36
m3
m3
m2
Kg
m3
m3
m3
11.00
11.00
11.00
11.00
11.00
11.00
11.00
33.60
22.40
13.80
18.50
20.16
10.08
3.36
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
369.60
246.40
151.80
203.50
221.76
110.88
36.96
369.60
246.40
151.80
203.50
221.76
110.88
36.96
m3
m3
m2
Kg
m3
m3
m3
5.00
5.00
5.00
5.00
5.00
5.00
5.00
38.64
25.76
15.87
21.28
23.18
11.59
3.86
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
193.20
128.80
79.35
106.38
115.92
57.96
19.32
193.20
128.80
79.35
106.38
115.92
57.96
19.32
307,172.15
34,130.24
60,406.40
59,355.85
DESCRIPCION
UND
CANT.
GLB
M2
UND.
M3
N VECES
DIMENSIONES (m)
LONGITUD
1.00
1.00
1.00
1.00
10.00
1.00
120.00
1.00
5.95
12.00
100.00
PARCIAL
Area=
2.00
2.00
9.15
1.00
2.00
2.00
2.00
9.15
5.30
Area=
38.10
96.99
152.40
38.10
96.99
152.40
5.30
Area=
1.00
2.00
2.00
2.00
9.15
1.00
2.00
1.00
2.00
2.00
7.00
9.15
5.30
Area=
38.10
5.30
Area=
38.10
MS=60 %
RS =30 %
RF=10 %
96.99
152.40
96.99
152.40
7.00
3,429.94
1,714.97
571.66
3,429.94
1,714.97
571.66
5,716.57
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
71.69
71.69
379.96
596.47
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
347.95
347.95
1,844.14
2,896.00
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
149.86
149.86
794.28
1,246.88
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
149.86
149.86
794.28
1,247.32
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
215.97
215.97
1,144.65
1,796.89
1.00
2.00
1.00
1.00
1.25
5.30
4.16
Area=
Area=
4,082.77
34.87
34.87
184.82
290.24
5,103.46
9.15
5.30
38.10
3.00
3.00
145.49
228.60
9.15
4,082.77
M3
3,416.61
M3
Vol=
M3
5,103.46
748.17
1.00
2.00
1.00
1.00
Area=
1.00
2.00
1.00
1.00
Area=
5.30
38.10
3.00
3.00
145.49
228.60
1.00
Perim-
46.24
3.00
138.72
1.00
Perim-
46.24
3.00
138.72
0.20
40.94
0.20
47.60
85.68
22.48
0.01
0.06
0.01
0.08
0.95
5.71
0.95
7.62
M2
277.44
1.00
1.00
47.60
4.30
1.00
1.00
1.00
2.00
2.00
2.00
47.60
47.60
0.50
0.90
56.20
KG
M3
2.00
2.00
2.00
2.00
40.94
155.76
6,313.15
15.23
47.60
47.60
47.60
47.60
Area=
Area=
Area=
Area=
M2
83.78
1.00
1.00
1.00
KG
1.00
120.00
1.00
595.00
498.78
M3
M3
M2
TOTAL
498.78
1.00
2.00
M2
Frizos de Losa
Acero F y =4200Kg/Cm2 de Losa
Concreto F'c=210Kg/Cm2 de Vereda
Zona 02
Zona 03
Zona 04
Zona 05
Encofrado y Desencofrado de Vereda
Base de Vereda
Frizos de Vereda
Inicio de Vereda
Acero F y =4200Kg/Cm2 de Vereda
ALTURA
M2
ANCHO
2.00
47.60
2.00
47.60
2.00
47.60
ver cuadro de metrado
0.52
0.15
0.21
49.50
14.28
19.99
1,688.25
M3
-Parapeto
Estribo Derecho
-Pantalla
- Contrafuerte
-Mensula-Cajuela
-Parapeto
1.00
3.00
1.00
1.00
1.00
2.00
0.30
0.30
1.55
5.30
0.30
0.80
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
2.00
0.30
0.30
1.55
5.30
0.30
0.80
5.30
area
5.30
area
5.30
0.30
5.30
area
5.30
area
5.30
0.30
8.58
17.39
0.30
0.37
2.10
2.10
13.64
15.65
2.46
1.96
3.34
1.01
8.58
17.39
0.30
0.37
2.10
2.10
13.64
15.65
2.46
1.96
3.34
1.01
M3
102.55
1.00
1.00
1.00
1.00
1.00
3.00
9.15
0.30
0.30
1.00
1.00
1.00
1.00
1.00
3.00
9.15
0.30
0.30
5.30
5.30
1.00
0.52
2.17
5.30
5.30
1.00
0.52
2.17
Area=
Area=
48.50
0.83
1.95
48.50
0.83
1.95
M2
- Mensula
-Cajuela
-Parapeto
Estribo derecho
- Pantalla
-Contrafuerte
- Mensula
-Cajuela
-Parapeto
Encofrado y Desencofrado - Estribos (Bajo Agua)
Estribo izquierdo
-Zapata
-Pantalla
-Contrafuerte
76.13
1.00
1.00
1.00
1.00
1.00
1.00
487.77
1.00
3.00
3.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
3.00
3.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
3.00
3.00
1.00
2.00
2.00
1.00
1.00
1.00
3.00
3.00
1.00
2.00
2.00
1.00
5.30
Area=
9.49
0.30
5.30
5.30
5.30
5.30
0.80
5.30
Area=
9.49
0.30
5.30
5.30
5.30
5.30
0.80
8.58
17.39
0.60
0.89
0.30
2.10
2.10
8.58
17.39
0.60
0.89
0.30
2.10
2.10
90.95
104.34
8.54
3.18
4.72
3.18
22.26
6.72
90.95
104.34
8.54
3.18
4.72
3.18
22.26
6.72
M2
Estribo derecho
- Zapata
- Pantalla
- Contrafuerte
Acero F y =4200 Kg/Cm2 - Estribos
KG
M3
M3
59.31
10.60
5.30
Area=
0.58
1.00
0.52
2.17
10.60
5.51
13.02
0.52
1.00
0.52
2.17
10.60
5.51
13.02
0.52
0.30
10.60
5.30
Area=
0.58
0.30
Segn cuadro de metrado e Acero
19,535.87
108.40
1.00
2.00
2.00
2.00
Area=
1.00
2.00
2.00
2.00
Area=
0.30
Area=
0.30
Area=
55.39
0.30
17.47
33.23
20.96
55.39
0.30
17.47
33.23
20.96
161.08
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
4.00
Area=
Area=
2.00
2.00
4.00
Area=
Area=
0.30
Area=
0.30
Area=
38.10
2.89
1.00
0.30
2.17
76.20
1.73
2.60
38.10
2.89
1.00
0.30
2.17
76.20
1.73
2.60
M2
Estribo derecho
- Pantalla
-Contrafuerte
M2
KG
744.14
2.00
4.00
2.00
2.00
2.00
2.00
Area=
55.39
2.00
4.00
2.00
2.00
2.00
2.00
Area=
1.00
2.00
4.00
2.00
2.00
2.00
Area=
1.00
2.00
4.00
2.00
2.00
2.00
Area=
17.39
221.56
139.12
11.39
17.39
221.56
139.12
11.39
17.82
0.52
1.00
5.55
2.17
35.64
11.54
17.36
17.82
0.52
1.00
5.55
2.17
35.64
11.54
17.36
Area=
9.49
0.30
55.39
Area=
9.49
0.30
129.09
27,153.13
69.81
2.00
1.00
6.00
2.00
2.00
284.00
10.60
30.00
0.01
1.40
1.40
0.08
Area=
Area=
0.04
0.06
1.81
0.02
0.02
0.00
0.18
Area=
Area=
Area=
20.97
38.86
6.26
0.79
2.77
0.16
TN
69.81
69.81
KG
176.26
176.26
69.81
69.81
1.00
1.00
TN
GLB
1.00
M2
M2
1.00
2.00
47.60
0.95
90.44
90.44
M2
1.00
2.00
47.60
0.20
19.04
19.04
UNID.
ML
PZA
ML
ML
GLB
23.00
1.00
3.00
2.00
2.00
2.00
2.00
21.00
2.00
1.00
46.00
95.20
6.00
21.00
7.20
1.00
46.00
95.20
6.00
21.00
7.20
1.00
1.00
06.10.00 VARIOS
Columnetas Pre fabricadas de 0,20x0,20M
Tubo de FG Para Baranda
Adquisiscin y colocacin de plantas Neopreno
Tubo de Drenaje en Losa con Tubo PVC Diam. 3"
Junta de Dilatacin Metlica (Apoyo fijo y movil)
SEAL, CARTEL INFORMATIVO = PUENTE
06.11.00 OBRAS COMPLEMENTARIAS
LIMPIEZA FINAL DE OBRA
06.12.00 PRUEBAS DE LABORATORIO
PRUEBA EN LABORATORIO DE AGREGADO, CONCRETO, ETC.
07.00.00 PUENTE L=25.50 mt.( sobre el rio caracha)
07.01.00 OBRAS PROVISIONALES
Movilizacin y desmovilizacin de equipo pesado
Campamento de obra
Cartel de Obra
Encausamiento de ro
1.00
47.60
0.50
3.60
GLB
1.00
1.00
GLB
1.00
1.00
GLB
M2
UND.
M3
1.00
1.00
1.00
1.00
1.00
10.00
100.00
8.00
Area=
1.00
80.00
1.00
4.55
1.00
80.00
1.00
455.00
M2
498.78
1.00
2.00
2.00
2.00
9.15
1.00
2.00
2.00
2.00
9.15
1.00
2.00
2.00
2.00
9.15
1.00
2.00
1.00
2.00
2.00
5.00
9.15
Area=
38.10
96.99
152.40
38.10
96.99
152.40
M2
498.78
5.30
Area=
5.30
Area=
470.00
6.00
38.10
96.99
152.40
5.00
0.80
476.80
476.80
2,263.64
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
63.69
63.69
337.56
529.90
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
102.49
102.49
543.18
853.00
M3
923.20
1.00
2.00
1.00
1.00
2.00
1.50
Area=
Area=
92.32
92.32
184.64
276.96
1.00
2.00
1.00
1.00
2.00
1.50
Area=
Area=
92.32
92.32
184.64
276.96
M3
642.80
1.00
2.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
M3
2.00
1.50
Area=
Area=
64.28
64.28
128.56
192.84
2.00
1.50
Area=
Area=
923.20
64.28
64.28
128.56
192.84
923.20
8.10
4.54
28.10
0.20
0.20
7.35
11.24
8.10
4.54
28.10
0.20
0.20
7.35
11.24
Vol=
M3
M3
M2
1.00
1.00
Area=
1.00
2.00
1.00
1.00
Area=
33.26
1.00
Perim-
30.24
0.55
16.63
1.00
Perim-
30.24
0.55
16.63
0.20
22.96
0.20
26.70
48.06
8.48
0.01
0.06
0.01
0.08
0.53
3.20
0.53
4.27
1.00
1.00
26.70
4.30
1.00
1.00
1.00
2.00
2.00
2.00
26.70
26.70
0.50
0.90
21.20
KG
M3
2.00
2.00
2.00
2.00
22.96
83.24
1,955.25
8.54
26.70
26.70
26.70
26.70
Area=
Area=
Area=
Area=
M2
46.99
1.00
1.00
1.00
KG
923.20
37.19
1.00
2.00
M2
Frizos de Losa
Acero F y =4200Kg/Cm2 de Losa
Concreto F'c=210Kg/Cm2 de Vereda
Zona 02
Zona 03
Zona 04
Zona 05
Encofrado y Desencofrado de Vereda
Base de Vereda
Frizos de Vereda
Inicio de Vereda
Acero F y =4200Kg/Cm2 de Vereda
38.10
96.99
152.40
5.30
Area=
Estribo Derecho
Cuerpo de estribo
Aletas
Estribo Izquierdo
Cuerpo de estribo
Aletas
Excavacin de Mat. Fracturada (bajo agua)
Estribo Derecho
Cuerpo de estribo
Aletas
Estribo Izquierdo
Cuerpo de estribo
Aletas
07.04.00 CONFORMACION DE PLATAFORMA
Relleno y Compact. C.Mat. De Prestamo en Espaldones de Estribo
Estribo Derecho
Cuerpo de estribo
Aletas
Estribo Izquierdo
Cuerpo de estribo
Aletas
Eliminacin de material excavado
5.30
2.00
26.70
2.00
26.70
2.00
26.70
ver cuadro de metrado
0.52
0.15
0.21
27.77
8.01
11.21
750.25
M3
-Parapeto
Estribo Derecho
-Pantalla
- Contrafuerte
-Mensula-Cajuela
-Parapeto
1.00
3.00
1.00
1.00
1.00
2.00
0.30
0.30
1.33
4.54
0.30
0.80
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
2.00
0.30
0.30
1.33
4.54
0.30
0.80
4.54
area=
4.54
area
4.54
0.30
4.54
area
4.54
area
4.54
0.30
6.44
8.70
0.30
0.37
1.30
1.30
8.77
7.83
1.81
1.68
1.77
0.62
6.44
8.70
0.30
0.37
1.30
1.30
8.77
7.83
1.81
1.68
1.77
0.62
M3
38.03
1.00
1.00
1.00
1.00
1.00
3.00
7.10
0.30
0.30
1.00
1.00
1.00
1.00
1.00
3.00
7.10
0.30
0.30
2.54
2.54
1.00
0.52
0.65
2.54
2.54
1.00
0.52
0.65
Area=
Area=
18.03
0.40
0.59
18.03
0.40
0.59
M2
- Mensula
-Cajuela
-Parapeto
Estribo derecho
- Pantalla
-Contrafuerte
- Mensula
-Cajuela
-Parapeto
Encofrado y Desencofrado - Estribos (Bajo Agua)
Estribo izquierdo
-Zapata
-Pantalla
-Contrafuerte
44.97
1.00
1.00
1.00
1.00
1.00
1.00
131.07
1.00
3.00
3.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
3.00
3.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
3.00
3.00
1.00
2.00
2.00
1.00
1.00
1.00
3.00
3.00
1.00
2.00
2.00
1.00
2.54
Area=
7.15
0.15
2.54
2.54
2.54
2.54
0.80
2.54
Area=
7.15
0.15
2.54
2.54
2.54
2.54
0.80
6.44
1.15
0.60
0.89
0.30
1.30
1.30
6.44
3.36
0.60
0.89
0.30
1.30
1.30
32.72
6.90
3.22
1.52
2.26
1.52
6.60
4.16
32.72
20.16
3.22
1.52
2.26
1.52
6.60
4.16
M2
Estribo derecho
- Zapata
- Pantalla
- Contrafuerte
Acero F y =4200 Kg/Cm2 - Estribos
KG
M3
M3
40.09
10.60
2.54
Area=
0.58
1.00
0.52
1.09
10.60
2.64
6.54
0.26
1.00
0.52
1.09
10.60
2.64
6.54
0.26
0.15
10.60
2.54
Area=
0.58
0.15
Segn cuadro de metrado e Acero
5,850.88
40.30
1.00
2.00
2.00
2.00
Area=
1.00
2.00
2.00
2.00
Area=
0.30
Area=
0.30
Area=
23.73
0.30
1.09
14.24
1.31
23.73
0.30
8.76
14.24
10.51
38.48
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
4.00
Area=
Area=
2.00
2.00
4.00
Area=
Area=
1.00
2.00
1.00
2.00
2.00
2.00
Area=
1.00
2.00
1.00
2.00
2.00
2.00
Area=
1.00
2.00
4.00
2.00
2.00
2.00
1.00
2.00
4.00
2.00
2.00
2.00
0.30
Area=
0.30
Area=
8.10
2.89
1.00
0.30
1.09
16.20
1.73
1.31
8.10
2.89
1.00
0.30
1.09
16.20
1.73
1.31
2.56
37.46
10.24
2.15
2.56
37.46
10.24
2.15
9.80
0.52
1.00
5.55
1.09
19.60
11.54
8.72
9.80
0.52
1.00
5.55
1.09
19.60
11.54
8.72
M2
Estribo derecho
- Pantalla
-Contrafuerte
M2
KG
99.69
18.73
Area=
7.15
0.15
18.73
Area=
7.15
0.15
79.73
Area=
Area=
6,752.25
26.81
2.00
1.00
5.00
2.00
2.00
130.00
18.24
20.00
0.01
1.00
1.00
0.08
Area=
Area=
0.18
Area=
Area=
Area=
0.04
0.06
1.81
0.02
0.02
0.00
24.05
1.58
0.57
0.57
0.05
TN
26.81
26.81
KG
47.01
47.01
26.81
26.81
1.00
1.00
TN
GLB
1.00
M2
M2
1.00
2.00
26.70
0.95
50.73
50.73
M2
1.00
2.00
26.70
0.20
10.68
10.68
UNID.
ML
PZA
ML
ML
GLB
6.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
12.00
53.40
4.00
2.00
7.20
1.00
12.00
53.40
4.00
2.00
7.20
1.00
1.00
07.10.00 VARIOS
Columnetas Pre fabricadas de 0,20x0,20M
Tubo de FG Para Baranda
Adquisiscin y colocacin de plantas Neopreno
Tubo de Drenaje en Losa con Tubo PVC Diam. 3"
Junta de Dilatacin Metlica (Apoyo fijo y movil)
SEAL, CARTEL INFORMATIVO = PUENTE
07.11.00 OBRAS COMPLEMENTARIAS
LIMPIEZA FINAL DE OBRA
07.12.00 PRUEBAS DE LABORATORIO
PRUEBA EN LABORATORIO DE AGREGADO, CONCRETO, ETC.
1.00
26.70
0.50
3.60
GLB
1.00
1.00
GLB
1.00
1.00
1.00
METRADOS REFERENCIALES
ALTERNATIVA 1
CONSTRUCCION DE TROCHA CARROZABLE PUMASAPO - MANZANAYOCC - URABAMBA - SAN ANDRES - ESPINOZAYOCC - TACCRA.
ITEM
DESCRIPCION
UND
VECES
LARGO
und
m2
1.00
1.00
Kg
glb
m2
km
glb
1.00
1.00
1.00
1.00
1.00
55,254.21
50,026.00
50.03
2.20
1.00
1.00
1.00
20,260.53
6,753.51
11,255.85
AREA=
AREA=
AREA=
8.86
8.80
2.70
179,508.30
59,430.89
30,390.80
1.00
1.00
1.00
1.00
2,251.17
750.39
1,250.65
7,503.90
AREA=
AREA=
AREA=
AREA=
8.86
8.80
2.70
7.53
19,945.37
6,603.43
3,376.76
56,504.37
22,511.70
7,503.90
12,506.50
7,503.90
50,026.00
AREA=
AREA=
AREA=
AREA=
4.00
1.39
0.74
0.57
1.31
m2
1.00
1.00
1.00
1.00
1.00
31,291.26
5,552.89
7,128.71
9,830.11
200,104.00
200,104.00
m3
1.00
50,026.00
3.50
0.15
26,263.65
26,263.65
m3
m3
m3
ml
1.00
1.00
1.00
1.00
7,503.90
-
0.80
0.80
0.80
0.40
0.40
0.40
1,200.62
-
1,200.62
-
m3
ml
m2
m3
m2
38.00
38.00
38.00
38.00
38.00
15.60
10.00
11.40
3.20
4.05
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
592.80
380.00
433.20
121.60
153.90
592.80
380.00
433.20
121.60
153.90
m3
m2
m3
m3
2.00
2.00
2.00
2.00
17.40
19.14
5.22
12.18
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
34.80
38.28
10.44
24.36
34.80
38.28
10.44
24.36
m3
m3
m2
Kg
m3
m3
m3
11.00
11.00
11.00
11.00
11.00
11.00
11.00
33.60
22.40
13.80
18.50
20.16
10.08
3.36
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
369.60
246.40
151.80
203.50
221.76
110.88
36.96
369.60
246.40
151.80
203.50
221.76
110.88
36.96
m3
m3
m2
Kg
m3
m3
m3
5.00
5.00
5.00
5.00
5.00
5.00
5.00
38.64
25.76
15.87
21.28
23.18
11.59
3.86
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
(X UNIDAD)
193.20
128.80
79.35
106.38
115.92
57.96
19.32
193.20
128.80
79.35
106.38
115.92
57.96
19.32
20.00
ANCHO
ALTURA
10.00
SUB- TOTAL
1.00
200.00
1.00
200.00
55,254.21
1.00
110,057.20
50.03
55,254.21
1.00
110,057.20
50.03
m3
269,329.98
m3
m3
m3
TOTAL
29,925.55
56,504.37
53,802.96
DESCRIPCION
UND
CANT.
GLB
M2
UND.
M3
DIMENSIONES (m)
N VECES
LONGITUD
1.00
1.00
1.00
1.00
10.00
PARCIAL
1.00
120.00
1.00
5.95
Area=
M2
2.00
2.00
9.15
1.00
2.00
2.00
2.00
9.15
5.30
Area=
38.10
96.99
152.40
38.10
96.99
152.40
5.30
Area=
1.00
2.00
2.00
2.00
9.15
1.00
2.00
1.00
2.00
2.00
7.00
9.15
5.30
Area=
38.10
5.30
Area=
38.10
MS=60 %
RS =30 %
RF=10 %
96.99
152.40
96.99
152.40
7.00
3,429.94
1,714.97
571.66
3,429.94
1,714.97
571.66
5,716.57
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
71.69
71.69
379.96
596.47
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
347.95
347.95
1,844.14
2,896.00
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
149.86
149.86
794.28
1,246.88
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
149.86
149.86
794.28
1,247.32
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
215.97
215.97
1,144.65
1,796.89
1.00
2.00
1.00
1.00
1.25
5.30
4.16
Area=
Area=
4,082.77
34.87
34.87
184.82
290.24
5,103.46
9.15
5.30
38.10
3.00
3.00
145.49
228.60
9.15
4,082.77
M3
3,416.61
M3
Vol=
M3
5,103.46
748.17
1.00
2.00
1.00
1.00
Area=
1.00
2.00
1.00
1.00
Area=
5.30
38.10
3.00
3.00
145.49
228.60
1.00
Perim-
46.24
3.00
138.72
1.00
Perim-
46.24
3.00
138.72
M2
277.44
1.00
1.00
47.60
4.30
0.20
40.94
1.00
1.00
1.00
2.00
2.00
2.00
47.60
47.60
0.50
0.90
56.20
0.20
47.60
85.68
22.48
0.01
0.06
0.01
0.08
0.95
5.71
0.95
7.62
KG
M3
2.00
2.00
2.00
2.00
40.94
155.76
6,313.15
15.23
47.60
47.60
47.60
47.60
Area=
Area=
Area=
Area=
M2
83.78
1.00
1.00
1.00
KG
1.00
120.00
1.00
595.00
498.78
M3
M3
M2
TOTAL
498.78
1.00
2.00
M2
Frizos de Losa
Acero F y =4200Kg/Cm2 de Losa
Concreto F'c=210Kg/Cm2 de Vereda
Zona 02
Zona 03
Zona 04
Zona 05
Encofrado y Desencofrado de Vereda
Base de Vereda
Frizos de Vereda
Inicio de Vereda
Acero F y =4200Kg/Cm2 de Vereda
ALTURA
12.00
100.00
ANCHO
2.00
47.60
2.00
47.60
2.00
47.60
ver cuadro de metrado
0.52
0.15
0.21
49.50
14.28
19.99
1,688.25
DESCRIPCION
UND
Estribo Derecho
-Pantalla
- Contrafuerte
-Mensula-Cajuela
-Parapeto
LONGITUD
ANCHO
ALTURA
PARCIAL
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
2.00
0.30
0.30
1.55
5.30
0.30
0.80
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
2.00
0.30
0.30
1.55
5.30
0.30
0.80
5.30
area
5.30
area
5.30
0.30
5.30
area
5.30
area
5.30
0.30
8.58
17.39
0.30
0.37
2.10
2.10
13.64
15.65
2.46
1.96
3.34
1.01
8.58
17.39
0.30
0.37
2.10
2.10
13.64
15.65
2.46
1.96
3.34
1.01
102.55
1.00
1.00
1.00
1.00
1.00
3.00
9.15
0.30
0.30
1.00
1.00
1.00
1.00
1.00
3.00
9.15
0.30
0.30
5.30
5.30
1.00
0.52
2.17
5.30
5.30
1.00
0.52
2.17
Area=
Area=
48.50
0.83
1.95
48.50
0.83
1.95
M2
-Cajuela
-Parapeto
Estribo derecho
- Pantalla
-Contrafuerte
- Mensula
-Cajuela
-Parapeto
487.77
1.00
3.00
3.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
3.00
3.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
2.00
2.00
2.00
5.30
Area=
9.49
0.30
5.30
5.30
5.30
5.30
0.80
5.30
Area=
9.49
0.30
5.30
5.30
5.30
5.30
0.80
8.58
17.39
0.60
0.89
0.30
2.10
2.10
8.58
17.39
0.60
0.89
0.30
2.10
2.10
90.95
104.34
8.54
3.18
4.72
3.18
22.26
6.72
90.95
104.34
8.54
3.18
4.72
3.18
22.26
6.72
M2
Estribo derecho
- Zapata
- Pantalla
- Contrafuerte
Acero F y =4200 Kg/Cm2 - Estribos
KG
M3
M3
TOTAL
76.13
M3
- Mensula
DIMENSIONES (m)
N VECES
M3
-Parapeto
CANT.
59.31
1.00
1.00
3.00
3.00
1.00
2.00
2.00
1.00
1.00
1.00
3.00
3.00
1.00
2.00
2.00
1.00
10.60
5.30
Area=
0.58
1.00
0.52
2.17
10.60
5.51
13.02
0.52
1.00
0.52
2.17
10.60
5.51
13.02
0.52
0.30
10.60
5.30
Area=
0.58
0.30
Segn cuadro de metrado e Acero
19,535.87
108.40
1.00
2.00
2.00
2.00
Area=
1.00
2.00
2.00
2.00
Area=
0.30
Area=
0.30
Area=
55.39
0.30
17.47
33.23
20.96
55.39
0.30
17.47
33.23
20.96
161.08
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
4.00
Area=
Area=
2.00
2.00
4.00
Area=
Area=
0.30
Area=
0.30
Area=
38.10
2.89
1.00
0.30
2.17
76.20
1.73
2.60
38.10
2.89
1.00
0.30
2.17
76.20
1.73
2.60
DESCRIPCION
Encofrado y Desencofrado - Alas
Estribo izquierdo
-Pantalla
-Contrafuerte
UND
CANT.
DIMENSIONES (m)
N VECES
LONGITUD
ANCHO
ALTURA
PARCIAL
M2
Estribo derecho
- Pantalla
-Contrafuerte
M2
KG
TOTAL
744.14
2.00
4.00
2.00
2.00
2.00
2.00
Area=
2.00
4.00
2.00
2.00
2.00
2.00
Area=
55.39
Area=
9.49
17.39
221.56
139.12
11.39
17.39
221.56
139.12
11.39
0.30
55.39
Area=
9.49
0.30
129.09
1.00
2.00
4.00
2.00
2.00
2.00
Area=
1.00
2.00
4.00
2.00
2.00
2.00
Area=
17.82
0.52
1.00
5.55
2.17
35.64
11.54
17.36
17.82
0.52
1.00
5.55
2.17
35.64
11.54
17.36
27,153.13
69.81
2.00
1.00
6.00
2.00
2.00
284.00
10.60
30.00
0.01
1.40
1.40
0.08
Area=
Area=
0.04
0.06
1.81
0.02
0.02
0.00
0.18
Area=
Area=
Area=
20.97
38.86
6.26
0.79
2.77
0.16
TN
69.81
69.81
KG
176.26
176.26
TN
69.81
69.81
1.00
1.00
GLB
1.00
M2
M2
1.00
2.00
47.60
0.95
90.44
90.44
M2
1.00
2.00
47.60
0.20
19.04
19.04
UNID.
ML
PZA
ML
ML
GLB
23.00
1.00
3.00
2.00
2.00
2.00
2.00
21.00
2.00
1.00
46.00
95.20
6.00
21.00
7.20
1.00
46.00
95.20
6.00
21.00
7.20
1.00
1.00
06.10.00 VARIOS
Columnetas Pre fabricadas de 0,20x0,20M
Tubo de FG Para Baranda
Adquisiscin y colocacin de plantas Neopreno
Tubo de Drenaje en Losa con Tubo PVC Diam. 3"
Junta de Dilatacin Metlica (Apoyo fijo y movil)
SEAL, CARTEL INFORMATIVO = PUENTE
06.11.00 OBRAS COMPLEMENTARIAS
LIMPIEZA FINAL DE OBRA
06.12.00 PRUEBAS DE LABORATORIO
PRUEBA EN LABORATORIO DE AGREGADO, CONCRETO, ETC.
07.00.00 PUENTE L=25.50 mt.( sobre el rio caracha)
07.01.00 OBRAS PROVISIONALES
Movilizacin y desmovilizacin de equipo pesado
Campamento de obra
Cartel de Obra
Encausamiento de ro
07.02.00 TRABAJOS PRELIMINARES
Limpieza de terreno
Estribo Derecho
Cuerpo de estribo
Aletas
Estribo Izquierdo
Cuerpo de estribo
Aletas
Trazo y replanteo puente
Estribo Derecho
Cuerpo de estribo
Aletas
Estribo Izquierdo
Cuerpo de estribo
Aletas
1.00
47.60
0.50
3.60
GLB
1.00
1.00
GLB
1.00
1.00
GLB
M2
UND.
M3
1.00
1.00
1.00
1.00
1.00
10.00
1.00
80.00
1.00
4.55
8.00
100.00
Area=
M2
498.78
1.00
2.00
2.00
2.00
9.15
1.00
2.00
2.00
2.00
9.15
5.30
Area=
38.10
96.99
152.40
38.10
96.99
152.40
5.30
Area=
M2
1.00
80.00
1.00
455.00
498.78
1.00
2.00
2.00
2.00
9.15
1.00
2.00
1.00
2.00
2.00
5.00
9.15
5.30
Area=
38.10
5.30
Area=
470.00
6.00
96.99
152.40
38.10
96.99
152.40
5.00
0.80
476.80
476.80
DESCRIPCION
Estribo Derecho
Cuerpo de estribo
Aletas
Estribo Izquierdo
Cuerpo de estribo
Aletas
Excavacin de Mat. Fracturada (bajo agua)
Estribo Derecho
Cuerpo de estribo
Aletas
Estribo Izquierdo
Cuerpo de estribo
Aletas
07.04.00 CONFORMACION DE PLATAFORMA
Relleno y Compact. C.Mat. De Prestamo en Espaldones de Estribo
Estribo Derecho
Cuerpo de estribo
Aletas
Estribo Izquierdo
Cuerpo de estribo
Aletas
Eliminacin de material excavado
07.05.00 OBRAS DE CONCRETO SIMPLE
Falsa Zapata C C 1:10+30% P.G.
Estribo Derecho
Cuerpo de estribo
Aletas
Estribo Izquierdo
Cuerpo de estribo
Aletas
Encofrado y Desencofrado de Falsa Zapata
Estribo Derecho
Cuerpo de estribo y Aletas
Estribo Izquierdo
Cuerpo de estribo y Aletas
07.06.00 Superestructura del Puente
Concreto F'c=210 Kg/cm2-LOSA
Encofrado y Desencofrado de LOSA
Base de Losa
UND
LONGITUD
ANCHO
ALTURA
PARCIAL
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
63.69
63.69
337.56
529.90
1.00
2.00
1.00
1.00
5.30
4.16
Area=
Area=
102.49
102.49
543.18
853.00
1.00
2.00
1.00
1.00
2.00
1.50
Area=
Area=
92.32
92.32
184.64
276.96
1.00
2.00
1.00
1.00
2.00
1.50
Area=
Area=
92.32
92.32
184.64
276.96
1.00
2.00
1.00
1.00
2.00
1.50
Area=
Area=
64.28
64.28
128.56
192.84
1.00
2.00
1.00
1.00
1.00
2.00
1.50
Area=
Area=
923.20
64.28
64.28
128.56
192.84
923.20
Vol=
M3
1.00
2.00
1.00
1.00
Area=
1.00
2.00
1.00
1.00
8.10
4.54
28.10
0.20
0.20
7.35
11.24
8.10
Area=
4.54
28.10
0.20
0.20
7.35
11.24
1.00
Perim-
30.24
0.55
16.63
1.00
Perim-
30.24
0.55
16.63
33.26
1.00
1.00
26.70
4.30
0.20
22.96
1.00
1.00
1.00
2.00
2.00
2.00
26.70
26.70
0.50
0.90
21.20
0.20
26.70
48.06
8.48
0.01
0.06
0.01
0.08
0.53
3.20
0.53
4.27
KG
M3
2.00
2.00
2.00
2.00
22.96
83.24
1,955.25
8.54
26.70
26.70
26.70
26.70
Area=
Area=
Area=
Area=
M2
46.99
1.00
1.00
1.00
KG
2.00
26.70
2.00
26.70
2.00
26.70
ver cuadro de metrado
0.52
0.15
0.21
27.77
8.01
11.21
750.25
M3
-Parapeto
923.20
37.19
M2
Estribo Derecho
-Pantalla
- Contrafuerte
-Mensula-Cajuela
2,263.64
642.80
M3
M3
M2
TOTAL
923.20
M3
-Parapeto
DIMENSIONES (m)
N VECES
M3
Frizos de Losa
Acero F y =4200Kg/Cm2 de Losa
Concreto F'c=210Kg/Cm2 de Vereda
Zona 02
Zona 03
Zona 04
Zona 05
Encofrado y Desencofrado de Vereda
Base de Vereda
Frizos de Vereda
Inicio de Vereda
Acero F y =4200Kg/Cm2 de Vereda
07.07.00 SUBESTRUCTURA DEL PUENTE
Concreto F'c=210Kg/Cm2 de Estribo
Estribo izquierdo
- Pantalla
- Contrafuerte
- Mensula-Cajuela
CANT.
44.97
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
2.00
0.30
0.30
1.33
4.54
0.30
0.80
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
2.00
0.30
0.30
1.33
4.54
0.30
0.80
4.54
area=
4.54
area
4.54
0.30
4.54
area
4.54
area
4.54
0.30
6.44
8.70
0.30
0.37
1.30
1.30
8.77
7.83
1.81
1.68
1.77
0.62
6.44
8.70
0.30
0.37
1.30
1.30
8.77
7.83
1.81
1.68
1.77
0.62
M3
38.03
1.00
1.00
1.00
1.00
1.00
3.00
7.10
0.30
0.30
1.00
1.00
1.00
1.00
1.00
3.00
7.10
0.30
0.30
2.54
2.54
1.00
0.52
0.65
2.54
2.54
1.00
0.52
0.65
Area=
Area=
18.03
0.40
0.59
18.03
0.40
0.59
M2
131.07
1.00
3.00
3.00
2.00
2.00
1.00
2.54
Area=
7.15
0.15
6.44
1.15
32.72
6.90
3.22
DESCRIPCION
UND
- Mensula
-Cajuela
-Parapeto
Estribo derecho
- Pantalla
-Contrafuerte
- Mensula
-Cajuela
-Parapeto
Encofrado y Desencofrado - Estribos (Bajo Agua)
Estribo izquierdo
-Zapata
-Pantalla
-Contrafuerte
CANT.
DIMENSIONES (m)
N VECES
1.00
1.00
1.00
1.00
2.00
1.00
1.00
2.00
2.00
2.00
1.00
3.00
3.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
2.00
2.00
2.00
LONGITUD
ANCHO
ALTURA
0.60
0.89
0.30
1.30
1.30
1.52
2.26
1.52
6.60
4.16
2.54
6.44
3.36
32.72
20.16
3.22
1.52
2.26
1.52
6.60
4.16
Area=
7.15
PARCIAL
2.54
2.54
2.54
2.54
0.80
0.15
2.54
2.54
2.54
2.54
0.80
0.60
0.89
0.30
1.30
1.30
M2
Estribo derecho
- Zapata
- Pantalla
- Contrafuerte
Acero F y =4200 Kg/Cm2 - Estribos
KG
M3
M3
40.09
1.00
1.00
3.00
3.00
1.00
2.00
2.00
1.00
1.00
1.00
3.00
3.00
1.00
2.00
2.00
1.00
10.60
2.54
Area=
0.58
1.00
0.52
1.09
10.60
2.64
6.54
0.26
1.00
0.52
1.09
10.60
2.64
6.54
0.26
0.15
10.60
2.54
Area=
0.58
0.15
Segn cuadro de metrado e Acero
5,850.88
40.30
1.00
2.00
2.00
2.00
Area=
1.00
2.00
2.00
2.00
Area=
0.30
Area=
0.30
Area=
23.73
0.30
1.09
14.24
1.31
23.73
0.30
8.76
14.24
10.51
38.48
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
4.00
Area=
Area=
2.00
2.00
4.00
Area=
Area=
0.30
Area=
0.30
Area=
8.10
2.89
1.00
0.30
1.09
16.20
1.73
1.31
8.10
2.89
1.00
0.30
1.09
16.20
1.73
1.31
M2
Estribo derecho
- Pantalla
-Contrafuerte
M2
KG
TOTAL
99.69
1.00
2.00
1.00
2.00
2.00
2.00
Area=
18.73
1.00
2.00
1.00
2.00
2.00
2.00
Area=
1.00
2.00
4.00
2.00
2.00
2.00
Area=
1.00
2.00
4.00
2.00
2.00
2.00
Area=
2.56
37.46
10.24
2.15
2.56
37.46
10.24
2.15
9.80
0.52
1.00
5.55
1.09
19.60
11.54
8.72
9.80
0.52
1.00
5.55
1.09
19.60
11.54
8.72
Area=
7.15
0.15
18.73
Area=
7.15
0.15
79.73
6,752.25
26.81
2.00
1.00
5.00
2.00
2.00
130.00
18.24
20.00
0.01
1.00
1.00
0.08
Area=
Area=
0.18
Area=
Area=
Area=
0.04
0.06
1.81
0.02
0.02
0.00
24.05
1.58
0.57
0.57
0.05
DESCRIPCION
UND
CANT.
DIMENSIONES (m)
N VECES
LONGITUD
ANCHO
ALTURA
PARCIAL
TOTAL
TN
26.81
26.81
KG
47.01
47.01
TN
26.81
26.81
1.00
1.00
GLB
1.00
M2
M2
1.00
2.00
26.70
0.95
50.73
50.73
M2
1.00
2.00
26.70
0.20
10.68
10.68
UNID.
ML
PZA
ML
ML
GLB
6.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
12.00
53.40
4.00
2.00
7.20
1.00
12.00
53.40
4.00
2.00
7.20
1.00
1.00
07.10.00 VARIOS
Columnetas Pre fabricadas de 0,20x0,20M
Tubo de FG Para Baranda
Adquisiscin y colocacin de plantas Neopreno
Tubo de Drenaje en Losa con Tubo PVC Diam. 3"
Junta de Dilatacin Metlica (Apoyo fijo y movil)
SEAL, CARTEL INFORMATIVO = PUENTE
07.11.00 OBRAS COMPLEMENTARIAS
LIMPIEZA FINAL DE OBRA
07.12.00 PRUEBAS DE LABORATORIO
PRUEBA EN LABORATORIO DE AGREGADO, CONCRETO, ETC.
1.00
26.70
0.50
3.60
GLB
1.00
1.00
GLB
1.00
1.00
1.00
LONGITUD (Km)
TERRENO CON
TERRENO CON
TERRENO
TERRENO CON
TALUD TIPICO
TALUD SUAVE
PLANO
TALUD ROCA
45.0%
15.0%
25.0%
15.0%
Pumasapo, Manzanayocc,
Urabamba, San Andres,
Espinozayocc, Taccra.
50.03
22.51
7.50
12.51
7.50
TOTAL
50.03
22.51
7.50
12.51
7.50
longitud
(m)
Geografia
Tipo de Terreno
ALTERNATIVA 1
17,400
5,700
8,900
18,026
50,026
sierra
sierra
sierra
sierra
Rocoso
Tipico
Tipico
Tipico
Ubicacin
Km
cada / km
Obra Proyectada
Ubicacin
Km
Baden tipo I
Baden tipo II
Observacion
Tipo
TMC
Total de Alcantarillas
Observacion
Lprom (m)
6
8
Total de Badenes
Obra Proyectada
Ubicacin
Observacion
Lprom (m)
puente
Km
puente 25.50 m, (rio
caracha Viscachayocc)
puente 46.40 m, (rio
Urabamba)
puente
38
11
5
16
25.5
46.4
Seccin Longitudinal
Canal de
Conduccin
Canal de
Conduccin
= VAR
Seccin Transversal
= VAR
Variable
LONGITUD (Km)
TERRENO CON
TERRENO CON
TERRENO
TERRENO CON
TALUD TIPICO
TALUD SUAVE
PLANO
TALUD ROCA
45.0%
15.0%
25.0%
15.0%
Pumasapo, Manzanayocc,
Urabamba, San Andres,
Espinozayocc, Taccra.
50.03
22.51
7.50
12.51
7.50
TOTAL
50.03
22.51
7.50
12.51
7.50
longitud
(m)
Geografia
Tipo de Terreno
ALTERNATIVA 2
17,400
5,700
8,900
18,026
50,026
sierra
sierra
sierra
sierra
Rocoso
Rocoso
Tipico
Tipico
Obra Proyectada
Obra Proyectada
Ubicacin
Km
cada / km
Ubicacin
Km
Baden tipo I
Baden tipo II
Obra Proyectada
Puente
Puente
Observacion
Tipo
TMC
Total de Alcantarillas
Observacion
Lprom (m)
6
8
Total de Badenes
Ubicacin
Km
38
11
5
16
Observacion
Lprom (m)
25.5
46.4
Total de Puente
Seccin Longitudinal
Canal de
Conduccin
Canal de
Conduccin
= VAR
Seccin Transversal
= VAR
Variable
Poblados
Total
Total
22 censo 2005
71 #### ####
14 censo 2005
45
19 censo 2005
61
55
177
235
668 #### ####
3.21
6,603 2.67%
240
11,411
SANCOS
2012
3731
3731
2013
3748
3748
2014
3765
3765
2015
3782
3782
2016
3800
3800
2017
3817
3817
2018
3834
3834
2019
3852
3852
3681
Numero de hab. por vivienda
118
246
88
14
23
11
30
22
19
19
38
15
22
28
17
28
43
54
55
25
27
28
25
38
21
35
53
15
72
20
39
141
17
110
62
145
107
22
45
43
122
53
PROVINCIA
Huanca Sancos
Sancos
Carapo
Sacsamarca
Santiago de Lucanamarca
39
12
SANCOS
HUANCASANCOS
2862.3
3408
PROVINCIA
CAPITAL
SUPERF.
ALTITUD
KM2
MSNM.
47
CARAPOCARAPO1289.7
3188
138
13
SACSAMARCA
SACSAMARCA
673.03
3470
15
36
56
65
20
22
19
57
14
10
25
24
58
19
10
14
57
10
9
6
6
21
39
13
4
87
38
11
223
42
76
14
10
36
13
25
31
21
17
20
54
18
15
14
10
16
10
39
12
21
1925
19
10
2279
2,862.33
1289.7
241.34
673.03
658.26
3408
3188
3470
3489
UBICACIN GEOGRAFICA
1355'07"
1350'00"
1356'22"
1350'21"
7419'55"
7418'51"
7418'39"
7422'14"
POBLACION
2003
2005
11,355
3,427
2,865
2,086
2,977
11,989
3,615
3,014
2,236
3,124
16
21
SUPERFICIE ALTITUD
Km 2 (m.s.n.m.)
CAPITAL
Huanca Sancos
Huanca Sancos
Carapo
Sacsamarca
Santiago de Lucanamarca
SANTIAGO
SANTIAGO
DE LUCANAMARCA
658.26
DE LUCANAMARCA
3489
3427
2865
2086
2977
11355
OVINOS
131112
134572
135512
127865
129138
ALPACAS
1590
1690
3196
1363
1469
LLAMAS
7348
7441
4255
3094
3088
AVES
3436
3628
7848
5366
5468
CUYES
1068
1816
1973
2071
2392
EQUINOS
4476
4594
4669
4762
4740
CUYES
365
550
605
635
835
EQUINOS
1685
1851
1855
1892
1790
OVINOS
48510
49908
55806
53894
54433
ALPACAS
687
721
804
345
352
LLAMAS
2750
2810
793
503
503
AVES
971
1068
2530
1910
1929
-3.96%
16.97%
-47.11%
4.82%
-7.32%
0.61%
103.33%
-49.17%
1.87%
14.16%
17.46%
-14.86%
31.78%
0.13%
8.63%
OVINOS
ALPACAS
LLAMAS
AVES
2.64%
0.70%
-5.64%
1.00%
-0.33%
6.29%
89.11%
-57.35%
7.78%
11.46%
1.27%
-42.82%
-27.29%
-0.19%
-17.26%
5.59%
116.32%
-31.63%
1.90%
23.05%
CUYES
70.04%
8.65%
4.97%
15.50%
24.79%
EQUINOS
2.64%
1.63%
1.99%
-0.46%
1.45%
-61.35%
371.43%
-81.14%
10.71%
59.91%
1.82%
681.25%
-84.23%
5.07%
150.98%
14.99%
-13.04%
14.99%
0.00%
4.24%
OVINOS
ALPACAS
LLAMAS
AVES
2.88%
11.82%
-3.43%
1.00%
3.07%
4.95%
11.51%
-57.09%
2.03%
-9.65%
2.18%
-71.78%
-36.57%
0.00%
-26.54%
9.99%
136.89%
-24.51%
0.99%
30.84%
CUYES
50.68%
10.00%
4.96%
31.50%
24.28%
EQUINOS
9.85%
0.22%
1.99%
-5.39%
1.67%
Area de influencia
Sector Sancos-Urubamba-Taccra
48
8350
Total
48
Fuente: Elaboracin del proyectista en base datos de campo
8,350
8,350
35,977
1.95
18,450
8,350
119924
83,947
19.5
28,888
25,120
25,120
25,120
25,120
CUADRO N
Proyeccin de la poblacin directamente afectada
Ao
familias
Poblacin
0
48
240
1
48
241
2
48
242
3
49
243
4
49
244
5
49
245
6
49
247
7
50
248
8
50
249
9
50
250
10
50
251
tasa de crecimiento poblacional
0.45%
N de Cabezas
Saca
N Cabezas
Rend./cabeza
(Kg)
produccin
(T.M)
Consumo
( T.M)
Excedente
Exportable
(T.M)
Vacuno
8350
2923
110.0
321.48
5.28
316.2
Ovino
25120
8792
20.0
175.84
2.88
173.0
Total
33470
11715
130.0
497.3
8.2
489.2
PRODUCTO
Fuente: Elaboracin propia a partir de datos MINAG y encuesta a pobladores del area de influencia
Poblacin
Peso vacuno
Carcasa
Carne
Saca (0.35)
Saca (0.35)
Und
cabezas
kg
kg
kg
Ton
cabezas
10
8350
110.0
55.0
55.0
321.5
2923
8388
110.0
55.0
55.0
322.9
2936
8425
110.0
55.0
55.0
324.4
2949
8463
110.0
55.0
55.0
325.8
2962
8501
110.0
55.0
55.0
327.3
2975
8540
110.0
55.0
55.0
328.8
2989
8578
110.0
55.0
55.0
330.3
3002
8617
110.0
55.0
55.0
331.7
3016
8655
110.0
55.0
55.0
333.2
3029
8694
110.0
55.0
55.0
334.7
3043
8733
110.0
55.0
55.0
336.2
3057
Poblacin
Peso vacuno
Carcasa
Carne
Saca (0.35)
Saca (0.35)
Und
cabezas
kg
kg
kg
Ton
cabezas
25120
20.0
16.0
16.0
175.8
8792
25233
20.0
16.0
16.0
176.6
8832
25347
20.0
16.0
16.0
177.4
8871
25461
20.0
16.0
16.0
178.2
8911
25575
20.0
16.0
16.0
179.0
8951
25690
20.0
16.0
16.0
179.8
8992
25806
20.0
16.0
16.0
180.6
9032
25922
20.0
16.0
16.0
181.5
9073
26039
20.0
16.0
16.0
182.3
9114
26156
20.0
16.0
16.0
183.1
9155
10
26274
20.0
16.0
16.0
183.9
9196
Poblacin
Peso vacuno
Carcasa
Carne
Saca (0.35)
Saca (0.35)
Und
cabezas
kg
kg
kg
Ton
cabezas
8350
110
55
55
321.5
2923
8667
200
120
120
606.7
3034
8997
208
125
125
653.7
3149
9339
215
129
129
704.3
3268
9693
224
134
134
758.9
3393
10062
232
139
139
817.6
3522
10444
241
145
145
881.0
3655
10841
250
150
150
949.2
3794
11253
260
156
156
1022.7
3939
11681
270
162
162
1101.9
4088
10
12124
280
168
168
1187.2
4244
Poblacin
Peso vacuno
Carcasa
Carne
Saca (0.35)
Saca (0.35)
Und
cabezas
kg
kg
kg
Ton
cabezas
25120
20
16
16
175.8
8792
26075
30
22
22
273.8
9126
27065
31
23
23
295.0
9473
28094
32
24
24
317.8
9833
29161
34
25
25
342.4
10207
30270
35
26
26
369.0
10594
31420
36
27
27
397.5
10997
32614
38
28
28
428.3
11415
33853
39
29
29
461.5
11849
35140
40
30
30
497.2
12299
10
36475
42
31
31
535.7
12766
Toneladas
Ao
Descripcin
Consumo
Consumo
Ex exportable
Ex exportable
Und
cabezas
ton
ton
cabezas
10
48
5.3
316.2
2875
48
5.3
317.6
2887
48
5.3
319.0
2900
49
5.4
320.5
2913
49
5.4
321.9
2927
49
5.4
323.4
2940
49
5.4
324.8
2953
50
5.4
326.3
2966
50
5.5
327.8
2980
50
5.5
329.2
2993
50
5.5
330.7
3007
Toneladas
Ao
Descripcin
Consumo
Consumo
Ex exportable
Ex exportable
Und
cabezas
ton
ton
cabezas
10
144
2.9
173.0
8648
145
2.9
173.7
8687
145
2.9
174.5
8726
146
2.9
175.3
8765
147
2.9
176.1
8805
147
2.9
176.9
8844
148
3.0
177.7
8884
149
3.0
178.5
8924
149
3.0
179.3
8964
150
3.0
180.1
9005
151
3.0
180.9
9045
10
Toneladas
Ao
Descripcin
Consumo
Consumo
Ex exportable
Ex exportable
Und
cabezas
ton
ton
cabezas
48
5.3
316.2
2875
48
5.3
601.4
2887
48
5.3
648.4
2900
49
5.4
699.0
2913
49
5.4
753.5
2927
49
5.4
812.2
2940
49
5.4
875.5
2953
50
5.4
943.7
2966
50
5.5
1017.2
2980
50
5.5
1096.4
2993
50
5.5
1181.7
3007
Toneladas
Ao
Descripcin
Consumo
Consumo
Ex exportable
Ex exportable
Descripcin
Consumo
Ex exportable
Und
cabezas
ton
ton
cabezas
10
144
2.9
173.0
8648
145
2.9
270.9
8687
145
2.9
292.1
8726
146
2.9
314.9
8765
147
2.9
339.5
8805
147
2.9
366.0
8844
148
3.0
394.6
8884
149
3.0
425.4
8924
149
3.0
458.5
8964
150
3.0
494.2
9005
151
3.0
532.7
9045
10
Und
8.2
489.2
ton
ton
8.2
872.3
8.2
940.4
8.3
1013.9
8.3
1093.0
8.3
1178.3
8.4
1270.1
8.4
1369.1
8.5
1475.7
8.5
1590.6
8.5
1714.4
10
2,875
8,648
2,887
8,687
2,900
8,726
2,913
8,765
2,927
8,805
2,940
8,844
2,953
8,884
2,966
8,924
2,980
8,964
2,993
9,005
3,007
9,045
10
Tipo de Vehculo
Camin 2E Carga Vacunos
(Cabezas)
Camin 2E Carga Ovinos
(Cabezas)
Total
Carga Media
(cabezas)
40
1
2
1
2
1
2
1
2
1
3
1
3
1
3
1
3
1
3
1
3
1
3
Unidad
Hab.
Fam.
Pasajeros
Ao
0
240
48
4
192
6
12
1
1
241
48
4
193
6
12
1
2
242
48
4
194
6
12
1
3
243
49
4
195
6
12
1
4
244
49
4
195
7
12
1
5
245
49
4
196
7
12
1
6
247
49
4
197
7
12
1
7
248
50
4
198
7
12
1
8
249
50
4
199
7
12
1
9
250
50
4
200
7
12
1
10
251
50
4
201
7
12
1
Excedente productor
carga
0
1
2
3
4
5
6
7
8
9
10
Fuente: Elaboracin proyectista
(*)Oferta "Sin Proyecto"
pasajero
2
2
2
2
3
3
3
3
3
3
3
1
1
1
1
1
1
1
1
1
1
1
Trafico desviado
Excedente productor
Ahorro COV
carga
38
44
45
45
46
46
47
47
48
49
49
pasajero
0
0
0
0
0
0
0
0
0
0
0
DEFICIT (B-A)
Trafico desviado
Ahorro COV
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-41
-47
-47
-48
-49
-50
-50
-51
-52
-52
-53
ALTERNATIVA 1
Ruta 1
Pumasapo - Urabamba
Ruta 1 y 2 Urabamba - San Andres
Ruta 1 y 2 San Andres - Espinozayocc
Ruta 1 y 2 Espinozayocc - Taccra
Longitud Total
ALTERNATIVA 2
Ruta 2
Pumasapo - desvio - Urabamba
Ruta 1 y 2 Urabamba - San Andres
Ruta 1 y 2 San Andres - Espinozayocc
Ruta 1 y 2 Espinozayocc - Taccra
Longitud Total
longitud (m)
17,400
5,700
11,300
15,626
50,026
longitud
17,400
5,700
11,300
15,626
50,026
17,400
23,100
34,400
50,026
Terreno %
suave duro
60
40
50
50
50
50
80
20
Comentarios
1 puente,alcant. Y baden
1 puente,alcant. Y baden
alcant. Baden y muro
alcant. Baden y muro
17,400
23,100
34,400
50,026
Terreno %
suave duro
60
40
50
50
50
50
80
20
Comentarios
1 puente,alcant. Y baden
1 puente,alcant. Y baden
alcant. Baden y muro
alcant. Baden y muro
Ao
0
1
2
3
4
5
6
7
8
9
10
Alternativa 1
Inversin Mantenimiento
Total
Sin Proyecto Incremental
4,586,579
4,586,579
24,531
4,611,110
1,146,645
81,494 1,228,139
24,531
1,252,670
81,494
81,494
24,531
106,025
120,827
120,827
24,531
145,358
81,494
81,494
24,531
106,025
81,494
81,494
24,531
106,025
120,827
120,827
24,531
145,358
81,494
81,494
24,531
106,025
81,494
81,494
24,531
106,025
120,827
120,827
24,531
145,358
-491,828
-491,828
24,531
-467,298
Alternativa 2
Inversin Mantenimiento
Total
Sin Proyecto Incremental
4,792,673
4,792,673
24,531
4,768,142
1,198,168
82,044
1,280,212
24,531
1,255,682
82,044
82,044
24,531
57,513
121,358
121,358
24,531
96,827
82,044
82,044
24,531
57,513
82,044
82,044
24,531
57,513
121,358
121,358
24,531
96,827
82,044
82,044
24,531
57,513
82,044
82,044
24,531
57,513
121,358
121,358
24,531
96,827
-517,040
-517,040
24,531
-541,571
Alternativa 2
Inversin Mantenimiento
Total
Sin Proyecto Incremental
3,786,211
3,786,211
18,398
3,767,813
946,553
61,533
1,008,086
18,398
989,688
61,533
61,533
18,398
43,135
91,018
91,018
18,398
72,620
61,533
61,533
18,398
43,135
61,533
61,533
18,398
43,135
91,018
91,018
18,398
72,620
61,533
61,533
18,398
43,135
61,533
61,533
18,398
43,135
91,018
91,018
18,398
72,620
-387,780
-387,780
18,398
-406,178
S/ x kg
S/ x kg
Sin
Con
Proyecto Proyecto
3.5
2.80
5.0
5.00
S/ x kg
S/ x kg
Sin
Con
Proyecto Proyecto
3.5
2.80
5.5
5.50
Valor Bruto
Costo de produccin
1,581.0
1,106.7
3,007.0
2,104.9
3,241.8
2,269.3
3,494.9
2,446.4
3,767.5
2,637.2
4,061.2
2,842.8
4,377.7
3,064.4
4,718.7
3,303.1
5,086.1
3,560.3
5,482.0
3,837.4
10
5,908.5
4,136.0
Valor Bruto
Costo de produccin
951.3
605.4
1,489.9
948.1
1,606.4
1,022.3
1,732.0
1,102.2
1,867.3
1,188.3
2,013.1
1,281.1
2,170.2
1,381.0
2,339.4
1,488.7
2,521.8
1,604.8
2,718.3
1,729.8
10
2,930.0
1,864.6
Valor Bruto
Costo de produccin
1,581.0
1,106.7
3,007.0
1,683.9
3,241.8
1,815.4
3,494.9
1,957.1
3,767.5
2,109.8
4,061.2
2,274.3
4,377.7
2,451.5
4,718.7
2,642.5
5,086.1
2,848.2
5,482.0
3,069.9
10
5,908.5
3,308.8
Valor Bruto
Costo de produccin
951.3
605.4
1,489.9
758.5
1,606.4
817.8
1,732.0
881.8
1,867.3
950.6
2,013.1
1,024.9
2,170.2
1,104.8
2,339.4
1,191.0
2,521.8
1,283.8
2,718.3
1,383.9
10
2,930.0
1,491.7
10
Con Proyecto
Valor bruto de produccin
Costo de produccin
Beneficios
2,532.3
1,712.0
820.2
4,496.9
2,442.4
2,054.5
4,848.3
2,633.3
2,215.0
5,226.9
2,838.9
2,388.0
5,634.8
3,060.4
2,574.4
6,074.3
3,299.1
2,775.2
6,547.9
3,556.3
2,991.5
7,058.1
3,833.4
3,224.7
7,607.9
4,132.0
3,475.9
8,200.3
4,453.8
3,746.5
8,838.6
4,800.4
4,038.1
Sin Proyecto
Valor bruto de produccin
Costo de produccin
Beneficios
2,532.3
1,712.0
820.2
4,496.9
3,053.0
1,443.9
4,848.3
3,291.6
1,556.7
5,226.9
3,548.6
1,678.3
5,634.8
3,825.5
1,809.3
6,074.3
4,123.9
1,950.4
6,547.9
4,445.4
2,102.5
7,058.1
4,791.8
2,266.3
7,607.9
5,165.1
2,442.9
8,200.3
5,567.2
2,633.1
8,838.6
6,000.5
2,838.0
610.6
658.3
709.7
765.1
824.8
889.1
10
Con Proyecto
Valor bruto de produccin
Costo de produccin
Beneficios
2,532.3
1,284.0
1,248.2
4,496.9
1,831.8
2,665.1
4,848.3
1,974.9
2,873.3
5,226.9
2,129.2
3,097.7
5,634.8
2,295.3
3,339.5
6,074.3
2,474.3
3,600.0
6,547.9
2,667.2
3,880.6
7,058.1
2,875.1
4,183.0
7,607.9
3,099.0
4,508.9
8,200.3
3,340.3
4,860.0
8,838.6
3,600.3
5,238.2
Sin Proyecto
Valor bruto de produccin
Costo de produccin
Beneficios
2,532.3
1,284.0
1,248.2
4,496.9
2,289.8
2,207.2
4,848.3
2,468.7
2,379.6
5,226.9
2,661.4
2,565.4
5,634.8
2,869.1
2,765.6
6,074.3
3,092.9
2,981.4
6,547.9
3,334.1
3,213.8
7,058.1
3,593.9
3,464.3
7,607.9
3,873.8
3,734.1
8,200.3
4,175.4
4,024.9
8,838.6
4,500.4
4,338.2
458.0
493.7
532.3
573.8
618.6
666.8
718.8
774.8
835.1
900.1
N
1.00
1.10
1.20
1.30
1.40
1.50
1.60
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
3.00
3.10
3.20
SERVICIOS
Componentes
longitud de la via
Km
Ancho
m
Cunetas
Km
Alcantarillas
Unid.
Badenes
Unid.
Puentes
Unid.
caracteresticas tecnicas
de transitabilidad
velocidad Directriz
Km/h
Pendiente max. Exc.
%
Pendiente max. .
%
Pendiente Minima.
%
Afirmado.
m
Bombeo.
%
Peralte Maximo Normal
%
Peralte Maximo excepcional
%
capacitacion
Personal de O y M
Personal
Poblacion
Eventos
N
SERVICIOS
1.00 Componentes
1.10 longitud de la via
15.626
3.00
15.626
0.00
0.00
0.00
50.026
4.00
50.026
38.00
16.00
2.00
15.00
15.00
12.00
5.00
0.00
4.00
0.00
0.00
20.00
12.00
8.00
0.50
0.15
2.00
6.00
8.00
0.00
0.00
10.00
5.00
ALTERNATIVA 01:
DEMANDA
15.626
ALTERNATIVA 01:
DEMANDA
50.026
1.20
1.30
1.40
1.50
1.60
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
3.00
3.10
3.20
N
1.00
1.10
1.20
1.30
1.40
1.50
1.60
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
3.00
3.10
3.20
Ancho
m
Cunetas
Km
Alcantarillas
Unid.
Badenes
Unid.
Puentes
Unid.
caracteresticas tecnicas
de transitabilidad
velocidad Directriz
Km/h
Pendiente max. Exc.
%
Pendiente max. .
%
Pendiente Minima.
%
Afirmado.
m
Bombeo.
%
Peralte Maximo Normal
%
Peralte Maximo excepcional
%
capacitacion
Personal de O y M
Personal
Poblacion
Eventos
3.00
15.626
0.00
0.00
0.00
3.50
50.026
38
16
2
15.00
15.00
12.00
5.00
0.00
4.00
0.00
0.00
20.00
12.00
8.00
0.50
0.15
2.00
6.00
8.00
0.00
0.00
10.00
5.00
SERVICIOS
UNIDAD OFERTA OPTIMIZADA
Componentes
longitud de la via
Km
15.626
Ancho
m
3.00
Cunetas
Km
15.626
Alcantarillas
Unid.
0.00
Badenes
Unid.
0.00
Puentes
Unid.
0.00
caracteresticas tecnicas
de transitabilidad
velocidad Directriz
Km/h
15.00
Pendiente max. Exc.
%
15.00
Pendiente max. .
%
12.00
Pendiente Minima.
%
5.00
Afirmado.
m
0.00
Bombeo.
%
4.00
Peralte Maximo Normal
%
0.00
Peralte Maximo excepcional
%
0.00
capacitacion
Personal de O y M
Personal
0.00
Poblacion
Eventos
0.00
ALTERNATIVA 02:
DEMANDA
50.026
4.00
50.026
38.00
16.00
2.00
20.00
12.00
8.00
0.50
0.15
2.00
6.00
8.00
10.00
5.00
ALTERNATIVA 01:
BRECHA
34.40
1.00
34.40
38.00
16.00
2.00
5.00
-3.00
-4.00
-4.50
0.15
-2.00
6.00
8.00
10.00
5.00
ALTERNATIVA 01:
BRECHA
A MEJORAR A CONSTRUIR
15.626
34.40
0.50
0.000
0
0
0
3.50
34.40
38
16
2
5.00
-3.00
-4.00
-4.50
0.15
-2.00
6.00
8.00
10.00
5.00
ALTERNATIVA 02:
BRECHA
A MEJORAR A CONSTRUIR
15.626
1.00
0.000
0
0
0
34.40
4.00
34.40
38.00
16.00
2.00
5.00
-3.00
-4.00
-4.50
0.15
-2.00
6.00
8.00
10.00
5.00
IMD
5
9
10
0
6
8
0
0
0
38
%
13.2%
23.7%
26.3%
0.0%
15.8%
21.1%
0.0%
0.0%
0.0%
100.0%
TASA DE CRECMIENTO
LIGEROS
TASA DE CRECMIENTO
VEHICULOS DE CARGA
Tasa Crec %
TRAFICO NORMAL
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
TOTAL
Fuente: elaboracin proyectista
0.45%
0.45%
0.45%
0.45%
0.45%
3.80%
3.80%
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
38
38
39
39
40
40
41
41
42
42
43
5
9
10
0
6
8
0
5
9
10
0
6
8
0
5
9
10
0
6
9
0
5
9
10
0
6
9
0
5
9
10
0
6
9
0
5
9
10
0
6
10
0
5
9
10
0
6
10
0
5
9
10
0
6
10
0
5
9
10
0
6
11
0
5
9
10
0
6
11
0
42
5
9
10
0
6
12
0
38
38
39
39
40
40
41
41
42
43
Tasa Crec %
TRAFICO NORMAL
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
0.45%
0.45%
0.45%
0.45%
0.45%
3.80%
3.80%
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
38
38
39
39
40
40
41
41
42
42
43
5
9
10
0
6
8
0
5
9
10
0
6
8
0
5
9
10
0
6
9
0
5
9
10
0
6
9
0
5
9
10
0
6
9
0
5
9
10
0
6
10
0
5
9
10
0
6
10
0
5
9
10
0
6
10
0
5
9
10
0
6
11
0
5
9
10
0
6
11
0
5
9
10
0
6
12
0
1
1
2
0
1
1
0
1
1
2
0
1
1
0
1
1
2
0
1
1
0
1
1
2
0
1
1
0
1
1
2
0
1
1
0
1
1
2
0
1
1
0
1
1
2
0
1
2
0
1
1
2
0
1
2
0
1
1
2
0
1
2
0
1
1
2
0
1
2
0
44
45
45
46
46
47
47
48
49
49
TRAFICO GENERADO
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
IMD TOTAL
Fuente: elaboracin proyectista
0.45%
0.45%
0.45%
0.45%
0.45%
3.80%
3.80%
38
TRAFICO NORMAL
SIN PROYECTO
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
TIPO DE VEHICULO
0.44
0.61
0.61
0.93
1.32
2.13
2.58
TRAMO N 1
Longitud km
Tipo cambio $
Regin: Sierra
Topografa:
Estado
Superficie
2009
2010
205.57
512.99
569.98
0.00
740.04
1,592.22
0.00
206.49
515.29
572.55
0.00
743.38
1,652.72
0.00
207.42
517.61
575.13
0.00
746.72
1,715.53
0.00
208.36
519.94
577.71
0.00
750.08
1,780.72
0.00
209.29
522.28
580.31
0.00
753.46
1,848.38
0.00
210.24
524.63
582.92
0.00
756.85
1,918.62
0.00
3,620.80
3,690.43
3,762.41
3,836.81
3,913.73
3,993.26
SP
80.00
3.20
CP
67.026
3.20
S. P.
C.P.
Alt. 1
Accidentada
M
B
AFI
AFI
Alt. 2
B
AFI
2016
2017
2018
2019
211.18
526.99
585.55
0.00
760.25
1,991.53
0.00
212.13
529.36
588.18
0.00
763.67
2,067.21
0.00
213.09
531.75
590.83
0.00
767.11
2,145.76
0.00
214.04
534.14
593.49
0.00
770.56
2,227.30
0.00
215.01
536.54
596.16
0.00
774.03
2,311.94
0.00
4,075.50
4,160.56
4,248.53
4,339.53
4,433.68
2017
2018
2019
TRAFICO NORMAL
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
TOTAL
TIPO DE VEHICULO
TRAFICO NORMAL
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
TOTAL
TRAFICO GENERADO
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
TOTAL
TIPO DE VEHICULO
TRAFICO NORMAL
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
TOTAL
TRAFICO GENERADO
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
TOTAL
2009
101.8
183.2
375.8
0.0
474.4
726.5
0.0
102.2
184.0
377.5
0.0
476.6
754.1
0.0
102.7
184.8
379.2
0.0
478.7
782.8
0.0
103.2
185.7
380.9
0.0
480.8
812.5
0.0
103.6
186.5
382.6
0.0
483.0
843.4
0.0
104.1
187.3
384.3
0.0
485.2
875.4
0.0
104.6
188.2
386.0
0.0
487.4
908.7
0.0
105.0
189.0
387.8
0.0
489.6
943.2
0.0
105.5
189.9
389.5
0.0
491.8
979.1
0.0
106.0
190.7
391.3
0.0
494.0
1,016.3
0.0
106.4
191.6
393.0
0.0
496.2
1,054.9
0.0
1,861.6
1,894.4
1,928.2
1,963.1
1,999.1
2,036.4
2,074.8
2,114.6
2,155.7
2,198.2
2,242.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
15.3
27.6
56.6
0.0
71.5
113.1
0.0
15.3
27.6
56.6
0.0
71.5
113.1
0.0
15.4
27.7
56.9
0.0
71.8
117.4
0.0
15.5
27.9
57.1
0.0
72.1
121.9
0.0
15.5
28.0
57.4
0.0
72.5
126.5
0.0
15.6
28.1
57.6
0.0
72.8
131.3
0.0
15.7
28.2
57.9
0.0
73.1
136.3
0.0
15.8
28.4
58.2
0.0
73.4
141.5
0.0
15.8
28.5
58.4
0.0
73.8
146.9
0.0
15.9
28.6
58.7
0.0
74.1
152.4
0.0
0.0
284.2
284.2
289.2
294.5
299.9
305.5
311.2
317.2
323.4
329.7
2017
2018
2019
2009
101.8
183.2
375.8
0.0
474.4
726.5
0.0
102.2
184.0
377.5
0.0
476.6
754.1
0.0
102.7
184.8
379.2
0.0
478.7
782.8
0.0
103.2
185.7
380.9
0.0
480.8
812.5
0.0
103.6
186.5
382.6
0.0
483.0
843.4
0.0
104.1
187.3
384.3
0.0
485.2
875.4
0.0
104.6
188.2
386.0
0.0
487.4
908.7
0.0
105.0
189.0
387.8
0.0
489.6
943.2
0.0
105.5
189.9
389.5
0.0
491.8
979.1
0.0
106.0
190.7
391.3
0.0
494.0
1,016.3
0.0
106.4
191.6
393.0
0.0
496.2
1,054.9
0.0
1,861.6
1,894.4
1,928.2
1,963.1
1,999.1
2,036.4
2,074.8
2,114.6
2,155.7
2,198.2
2,242.2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.33
27.60
56.62
0.00
71.48
113.12
0.00
15.33
27.60
56.62
0.00
71.48
113.12
0.00
15.40
27.73
56.87
0.00
71.80
117.41
0.00
15.47
27.85
57.13
0.00
72.13
121.88
0.00
15.54
27.98
57.39
0.00
72.45
126.51
0.00
15.61
28.10
57.65
0.00
72.78
131.31
0.00
15.68
28.23
57.91
0.00
73.11
136.30
0.00
15.75
28.36
58.17
0.00
73.43
141.48
0.00
15.82
28.48
58.43
0.00
73.76
146.86
0.00
15.90
28.61
58.69
0.00
74.10
152.44
0.00
0.00
284.15
284.15
289.22
294.46
299.87
305.45
311.23
317.19
323.36
329.74
AO
SIN
PROYECTO
CON PROYECTO
ALTERNATIVA N1
ALTERNATIVA N2
TRAF. NORMAL
TRAF. GENERADO
TRAF. NORMAL
TRAF. GENERADO
2004
2010
3690.43
1894.36
284.15
1894.36
284.15
2011
3762.41
1928.15
284.15
1928.15
284.15
2012
3836.81
1963.05
289.22
1963.05
289.22
2013
3913.73
1999.10
294.46
1999.10
294.46
2014
3993.26
2036.35
299.87
2036.35
299.87
2015
4075.50
2074.84
305.45
2074.84
305.45
2016
4160.56
2114.62
311.23
2114.62
311.23
2017
4248.53
2155.74
317.19
2155.74
317.19
2018
4339.53
2198.24
323.36
2198.24
323.36
2019
4433.68
2242.17
329.74
2242.17
329.74
TIPO DE VEHICULO
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
TRAFICO GENERADO
22
22
23
23
24
24
25
25
26
26
0.8
1.4
1.5
0.0
0.9
1.2
0.0
0.8
1.4
1.5
0.0
0.9
1.2
0.0
0.8
1.4
1.5
0.0
0.9
1.3
0.0
0.8
1.4
1.5
0.0
0.9
1.3
0.0
0.8
1.4
1.5
0.0
0.9
1.4
0.0
0.8
1.4
1.5
0.0
0.9
1.4
0.0
0.8
1.4
1.5
0.0
0.9
1.5
0.0
0.8
1.4
1.5
0.0
0.9
1.6
0.0
0.8
1.4
1.6
0.0
0.9
1.6
0.0
0.8
1.4
1.6
0.0
0.9
1.7
0.0
ALTERNATIVA N 01
TRAFICO GENERADO
2016
100.48
2017
102.84
2018
105.28
2019
107.82
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
5.28
18.50
7.63
0.00
10.92
45.56
0.00
5.40
18.92
7.81
0.00
11.17
54.90
0.00
5.43
19.00
7.84
0.00
11.22
56.99
0.00
5.45
19.09
7.88
0.00
11.27
59.15
0.00
5.48
19.17
7.91
0.00
11.32
61.40
0.00
5.50
19.26
7.95
0.00
11.37
63.74
0.00
ALTERNATIVA N 02
TRAFICO GENERADO
2016
100.48
2017
102.84
2018
105.28
2019
107.82
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
5.28
18.50
7.63
0.00
10.92
45.56
0.00
5.43
19.00
7.84
0.00
11.22
56.99
0.00
5.45
19.09
7.88
0.00
11.27
59.15
0.00
5.48
19.17
7.91
0.00
11.32
61.40
0.00
5.50
19.26
7.95
0.00
11.37
63.74
0.00
Automvil
Camioneta
Camioneta Rural
Microbs
Omnibs
Camin 2E
Camin 3E
0
0
0
0
0
0
0
5.31
18.58
7.67
0.00
10.97
47.29
0.00
5.31
18.58
7.67
0.00
10.97
47.29
0.00
5.33
18.66
7.70
0.00
11.02
49.09
0.00
5.36
18.75
7.74
0.00
11.07
50.96
0.00
5.33
18.66
7.70
0.00
11.02
49.09
0.00
5.36
18.75
7.74
0.00
11.07
50.96
0.00
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
ALTERNATIVAS
ALT. 01
ALT. 02
87.90
89.82
91.81
93.86
95.99
98.20
100.48
102.84
105.28
107.82
87.90
89.82
91.81
93.86
95.99
98.20
100.48
102.84
105.28
107.82
5.38
18.83
7.77
0.00
11.12
52.89
0.00
5.38
18.83
7.77
0.00
11.12
52.89
0.00
5.40
18.92
7.81
0.00
11.17
54.90
0.00
ALTERNATIVA N1
1,883.96
1,924.07
1,965.56
2,008.49
2,052.90
2,098.86
2,146.42
2,195.64
2,246.58
2,299.32
ALTERNATIVA N2
1,883.96
1,924.07
1,965.56
2,008.49
2,052.90
2,098.86
2,146.42
2,195.64
2,246.58
2,299.32
Pecuario
Beneficios incrementales
Ahorro COV
457,956.0
493,735.9
532,288.0
573,827.3
618,584.9
666,810.2
718,771.7
774,758.7
835,083.0
900,080.6
1,883,964.0
1,924,071.9
1,965,562.2
2,008,486.8
2,052,899.6
2,098,856.5
2,146,415.5
2,195,636.9
2,246,583.1
2,299,319.1
TOTALES
2,341,920.0
2,417,807.7
2,497,850.2
2,582,314.1
2,671,484.5
2,765,666.7
2,865,187.2
2,970,395.6
3,081,666.2
3,199,399.7
EVALUACION SOCIAL
ALTERNATIVA 1: EVALUACION ECONOMICA
En nuevos soles a Precios Sociales
Ao
0
1
2
3
4
5
6
7
8
9
10
Costos de
Inversin
Costos de
Mantenimiento
3,623,398
905,849
61,120.5
61,120.5
90,620.2
61,120.5
61,120.5
90,620.2
61,120.5
61,120.5
90,620.2
-368,871.3
Beneficios
incrementales
Pecuario
0.0
457,956.0
493,735.9
532,288.0
573,827.3
618,584.9
666,810.2
718,771.7
774,758.7
835,083.0
900,080.6
Flujo Neto
Ahorro COV
1,883,964.0
1,924,071.9
1,965,562.2
2,008,486.8
2,052,899.6
2,098,856.5
2,146,415.5
2,195,636.9
2,246,583.1
2,299,319.1
Factor de
Descuento
-3,623,397.7
1,374,950.1
2,356,687.2
2,407,230.0
2,521,193.6
2,610,364.0
2,675,046.5
2,804,066.7
2,909,275.1
2,991,046.0
3,568,271.0
1.00
0.90
0.81
0.73
0.66
0.59
0.53
0.48
0.43
0.39
0.35
VAN:
TIR:
Parcial
-3,623,397.67
1,238,693.77
1,912,740.21
1,760,145.86
1,660,788.30
1,549,123.99
1,430,189.11
1,350,602.30
1,262,411.54
1,169,273.98
1,256,689.67
10,967,261.07
56.81%
EVALUACION SOCIAL
ALTERNATIVA 2: EVALUACION ECONOMICA
En nuevos soles a Precios Sociales
Ao
Costos de
Costos de
Beneficio
Pecuario
0
1
2
3
4
5
6
7
8
9
10
3,786,211
946,553
61,533.2
61,533.2
91,018.3
61,533.2
61,533.2
91,018.3
61,533.2
61,533.2
91,018.3
-387,779.8
0.00
457956.0
493735.9
532288.0
573827.3
618584.9
666810.2
718771.7
774758.7
835083.0
900080.6
Flujo Neto
Factor de
1883964.0
1924071.9
1965562.2
2008486.8
2052899.6
2098856.5
2146415.5
2195636.9
2246583.1
2299319.1
-3,786,211
1,333,834
2,356,275
2,406,832
2,520,781
2,609,951
2,674,648
2,803,654
2,908,862
2,990,648
3,587,180
1.00
0.90
0.81
0.73
0.66
0.59
0.53
0.48
0.43
0.39
0.35
VAN:
TIR:
ALTERNATIVA N 01 Y 02
VAN
TIR
10,967,261
56.81%
10,772,176
54.26%
ALTERNATIVA 1
-3,786,211.35
1,201,652.21
1,912,405.24
1,759,854.76
1,660,516.43
1,548,879.06
1,429,976.26
1,350,403.52
1,262,232.46
1,169,118.34
1,263,348.96
10,772,175.89
54.26%
Parcial
Ahorro COV
ALTERNATIVA 2
Inversin
Beneficios
VAN
TIR
VAN
TIR
20%
Constante
-20%
Constante
-20%
-20%
10,079,365.42
7,834,435.19
8,722,330.83
46.89%
44.58%
56.42%
9,844,383.55
7,639,350.00
8,567,142.34
44.74%
42.52%
53.88%
ANALISIS DE SENSIBILIDAD
INVERSION 20%
BENEFICIOS CONSTANTE
Beneficio
Costos de
Costos de
Factor de
Flujo Neto
Inversin Mantenimiento Pecuario
Descuento
Ahorro COV
1.00
4,348,077
0.0
0.0 -4,348,077.2
0.90
1,087,019
61,120.5 457,956.0 1,883,964.0 1,193,780.2
0.81
61,120.5 493,735.9 1,924,071.9 2,356,687.2
0.73
90,620.2 532,288.0 1,965,562.2 2,407,230.0
0.66
61,120.5 573,827.3 2,008,486.8 2,521,193.6
0.59
61,120.5 618,584.9 2,052,899.6 2,610,364.0
0.53
90,620.2 666,810.2 2,098,856.5 2,675,046.5
0.48
61,120.5 718,771.7 2,146,415.5 2,804,066.7
0.43
61,120.5 774,758.7 2,195,636.9 2,909,275.1
0.39
90,620.2 835,083.0 2,246,583.1 2,991,046.0
0.35
-368,871.3 900,080.6 2,299,319.1 3,568,271.0
VAN
TIR
Parcial
-4,348,077.210
1,075,477.656
1,912,740.213
1,760,145.865
1,660,788.297
1,549,123.990
1,430,189.115
1,350,602.303
1,262,411.544
1,169,273.976
1,256,689.674
10,079,365.423
46.89%
Ao
Beneficio
Pecuario
Ahorro COV
457956.0
493735.9
532288.0
573827.3
618584.9
666810.2
718771.7
774758.7
835083.0
900080.6
1883964.0
1924071.9
1965562.2
2008486.8
2052899.6
2098856.5
2146415.5
2195636.9
2246583.1
2299319.1
Flujo Neto
-4,543,454
1,144,523
2,356,275
2,406,832
2,520,781
2,609,951
2,674,648
2,803,654
2,908,862
2,990,648
3,587,180
Factor de
Descuento
1.00
0.90
0.81
0.73
0.66
0.59
0.53
0.48
0.43
0.39
0.35
-4,543,454
1,031,102
1,912,405.24
1,759,854.76
1,660,516.43
1,548,879.06
1,429,976.26
1,350,403.52
1,262,232.46
1,169,118.34
1,263,348.96
VAN
TIR
9,844,383.55
44.74%
Parcial
ANALISIS DE SENSIBILIDAD
INVERSION CONSTANTE
BENEFICIOS -20%
Costos de
Costos de
Inversin
Mantenimient
3,623,398
905,849
61,120.5
61,120.5
90,620.2
61,120.5
61,120.5
90,620.2
61,120.5
61,120.5
90,620.2
-368,871.3
Pecuario
Beneficio
Ahorro COV
366,364.8
394,988.7
425,830.4
459,061.8
494,867.9
533,448.2
575,017.3
619,807.0
668,066.4
720,064.5
1,507,171.2
1,539,257.5
1,572,449.7
1,606,789.4
1,642,319.7
1,679,085.2
1,717,132.4
1,756,509.5
1,797,266.5
1,839,455.3
Flujo Neto
-3,623,397.7
906,566.1
1,873,125.7
1,907,660.0
2,004,730.8
2,076,067.1
2,121,913.2
2,231,029.2
2,315,196.0
2,374,712.8
2,928,391.1
Factor de
Descuento
1.00
0.90
0.81
0.73
0.66
0.59
0.53
0.48
0.43
0.39
0.35
-3,623,397.7
816,726.2
1,520,270.8
1,394,864.6
1,320,578.2
1,232,044.8
1,134,461.4
1,074,594.0
1,004,624.9
928,334.0
1,031,333.9
VAN
TIR
7,834,435.19
44.58%
Parcial
Costos de
Costos de
Inversin
Mantenimient
3,786,211
946,553
61,533
61,533
91,018
61,533
61,533
91,018
61,533
61,533
91,018
-387,780
Pecuario
Beneficio
Ahorro COV
366364.8
394988.7
425830.4
459061.8
494867.9
533448.2
575017.3
619807.0
668066.4
720064.5
1507171.2
1539257.5
1572449.7
1606789.4
1642319.7
1679085.2
1717132.4
1756509.5
1797266.5
1839455.3
Flujo Neto
-3,786,211.35
865,449.95
1,872,712.96
1,907,261.88
2,004,318.04
2,075,654.40
2,121,515.07
2,230,616.53
2,314,783.25
2,374,314.65
2,947,299.62
Factor de
Descuento
1.00
0.90
0.81
0.73
0.66
0.59
0.53
0.48
0.43
0.39
0.35
VAN
TIR
Parcial
-3,786,211.35
779,684.64
1,519,935.85
1,394,573.45
1,320,306.38
1,231,799.86
1,134,248.59
1,074,395.22
1,004,445.79
928,178.41
1,037,993.18
7,639,350.00
42.52%
ANALISIS DE SENSIBILIDAD
INVERSION -20%
BENEFICIOS -20%
Costos de
Costos de
Inversin Mantenimiento
2,898,718
724,680
61,120.5
61,120.5
90,620.2
61,120.5
61,120.5
90,620.2
61,120.5
61,120.5
90,620.2
-368,871.3
Pecuario
Beneficio
Ahorro COV
366,364.8
394,988.7
425,830.4
459,061.8
494,867.9
533,448.2
575,017.3
619,807.0
668,066.4
720,064.5
1,507,171.2
1,539,257.5
1,572,449.7
1,606,789.4
1,642,319.7
1,679,085.2
1,717,132.4
1,756,509.5
1,797,266.5
1,839,455.3
Flujo Neto
-2,898,718
1,087,736
1,873,126
1,907,660
2,004,731
2,076,067
2,121,913
2,231,029
2,315,196
2,374,713
2,928,391
Factor de
Descuento
1.00
0.90
0.81
0.73
0.66
0.59
0.53
0.48
0.43
0.39
0.35
-2,898,718.1
979,942.3
1,520,270.8
1,394,864.6
1,320,578.2
1,232,044.8
1,134,461.4
1,074,594.0
1,004,624.9
928,334.0
1,031,333.9
VAN
TIR
8,722,330.83
56.42%
Parcial
Ao
Pecuario
Beneficio
Ahorro COV
366364.8
394988.7
425830.4
459061.8
494867.9
533448.2
575017.3
619807.0
668066.4
720064.5
1507171.2
1539257.5
1572449.7
1606789.4
1642319.7
1679085.2
1717132.4
1756509.5
1797266.5
1839455.3
Flujo Neto
-3,028,969
1,054,761
1,872,713
1,907,262
2,004,318
2,075,654
2,121,515
2,230,617
2,314,783
2,374,315
2,947,300
Factor de
Descuento
1.00
0.90
0.81
0.73
0.66
0.59
0.53
0.48
0.43
0.39
0.35
VAN
TIR
Parcial
-3,028,969.08
950,234.70
1,519,935.85
1,394,573.45
1,320,306.38
1,231,799.86
1,134,248.59
1,074,395.22
1,004,445.79
928,178.41
1,037,993.18
8,567,142.34
53.88%