VALORIZACION N 2

OBRA

EDIFICIO PARQUE SANTA TERESITA

SUBCONTRATISTA : CONSTRUCTORA RIEDEL SAC


FECHA :
2/1/2011
ACUMULADO VALORIZACION ACUMULADO
ANTERIOR
N2
ACTUAL

SALDO POR
VALORIZAR

saldo por
valorizar

ITEM

DESCRIPCION

1.00

ESTRUCTURAS

2,739,908.94

172,430.09

378,538.74

550,968.83

2,188,940.11

79.89%

2.00

ARQUITECTURA

2,443,223.38

0.00

0.00

0.00

2,443,223.38

100.00%

3.00

INSTALACIONES SANITARIAS

307,272.09

0.00

0.00

0.00

307,272.09

100.00%

4.00

INSTALACIONES ELECTRICAS

315,301.50

0.00

0.00

0.00

315,301.50

100.00%

5.00

INSTALACIONES ELECTROMECANICAS

214,690.00

0.00

0.00

0.00

214,690.00

100.00%

6.00

GAS

72,000.00

0.00

0.00

0.00

72,000.00

100.00%

7.00

SISTEMA DE EXTRACCION DE MONOXIDO

60,424.80

0.00

0.00

0.00

60,424.80

100.00%

8.00

EVACUACION Y SEALIZACION

7,500.00

0.00

0.00

0.00

7,500.00

100.00%

9.00

INSTALACION CONTRAINCENDIO

153,298.13

0.00

0.00

0.00

153,298.13

100.00%

10.00

SISTEMA DETECCION CONTRAINCENDIO

23,704.83

0.00

0.00

0.00

23,704.83

100.00%

TOTAL COSTO DIRECTO


FEE - ADMINISTRACION Y GERENCIA 6%
GASTOS GENERALES1
SUBTOTAL
IGV 2
TOTAL

6,337,323.68
380,239.42
447,405.00
7,164,968.10
1,198,120.95
8,363,089.05

172,430.09
10,345.81
20,336.59
203,112.49
33,964.33
237,076.81

378,538.74
22,712.32
40,673.18
441,924.25
73,898.26
515,822.51

550,968.83
33,058.13
61,009.77
645,036.74
107,862.59
752,899.33

5,786,354.85
347,181.29
386,395.23
6,519,931.36
1,090,258.36
7,610,189.72

91.31%

FEE - ADMINISTRACION Y GERENCIA 6%

380,239.42

10,345.81

22,712.32

33,058.13

347,181.29

FONDO DE GARANTIA (40%)


AMORTIZACION DE ADELANTO3
PARCIAL
IGV (18%)
TOTAL A PAGAR

-152,095.77
-42,000.00
186,143.65
33,505.86
219,649.51

-9,084.93
-4,000.00
9,627.39
1,732.93
11,360.33

-13,223.25
-6,000.00
13,834.88
2,490.28
16,325.16

-138,872.52
-36,000.00
172,308.77
31,015.58
203,324.35

TOTAL

-4,138.32
-2,000.00
4,207.48
757.35
4,964.83

NOTAS
1
Los Gastos Generales se calculan en partes iguales. S/. 40,673.18 @ mes.
2
El IGV se calcul que sera 16.722%, descontando la planilla de obreros.
3
La amortizacin del adelanto ser de S/. 4,000.00 soles mensuales.

1.00

FORMATO DE VALORIZACION RIEDEL


PROYECTO: PARQUE SANTA TERESITA
VALORIZACION ESTRUCTURAS N

2
ACUMULADO ANTERIOR

SALDO POR VALORIZAR

Und

Metrado

1.01

OBRAS PROVISIONALES Y PRELIMINARES


Cerco de Obra
Caseta de Ingenieria
Caseta provisional para Guardiana y Almacen
Comedor, Vestuarios y Baos de Obreros
Talleres y almacn Abierto

ml
Und
Und
Und
Und

46.00
1.00
1.00
1.00
1.00

150.00
3,500.00
4,000.00
4,000.00
2,500.00

6,900.00
3,500.00
4,000.00
4,000.00
2,500.00

46.00
0.50
0.50
0.10
0.25

6,900.00
1,750.00
2,000.00
400.00
625.00

0.00
0.50
0.25
0.40
0.00

0.00
1,750.00
1,000.00
1,600.00
0.00

46.00
1.00
0.75
0.50
0.25

6,900.00
3,500.00
3,000.00
2,000.00
625.00

0.00
0.00
0.25
0.50
0.75

0.00
0.00
1,000.00
2,000.00
1,875.00

1.02.07

INSTALACIONES PROVISIONALES
Instalacin Provisional de Agua
Instalacin Provisional de Desage
Instalacin Provisional de Energa
Instalacin Provisional de Telfono
Consumo de Agua durante la obra
Consumo de Energa durante la obra
Servicios higinicos (2 und)

Glb
Glb
Glb
Glb
Mes
Mes
Mes

1.00
1.00
1.00
1.00
11.00
11.00
11.00

700.00
600.00
3,000.00
1,200.00
800.00
1,000.00
300.00

700.00
600.00
3,000.00
1,200.00
8,800.00
11,000.00
3,300.00

1.00
0.00
1.00
1.00
0.50
0.50
0.50

700.00
0.00
3,000.00
1,200.00
400.00
500.00
150.00

0.00
1.00
0.00
0.00
1.00
1.00
1.00

0.00
600.00
0.00
0.00
800.00
1,000.00
300.00

1.00
1.00
1.00
1.00
1.50
1.50
1.50

700.00
600.00
3,000.00
1,200.00
1,200.00
1,500.00
450.00

0.00
0.00
0.00
0.00
9.50
9.50
9.50

0.00
0.00
0.00
0.00
7,600.00
9,500.00
2,850.00

1.03

TRABAJOS CONTRIBUTORIOS Y PARALELOS

1.03.01

Movlizacin y Desmovilizacin de Equipo


Trazo y Replanteo durante la Obra (Topgrafo)
Transporte Vertical con Winche de Plataforma
Transporte Vertical con Winche de dos Baldes
Acarreo Horizontal de Materiales
Escalera Metlica Provisional
Limpieza permanente de Obra
Eliminacion de Desmonte durante la Obra
Limpieza Final de Obra
Seguridad de Obra (Sealizacin, EPP, EPG y Polica
dirigir trnsito)
Seguridad de Obra (Viviendas Vecinas)

Glb
Mes
Mes
Mes
Mes
Mes
Mes
Mes
Glb

1.00
11.00
6.00
6.00
10.00
10.00
11.00
10.00
1.00

2,000.00
9,527.16
2,000.00
1,500.00
1,948.50
1,000.00
1,948.50
810.00
9,000.00

2,000.00
104,798.76
12,000.00
9,000.00
19,485.00
10,000.00
21,433.50
8,100.00
9,000.00

0.25
0.50
0.00
0.00
0.50
0.00
0.50
0.50
0.00

500.00
4,763.58
0.00
0.00
974.25
0.00
974.25
405.00
0.00

0.00
1.00
0.00
0.00
1.00
0.00
1.00
1.00
0.00

0.00
9,527.16
0.00
0.00
1,948.50
0.00
1,948.50
810.00
0.00

0.25
1.50
0.00
0.00
1.50
0.00
1.50
1.50
0.00

500.00
14,290.74
0.00
0.00
2,922.75
0.00
2,922.75
1,215.00
0.00

0.75
9.50
6.00
6.00
8.50
10.00
9.50
8.50
1.00

1,500.00
90,508.02
12,000.00
9,000.00
16,562.25
10,000.00
18,510.75
6,885.00
9,000.00

Glb

1.00

36,222.81

36,222.81

0.05

1,811.14

0.08

2,716.71

0.13

4,527.85

0.88

31,694.96

Glb

1.00

5,000.00

5,000.00

0.20

1,000.00

0.05

250.00

0.25

1,250.00

0.75

3,750.00

m3
%
hm
m3

33.00
1.00
140.00
5,709.94

122.72

4,049.76
106,891.54
25,200.00

33.00
0.31
26.50

4,049.76
33,136.38
4,770.00

0.00
0.33
37.00

0.00
34,739.75
6,660.00

33.00
0.64
63.50

4,049.76
67,876.13
11,430.00

0.00
0.37
76.50

0.00
39,015.41
13,770.00

m3

172.35

m3

878.20

1.01.02
1.01.03
1.01.04
1.01.05
1.02
1.02.01
1.02.02
1.02.03
1.02.04
1.02.05
1.02.06

1.03.02
1.03.03
1.03.04
1.03.05
1.03.06
1.03.07
1.03.08
1.03.09
1.03.10
1.03.11
1.04
1.04.01
1.04.02
1.04.03

MOVIMIENTO DE TIERRAS
Demolicion de cimentacion antigua
Excavaxion y eliminacion Total
Maquinaria para Muros Pantalla
Excavacin Masiva para Stano
Excavacin Masiva para Cisternas y Cuarto de
Maquinas
Excavacin de Zapatas, Vigas de Conexin,
Cimientos
Excavacin para Muros
Eliminacin de material excedente de excavaciones

m3

30.66

m3

8,828.49

180.00

Parcial (S/.)

ACUMULADO N 2

Descripcin

1.01.01

PU (S/.)

VALORIZACION 2

Item

CANT.

PARCIAL

CANT.

PARCIAL

CANT.

PARCIAL

CANT.

PARCIAL

ACUMULADO ANTERIOR

Item

Descripcin

1.04.04

Relleno con Material de Prestamo


Relleno mat. Prestamo en Zapatas
Relleno mat. Prestamo en Vigas de Conexion
Relleno mat. Prestamo en Cimientos
Relleno mat. Prestamo en Muros Pantalla
Compactacin para recibir solados de cimientos y
fondos de cisterna

Und

Metrado

m3
m3
m3
m3

256.61
32.91
0.33
68.32

m2
m2

1.05.01.01

CONCRETO SIMPLE
Solados
Solado para zapatas, e=2", 1:12 Cem:Horm.

1.05.01.02

Solado para Muros Pantallas, e=2", 1:12 Cem:Horm.

1.05.01.03

PU (S/.)

Parcial (S/.)

CANT.

PARCIAL

VALORIZACION 2
CANT.

ACUMULADO N 2

PARCIAL

CANT.

SALDO POR VALORIZAR

PARCIAL

CANT.

PARCIAL

22.95
22.95
22.95
22.95

5,889.20
755.28
7.57
1,567.94

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

256.61
32.91
0.33
68.32

5,889.20
755.28
7.57
1,567.94

346.89

5.00

1,734.45

0.00

0.00

0.00

0.00

0.00

0.00

346.89

1,734.45

383.18

20.00

7,663.60

0.00

0.00

0.00

0.00

0.00

0.00

383.18

7,663.60

m2

201.54

11.00

2,216.94

0.00

0.00

12.00

132.00

12.00

132.00

189.54

2,084.94

m2

123.34

11.00

1,356.74

0.00

0.00

18.00

198.00

18.00

198.00

105.34

1,158.74

Solado para Muros - Placas, e=2", 1:12 Cem:Horm.


Solado para Cisterna, e=2", 1:12 Cem:Horm.
Cimiento, F'c=100 kg/cm2 + 30% P.G.
Sobrecimiento, F'c=140 kg/cm2
Sobrecimiento, encofrado y desencofrado
Gradas, F'c=140 kg/cm2
Gradas, Encofradoo y Desencofrado
Falsa Zapatas, F'c=100 kg/cm2 + 30% P.G.
Reposicin de Veredas, Rampas y daos en bermas Concreto fc 100 kg/cm2
Reposicin de Veredas, Rampas y daos en bermas Encofrado

m2
m2
m3
m3
m2
m3
m2
m3

9.55
30.70
1.75
0.58
7.76
2.01
7.95
26.83

11.00
11.00
220.00
220.00
25.00
200.00
20.00
200.00

105.05
337.70
385.00
127.60
194.00
402.00
159.00
5,366.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

9.55
30.70
1.75
0.58
7.76
2.01
7.95
26.83

105.05
337.70
385.00
127.60
194.00
402.00
159.00
5,366.00

m3

22.08

250.00

5,520.00

0.00

0.00

0.00

0.00

0.00

0.00

22.08

5,520.00

ml

64.80

20.00

1,296.00

0.00

0.00

0.00

0.00

0.00

0.00

64.80

1,296.00

1.05.10

Reposicin de Sardineles - Concreto fc 100 kg/cm2

m3

1.38

250.00

345.00

0.00

0.00

0.00

0.00

0.00

0.00

1.38

345.00

1.05.11

Reposicin de Sardineles - Encofrado

ml

46.00

20.00

920.00

0.00

0.00

0.00

0.00

0.00

0.00

46.00

920.00

1.06

CONCRETO ARMADO
Zapatas
Zapatas Aisladas,Zapatas conectadas, Concreto
Premezclado F'c=210kg/cm2
Zapatas aisladas, Zapatas conectadas, Encofrado y
desencofrado
Zapatas aisladas, Zapatas coenectadas, Acero
Fy=4200 kg/cm2

m3

181.04

284.10

51,433.46

0.00

0.00

9.00

2,556.90

9.00

2,556.90

172.04

48,876.56

m2

165.43

27.32

4,519.55

0.00

0.00

12.25

334.67

12.25

334.67

153.18

4,184.88

kg

12,340.45

3.69

45,536.26

0.00

0.00

615.00

2,269.35

615.00

2,269.35

11,725.45

43,266.91

m3

12.04

284.10

3,420.56

0.00

0.00

2.06

585.25

2.06

585.25

9.98

2,835.32

m2
kg

74.50
2,908.09

26.32
3.69

1,960.84
10,730.85

0.00
0.00

0.00
0.00

11.80
497.50

310.58
1,835.78

11.80
497.50

310.58
1,835.78

62.70
2,410.59

1,650.26
8,895.08

1.04.04.01
1.04.04.02
1.04.04.03
1.04.04.04
1.04.05
1.04.06

1.05
1.05.01

1.05.01.04
1.05.02
1.05.03
1.05.04
1.05.05
1.05.06
1.05.07
1.05.08
1.05.09

1.06.01
1.06.01.01
1.06.01.02
1.06.01.03

1.06.02
1.06.02.01
1.06.02.02
1.06.02.03

Nivelacion y Compactacin - Material Prstamo

Vigas de Conexin
Vigas de Conexion, Concreto Premezclado
F'c=210kg/cm2
Vigas de Conexin, Encofrado y Desencofrado
Vigas de Conexin, Acero Fy=4200 kg/cm2

ACUMULADO ANTERIOR

Item

Descripcin

1.06.03

Muros Pantalla
Muros Pantalla, Concreto Premezclado
F'c=280kg/cm2
Muros Pantalla, Encofrado y Desencofrado
Muros pantalla, Acero Fy=4200 kg/cm2
Anclajes post tensados(31)
Muro Pantalla, Curado
Movilizacion y desmovilizacion
Alquiler de grupo electrogeno para inyeccion de
anclaje
Combustible de Grupo Electrogeno

1.06.03.01
1.06.03.02
1.06.03.03
1.06.03.04
1.06.03.05
1.06.03.06
1.06.03.07
1.06.03.08
1.06.03.09

1.06.04

Picado de Cachimba y Reparacion de Muro pantalla

Und
m3

Metrado

PU (S/.)

Parcial (S/.)

CANT.

PARCIAL

VALORIZACION 2
CANT.

ACUMULADO N 2

PARCIAL

CANT.

SALDO POR VALORIZAR

PARCIAL

CANT.

PARCIAL

376.86

463.88

174,817.82

18.50

8,581.78

200.00

92,776.00

218.50

101,357.78

158.36

73,460.04

914.09
45,031.49
312.29
914.09
2.00

42.31
3.89
387.56
0.96
7,937.72

38,675.15
175,172.50
121,031.11
877.53
15,875.44

87.60
4,870.00
121.00
87.60
1.00

3,706.36
18,944.30
46,894.76
84.10
7,937.72

442.57
21,248.26
191.29
442.57
1.00

18,725.14
82,655.73
74,136.35
424.87
7,937.72

530.17
26,118.26
312.29
530.17
2.00

22,431.49
101,600.03
121,031.11
508.96
15,875.44

383.92
18,913.23
0.00
383.92
0.00

16,243.66
73,572.47
0.00
368.56
0.00

mes

1.00

4,950.00

4,950.00

1.00

4,950.00

0.00

0.00

1.00

4,950.00

0.00

0.00

Gln

528.00

8.47

4,474.58

264.00

2,237.29

264.00

2,237.29

528.00

4,474.58

0.00

0.00

ml

224.00

40.17

8,998.08

0.00

0.00

40.00

1,606.80

40.00

1,606.80

184.00

7,391.28

m2
kg
ml
m2
viajes

Cisterna de Agua Contra Incendio - Consumo

1.06.04.01

Cisterna, Concreto Premezclado F'c=280kg/cm2

m3

5.00

362.38

1,811.90

0.00

0.00

0.00

0.00

0.00

0.00

5.00

1,811.90

1.06.04.02

Cisterna, Encofrado y desencofrado de Paredes

m2

125.97

29.32

3,693.44

0.00

0.00

0.00

0.00

0.00

0.00

125.97

3,693.44

1.06.04.03

Cisterna, Acero Fy=4200 kg/cm2


Cisterna, Curado de Paredes

kg
m2

1,319.47
125.00

3.69
0.96

4,868.84
120.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

1,319.47
125.00

4,868.84
120.00

m3

202.51

362.38

73,385.57

0.00

0.00

2.53

916.82

2.53

916.82

199.98

72,468.75

m2
kg
m2

1,279.29
22,517.71
1,279.29

28.95
3.69
0.96

37,035.45
83,090.35
1,228.12

0.00
0.00
0.00

0.00
0.00
0.00

18.85
281.32
18.85

545.71
1,038.07
18.10

18.85
281.32
18.85

545.71
1,038.07
18.10

1,260.44
22,236.39
1,260.44

36,489.74
82,052.28
1,210.02

m3

301.34

298.33

89,898.76

0.00

0.00

0.00

0.00

0.00

0.00

301.34

89,898.76

m2

621.30

32.30

20,067.99

0.00

0.00

0.00

0.00

0.00

0.00

621.30

20,067.99

m2

1,014.20

28.95

29,361.09

0.00

0.00

0.00

0.00

0.00

0.00

1,014.20

29,361.09

m2

645.56

33.95

21,916.76

0.00

0.00

0.00

0.00

0.00

0.00

645.56

21,916.76

1.06.04.04
1.06.05
1.06.05.01
1.06.05.02
1.06.05.03
1.06.05.04
1.06.06
1.06.06.01
1.06.06.02
1.06.06.03
1.06.06.04

Placas de Sotano
Placas de Sotano, Concreto Premezclado F'c=280
kg/cm2
Placas de Sotano, Encofrado y Desencofrado
Placas de Sotano, Acero Fy=4200 kg/cm2
Placas de Sotano, Curado
Placas de Pisos Superiores
Placas Pisos Superiores, Concreto Premezclado
F'c=210 kg/cm2
Placas Pisos Superiores, Encofrado y Desencofrado
1 cara
Placas Pisos Superiores, Encofrado y Desencofrado
2 caras
Placas Pisos Superiores, Encofrado Perdido

1.06.06.05

Placas Pisos Superiores, Acero Fy=4200 kg/cm2

kg

39,801.28

3.69

146,866.72

0.00

0.00

0.00

0.00

0.00

0.00

39,801.28

146,866.72

1.06.06.06

Placas Pisos Superiores, Curado

m2

1,635.50

0.96

1,570.08

0.00

0.00

0.00

0.00

0.00

0.00

1,635.50

1,570.08

m3

40.43

362.38

14,651.02

8.00

2,899.04

15.45

5,598.77

23.45

8,497.81

16.98

6,153.21

1.06.07
1.06.07.01

Columnas de Stano
Columnas de Stano, Concreto Premezclado
Fc=280 Kg/cm2.

1.06.07.02

Columnas de Stano, Encofrado y Desencofrado

m2

340.05

29.15

9,912.46

18.50

539.28

178.73

5,209.98

197.23

5,749.25

142.82

4,163.20

1.06.07.03

Columnas de sotano, Acero Fy=4200 kg/cm2


Columnas de Stano, Curado

kg
m2

7,613.77
340.05

3.69
0.96

28,094.81
326.45

1,525.30
18.50

5,628.36
17.76

2,890.70
178.73

10,666.68
171.58

4,416.00
197.23

16,295.04
189.34

3,197.77
142.82

11,799.77
137.11

1.06.07.04

ACUMULADO ANTERIOR

Item

Descripcin

1.06.08

Columnas de Pisos Superiores


Columnas, pisos superiores Concreto Premezclado
F'c=210 kg/cm2
Columnas, pisos superiores Encofrado y
Desencofrado

1.06.08.01

Und
m3

Metrado

PU (S/.)

Parcial (S/.)

CANT.

PARCIAL

VALORIZACION 2
CANT.

ACUMULADO N 2

PARCIAL

CANT.

SALDO POR VALORIZAR

PARCIAL

34.55

298.33

10,307.30

0.00

0.00

0.00

0.00

0.00

0.00

CANT.

PARCIAL

34.55

10,307.30

m2

343.49

29.15

10,012.73

0.00

0.00

0.00

0.00

0.00

0.00

343.49

10,012.73

1.06.08.03

Columnas, pisos superiores Acero Fy=4200 kg/cm2

kg

7,495.36

3.69

27,657.88

0.00

0.00

0.00

0.00

0.00

0.00

7,495.36

27,657.88

1.06.08.04

Columnas pisos superiores, Curado

m2

343.49

0.96

329.75

0.00

0.00

0.00

0.00

0.00

0.00

343.49

329.75

m3

100.66

284.10

28,597.51

0.00

0.00

0.00

0.00

0.00

0.00

100.66

28,597.51

m2
kg

605.36
16,661.78

31.95
3.69

19,341.21
61,481.95

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

605.36
16,661.78

19,341.21
61,481.95

m3

223.75

284.10

63,566.17

0.00

0.00

0.00

0.00

0.00

0.00

223.75

63,566.17
45,205.50

1.06.08.02

1.06.09
1.06.09.01
1.06.09.02
1.06.09.03
1.06.10
1.06.10.01

Vigas de Stano
Vigas de Stano, Concreto Premezclado
F'c=210kg/cm2
Vigas de Stano, Encofrado y Desencofrado
Vigas, de sotano acero Fy=4200 kg/cm2
Vigas de Pisos Superiores
Vigas de Pisos Superiores, Concreto Premezclado
F'c=210kg/cm2

1.06.10.02

Vigas, Pisos superiores Encofrado y Desencofrado

m2

1,414.88

31.95

45,205.50

0.00

0.00

0.00

0.00

0.00

0.00

1,414.88

1.06.10.03

Vigas, Encofrado Perdido

m2

50.90

35.95

1,829.68

0.00

0.00

0.00

0.00

0.00

0.00

50.90

1,829.68

1.06.10.04

Vigas, Pisos superiores acero Fy=4200 kg/cm2

kg

49,447.74

3.69

182,462.17

0.00

0.00

0.00

0.00

0.00

0.00

49,447.74

182,462.17

m3

108.41

317.37

34,404.89

0.00

0.00

0.00

0.00

0.00

0.00

108.41

34,404.89

1.06.11
1.06.11.01
1.06.11.02
1.06.11.03

Losas Aligeradas - Stanos


Losas aligeradas de Stano, Concreto Premezclado
F'c=210kg/cm2
Losa aligerada de sotano, encofrado y
desencofrado
Losa aligerada de sotano, Sistemas de Viguetas,
Bobedillas y Poliestireno

m2

1,254.16

25.63

32,144.10

0.00

0.00

0.00

0.00

0.00

0.00

1,254.16

32,144.10

Glb

1.00

79,200.28

79,200.28

0.00

0.00

0.00

0.00

0.00

0.00

1.00

79,200.28

1.06.11.04

Losa aligerada de sotano acero Fy=4200 kg/cm2

kg

4,164.37

3.69

15,366.54

0.00

0.00

0.00

0.00

0.00

0.00

4,164.37

15,366.54

1.06.11.05

Losa aligerada y Maciza de sotano, Curado

m2

1,752.94

1.27

2,226.23

0.00

0.00

0.00

0.00

0.00

0.00

1,752.94

2,226.23

m3

284.46

316.50

90,031.01

0.00

0.00

0.00

0.00

0.00

0.00

284.46

90,031.01

m2

2,201.89

25.63

56,434.31

0.00

0.00

0.00

0.00

0.00

0.00

2,201.89

56,434.31

Glb

1.00

130,518.28

130,518.28

0.00

0.00

0.00

0.00

0.00

0.00

1.00

130,518.28

Kg

9,633.03

3.69

35,545.89

0.00

0.00

0.00

0.00

0.00

0.00

9,633.03

35,545.89

m2

2,828.28

1.27

3,591.92

0.00

0.00

0.00

0.00

0.00

0.00

2,828.28

3,591.92

m3

42.86

317.37

13,603.70

0.00

0.00

0.00

0.00

0.00

0.00

42.86

13,603.70

1.06.12
1.06.12.01
1.06.12.02
1.06.12.03
1.06.12.04
1.06.12.05

1.06.13
1.06.13.01

Losas Aligeradas - Piso Superiores


Losas aligeradas - Pisos superiores, Concreto
F'c=210 kg/cm2,
Losa aligerada - Pisos superiores encofrado y
desencofrado
Losa aligerada de sotano, Sistemas de Viguetas,
Bobedillas y Poliestireno
Losa aligerada - Pisos superiores, acero Fy=4200
kg/cm2
Losa aligerada y Maciza - Pisos superiores, curado
Losas Macizas - Stanos
Losas macizas de Stano, Concreto Premezclado
F'c=210kg/cm2

1.06.13.02

Losa macizas de Stano, encofrado y desencofrado

m2

214.32

27.33

5,857.34

0.00

0.00

0.00

0.00

0.00

0.00

214.32

5,857.34

1.06.13.03

Losa macizas de Stano, acero Fy=4200 kg/cm2

kg

6,155.65

3.69

22,714.36

0.00

0.00

0.00

0.00

0.00

0.00

6,155.65

22,714.36

ACUMULADO ANTERIOR

Item

Descripcin

1.06.14

Losas Macizas - Pisos Superiores


Losas macizas de Pisos Superiores, Concreto
F'c=210kg/cm2
Losa macizas de Pisos Superiores, encofrado y
desencofrado
Losa macizas de Pisos Superiores, acero Fy=4200
kg/cm2

1.06.14.01
1.06.14.02
1.06.14.03

1.06.15

Und
m3

Metrado

PU (S/.)

5.32

316.50

m2

26.60

kg

756.07

Parcial (S/.)

CANT.

PARCIAL

VALORIZACION 2
CANT.

ACUMULADO N 2

PARCIAL

CANT.

SALDO POR VALORIZAR

PARCIAL

CANT.

5.32

PARCIAL

1,683.78

0.00

0.00

0.00

0.00

0.00

0.00

1,683.78

27.33

726.98

0.00

0.00

0.00

0.00

0.00

0.00

26.60

726.98

3.69

2,789.91

0.00

0.00

0.00

0.00

0.00

0.00

756.07

2,789.91

Escaleras

1.06.15.01

Escaleras, Concreto Premezclado F'c=210 kg/cm2

m3

44.00

284.10

12,499.37

0.00

0.00

0.00

0.00

0.00

0.00

44.00

12,499.37

1.06.15.02

Escalera, encofrado y desencofrado


Escalera, acero Fy=4200 kg/cm2
Escalera, Curado

m2
kg
m2

237.66
5,097.57
226.64

40.00
3.69
1.00

9,506.33
18,810.03
226.64

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

237.66
5,097.57
226.64

9,506.33
18,810.03
226.64

1.06.15.03
1.06.15.04
1.06.16

Rampas

1.06.16.01

Rampas, Concreto Premezclado F'c=210 kg/cm2

m3

32.86

316.50

10,400.19

0.00

0.00

0.00

0.00

0.00

0.00

32.86

10,400.19

1.06.16.02

Rampa, encofrado y desencofrado


Rampa, acero Fy=4200 kg/cm2
Rampa, Curado

m2
kg
m2

302.10
1,026.16
302.10

25.63
3.69
1.27

7,742.82
3,786.53
383.67

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

302.10
1,026.16
302.10

7,742.82
3,786.53
383.67

Varios
Junta de Construccion con tecnoport 4"
Junta de Dilatacion con tecnoport

m2
ml

842.52
590.00

11.15
0.21

9,394.10
123.90

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

842.52
590.00

9,394.10
123.90

1.06.16.03
1.06.16.04
1.06.17
1.06.17.01
1.06.17.02

COSTO DIRECTO

2,739,908.94

COSTO DIRECTO S/.

172,430.09

378,538.74

378,538.74

550,968.83

2,188,940.11

2.00

FORMATO DE VALORIZACION RIEDEL


PROYECTO: PARQUE SANTA TERESITA
VALORIZACION ARQUITECTURA N

Item

1
Und

Metrado

m2
m2
m2
m2
m2

298.38
344.03
2,698.27
151.45

102.06
86.49
59.03
59.03

m3

62.15

298.33

18,541.21

2.01.04.02 Columnetas, encofrado y desencofrado


2.01.04.03 Columnetas, Dowels

m2

505.14

29.15

14,724.83

ml

676.00

19.00

12,841.57

2.01.04.04 Columnetas, acero Fy=4200 kg/cm2

kg

6,472.94

3.69

23,885.16

Dinteles
2.01.05.01 Dinteles, Concreto F'c=210kg/cm2

m3

2.54

298.33

757.76

2.01.05.02 Dinteles, Encofrado y desencofrado

m2

58.01

31.95

1,853.42

2.01.05.03 Dinteles, Tabique 25cm

m2

3.99

95.07

379.33

2.01.05.04 Dinteles, Tabique 15cm

m2

37.85

60.45

2,288.03

2.01.05.05 Dinteles, Acero Fy=4200 kg/cm2

kg

259.09

3.69

956.04

m3

4.92

298.33

1,467.78

2.01.06.02 Alfeizer, Encofrado y desencofrado

m2

52.91

29.15

1,542.33

2.01.06.03 Alfeizer, Acero Fy=4200 kg/cm2

kg

70.03

3.69

258.41

Descripcin
MUROS DE ALBAILERIA
2.01
Muros de cabeza
2.01.01
Muros de 30 cm.
2.01.01.01
Muros de 25 cm.
2.01.01.02
Muros de soga - muros de 15 cm.
2.01.02
Muros de canto - muros de 10 cm.
2.01.03
Columnetas
2.01.04
2.01.04.01 Columnetas, Concreto Premezclado F'c=210 kg/cm2

PU (S/.)

Parcial (S/.)

30,452.13
29,755.15
159,278.88
8,940.09

VALORIZACION 1
CANT.
PARCIAL

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.01.05

2.01.06
2.01.06.01

2.01.07
2.01.07.01

Alfeizer
Alfeizer, Concreto F'c=210kg/cm2

Tablero de Concreto (Cocinas, Lavatorios, Consejeria)


Tableros, Concreto F'c=210kg/cm2

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

m3

12.10

298.33

3,609.79

2.01.07.02 Lavatorio, Encofrado y desencofrado

m2

102.10

31.95

3,262.10

2.01.07.03 Lavatorio, Tarrajeo Inferior de Losa

m2

79.74

16.20

1,291.79

2.01.07.04 Lavatorio, Acero Fy=4200 kg/cm2

kg

427.85

3.69

1,578.77

Lavanderia
2.01.08.01 Lavanderia, Concreto F'c=210kg/cm2

m3

2.52

298.33

751.79

2.01.08.02 Lavanderia, Encofrado y desencofrado

m2

35.96

31.95

1,148.92

2.01.08.03 Lavanderia, Acabado en Cemento Pulido Impermeabilizado Color Blanco

m2

29.63

50.74

1,503.43

2.01.08.04 Lavanderia, Acero Fy=4200 kg/cm2

kg

243.02

3.69

896.74

0.00

2.01.09.01 Jardineras, Concreto Premezclado F'c=210 kg/cm2

m3

13.86

298.33

4,134.85

2.01.09.02 Jardineras, encofrado y desencofrado

m2

84.40

31.95

2,696.58

2.01.09.03 Jardineras, acero Fy=4200 kg/cm2

kg

856.52

3.69

3,160.56

0.00
0.00
0.00

m2
m2
m2
m2
m2
m2
m2
m2
Und
ml
m2
m2
m2
m2

7,280.81
1,390.31
1,686.10
63.25
418.66
405.95
163.55
25.51
368.00
1,684.36
72.81
1,525.67
2,084.81
574.04

19.90
38.65
28.88
233.75
28.35
24.22
38.65
50.74
4.84
9.67
35.00
16.75
8.82
10.92

144,888.21

m2

2,396.08

20.18

48,352.79

m2

45.80

125.00

m2
m2

130.56
1,419.34

25.03
22.22

ml
ml
ml
m2
m2

46.35
400.00
100.00
598.85
15.64

40.00
4.50
13.00
26.96
325.65

Und

53.00

60.00

m2
m2
m2

126.00
87.00
7.00

50.74
50.74
50.74

Escaleras Duplex 303/503- acabado en Piso de madera cedro 1 1/2"

N pasos

34.00

200.00

Escaleras Duplex 601- acabado en Piso de madera cedro 1 1/2"


Escaleras Duplex 602- acabado en Piso de madera cedro 1 1/2"

N pasos
N pasos

17.00
17.00

200.00
200.00

2.01.08

2.01.09

2.02
2.02.01
2.02.02
2.02.03
2.02.04
2.02.05
2.02.06
2.02.07
2.02.08
2.02.09
2.02.10
2.02.11
2.02.12
2.02.13
2.02.14
2.03
2.03.01
2.03.02
2.03.03
2.03.04
2.04
2.04.01
2.04.02
2.04.03
2.04.04
2.04.05
2.04.06
2.05

2.05.01
2.05.02
2.05.03
2.05.04
2.05.05
2.05.06

0.00
0.00
0.00

Jardineras

TARRAJEOS
Tarrajeo en muros interiores
Tarrajeo en muros exteriores
Tarrajeo de vigas (interior)
Tarrajeo microcemento color oxido
Tarrajeo con impermeabilizante
Tarrajeo de losa azotea con fibra
Tarrajeo en fachada exterior edificio - vecinos
Acabado en cemento pulido
Tarrajeo en dicroicos
Vestidura de derrames
Malla expand metal para tarrajeos
Tarrajeo Primario
Solaqueo de muros interiores
Solaqueo de vigas
CIELO RASOS
Cielorraso con mezcla C:A 1:5
Cielorrado revestido c/madera machihembrado color cedro con
Varathane mate
Vestidura de fondo de escalera
Emporrado y pintado de cielo raso en sotano
PISO CONTRAZOCALOS Y SARDINELES DE CEMENTO
Sardinel de duchas h= 10 cm
Bruado de rampas
Junta de dilatacin en piso con brea
Falso Piso e=12 cm (3er y 2do sotano)
Poyo de concreto en Cuarto de Maquinas h=30cm.
Botallantas de concreto armado h=10cm con pintura para trfico
color blanco
REVESTIMIENTO DE GRADAS Y ESCALERA
FORJADO Y REVESTIMIENTO DE GRADAS, DESCANSOS Y
CONTRAZOCALOS DE ESCALERA
Escaleras 1-2 de Escape - acabado en Cemento Pulido
Escaleras 3 - acabado en Cemento Pulido
Escaleras 4 - acabado en Cemento Pulido

53,735.57
48,694.43
14,784.69
11,869.07
9,830.49
6,321.21
1,294.38
1,779.28
16,287.76
2,548.29
25,554.92
18,388.00
6,268.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

5,725.00
3,267.95
31,537.73

1,854.00
1,800.00
1,300.00
16,145.00
5,093.17

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

3,180.00

6,393.24
4,414.38
355.18

0.00
0.00
0.00
0.00

6,800.00
3,400.00
3,400.00

0.00
0.00

ACUMULADO N 1
CANT.
PARCIAL

SALDO POR VALORIZAR


CANT.
PARCIAL

2.06

2.06.01
2.06.02
2.06.03
2.06.04
2.06.05
2.06.06
2.06.07
2.06.08
2.06.09
2.06.10
2.06.11
2.06.12
2.06.13
2.06.14
2.06.15
2.06.16
2.06.17
2.06.18

2.06.19
2.06.20
2.06.21
2.06.22
2.06.23
2.06.24
2.06.25
2.06.26
2.06.27
2.06.28
2.06.29
2.06.30
2.06.31
2.06.32
2.06.33
2.06.34
2.06.35
2.06.36
2.06.37

CERAMICO, PISO Y PARED


PISOS
Piso de Porc. Porcelanix cementi blanco satinado 44 x 44
(decorcenter)
Piso de Porc. Urban Gris Pulido 30 x 60
Piso de Porc. Urban Gris Pulido 60 x 60
Piso Estructurado de madera Cabreuva
Piso de Baldosa de Cemento Laja Fina Spazio 40x40 Gris Oscuro
Piso de Granito Lavado Color Grafito
Piso Porc. Porcellanix Constellazione Gris Pulido 38.2x38.2 fragua
3mm color gris natural
Piso Porc. Porcellanix Goya crema 50.5x50.5 fragua de 3 mm marca
celima color blanco humo o similar
Piso Porc. Celima Gris pulido 60x60 fragua 3mm celima color marfil o
similar
Piso Porc. Porcellanix Titanium Bruno 45 x 45 Fragua 3mm marca
Celima color cafe o similar
Piso Cermico Amrica blanco 30x30 Fragua 3mm color Blanco
Piso Laja Fina
Instalacin de Porcelanato
Instalacin de Cermico
Instalacin de Piso Estructurado
Instalacin de Granito Lavado
Instalacin de Baldosa de Cemento
Instalacin de Laja fina
CONTRAZCALOS
C.Zocalo Porcelanix cementi blanco satinado 44 x 44 (decorcenter)
h=10 cm.
C.Zocalo Porc. Urban gris pulido 30 x 60 h=10 cm.
C.Zocalo Madera sin boleado y con rodon chaflan h= 10 cm.
C.Zocalo de Baldosa de Cemento Laja Fina Spazio 40x40 Gris Oscuro
h=10 cm.
C.Zocalo de Granito Lavado Color Grafito h= 10 cm.
C.Zocalo Porc. Porcellanix Constellazione Gris 38.2x38.2, h=10 cm.
C.Zocalo de Granito Negro Aracruz h= 10 cm., Suministro e
Instalacion
C.Zocalo de Granito Kashmir White h= 7.5 cm. En SSHH Principales,
Suministro e Instalacion
C.Zocalo de Granito Serena Blanco h= 7.5 cm. En SSHH secundarios,
Suministro e Instalacion
C.Zocalo de madera e=1" Color nogal con Sellador Mate h=7.5 cm. En
SSHH Visita, Suministro e Instalacion
C.Zocalo Por. Porcellanix Titanium Bruno 45x45 h= 10 cm. fragua
3mm marca Celima color caf o similar
C.Zocalo Cermico Amrica blanco 30x30 Fragua 3MM Color Blanco
h= 10 cm.
C.Zocalo Laja Fina h= 10 cm.
Instalacin de Contra-Zcalo de Porcelanato
Instalacin de Contra-Zcalo de Cermico
Instalacin de Contra-Zcalo de Madera
Instalacin de Contra-Zcalo de Granito Lavado
Instalacin de Contra-Zcalo de Baldosa de Cemento
Instalacin de Contra-Zcalo de Laja Fina

2.06.53

ZCALOS
Zocalo de Madera Machihembrado color Cedro
Zocalo Porc. Dubai Lappato Color Negro 30x30
Zocalo Granito Lavado Color gris
Zocalo de Porcelanato Porcellanix Constellazione Gris Pulido
38.2x38.2 fragua 3mm color gris natural
Zocalo Porc. Porcellanix Goya Crema 50.5x50.5 fragua de 3mm marca
Celima color blanco humo o similar
Zocalo Mosaico Porcelanix Goya Tricolor pza. 30x30
Zocalo Porc. Nature Unicolor Gaudi pulio super blanco 30x60 fragua
3mm. Celima color marfil o similar
Zocalo Cermico Celima Amrica Blanco 30x30 fragua 3mm color
blanco
Zocalo de Piedra Spazio Color Gris Claro (incluye instalcin?)
Zocalo de Porcelanato Urban Gris Pulido 30x60
Zocalo Geoart Mosaico Pizarra negra 5x5 / 30x30
Instalacin de Zcalo de Porcelanato
Instalacin de Zcalo de Cermico
Instalacin de Zcalo de Madera
Instalacin de Zcalo de Granito Lavado
Instalacin de Geoart Mosaico Pizarra negra 5x5 / 30x30

2.07.01

ALFOMBRA
Piso de alfombra Boucl en dormitorios

2.06.38
2.06.39
2.06.40
2.06.41
2.06.42
2.06.43
2.06.44
2.06.45
2.06.46
2.06.47
2.06.48
2.06.49
2.06.50
2.06.51
2.06.52

2.07

m2

54.22

34.00

m2
m2
m2
m2
m2

140.20
9.13
889.26
35.60
93.27

66.00
66.00
96.36
42.00
100.00

m2

332.83

75.00

m2

53.47

49.50

m2

108.94

46.00

m2

37.02

85.50

m2
m2
m2
m2
m2
m2
m2
m2

91.60
348.29
725.97
91.60
889.26
93.27
35.60
348.29

20.00
42.00
17.00
16.00
10.50
100.00
17.00
25.00

42.50

3.40

m
m

6.10
1,652.87

6.60
22.00

16.80

4.20

75.17

10.00

349.30

7.50

m2

11.19

715.00

12.04

522.50

0.00
1,843.48
9,253.20
602.58
85,689.09
1,495.20
9,327.00

0.00
0.00
0.00
0.00
0.00
0.00

24,962.25

0.00
2,646.77

0.00
5,011.24

0.00
3,165.21
1,832.00
14,628.18
12,341.49
1,465.60
9,337.23
9,327.00
605.20
8,707.25

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
144.50
40.26
36,363.14

0.00
0.00
0.00

70.56
751.70

0.00
0.00

2,619.75

0.00
8,000.85

0.00
6,290.90

0.00

21.96

316.25

m2

1.29

15.00

71.32

8.55

143.92

2.00

m
m
m
m
m
m
m

187.08
469.22
143.92
1,651.87
75.15
16.80
187.08

4.20
7.50
6.50
8.00
20.00
9.00
12.00

m2
m2
m2

21.76
12.16
104.58

22.00
158.00
100.00

m2

335.97

42.00

m2

215.51

42.00

m2

13.21

366.67

m2

362.08

45.80

m2

149.12

20.00

m2
m2
m2
m2
m2
m2
m2
m2

481.36
2.15
15.38
941.07
507.86
22.78
108.63
15.38

42.00
66.00
30.00
7.50
6.50
20.00
25.00
10.00

20,217.25

153.81

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

m2

768.72

41.25

31,709.70

0.00

6,944.85

0.00
19.35

0.00
609.79

0.00
287.84
785.74
3,519.12
935.45
13,214.97
1,503.00
151.20
2,244.96

478.74
1,920.52
10,458.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

14,110.74

0.00
9,051.23
4,842.37

0.00
0.00

16,583.26

0.00
2,982.40
141.97
461.44
7,058.03
3,301.09
455.60
2,715.75

2.08.21

CARPINTERIA DE MADERA
Puerta Principal de Departamentos, Hoja de Madera Cedro
Machihembrada y Laqueada
Puertas Interiores, Hoja Contraplacada de MDF Pintada al Duco
Color Blanco
Puertas Vaiven en cocinas, Hoja Contraplacada de MDF acabado
Laqueado Natural Mate
Bisagras en Puerta de Cto de extraccion de monoxido P01
Bisagras en Puerta de Cto de bomba P02
Bisagras en Puerta de Escalera 1,2,3 P09
Bisagras en Puerta Ingreso a Dptos P10
Bisagras C/rodajes 4.5" x 4.5" BB5 NRPx26D Design en acero mate
o similar
Bisagras Deltana capuchina de 3.5" x 3.5" acabado zincado o
sinilar
Bisagra 1500 CS PHILLIPS acabado en cromo
Cerradura GEO 116NL 26D INTL para Puerta Cto Extraccion de
Monoxido
Cerradura de Manija Llave/Botn GEO 116NL 26D Acabado en
acero o similar para Puerta Cto de Maquina
Cerradura de Manija Llave/Botn GEO 116NL 26D Acabado en
acero o similar para Puerta de MDF pintadas al duco
Cerradura de Manija Ranura/Botn GEO 115NL 26D Acabado en
acero o similar para Puerta de MDF pintadas al duco
Cerradura de Manija para Barra Antipnico KIL ENTRY-AL DESIGN
O SIMILAR
Cerradura de embutir TESA con manija-manija para Puerta
Principal en acero inoxidable
Cerradura de manija llave/botn GEO 116NL 26D acabado en
acero o similar para M05 Lavanderia
Cerradura para pta. de Ingreso a Edificio, inc. tirador HDL -633
(FURUKAWA)
Porton Levadizo Ingreso vehicular, con bastidores de madera
cedro 1 3/4"x3" y Listones de madera Cedro 8" acabado natural, incl
sistema
Tapa de Madera de valvula de Agua Fria/Caliente 50x15 SSHH
Principal, Secundarios
Tapa de Madera de valvula de Agua Fria/Caliente 25x15 SSHH
Visita

2.09.01

MARCOS - PASAMANOS y TABLEROS DE MADERA MACISA


Tablero de madera e=1" + mandil 30 cm color nogal con barniz
marino mate en SSHH visita

2.08
2.08.01
2.08.02
2.08.03
2.08.04
2.08.05
2.08.06
2.08.07
2.08.08
2.08.09
2.08.10
2.08.11
2.08.12
2.08.13
2.08.14
2.08.15
2.08.16
2.08.17
2.08.18

2.08.19
2.08.20

2.09

2.10
2.10.01

2.10.02

2.10.03
2.10.04
2.10.05
2.10.06
2.10.07
2.10.08
2.10.09
2.10.10
2.10.11
2.11
2.11.01
2.11.01.01
2.11.01.02
2.11.02
2.11.02.01
2.11.02.02
2.11.03
2.11.04
2.11.05
2.11.06
2.11.07
2.11.08
2.11.09
2.11.10
2.11.11
2.11.12
2.11.13
2.11.14
2.11.15

2.11.16

2.11.17
2.11.18
2.11.19
2.11.20
2.11.21
2.11.22
2.11.23
2.11.24

MUEBLE DE MELAMINE - GRANITO


Repostero de Melamine C/Canto delgado + Puertas de Cristal
C/marco de Aluminio (Altos)
Muebles de Melamine Color Nogal con Canto grueso + bisagras tipo
cangrejo + tiradores nacionalees de acero inoxidable en SSHH
Principal.
Muebles de melamine Color Charcoal con Canto grueso + bisagras
tipo cangresjo + tiradores nacionales de acero en SSHH Secundarios
Tablero de Granito Negro Aracruz en cocina
Tablero de MDF Pintado en Poliuretano color blanco (60x35x2cm)
Tablero de MDF acabado con pintura poliuretano color blanco
(1.80x0.50x0.05)
Tiradores de Acero inoxidable para cocina
Closet
Tiradores de Acero Inoxidable para Closets
Tablero de granito Kashmir White en Bao Prncipal
Tablero de Granito Serena Blanco en Baos Secundarios
CARPINTERIA METALICA
Barandas metlica en escaleras segn diseo
Pieza Metalica de e = 5cm.
Pieza Metalica de e = 2cm.
Pasamanos y Parantes de Aluminio en Balcones
Pasamano de aluminio de 1" x 2" color grafito en balcones
Parante de aluminio de 1" x 2" color grafito en balcones
Pasamano Metalico en Escaleras
Pasamano Acero Inoxidable
Tubo Metlicos 2" Color Grafito sobre parapeto n.+1.25m
Canal de acero inoxidable (1" x 1") en parapeto de Tubo Metlicos
2"
Rejilla metlica par ventilacion Sistena de Extraxxion Mecnica
(1.80x0.40)
Numeracion de Edificio en Acero Inoxidable
Columna Metlica de 6"x6" color grafito
Marco y Tapa de Fierro para Cisterna segn diseo
Marco y Tapa de Fierro para Bomba Sumergible segn diseo
Cierrapuera 116-AL design multisize 1-6 listed UL Grado 1 o similar
para P03,P09,P15
Escalera de Gato de tubo 1 1/2" hacia azotea
Escalera de Gato de acceso a cisterna
Hoja de Plancha Metlica con pintura zincromato acabado coloc
grafito satinado (P01,P02... 1.00x2.10)
Hoja Cortafuego (RF 90min) contraplacada en Plancha Metlica de
1.8 mm. Con Pintura Zincromato y acabado color grafito satinado
(P03,P051.00x2.10)
Hoja Cortafuego (RF 90min) contraplacada en Plancha Metlica de
1.8 mm. Con Pintura Zincromato y acabado color grafito satinado
(P091.20x2.10)
Canaletas de Desage con Rejilla Metalica en Stanos
Escotilla Metlica de Acceso a Aires
Rejilla Metlica Colectora de Agua de Lluvia
Estructura Metlica 1 1/2" para Tablero en SSHH Visita
Pata de Acero Inoxidable 2" para tablero de Cocina
Tubo metlico de 2"x10" c/base zincromato acabado color grafito
(h=1.00m), en mueble consejeria
Plancha metlica color grafito (1.00x0.25), en mueble consejeria

0.00

Und

2.00

1,228.81

Und

131.00

381.36

Und

13.00

440.68

Und
Und
Und
Und

3.00
3.00
9.00
6.00

3.39
3.39
3.39
3.39

Und

69.00

15.00

Und

393.00

9.25

Und

26.00

67.80

Und

1.00

24.69

Und

1.00

24.69

Und

66.00

24.69

Und

65.00

23.11

Und

23.00

85.85

Und

2.00

95.50

Und

4.00

24.69

Und

1.00

550.00

Und

1.00

31,900.00

31,900.00

Und

36.00

25.00

900.00

Und

13.00

25.00

325.00

Und

13.00

450.00

Und

14.00

7,072.80

Und

14.00

650.00

2,457.63

0.00
49,957.63

0.00
5,728.81
10.17
10.17
30.51
20.34

0.00
0.00
0.00
0.00
0.00

1,035.00

0.00
3,635.25
1,762.80

0.00
0.00

24.69

0.00
24.69

0.00
1,629.54

0.00
1,502.15

0.00
1,974.55

0.00
191.00

0.00
98.76

0.00
550.00

0.00
0.00
0.00

5,850.00

0.00
99,019.14

0.00
9,100.00

0.00
Und

22.00

650.00
14,300.00

ml

103.17

396.80

Und

14.00

250.00

Und

1.00

300.00

Und
Und
Und
m
m

390.00
51.00
603.00
27.53
26.99

15.00
934.39
15.00
458.51
309.38

175.20
160.00

350.00
350.00

61,320.00

110.50
91.50
147.23
2.47
176.30

180.00
180.00
350.00
350.00
20.00

19,890.00

m
m
m
m
m
m
m
m
m
m

19.45

172.88

Und

1.00

375.75

Und
Und
Und
Und

2.00
1.00
2.00
2.00

357.98
350.00
350.00
800.00

Und

23.00

165.25

Und
Und

1.00
2.00

450.00
750.00

Und

2.00

650.00

Und

20.00

1,450.00

40,937.60

0.00
0.00

3,500.00

0.00
300.00
5,850.00
47,653.64
9,045.00
12,622.71
8,350.03

56,000.00

16,470.00
51,530.50
864.50
3,526.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3,362.52

0.00
375.75
715.96
350.00
700.00
1,600.00

0.00
0.00
0.00
0.00
0.00

3,800.75
450.00
1,500.00

0.00
0.00
0.00

1,300.00

0.00
29,000.00

0.00
Und

3.00

1,450.00
4,350.00

ml
Und
Und
Und
Und

23.90
1.00
1.00
13.00
2.00

185.59
250.00
35.00
150.75
46.61

Und

2.00

685.59

Und

1.00

285.00

4,435.60
250.00
35.00
1,959.75
93.22

0.00
0.00
0.00
0.00
0.00
0.00

1,371.18

0.00
285.00

2.11.25
2.11.26
2.11.27
2.11.28
2.11.29
2.11.30
2.11.31

Pedestal para Intercomunicadores h=1.40 Estructura Metlica


Soporte Metalico Para Ovalines en BP-BS-BV
Soporte metalico para lavadero de cocina (par de angulos)
Esquinero metlico h=1.00m. acabado pintado con lneas blancas y
amarillas de pintura de trfico
Celosias de Madera con Peralte Metalico
Celosias de Aluminio Color Grafito
Celosias de Aluminio Color Natural

2.12

VENTANAS, MAMPARAS Y ESPEJOS

2.13

PINTURA
Pintura latex 2 manos en cieloraso
Pintura latex 2 manos antihongos en cielorrasos de cocina y
baos
Pintura ltex 2 manos en interiores
Pintura latex 2 manos antihongos en muros interiores ,cocinas ,
baos
Pintura latex 2 manos, en muros exteriores
Pintura latex 2 manos, en fachada
Pintura de Sealizacin en Estacionamiento amarilla
Pintura Muros Sotano
Pintura color negro en fachada Av. Beln
Pintura de fachada de edificaciones Vecinas
JARDINES
Geomembrana
Tecnopor h=25cm. En jardines y jardineras
Canto rodado
Tierra de Chacra para Jardinera
Sembrado y Acondicionamiento de Jardines

2.13.01
2.13.02
2.13.03
2.13.04
2.13.05
2.13.06
2.13.07
2.13.08
2.13.09
2.13.10
2.14
2.14.01
2.14.02
2.14.03
2.14.04
2.14.05
2.15
2.15.01
2.15.02
2.16
2.16.01
2.16.02
2.16.03
2.16.04
2.16.05
2.16.06

BARRA ANTIPANICO
Barra Antipnico F2000R-AL Design Fire Simple Listed UL GRADO 1 O
SIMILAR para Puertas P03,P15
Barra Antipnico Metlica VON DUPRIN 22 SIMILAR
VARIOS
Falso Cielo de Drywall
02 Placas Fermax Modelo N-CITY de 16 Pulsadores Preparada para
video
Cinta Antideslizante @10cm
Cobertura de ladrillo pastelero asentado con mezcla e=2",
c/fragua
Rejilla inferior plastica 24X24
Registro de Tina 30x30

COSTO DIRECTO

Und
Und
Und

1.00
56.00
13.00

125.25
180.00
200.00

Und

58.00

85.00

m2
m2
m2

2.63
60.00
35.00

250.00
250.00
250.00

125.25
10,080.00
2,600.00

0.00
0.00
0.00
0.00

4,930.00

8,750.00

0.00
0.00
0.00

304,661.02

0.00

26,400.00

0.00
0.00

656.25
15,000.00

m2

2,200.00

12.00

m2

410.00

13.00

m2

6,100.00

12.00

m2

380.00

13.00

m2
m2
m2
m2
m2
Glb

590.00
260.00
92.00
2,500.00
30.00
1.00

14.00
14.00
33.00
13.00
30.00
4,165.00

m2
m2
m3
m3
m2

150.00
115.00
11.50
15.00
115.00

16.10
24.90
108.91
70.00
30.00

2,415.30

3,450.00

0.00
0.00
0.00
0.00
0.00

Und

20.00

800.00

16,000.00

0.00

Und

3.00

360.80

1,082.40

0.00

0.00
0.00

5,330.00
73,200.00

0.00
0.00

4,940.00
8,260.00
3,640.00
3,036.00
32,500.00
900.00
4,165.00

2,863.50
1,252.50
1,050.00

m2

116.50

139.00

16,193.50

Glb

1.00

9,671.61

9,671.61

ml

48.40

7.50

m2
Und
Und

38.00
14.00
14.00

30.00
105.00
47.50

363.00
1,140.00
1,470.00
665.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

2,443,223.38

COSTO DIRECTO S/.

0.00

0.00

0.00

0.00

FORMATO DE VALORIZACION RIEDEL


PROYECTO: PARQUE SANTA TERESITA
VALORIZACION n
SUB-CONTRATISTA IISS

1
A&A

Item

Descripcin

Und

Metrado

3.01

APARATOS SANITARIO, GRIFERIAS Y ACCESORIOS


3.01.01.01 Inodoro Klipen One Piece Duralife Economico - SSHH Principal, Secundarios
3.01.01.02 Inodoro One Piece Golden Bath Graciela Color Blanco - SSHH Visita

Und

36.00

295.00

Und

13.00

309.00

3.01.01.03 Inodoro Trebol Rapid Jet Blanco o Similar - SSHH Servicio

und

14.00

100.00

1,400.00

Und

63.00

20.00

1,260.00

3.01.02.01 Bowl Kiplen Aina Blanco 400x400x150 mm. - SSHH Principal, Secundario
Bowl Mara 49.5x49.5x11.5 Color Blanco - SSHH Visita + desage 1 1/4x4" tipo sumidero sin
3.01.02.02
rebose

Und

43.00

135.00

5,805.00

Und

13.00

122.50

1,592.50

3.01.02.03 Griferia de lavatorio Mezc. Alta monocomando Huayni - SSHH Principal, Secundario

und

43.00

149.00

6,407.00

3.01.02.04 Griferia de lavatorio Llave Vainsa Minimalista Cuadrada - SSHH Visita

und

13.00

286.00

3.01.02.05 Tina DH Serie 76 sin asa (76150/40)

Und

14.00

499.50

6,993.00

3.01.02.06 Mezcladora monocomando p/ducha-tina LEVER HUAYNI - SSHH Principal, Secundario

Und

36.00

383.00

13,788.00

3.01.02.07 Accesorios para Lavatorios de Baos

Und

70.00

20.00

1,400.00

und

14.00

60.00

840.00

3.01.03.02 Mezcladora Trebol Grazia de Ducha empotrada con salida ABS - SSHH servicio

und

14.00

413.82

5,793.48

3.01.03.03 Griferia de lavadero de cocina, Mesz. Ferreti Holland Pico Bajo para Cocina

und

14.00

210.00

2,940.00

3.00

3.01.01

Parcial (S/.)

Inodoros

3.01.01.04 Accesorios para Inodoros


Lavatorios y Griferas para Baos
3.01.02

Lavatorios y Griferas para Cocinas y Lavanderas


3.01.03
3.01.03.01 Lavatorio Vainsa Fontana Blanco o Similar - SSHH Servicio

3.01.03.04 Lavadero Ac. Inox. Presenza o Similar 58x43x30

10,620.00
4,017.00

3,718.00

und

14.00

225.00

3,150.00

3.01.03.05 Grifera de Lavatorio Llave trebol Grazia - SSHH Servicio

und

14.00

30.00

420.00

3.01.03.06 Papelera Kit de Accesorios de Loza treboll Color Blanco

Und

14.00

27.50

3.01.03.07 Jabonera Kit de Accesorios de Loza Trebol Color Blanco

Und

14.00

27.50

385.00

3.01.03.08 Llave Vainsa clase minimalista cruz cromo estndar pico L Giratorio

Und

14.00

1,016.40

14,229.60

3.01.03.09 Accesorios para Lavatorios de Cocinas

Und

28.00

20.00

560.00

Accesorios
3.01.04
3.01.04.01 Instalacin de Accesorios

3.02

PU (S/.)

385.00

Und

121.00

10.00

1,210.00

3.01.04.02 Toallero de barra Metalico Cromado Helvex spazio - SSHH Principal, Secundario

Und

36.00

91.50

3,294.00

3.01.04.03 Papelera metalica Cromada Helvex Spazio

Und

49.00

46.90

2,298.10

3.01.04.04 Perchero Metalico Cromado Helvex Spazio

Und

36.00

25.70

925.20

INSTALACIONES SANITARIAS
SISTEMA DE DESAGUE Y VENTILACION
3.02.01
3.02.01.01
TRABAJOS PRELIMINARES
3.02.01.01.01
Trazo y replanteo
3.02.01.01.02
Excavacin de zanja
3.02.01.01.03
Relleno con cama de arena
3.02.01.01.04
Relleno y compactacin de zanja
3.02.01.01.05
Eliminacin de desmonte
3.02.01.02
REDES DE DESAGUE ENTERRADAS
3.02.01.02.01
Tuberia PVC SAL para desage de 2" enterrada
3.02.01.02.02
Tuberia PVC SAL para desage de 4" enterrada
3.02.01.03
REDES DE DESAGUE EMPOTRADAS
3.02.01.03.01
Tuberia PVC SAL para desage de 2" empotrada
3.02.01.03.02
Tuberia PVC SAL para desage de 4" empotrada
3.02.01.04
REDES DE DESAGUE COLGADAS
3.02.01.04.01
Tuberia PVC SAL para desage de 2" colgada
3.02.01.04.02
Tuberia PVC C-10 de 3" S/P colgada (impusion de desague)
3.02.01.04.03
Tuberia PVC SAL para desage de 4" colgada
3.02.01.04.04
Tuberia PVC SAL para desage de 6" colgada
3.02.01.05
MONTANTES DE DESAGUE
3.02.01.05.01
Tuberia PVC SAL para desage de 2"
3.02.01.05.02
Tuberia PVC C-10 de 3" S/P
3.02.01.05.03
Tuberia PVC SAL para desage de 4"
3.02.01.06
SALIDAS DE DESAGUE
3.02.01.06.01
Salida de desage PVC SAL de 2"
3.02.01.06.02
Salida de desage PVC SAL de 4"
3.02.01.07
REDES DE VENTILACION EMPOTRADAS
3.02.01.07.01
Tuberia PVC SAL para ventilacin de 2" empotrada
3.02.01.08
MONTANTES DE VENTILACION
3.02.01.08.01
Tuberia PVC SAL para ventilacin de 2" empotrada
3.02.01.08.02
Tuberia PVC SAL para ventilacion de 3" empotrada
3.02.01.08.03
Tuberia PVC SAL para ventilacin de 4" adosada
3.02.01.09
SALIDAS DE VENTILACION
3.02.01.09.01
Salida de ventilacin PVC SAL de 2"
3.02.01.10
PRUEBA DE ESTANQUEIDAD
3.02.01.10.01
Prueba de estanqueidad
3.02.01.11
INSTALACION DE APARATOS (SOLO MANO DE OBRA)
3.02.01.11.01
Instalacin de Ovalin
3.02.01.11.02
Instalacin de Lavatorio
3.02.01.11.03
Instalacin de Ducha
3.02.01.11.04
Instalacin de Tina
3.02.01.11.05
Instalacin de lavadero de cocina
3.02.01.11.06
Instalacin de Lavadero de ropa
3.02.01.11.07
Instalacin de inodoro
3.02.01.12
ACCESORIOS VARIOS
3.02.01.12.01
Sumidero de bronce roscado de 2"
3.02.01.12.02
Sumidero de bronce roscado de 4"
3.02.01.12.03
Sumidero de bronce roscado de 6"
3.02.01.12.04
Registro roscado de bronce de 2"
3.02.01.12.05
Registro roscado de bronce de 4"
3.02.01.12.06
Registro de bronce de 2" Tipo Dado
3.02.01.12.07
Registro de bronce de 4" Tipo Dado
3.02.01.12.08
Sombrero de ventilacin de 2"
3.02.01.12.09
Sombrero de ventilacin de 3"
3.02.01.12.10
Sombrero de Ventilacin de 4"
3.02.01.13
CAJAS DE REGISTRO
3.02.01.13.01
Caja de registro de 12" x 24"
3.02.01.14
REJILLAS METALICAS
3.02.01.14.01
Rejilla metlica de 0.15 x 0.30 para caja sumidero
3.02.01.14.02
Rejilla metlica para canaleta de b=0.25m
3.02.01.15
VALVULAS
3.02.01.15.01
Vlvula compuerta de bronce de 3"
3.02.01.15.02
Vlvula Check de bronce de 3"
3.02.01.16
PASES DE PVC
3.02.01.16.01
Pase en viga de PVC
3.02.01.17SISTEMA DE BOMBEO DE DESAGUE
3.02.01.17.01
Linea de Impulsin de Desage de 3"
3.02.01.17.02
Suministro e instalacin de Equipo de Bombeo
3.02.02
SISTEMA DE AGUA FRIA
3.02.02.01
REDES EMPOTRADAS
3.02.02.01.01
Tuberia de Polipropileno D = 20mm (empotrada)
3.02.02.01.02
Tuberia de Polipropileno D = 25mm (empotrada)
3.02.02.01.03
Tuberia de Polipropileno D = 32mm (empotrada)
3.02.02.01.04
Tuberia de Polipropileno D = 40mm (empotrada)
3.02.02.02
REDES COLGADAS
3.02.02.02.01
Tuberia de Polipropileno D = 20mm COLGADA
3.02.02.02.02
Tuberia de Polipropileno D = 25mm COLGADA
3.02.02.02.03
Tuberia de Polipropileno D = 32mm COLGADA
3.02.02.02.04
Tuberia de Polipropileno D = 75mm COLGADA
3.02.02.03
ALIMENTADORES DE AGUA
3.02.02.03.01
Tuberia de Polipropileno PN-10, D = 75mm. Adosada
3.02.02.03.02
Tubera de Polipropileno D=32 mm Adosada
3.02.02.04
SALIDAS DE AGUA FRIA
3.02.02.04.01
Salida agua fria D=20mm Polip. PN-10 (empotrada)
3.02.02.04.02
Salida agua fria D=20mm Polip. PN-10 (empotrada) Ducha
3.02.02.04.03
Salida agua fria D=20mm Polip. PN-10 (empotrada) Tina
3.02.02.04.04
Salida agua fria D=25mm Polip. PN-10 (empotrada) Calentador

m
m
m
m
m3

125.00
125.00
125.00
125.00
57.00

2.24
13.83
15.93
15.40
28.03

280.00
1,729.00
1,990.80
1,925.00
1,597.92

m
m

6.00
123.00

10.77
21.01

64.65
2,584.38

m
m

165.00
24.00

10.77
21.01

1,777.78
504.27

m
m
m
m

54.00
10.00
141.00
24.00

16.21
37.03
28.48
60.86

875.15
370.27
4,015.91
1,460.66

m
m
m

33.00
15.00
543.00

15.46
48.38
29.90

510.05
725.76
16,237.87

pto
pto

165.00
64.00

42.28
67.74

6,976.20
4,335.21

84.00

10.68

897.52

m
m
m

387.00
36.00
54.00

11.01
15.84
28.95

4,260.72
570.12
1,563.41

pto

164.00

36.67

6,013.68

1,400.00

2.24

3,136.00

und
und
und
und
und
und
und

56.00
16.00
38.00
13.00
14.00
14.00
64.00

59.58
58.17
44.39
152.58
56.30
56.30
51.26

3,336.70
930.76
1,686.65
1,983.51
788.23
788.23
3,280.79

und
und
und
und
und
und
und
und
und
und

108.00
21.00
2.00
61.00
38.00
14.00
27.00
30.00
12.00
41.00

37.41
63.82
198.27
33.23
54.29
37.42
77.69
20.09
25.59
33.02

4,040.06
1,340.17
396.55
2,027.05
2,062.88
523.87
2,097.75
602.78
307.10
1,353.72

und

1.00

303.13

303.13

und
m

15.00
25.00

103.67
427.07

1,555.01
10,676.68

und
und

1.00
1.00

575.39
657.83

575.39
657.83

und

28.00

20.66

glb
glb

1.00
1.00

3,250.35
16,136.93

3,250.35
16,136.93

m
m
m
m

35.00
265.00
140.00
5.00

5.89
7.48
10.68
14.66

206.19
1,982.62
1,495.87
73.30

m
m
m
m

45.00
70.00
165.00
30.00

8.98
10.56
13.50
52.53

404.21
739.31
2,226.84
1,575.84

m
m

25.00
205.00

59.17
15.70

1,479.24
3,218.99

pto
pto
pto
pto

183.00
38.00
13.00
14.00

35.99
40.60
40.60
47.12

6,585.36
1,542.80
527.80
659.66

578.59

VALORIZACION 1
CANT.
PARCIAL

ACUMULADO N 1
CANT.
PARCIAL

SALDO POR VALORIZAR


CANT.
PARCIAL

3.02.02.05
PRUEBA HIDROSTATICA
3.02.02.05.01
Prueba hidralica y desinfeccin del sistema de agua
3.02.02.06
VALVULAS
3.02.02.06.01
Llave de paso de 32mm Met. Fusion Polipropileno, R-3
3.02.02.06.02
Llave de paso de 25mm Cromo. Fusion Polipropileno, R-3
3.02.02.06.03
Llave de paso de 25mm Met. Fusion Polipropileno, R-3
3.02.02.06.04
Llave de paso de 20mm Cromo. Fusion Polipropileno, R-3
3.02.02.06.05
Llave de paso de 20mm Met. Fusion Polipropileno, R-3
3.02.02.06.06
Grifo de riego de 1/2"
3.02.02.07
MEDIDORES DE AGUA
3.02.02.07.01
Bateria para medidores de agua
3.02.02.07.02
Medidor de agua de 3/4"
3.02.03
SISTEMA DE AGUA CALIENTE
3.02.03.01
SALIDAS DE AGUA CALIENTE
3.02.03.01.01
Salida agua caliente D=16mm Polip. PN-16
3.02.03.01.02
Salida agua caliente D=16mm Polip. PN-16 Ducha
3.02.03.01.03
Salida agua caliente D=16mm Polip. PN-16 (empotrada) Tina
3.02.03.01.04
Salida agua caliente D=25mm Polip. PN-16 (empotrada) Calentador
3.02.03.02
REDES EMPOTRADAS
3.02.03.02.01
Tuberia de Polipropileno PN-16, D = 16mm
3.02.03.02.02
Tuberia de Polipropileno PN-16, D = 25mm
3.02.03.03
VALVULAS
3.02.03.03.01
Llave de paso de 25mm Met. Fusion Polipropileno, R-3
3.02.03.03.02
Llave de paso de 16mm Cromo. Fusion Polipropileno, R-3
3.02.03.03.03
Llave de paso de 16mm Met. Fusion Polipropileno, R-3
3.02.04
ABASTECIMIENTO
3.02.04.01
INGRESO A CISTERNA DE AGUA POTABLE
3.02.04.01.01
Rompeagua de SCH-40 de 1" L:0.60m
3.02.04.01.02
Vlvula esfrica de bronce de 1"
3.02.04.01.03
Vlvula flotadora de bronce de 1"
3.02.05
SISTEMA BOMBEO DE PRESION CONSTANTE
3.02.05.01
INSTALACIONES ELECTROMECANICAS
3.02.05.01.01
Rompeagua de SCH-40 de 3" L:0.60m
3.02.05.01.02
Rompeagua de SCH-40 de 4" L:0.60m
3.02.05.01.03
Linea de succin de agua fra de 3"
3.02.05.01.04
Linea de Impulsin de agua fra de 2.1/2"
3.02.05.01.05
Linea Sensora de Presin
3.02.05.01.06
Linea de Rebose de 4"
3.02.05.01.07
Linea de desague de Cisterna de 4"
3.02.05.02
EQUIPAMIENTO
Suministro e instalacin de Equipo de Bombeo
3.02.05.02.01

COSTO DIRECTO

1,200.00

1.14

1,370.88

pto
und
und
und
und
und

14.00
50.00
15.00
14.00
47.00
4.00

69.15
62.06
54.38
53.39
47.92
54.40

968.08
3,102.96
815.64
747.47
2,252.47
217.59

glb
und

1.00
14.00

1,098.70
276.74

1,098.70
3,874.37

pto
pto
pto
pto

85.00
37.00
13.00
14.00

35.84
41.17
41.17
51.26

3,046.40
1,523.33
535.23
717.67

m
m

225.00
140.00

7.03
9.58

und
und
und

14.00
78.00
28.00

66.15
63.26
59.54

1,582.56
1,340.64
0.00
926.06
4,934.09
1,667.10

und
und
und

2.00
2.00
2.00

382.40
108.57
124.95

764.80
217.15
249.89

und
und
est
est
glb
und
glb

3.00
4.00
1.00
1.00
1.00
2.00
2.00

419.33
537.50
4,014.26
4,077.00
318.44
364.47
1,281.74

1,257.98
2,150.00
4,014.26
4,077.00
318.44
728.94
2,563.48

est

1.00

18,376.93

18,376.93

307,272.09

COSTO DIRECTO S/.

0.00

0.00

0.00

0.00

4.00

FORMATO DE VALORIZACION RIEDEL


PROYECTO: PARQUE SANTA TERESITA
VALORIZACION n
SUB-CONTRATISTA IIEE

1
A&A
VALORIZACION 1

Descripcin
Item
4.01
INSTALACIONES ELECTRICAS INTERIORES
4.01.01
SALIDAS ELCTRICAS
4.01.01.01
EN REAS COMUNES DEL EDIFICIO Y STANOS
4.01.01.01.01
Salida para centro de luz, en reas comunes
4.01.01.01.02
Salida para centro de luz, en stanos
4.01.01.01.03
Salida para braquete, en reas comunes
4.01.01.01.04
Salida para ahorrador empotrado, en reas comunes
4.01.01.01.05
Salida para dicroico empotrado, en reas comunes
4.01.01.01.06
Salida para luminaria en piso, en reas comunes
4.01.01.01.07
Salida para luminaria en jardin, en reas comunes
Salida para artefacto de emergencia de 2 lamparas reflectoras, en reas comunes
4.01.01.01.08
Salida para artefacto de emergencia de 2 lamparas reflectoras, en stanos
4.01.01.01.09
4.01.01.01.10
Salida para interruptor unipolar simple-Modus Plus Bticino
4.01.01.01.11
Salida para interruptor unipolar simple
4.01.01.01.12
Salida para interruptor unipolar doble-Modus Plus Bticino
4.01.01.01.13
Salida para interruptor unipolar triple
4.01.01.01.14
Salida para interruptor de conmutacin simple-Modus Plus Bticino
Salida para tomacorriente bipolar c/l.t. doble, en reas comunes-Modus Plus
4.01.01.01.15
Bticino
4.01.01.01.16
Salida para tomacorriente bipolar c/l.t. doble, en reas comunes
Salida para tomacorriente bipolar c/l.t. doble, a prueba de agua en reas comunes4.01.01.01.17
Modus Plus Bticino
Salida para tomacorriente bipolar c/l.t. doble, a prueba de agua en stanos-Modus
4.01.01.01.18
Plus Bticino
4.01.01.01.19
Salida para chapa elctrica
4.01.01.02
EN DEPARTAMENTO
4.01.01.02.01
Salida para ahorrador empotrado, en departamentos
4.01.01.02.02
Salida para dicroico empotrado, en departamentos
4.01.01.02.03
Salida para braquete, en departamentos
Salida para artefacto de emergencia de 2 lamparas reflectoras, en departamentos
4.01.01.02.04
4.01.01.02.05
Salida para interruptor unipolar simple-Modus Plus Bticino
4.01.01.02.06
Salida para interruptor unipolar simple
4.01.01.02.07
Salida para interruptor unipolar doble-Modus Plus Bticino
4.01.01.02.08
Salida para interruptor unipolar doble
4.01.01.02.09
Salida para interruptor unipolar triple
4.01.01.02.10
Salida para interruptor de conmutacin simple
Salida para tomacorriente bipolar c/l.t. doble, en departamentos-Modus Plus
4.01.01.02.11
Bticino
4.01.01.02.12
Salida para tomacorriente bipolar c/l.t. doble, en departamentos
4.01.01.02.13
Salida para tomacorriente bipolar c/l.t. doble a prueba de agua
4.01.01.02.14
Salida para campana extractora
4.01.01.02.15
Salida para pulsador de timbre
4.01.01.02.16
Salida para zumbador de timbre
4.01.02
INTERRUPTORES TERMOMAGNETICOS
4.01.02.01
Interruptor termomagntico de 2x10A, en caja de FG
4.01.02.02
Interruptor termomagntico de 2x20A, en caja de FG
4.01.03
TABLEROS ELECTRICOS
4.01.03.01
Tablero TSG
4.01.03.02
Tablero T-D1 (DPTO. 101)
4.01.03.03
Tablero T-D2 (DPTO. 102,202,302,402,502)
4.01.03.04
Tablero T-D3 (DPTO. 201,301,401,501)
4.01.03.05
Tablero T-D4 (DPTO. 303,503)
4.01.03.06
Tablero T-D5 (DPTO. 602)
4.01.03.07
Tablero T-D6 (DPTO. 601)
4.01.03.08
Tablero T-EXT1
4.01.03.09
Tablero T-EXT2
4.01.03.10
Tablero T-BCI
4.01.03.11
Tablero T-BA
4.01.03.12
Tablero T-BS
4.01.03.13
Tablero T-GE
4.01.03.14
Tablero T-ASC.1
4.01.03.15
Tablero T-ASC.2
4.01.04
ALIMENTADORES ELCTRICOS
4.01.04.01
De B.M. a Tablero TSG
Cable 3-1x150mm2THW+1x35mm2TW
4.01.04.02
De B.M. a Tablero T-BCI
Cable 3-1x95mmTHW+1x25mm2 THW
4.01.04.03
De B.M. a Tablero T-D1 (101)
Cable 3-1x10mm2THW+1x10mm2TW
4.01.04.04
De B.M. a Tablero T-D2 (102)
Cable 3-1x16mm2THW+1x10mm2TW
4.01.04.05
De B.M. a Tablero T-D3 (201)
Cable 3-1x10mm2THW+1x10mm2TW
4.01.04.06
De B.M. a Tablero T-D2 (202)
Cable 3-1x10mm2THW+1x10mm2TW
4.01.04.07
De B.M. a Tablero T-D3 (301)
Cable 3-1x16mm2THW+1x10mm2TW
4.01.04.08
De B.M. a Tablero T-D2 (302)
Cable 3-1x10mm2THW+1x10mm2TW
4.01.04.09
De B.M. a Tablero T-D4 (303)
Cable 3-1x10mm2THW+1x10mm2TW
4.01.04.10
De B.M. a Tablero T-D3 (401)
Cable 3-1x16mm2THW+1x10mm2TW
4.01.04.11
De B.M. a Tablero T-D2 (402)
Cable 3-1x10mm2THW+1x10mm2TW
4.01.04.12
De B.M. a Tablero T-D3 (501)
Cable 3-1x16mm2THW+1x10mm2TW
4.01.04.13
De B.M. a Tablero T-D2 (502)
Cable 3-1x10mm2THW+1x10mm2TW
4.01.04.14
De B.M. a Tablero T-D4 (503)
Cable 3-1x16mm2THW+1x10mm2TW
4.01.04.15
De B.M. a Tablero T-D5 (601)
Cable 3-1x16mm2THW+1x10mm2TW
4.01.04.16
De B.M. a Tablero T-D6 (602)
Cable 3-1x16mm2THW+1x10mm2TW
4.01.04.17
De G.E.30 KW,3? a Tablero T-GE
Cable 3-1x35mm2THW+1x16mm2TW
4.01.04.18
De T-GE a Tablero T-EM
Cable 3-1x35mm2THW+1x16mm2TW
4.01.04.19
De TSG a Tablero T-EXT.1 Cable 3-1x10mm2THW+1x10mm2TW
4.01.04.20
De TSG a Tablero T-EM Cable 3-1x35mm2THW+1x16mm2TW
4.01.04.21
De TSG a Tablero T-ASC.1 Cable 3-1x25mm2TW+1x10mm2TW
4.01.04.22
De TSG a Tablero T-ASC.2 Cable 3-1x25mm2TW+1x10mm2TW
4.01.04.23
De TSG a Tablero T-BA Cable 3-1x6mm2THW+1x6mm2TW
4.01.04.24
De TSG a Tablero T-BS Cable 3-1x4mm2TW+1x4mm2TW
4.01.04.25
De T-BCI a Tablero T-EXT.2 Cable 3-1x4mm2THW+1x4mm2 TW
4.01.05
SALIDAS DE FUERZA
Salida para COCINA ELECTRICA
Cable 3-1x6mm2TW+1x6mm2TW-25mm PVC-P
4.01.05.01
Salida para CALENTADOR ELECTRICO
Cable 2-1x4mm2TW+1x4mm2TW-20mm
4.01.05.02 PVC-P
Salida para LAVADORA-SECADORA
Cable 2-1x6mm2TW+1x6mm2TW-25mm
4.01.05.03 PVC-P
Salida para TELEFONO INTERNO
Cable 2-1x4mm2TW+1x4mm2TW-20mm PVC4.01.05.04 P
Salida para CONTROL PUERTA LEVADIZA
Cable 2-1x4mm2TW+1x4mm2TW4.01.05.05 20mm PVC-P
Salida para BOMBA DE AGUA 1 (2.3HP.) DE PRESION CONSTANTE Y VELOCIDAD
4.01.05.06 VARIABLE
Cable 3-1x4mm2TW+1x4mm2TW-20mm PVC-P
Salida para BOMBA DE AGUA 2 (2.3HP.) DE PRESION CONSTANTE Y VELOCIDAD
4.01.05.07 VARIABLE
Cable 3-1x4mm2TW+1x4mm2TW-20mm PVC-P
Salida para BOMBA DE AGUA 3 (2.3HP.) DE PRESION CONSTANTE Y VELOCIDAD
4.01.05.08 VARIABLE
Cable 3-1x4mm2TW+1x4mm2TW-20mm PVC-P
Salida para CONTROL DE NIVEL DE CISTERNA
Cable 2 - 1 x 2.5mm2 THW 4.01.05.09 15mm PVC-P
4.01.05.10
Salida para PRESOSTATO
Cable 2 - 1 x 2.5mm2 THW - 15mm PVC-P

Und

Metrado

PU (S/.)

Parcial (S/.)

pto
pto
pto
pto
pto
pto
pto
pto

11.00
77.00
20.00
28.00
4.00
9.00
4.00
22.00

35.78
51.79
49.46
38.07
38.07
44.90
40.34
79.97

393.62
3,987.74
989.18
1,065.93
152.28
404.11
161.37
1,759.30

pto

39.00

95.35

3,718.48

pto
pto
pto
pto
pto
pto

13.00
4.00
4.00
2.00
2.00
2.00

45.29
55.50
56.24
78.70
56.95
80.64

588.81
221.98
224.94
157.40
113.90
161.28

pto
pto

9.00
6.00

96.53
116.20

868.80
697.20

pto

21.00

129.45

2,718.44

pto

2.00

75.60

151.20

pto
pto
pto
pto

197.00
364.00
2.00
14.00

33.78
33.78
35.45
70.03

6,654.50
12,295.63
70.90
980.47

pto
pto
pto
pto
pto
pto
pto

21.00
130.00
20.00
65.00
21.00
116.00
57.00

41.00
51.21
49.81
60.67
70.15
55.87
64.08

861.07
6,656.83
996.13
3,943.58
1,473.06
6,480.41
3,652.29

pto
pto
pto
pto

335.00
12.00
14.00
14.00
14.00

79.97
106.59
70.03
71.57
85.49

26,789.28
1,279.08
980.47
1,001.95
1,196.85

und
und

28.00
14.00

132.87
136.83

3,720.24
1,915.63

und
1.00 16,528.79
und
1.00 2,248.22
und
5.00 2,671.21
und
4.00 2,352.04
und
2.00 2,510.98
und
1.00 2,839.40
und
1.00 2,998.33
und
1.00 1,907.76
und
1.00 1,193.92
und
1.00 2,378.60
POR EQUIPADOR
POR EQUIPADOR
POR EQUIPADOR
POR EQUIPADOR
POR EQUIPADOR

16,528.79
2,248.22
13,356.06
9,408.18
5,021.97
2,839.40
2,998.33
1,907.76
1,193.92
2,378.60

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

72.00
52.00
60.00
39.00
60.00
43.00
64.00
47.00
56.00
68.00
51.00
72.00
55.00
65.00
77.00
59.00
10.00
28.00
38.00
15.00
42.00
45.00
30.00
27.00
50.00

208.17
133.69
21.53
28.12
21.53
21.53
28.12
21.53
21.53
28.12
21.53
28.12
21.53
28.12
28.12
28.12
55.23
55.23
21.53
55.23
39.72
39.72
13.00
9.08
9.08

14,988.56
6,952.11
1,291.58
1,096.80
1,291.58
925.64
1,799.88
1,011.74
1,205.48
1,912.38
1,097.85
2,024.87
1,183.95
1,828.01
2,165.49
1,659.27
552.27
1,546.36
818.00
828.41
1,668.04
1,787.18
390.10
245.25
454.16

pto

14.00

145.06

2,030.87

pto

14.00

111.18

1,556.55

pto

14.00

157.47

2,204.61

pto

1.00

171.19

171.19

pto

1.00

222.12

222.12

pto

1.00

90.19

90.19

pto

1.00

90.19

90.19

pto

1.00

90.19

90.19

pto

2.00

67.09

134.18

pto

1.00

70.73

70.73

CANT.

PARCIAL

ACUMULADO N 1
CANT.

PARCIAL

SALDO POR VALORIZAR


CANT.

PARCIAL

Salida para BOMBA SUMIDERO 1 (2.0HP.) Cable 3-1x4mm2TW+1x4mm2TW-20mm


4.01.05.11 PVC-P
Salida para BOMBA SUMIDERO 2 (2.0HP.) Cable 3-1x4mm2TW+1x4mm2TW-20mm
4.01.05.12 PVC-P
Salida para POZO SUMIDERO Cable 2-1x2.5mm2TW+1x2.5mm2TW-15mm PVC-P
4.01.05.13
Salida para BOMBA CONTRA INCEN. 50HP Cable 3-1x35mm2THW+1x16mm2TW4.01.05.14 40mm PVC-P
Salida para BOMBA JOCKEY 1.0HP Cable 3-1x4mm2THW+1x4mm2-25mm PVC-P
4.01.05.15
4.01.05.16
Salida para ALARMA A.C.I. Cable 2-1x4mm2THW+1x4mm2-25mm PVC-P
Salida para EXTRACTOR SOTANO 3 EC-01 (10 HP) Cable 3-1x4mm2THW+1x4mm2TW4.01.05.17 20mm PVC-P
Salida para EXTRACTOR AZOTEA EC-02 (2.0 HP) Cable 3-1x4mm2THW+1x4mm2TW4.01.05.18 20mm PVC-P
Salida de fuerza para ASCENSOR Cable 3-1x25mm2TW+1x10mm2TW-40mm PVC-P
4.01.05.19
4.01.06
CAJAS DE PASE
4.01.06.01
Caja de pase octogonal
4.01.06.02
Caja de pase de 100x100x50 mm
4.01.06.03
Caja de pase de 100x100x50 mm (hermtica)
4.01.06.04
Caja de pase de 150x150x75 mm
4.01.06.05
Caja de pase de 200x200x100 mm
4.01.06.06
Caja de pase de 250x250x100 mm
4.01.06.07
Caja de pase de 300x300x100 mm
4.01.06.08
Caja de pase de 400x400x150 mm
4.01.06.09
Caja de pase de 500x500x200 mm
4.01.07
TUBERA ELCTRICA
4.01.07.01
Tuberia PVC SAP de 20mm
4.01.07.02
Tuberia PVC SAP de 25mm
4.01.07.03
Tuberia PVC SAP de 40mm
4.01.07.04
Tuberia PVC SAP de 65mm
4.01.07.05
Tuberia PVC SAP de 80mm
4.01.07.06
Tuberia PVC SAP de 100mm
4.01.07.07
Tubera conduit RGS de 100mm
4.01.08
SOPORTERA ELCTRICA
4.01.08.01
Soportera para tubera elctricas (1und 65)
4.01.08.02
Soportera para tubera elctricas (1und 80)
4.01.08.03
Soportera para tubera elctricas (14und 25)
4.01.09
INSTALACIN Y SUMINISTRO DE LUMINARIAS
4.01.09.01
Instalacin de centro de luz, en reas comunes, incluye luminaria
4.01.09.02
Instalacn de centro de luz en stanos, incluye luminaria braquete
4.01.09.03
Instalacin de braquete, en areas comunes, incluye luminaria
4.01.09.04
Instalacn de ahorrador empotrado, en areas comunes, incluye luminaria
4.01.09.05
Instalacin de dicroico empotrado, en reas comunes, incluye luminaria
4.01.09.06
Instalacin de luminaria en piso
4.01.09.07
Instalacin de luminaria en jardin
Instalacin de artefacto de emergencia, en stanos, reas comunes y departamentos
4.01.09.08
4.01.10
PRUEBAS ELECTRICAS
4.01.10.01
Prueba de aislamiento
4.01.10.02
Conexion a banco de medidores
4.02
4.02.01
4.02.01.01
4.02.01.02
4.02.01.03
4.02.01.04
4.02.02
4.02.02.01
4.02.02.02
4.02.02.03
4.02.02.04
4.02.02.05
4.02.02.06
4.02.03
4.02.03.01
4.02.03.02
4.02.03.03
4.02.03.04
4.02.03.05
4.02.04
4.02.04.01
4.02.04.02

SISTEMA DE COMUNICACIONES
SALIDA PARA COMUNICACIONES
Salida para telefono externo
Salida para intercomunicadores
Salida para TV-Cable
Salida para central de intercomunicador
CAJAS DE PASE COMUNICACIONES
Caja de pase de 100x100x50 mm
Caja de pase de 150x150x75 mm
Caja de pase de 250x250x100 mm
Caja de pase de 300x300x100 mm
Caja de pase de 400x400x150 mm
Caja de Pase tipo "D" emp. 500x800x150 mm
TUBERIA PARA COMUNICACIONES
Tuberia PVC SAP de 20mm
Tuberia PVC SAP de 25mm
Tuberia PVC SAP de 35mm
Tuberia PVC SAP de 50mm
Tuberia PVC SAP de 65mm
SOPORTERA COMUNICACIONES
Soportera para tubera de comunicaciones (1und 35)
Soportera para tubera de comunicaciones (1und 50)

4.03.01
4.03.01.01
4.03.01.02
4.03.01.03
4.03.01.04
4.03.01.05
4.03.02
4.03.02.01
4.03.03
4.03.03.01
4.03.04
4.03.04.01

SISTEMA DE DETECCION Y ALARMA CONTRA INCENDIO


SALIDAS PARA CONTRA INCENDIO
Salida para detector de temperatura
Salida para detector de humo
Salida para sirena con luz estroboscopica
Salida para estacin manual
Salida para central de alarma contraincendio
CAJAS DE PASE DETECCION Y ALARMA
Caja de pase de 150x150x75 mm
TUBERIA PARA DETECCION Y ALARMAS
Tuberia PVC SAP de 20mm
SOPORTERIA DETECCION Y ALARMAS
Soportera para tubera de deteccin y alarmas (2und 20)

4.04.01
4.04.01.01
4.04.01.02
4.04.01.03
4.04.01.04
4.04.02
4.04.02.01
4.04.02.02
4.04.02.03
4.04.02.04

SISTEMA DE PUESTA A TIERRA


PARA ASCENSORES
Electrodo de desnudo de 70 mm2 segn Norma IEC 61024
Registro de Puesta aTierra
Soldadura exotrmica de 115 gramos
Mejorador de Puesta a tierra FAVIGEL
PARA BAJA TENSIN
Electrodo de desnudo de 70 mm2 segn Norma IEC 61024
Registro de Puesta aTierra
Soldadura exotrmica de 115 gramos
Mejorador de Puesta a tierra FAVIGEL

4.03

4.04

COSTO DIRECTO

pto

1.00

116.28

116.28

pto

1.00

116.28

116.28

pto

1.00

83.43

83.43

pto

1.00

468.59

468.59

pto

1.00

99.00

99.00

pto
pto

1.00
1.00

198.65
99.00

198.65
99.00

pto

1.00

99.00

99.00

pto

2.00

316.23

632.46

und
und
und
und
und
und
und
und
und

33.00
7.00
4.00
21.00
1.00
1.00
2.00
7.00
11.00

13.83
19.17
33.51
25.47
31.37
39.47
47.54
73.96
108.46

456.46
134.22
134.04
534.84
31.37
39.47
95.09
517.75
1,193.07

m
m
m
m
m
m
m

27.00
934.00
140.00
52.00
72.00
16.00
10.00

3.40
3.92
6.05
12.06
22.71
20.97
312.91

91.93
3,661.28
846.72
627.24
1,635.38
335.46
3,129.06

und
und
und

25.00
32.00
45.00

65.87
66.38
82.45

1,646.68
2,124.24
3,710.45

und
und
und
und
und
und
und
und

11.00
77.00
20.00
28.00
4.00
9.00
4.00
75.00

172.84
90.14
73.52
145.59
543.60
28.31
28.31
28.31

1,901.22
6,940.60
1,470.34
4,076.49
2,174.41
254.82
113.25
2,123.52

glb
glb

1.00
1.00

3,130.72
498.37

3,130.72
498.37

pto
pto
pto
pto

17.00
33.00
62.00
2.00

31.72
35.38
36.97
90.05

539.21
1,167.57
2,292.21
180.10

und
und
und
und
und
und

52.00
4.00
3.00
15.00
6.00
2.00

19.17
25.47
39.47
47.54
73.96
309.47

997.07
101.88
118.41
713.16
443.79
618.93

m
m
m
m
m

296.00
110.00
75.00
118.00
10.00

3.40
3.92
4.98
8.36
12.06

1,007.82
431.20
373.80
985.91
120.62

und
und

34.00
80.00

65.04
65.45

2,211.31
5,236.22

pto
pto
pto
pto
pto

67.00
51.00
28.00
28.00
1.00

30.41
30.41
32.74
29.08
90.05

2,037.34
1,550.81
916.65
814.11
90.05

und

22.00

25.47

560.31

328.00

3.40

1,116.77

und

32.00

68.56

2,193.77

m
m
und
und

16.00
1.00
1.00
2.00

128.93
151.47
216.10
708.89

2,062.95
151.47
216.10
1,417.79

m
m
und
und

110.00
1.00
11.00
15.00

107.02
129.55
194.17
686.96

11,771.76
129.55
2,135.92
10,304.45

315,301.50

COSTO DIRECTO S/.

0.00

0.00

0.00

0.00

5.00

FORMATO DE VALORIZACION RIEDEL


PROYECTO: PARQUE SANTA TERESITA
VALORIZACION N
SUB-CONTRATISTA II ELECTROMECANICAS

1
Thysenkroup
ACUMULADO N 1

VALORIZACION 1

Item
5.01

Descripcin

Und

Metrado

Und
Und
Und

1
1
1

PU (S/.)

Parcial (S/.)

CANT.

PARCIAL

CANT.

PARCIAL

SALDO POR VALORIZAR


CANT.

PARCIAL

INSTALACIONES ELECTROMECANICAS

5.01.01 Ascensor de Minusvlidos


5.01.02 Ascensores para Departamentos
5.01.03 Ascensores para Departamentos

COSTO DIRECTO

15,400.00
102,375.00
96,915.00

15,400.00
102,375.00
96,915.00

214,690.00

COSTO DIRECTO S/.

0.00

0.00

6.00

FORMATO DE VALORIZACION RIEDEL


PROYECTO: PARQUE SANTA TERESITA
VALORIZACION n
SUB-CONTRATISTA GAS

VALORIZACION 1
Item
6.01

Descripcin

INSTALACIONES DE GAS-GLP
Sistema de Gas-GLP
6.01.01
Izaje de Tanque
6.01.02
Trmites OSINERGMIN
6.01.03

COSTO DIRECTO

Und

Metrado

Und
Und
Und

1
1
1

PU (S/.)
65,000.00
4,000.00
3,000.00

Parcial (S/.)

CANT.

PARCIAL

ACUMULADO N 1
CANT.

PARCIAL

SALDO POR VALORIZAR


CANT.

PARCIAL

65,000.00
4,000.00
3,000.00

72,000.00

COSTO DIRECTO S/.

0.00

0.00

0.00

0.00

7.00

FORMATO DE VALORIZACION RIEDEL


PROYECTO: PARQUE SANTA TERESITA
VALORIZACION n

SUB-CONTRATISTA SISTEMA DE EXTRACCION DE MONOXIDO


T/C

2.72
VALORIZACION 1

Item
7.01

Descripcin

INSTALACIONES DE EXTRACCION DE MONOXIDO - Tipo JETFAN


7.01.01
Sistema de Extraccion de Monxido JetFan
7.01.02
Sistema de Extraccion de humo en Vestibulos

COSTO DIRECTO

Und Metrado

PU ($.)

Und
Und

53,067.20
7,357.60

1
1

Parcial ($.)

CANT.

PARCIAL

ACUMULADO N 1
CANT.

PARCIAL

SALDO POR VALORIZAR


CANT.

PARCIAL

53,067.20
7,357.60

60,424.80

COSTO DIRECTO S/.

0.00

0.00

0.00

0.00

8.00

FORMATO DE VALORIZACION RIEDEL


PROYECTO: PARQUE SANTA TERESITA
VALORIZACION N
SUB-CONTRATISTA EVACUACION Y SEALIZACION

TOTAL
T/C

7,500.00
2.75

PU (S/.)

Parcial (S/.)

VALORIZACION 1

Item
8.01

Descripcin

Und Metrado

CANT.

PARCIAL

ACUMULADO N 1
CANT.

PARCIAL

SALDO POR VALORIZAR


CANT.

PARCIAL

SISTEMA DE EVACUACION Y SEALIZACION


8.01.01Seales de Evacuacin y Seguridad
8.01.02Luces de Emergencia

COSTO DIRECTO

Glb
Und

1
1

3,000.00
4,500.00

3,000.00
4,500.00

7,500.00

COSTO DIRECTO S/.

0.00

0.00

0.00

0.00

9.00

FORMATO DE VALORIZACION RIEDEL


PROYECTO: PARQUE SANTA TERESITA
VALORIZACION n
SUB-CONTRATISTA INSTALACION CONTRAINCENDIO

1
A&A

Descripcin

Und

VALORIZACION 1
Item
9.01

SISTEMA DE AGUA CONTRA INCENDIO


TUBERIA SCH-40 COLGADA
9.01.01
9.01.01.01 Tuberia de acero SCH-40 de 6" colgada
9.01.01.02 Tuberia de acero SCH-40 de 4" colgada
9.01.01.03 Tuberia de acero SCH-40 de 3" colgada
9.01.01.04 Tuberia de acero SCH-40 de 2.1/2" colgada
9.01.01.05 Tuberia de acero SCH-40 de 2" colgada
9.01.01.06 Tuberia de acero SCH-40 de 1.1/2" colgada
9.01.01.07 Tuberia de acero SCH-40 de 1.1/4" colgada
9.01.01.08 Tuberia de acero SCH-40 de 1" colgada
TUBERIA SCH-40 ADOSADA
9.01.02
9.01.02.01 Tuberia de acero SCH-40 de 6" adosada
9.01.02.02 Tuberia de acero SCH-40 de 4" adosada
9.01.02.03 Tuberia de acero SCH-40 de 2" adosada
PRUEBAS
9.01.03
9.01.03.01 Prueba Hidralica del Sistema de A.C.I.
ROCIADORES - ESTACIONES DE CONTROL
9.01.04
9.01.04.01 Rociador Tipo Pendent de 1/2" Standard
9.01.04.02 Estacin Controladora de Rociadores de 4"
VALVULAS
9.01.05
9.01.05.01 Vlvula Siamesa de 4" x 2.1/2" x 2.1/2" Tipo Poste
9.01.05.02 Vlvula Check ranurada de 4"
9.01.05.03 Vlvula Angular de 2.1/2" (sin gabinete)
9.01.05.04 Vlvula de Purga de 1"
GABINETE
9.01.06
9.01.06.01 Gabinete contraincendio de 1.1/2"
SOPORTES
9.01.07
9.01.07.01 Soporte Antissmico de 02 vias
9.01.07.02 Soporte Antissmico de 04 vias
SISTEMA DE BOMBEO CONTRAINCENDIO (NO LISTADO)
9.01.08
9.01.08.01 BOMBA PRINCIPAL
Rompeagua de SCH-40 de 6" L:0.60m
9.01.08.01.01
Linea de Succin de 6"
9.01.08.01.02
Linea de Impulsin de 6"
9.01.08.01.03
Linea de Prueba de 6"
9.01.08.01.04
Linea de Alivio de 3"
9.01.08.01.05
Linea Sensora de cobre de 1/2"
9.01.08.01.06
9.01.08.02 BOMBA JOCKEY
Linea de Succin de 1"
9.01.08.02.01
Linea de Impulsin de 1"
9.01.08.02.02
Linea Sensora de cobre de 1/2"
9.01.08.02.03
9.01.08.03 EQUIPAMIENTO (NO LISTADO)
9.01.08.03.01
Suministro e instalacin de Electrobomba Principal y
Electrobomba Jockey
COSTO DIRECTO

Metrado

PU (S/.)

Parcial (S/.)

m
m
m
m
m
m
m
m

24.00
90.00
6.00
30.00
90.00
78.00
78.00
270.00

206.55
136.95
100.39
70.90
59.48
51.90
40.75
32.86

4,957.21
12,325.82
602.31
2,126.88
5,353.49
4,048.26
3,178.16
8,872.42

m
m
m

18.00
36.00
18.00

277.23
139.15
50.71

4,990.20
5,009.36
912.84

1,000.00

1.12

1,120.00

und
glb

157.00
3.00

54.14
2,533.92

8,500.11
7,601.76

und
und
und
und

1.00
1.00
13.00
20.00

1,124.70
775.19
577.68
133.68

1,124.70
775.19
7,509.90
2,673.66

und

13.00

1,108.58

14,411.49

und
und

4.00
3.00

111.15
178.33

444.60
534.98

und
glb
glb
glb
glb
glb

1.00
1.00
1.00
1.00
1.00
1.00

620.42
4,125.48
5,125.79
9,753.04
6,590.46
1,164.68

620.42
4,125.48
5,125.79
9,753.04
6,590.46
1,164.68

glb
glb
glb

1.00
1.00
1.00

1,129.97
1,187.38
1,164.68

1,129.97
1,187.38
1,164.68

glb

1.00

25,362.89

CANT.

ACUMULADO N 1

PARCIAL

CANT.

PARCIAL

SALDO POR VALORIZAR


CANT.

PARCIAL

25,362.89
153,298.13

COSTO DIRECTO S/.

0.00

0.00

0.00

0.00

10.00

FORMATO DE VALORIZACION RIEDEL


PROYECTO: PARQUE SANTA TERESITA
VALORIZACION n
SUB-CONTRATISTA SISTEMA DETECCION CONTRAINCENDIO

A&A

Descripcin

Und

Metrado

und
und
und
und
und
rll

1.00
28.00
28.00
51.00
67.00
7.00

1
VALORIZACION 1

Item

PARTIDAS COMPLEMENTARIAS
10.01
EQUIPAMIENTO DEL SISTEMA DE DETECCIN DE INCENDIOS
10.01.01
10.01.01.01 Central de alarma contraincendio
10.01.01.02 Estacin manual de simple accin
10.01.01.03 Sirena con luz estroboscpica
10.01.01.04 Detector de humo
10.01.01.05 Detector de temperatura
10.01.01.06 Cableado del sistema de deteccin contraincendio
COSTO DIRECTO

PU (S/.)

3,839.62
106.70
55.12
84.80
68.63
915.90

Parcial (S/.)

CANT.

PARCIAL

ACUMULADO N 1
CANT.

SALDO POR VALORIZAR

PARCIAL

CANT.

PARCIAL

3839.6176
2987.6672
1543.2256
4324.5552
4598.4512
6411.3168
23,704.83

COSTO DIRECTO S/.

0.00

0.00

0.00

0.00