Analysis of Rate

Sl.No. Item of work 1 Earth work in excavation by mechanical means upto depth of 6 M for footing foundation, Pile Cap, Tie Beam extra as per drawing and technical specification including settting out, Construction of soring and bracing removal of slumps and other deterious matter braking of side and bottom and back filling as per standard data book of IRC.SL. NO.12.1(11) Page 3 to 4 Unit Qty. Rate Amount

Take Qty=210 Cum. ALabour Mate Mazdoor Day Day 0.32 8.00 210.00 200.00 Total BMachinery Hydraulic excavator 1.00 Cum bucket (Market value) CD.For the watering@7.5% (A+B) 8867.20 Over head establishment & mobilization @20% on (A+B+C) 9532.24 1906.44 Hour 6.00 1200.00 7200.00 67.20 1600.00 1667.20

665.04

E-

Contractor profit @ 10%(A+B+C+D) 11438.68 Total Hence Rate for one Cum 12582.54/210 Say

1143.86

12582.54 59.91 60.00

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work 2 Fabricating and laying cutting edge made out of M.S. Angle & plates, including cutting, moulding in the required shape, welding as per approved drawing and specification, including cost of all materials, labour, tools tackels, plants & equipments etc. Complete as required for successful completion of the work Standard data book of IRC Sl No. 12.10 page no. 350 A) Material Structure Nuts & Bolts B) Labour Mate Fitter Blacksmith Welder Mazdoor Day Day Day 1.32 5.50 5.50 5.50 16.50 210.00 250.00 290.00 250.00 200.00 Total Consumables 10% 0.10 Total (A+B) A) Over Heads, establishment & mobilzation etc. @ 20% on (A+B) Total (A+B+C) All Taxes Risk and contractor Profit etc. @10% Total Say Rs. . 277.20 1375.00 1595.00 1375.00 3300.00 63922.20 6392.22 70314.42 14062.88 84377.30 8437.73 92815.03 92815.00 MT KG 1.05 20.00 52000.00 70.00 54600.00 1400.00 Unit Qty. Rate Amount

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work 3 RCC work in well kerb with concrete mix M25 grade with coarse sand (F.M. 1.8 to 2.5) and graded hard stone ballast including shuttering and placing and fixing of reinforcement bars with 24 BWG bindingwire in proper position as per approved drawing, including placing of concrete and compacting the same with vibrators with cost of materials, labour and T&P complete. (Standard data book of I.R.C. S/No. 12.11 page 351 ) Unit Qty. Rate Amount

Take Qty=15 Cum. A) Material Cement C. Sand 20 mm Aggregate 10 mm Aggregate B) Labour Mate Mason Mazdoor Day Day Day 0.86 1.50 20.00 210.00 290.00 200.00 180.60 435.00 4000.00 4615.60 C) Machinery Concrete mixer Generator D) Form work 20% (A+B+C) = 73069.60 E) 20% over head (A+B+C+D) =87683.52 F) 10% Contractor profit on Rs. 105220.22 Total . Hour Hour 6.00 6.00 160.00 240.00 960.00 1440.00 2400.00 14613.92 17536.70 10522.02 115742.24 M.T. Cum. Cum. Cum. 6.05 6.75 8.10 5.40 6000.00 1600.00 1440.00 1350.00 36300.00 10800.00 11664.00 7290.00 66054.00

Rate per Cum. 7716.15Cum. Say Rs. 7716.00Cum.

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work 4 Providing and laying RCC with cement approved coarse sand (FM-1.8 to 2.5) and graded approved hard stone ballast with M20 grade concrete in well staining of well foundation complete as per drawing and technical specifications excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG G.I. binding wire and including necessary centering & shuttering including supply of all materials labour and T&P etc. required for proper completion of work. Standard data book of IRC SL No. ) 12.11 Page 351 Unit Qty. Rate Amount

Take Qty=15 Cum. A) Material Cement Coarse sand 20 mm Aggregate 10 mm Aggregate B) Mate Mason Mazddor for concreting C) Machinery Conrete Mixer (Capacity 0.40/0.28 Cum.) Generator (Capacity 33 KVA) M.T. Cum Cum Cum Day Day Day Hour Hour 5.16 6.75 10.80 2.70 0.86 1.50 20.00 6.00 6.00 Total (A+B+C) Add. 25% escalation on machinery on 960.00+1440.00=2400 Total (A+B+C+D) E) Form Work 20% (L.S.) Total (A+B+C+D+E) Over Heads. Establishment & mobilization etc. @ 20% on Rs. 82287.00 Total All taxes & Contractor Profit Taxes etc. @ 10% Total Rate Per Cum. Say 6000.00 1600.00 1440.00 1350.00 210.00 290.00 200.00 160.00 240.00 30960.00 10800.00 15552.00 3645.00 180.60 435.00 4000.00 960.00 1440.00 67972.60 600.00 68572.60 13714.40 82287.00 16457.40

98744.40 98744.44 108618.84 7241.25 7241.00

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work 5 Providing and laying PCC with cement approved coarse sand (FM 1.8 to 2.5) and graded approved hard stone ballast with M20 grade concrete in Botton Plug of well foundation with 10% extra cement for under water concreting complete as per drawing and technical specifications including supply of all materials labour and T& P etc. required for proper completion of work. Standard data book of IRC SL No) 12.11 (C) Page 354 Unit Qty. Rate Amount

Take Qty=15 Cum. A) Material Cement Coarse sand 20 mm. Aggregate 10 mm. Aggregate Admixtures B) Labour Mate Mason Mazdoor for concreting M.T. Cum Cum Cum 6.105 6.75 10.80 2.70 18.60 Total (A) Day Day Day 0.90 1.50 20.00 210.00 290.00 200.00 Total (B) Total (A+B) C) Machinery a) Concrete mixer (Capacity 0.40/0.28 Hour Cum. (maket Rate) b) Generator (Capacity 33 KVA) (market Hour Rate) c) Crane 3 tonnes capacity for wall sinking Hour Tata with 0.75 M3 grab d) Form work 5% of (A+B) i.e 72035.00 D) Over Heads. Establishment & mobilization etc. @ 20% on (A+B+C) i.e. 94896.75 Total (A+B+C+D) All taxes & Contractor Profit Taxes etc. @ 10% on Rs. 113876.10 Total Rate per Cum. Say Rs. 6.00 6.00 6.00 210.00 500.00 2500.00 6000.00 1600.00 1440.00 1350.00 40.00 36630.00 10800.00 15552.00 3645.00 744.00 67371.00 189.00 475.00 4000.00 4664.00 72035.00 1260.00 3000.00 15000.00 3601.75 Total (C) 22861.75

18979.35 113876.10 11387.61 125263.71 8350.91 8351.00

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work Unit Qty. 6 Sinking of 6 m. external diameter well through sandy soil complete as per drawing and technical specifications including supply of all materials, labour & T&P etc. required for proper completion of work. Depth of sinking is reckoned from bed level Standred data book of IRC SL No. 12.12 page 372 Taking output =1 Mt. Sandy Soil (i) Depth below bed level upto 3.00 m. Rate of sinking=0.50 m. per hour A) Labour Head Sinker Sinker Sinker helper B) Machinery Crane for will sinking TATA P&H 325 or equivalent with 0.75 cum. Hour grab with average diesel consumption 18 ltr per hour, Mobil 1 ltrs for 5 hours. Hire and running charges of 10 KVA Generator with fuel & Operator Day Day Day 0.12 1.00 2.00 900.00 450.00 300.00 Total (A) 3000.00 108.00 450.00 600.00 1158.00 6000.00 Rate Amount

Hour

2.00

Hour

2.00

240.00 Total (B) Total (A+B)

480.00 6480.00 7638.00 1527.60

C)

Over Heads, establishment & moblization etc. @ 20% on (A+B) 20% of (1158.00+6480.00) i.e. 7638.00 All Taxes Risk and contractor Profit etc. @ 10% of total of (A+B+C) 10% (1158+6480+1527.60)x10%

Total "C"

D)

Total (A+B+C) Total (D)

9165.60 916.56

Grand Total Say Rs.

10082.16 10082.00

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work (ii) Beyond 3 m upto 6m. Depth Rate of sinking =0.33m. Per hour A) Labour Head Sinker Sinker Sinker helper B) Machinary Crane for well sinking TATA P&H 325 or equivalent with 0.75 cum. Hour grab with average diesel consumption 18 ltr. Per hour, Mobil 1 litrs for 5 hours. Hire and running charges of 10 KVA Generator with fuel & operator Day Day Day 0.15 1.25 2.50 900.00 450.00 300.00 Total (A) 3000.00 135.00 562.50 750.00 1447.50 9000.00 Unit Qty. Rate Amount

Hour

3.00

Hour

3.00

240.00 Total (B) Total (A+B)

720.00 9720.00 11167.50 2233.50

C)

Over Heads, establishment & mobilzation etc. @ 20% on (A+B) Total (A+B+C) All Taxes Risk and contractor Profit etc. @ 10% Total Say

D)

13401.00 1340.10 14741.10 14741.00

(iii) Beyond 6 m up to 10m depth (A) Rate of sinking=0.25m per hour Labour Head Sinker Siner Sinker helper Day Day Day 0.30 2.50 5.00 900.00 450.00 300.00 Total (A) 270.00 1125.00 1500.00 2895

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. B) Machinary Crane for well sinking TATA P&H 325 or equivalent with 0.75 cum. Hour grab with average diesel consumption 18 ltr. Per hour, Mobil 1 litrs for 5 hours. Hire and running charges of 10 KVA Generator with fuel & operator Hour 4.00 3000.00 12000.00 Item of work Unit Qty. Rate Amount

Hour

4.00

240.00 Total (B) Total (A+B)

960.00 12960.00 15855.00 3171.00

C)

Over Heads, establishment & mobilzation etc. @ 20% on (A+B) Total (A+B+C) All Taxes Risk and contractor Profit etc. @ 10% Grand Total Say Rs.

19026.00 1902.60 20928.60 20928.00

(iv) Beyond 10m. Upto 15m. Depth 1 10m upto 11m. Depth Add 5% over the rate of previous Mt. 2 11m upto 12m. Depth Add 5% over the rate of previous Mt. 3 12m upto 13m. Depth Add 5% over the rate of previous Mt. 4 13m upto 14m. Depth Add 5% over the rate of previous Mt. 14m upto 15m. Depth Add 5% over the 5 rate of previous Mt. TOTAL (v) 6 7 8 9 10 Beyond 15m. Upto 20m. Depth 15m upto 16m. Depth Add 5% over the rate of previous Mt. 16m upto 17m. Depth Add 5% over the rate of previous Mt. 17m upto 18m. Depth Add 5% over the rate of previous Mt. 18m upto 19m. Depth Add 5% over the rate of previous Mt. 19m upto 20m. Depth Add 5% over the rate of previous Mt. TOTAL

21974.00 23073.00 24227.00 25438.00

26710.00 121422/5

24284.00

28046.00 29448.00 30920.00 32466.00 34089.00 154969/5 30994.00

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work 7 Supply cutting bending to the shape, welding fixing placing uncoated HYSD/TMT bar Fe-415 of approved make ISI marked reinforcement in Pile cap, well, Beam and Chimney etc. above ground level complete as per drawing and technical specification IRC 13-70 page 460 Qty=1.00 MT (A)- Material (ISI Mark) HYSD/TMT Bar including 5% wastage & Cartage etc. Binding wire. Binding wire B)-Labour Mate Blacksmith Mazdoor MT 1.05 49000.00 51450.00 Unit Qty. Rate Amount

Kg

6.00 Total (A)

60.00

360.00 51810.00 58.80 435.00 1100.00 1593.80 53403.80 10680.76

Day Day Day

0.28 1.50 5.50

210.00 290.00 200.00 Total (B) Total (A+B)

Over Heads, establishment & mobilization etc. @ 20% on (A+B) i.e. (53403.80) Total All Taxes Risk and contractor Profit etc. @ 10% Grand Total Say Rs.

64084.56 6408.45 70493.01 70493.00

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work 8 Sand filling in well foundaiton Unit Qty. Rate Amount

available from site including watering , dressing etc. Rate to include of all materials, labour & T&P etc. required for proper completion of work. Standared data book of I.R.C. Sl. No. 12.21 page 422
Unit =1 cum Taking output =1 cum ALABOUR Mate Mazdoor Day Day 0.01 0.30 Total B.Over head @20% Total (A+B) CContractor profit @ 10%(A+B) 12.42 74.52 7.45 210.00 200.00 2.10 60.00 62.10

Total (A+B+C) Say

81.97 82.00

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work 9 Same as item no. 5 above but in M-20 grade concrete in Top Plug of well foundation with coarse sand (F.M. 1.8 to 2.5) and approved graded hard stone ballast complete. Standard data book of IRC SL. No. 12.11 (E) page-362 A) Material Cement Coarse sand 40 mm. aggregate 20 mm. aggregate 10 mm. aggregate M.T. Cum Cum Cum Cum 5.16 6.75 5.40 5.40 2.70 6000.00 1600.00 1350.00 1440.00 1350.00 Total (A) B) Labour Mate Mason Madzoor for concreting Day Day Day 0.86 1.50 20.00 210.00 290.00 200.00 Total (B) C) Machinary Concrete Mixer (0.40/0.28 Cum. (market Rate) Generator (Capacity 33 KVA) (Market Rate) Hour Hour 6.00 6.00 160.00 240.00 Total "C" Total (A+B+C) D) Over Heads Establishment & mobilization etc. @ 20% on (A+B+C) i.e. Rs. 67486.00 Total (A+B+C+D) E) All taxes & Contractor Profit Taxes etc. @ 10% on Rs. 80983.20 Grand Total Rate per Cum. Rs. Say Rs. 960.00 1440.00 2400.00 67486.00 13497.20 180.60 435.00 4000.00 4615.60 30960.00 10800.00 7290.00 7776.00 3645.000 60471.00 Unit Qty. Rate Amount

Qt. 15.00 Cum.

80983.20 8098.32 89681.52 5938.77 5939.00

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work 10 RCC work with cement approved Coarse sand (FM 1.8 to 2.5) and 2 CM gauge graded hard stone ballast) in M-20 grade concrete in RCC Beam Chimney, Well cap , excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 BWG G.I. binding wire and including necessary centering & shuttering including supply of all materials ) labour and T&P etc. required for proper completion of work M-20 grade Concrete (1:11/2:3) Nominal mix. (Min. cement content shall be 400 Kg. per Cum.) A) Rate as per schedule item no. 5.25 on 6933/1.10 B)- Over Heads. Establishment & mobilization etc. @ 20% on Rs. 6409.00 Total (A+B) C)-Contractor Profit Taxes etc. @ 10% on Rs. 7563.26 Grand Total Say Rs. Unit Qty. Rate Amount

6302.72 1260.54 7563.26 756.32 8319.59 8319.00

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work 11 Providing and constructing temporary island 4.5 m. average height for construction with wooden with wooden ballies, sand bages, compacted earth etc. including supply of all materials labor and T&P etc. required for proper completion of work. Standard data book of IRC SL No. 12.9 (A) page-348 QTY=200.00 Sqm. A) Material Earth Sand Bags Wooden ballies 200mm dia and 9m long Wooden ballies 50mm dia Cum No. No. RM 904.32 6000.00 95.00 190.00 60.00 1.50 1200.00 30.00 Total (A) B) Labour Mate Mazdoor for piling 8" dia ballis Mazdoor for piling 2" dia ballis Mazdoor for filling sand bags, stitching & Placing Day Day Day Day 5.60 18.00 12.00 110.00 250.00 200.00 200.00 200.00 Total (B) C) Machinery Crane (Light Crane) Hour 50.00 2000.00 Total "C" Total (A+B+C) Total (D) Total (A+B+C+D) Total (E) Total (A+B+C+D+E) All taxes & Contractor Profit Taxes etc. @ 10% on Rs.384201.81 Grand Total Rate Rs. Per Sqm. Say Rs. 100000.00 100000.00 312359.20 7808.98 320168.18 64033.63 384201.81 38420.18 422621.99 2113.11 2113.00 1400.00 3600.00 2400.00 22000.00 29400.00 54259.20 9000.00 114000.00 5700.000 182959.20 Unit Qty. Rate Amount

D) E)

Consumables @ 2.5% of (A+B+C) Over Heads. Establishment & mobilization etc.@20% on (A+B+C)

J.E.

S.D.O.

E.E.

Analysis of Rate
Sl.No. Item of work 12 Providing and constructing 5.0 m. wide service road tyo reach island locations with sand bags and compacted earth including supply of all materials labour and T&P etc. required for proper completion of work. Standard data book of IRC SL. No. 12.9 (A) page -349. In case of change of width of road the same will be paid on the pre-rata basis. Span 60.00 M A) Material Earth Sang Bags Cum No. 450.00 300.00 60.00 1.50 Total (A) B) Labour Mate Mazdoor for piling "8" dia ballies Day Day 0.24 6.00 250.00 200.00 Total (B) C) Machinery Front end loader (Market Rate) Tipper 5.5 cum capacity (Market Rate) Hour Hour 27.00 28.00 750.00 300.00 Total "C" Total (A+B+C) D) Over Heads, Establishment & mobilization etc. @ 20% on (A+B+C) Total (A+B+C+D) E) All taxes & Contractor Profit etc. @ 10% on Rs. 68832.00 Grand Total Rate per RM. Say Rs. 20250.00 8400.00 28650.00 57360.00 11472.00 68832.00 6883.20 75715.20 1261.92 1262.00 60.00 1200.00 1260.00 27000.00 450.00 27450.00 Unit Qty. Rate Amount

J.E.

S.D.O.

E.E.

Analysis of Rate
Sinking of 6 m. external diameter well through sandy soil complete as per drawing and technical specifications including supply of all materials, labour & T&P etc. required for proper completion of work. Depth of sinking is reckoned from bed level Standred data book of IRC SL No. 12.12 page 372 SL.No. 1 2 3 4 5 QTY=1.00 M 0 to 3m depth 3 mt. upto 6 mt 6 mt. upto 10 mt 10 mt upto 15 mt 15 mt upto 20 mt Rate per Mtr. 10082.00 14741.00 20928.00 24284.00 30994.00

J.E.

S.D.O.

E.E.

BILL OF QUANTITY FOR CONSTRUCTION OF THREE NO. WELL FOUNDATION FOR CROSSING OF 220KV ROZA-BADAUN (D/C) TRANSMISSION LINE OVER GARRA RIVER (SHAHJAHANPUR) Sl.No. Item of work Unit Qty. 1 Earth work in excavation by mechanical CUM. 300.00 means upto depth of 6 M for footing foundation, Pile Cap, Tie Beam extra as per drawing and technical specification including settting out, Construction of soring and bracing removal of slumps and other deterious matter braking of side and bottom and back filling as per standard data book of IRC.SL. NO.12.1(11) Page 324 2 Fabricating and laying cutting edge made out MT 9.25 of M.S. Angle & plates, including cutting, moulding in the required shape, welding as per approved drawing and specification, including cost of all materials, labour, tools tackels, plants & equipments etc. Complete as required for successful completion of the work Standard data book of IRC Sl No. 12.10 page no. 350 3 RCC work in well kerb with concrete mix M-25 CUM. 69.00 grade with coarse sand (F.M. 1.8 to 2.5) and graded hard stone ballast including shuttering and placing and fixing of reinforcement bars with 24 BWG bindingwire in proper position as per approved drawing, including placing of concrete and compacting the same with vibrators with cost of materials, labour and T&P complete. (Standard data book of I.R.C. S/No. 12.11 page 351 ) (cement content shall be 550 kg/cum.) 4 Rate 60.00 (Rupees Sixty only) Amount 18000.00

94340.00 (Rupees Ninty four thousand three hundred forty only)

872645.00

9110.00 (Rupees Nine thousand One Hundred ten only)

628590.00

Providing and laying RCC with cement CUM. 576.00 7773.00 approved coarse sand (FM-1.8 to 2.5) and (Rupees Seven graded approved hard stone ballast with M-20 thousand seven grade concrete in well staining of well Hundred foundation complete as per drawing and seventy three technical specifications excluding supply of only) reinforcement and its bending but including its fixing and binding the same with 24 BWG G.I. binding wire and including necessary centering & shuttering including supply of all materials labour and T&P etc. required for proper completion of work. Standard data book of IRC SL No. ) 12.11 Page 351 (cement content shall be 400 kg/cum)

4477248.00

J.E.

S.D.O.

E.E.

BILL OF QUANTITY FOR CONSTRUCTION OF THREE NO. WELL FOUNDATION FOR CROSSING OF 220KV ROZA-BADAUN (D/C) TRANSMISSION LINE OVER GARRA RIVER (SHAHJAHANPUR) Sl.No. Item of work Unit Qty. 5 Providing and laying PCC with cement CUM. 282.00 approved coarse sand (FM 1.8 to 2.5) and graded approved hard stone ballast with M-20 grade concrete in Botton Plug of well foundation with 10% extra cement for under water concreting complete as per drawing and technical specifications including supply of all materials labour and T& P etc. required for proper completion of work. Standard data book of IRC SL No) 12.11 (C) Page 354 (cement content shall be 400 kg/ cum) 6 Sinking of 6 m. external diameter well through sandy soil complete as per drawing and technical specifications including supply of all materials, labour & T&P etc. required for proper completion of work. Depth of sinking is reckoned from bed level Standred data book of IRC SL No. 12.12 page 372 RM Rate 8293.00 (Rupees Eight thousand two hundred ninety three only) Amount 2338626.00

A- Depth 0.00 to 3.00 Mt, below bed level

RM

B- Depth beyond 3.00 Mt, upto 6.00 M.

RM

C- Depth beyond 6.00 Mt, upto 10.00 M.

RM

D- Depth beyond 10.00 Mt, upto 15.00 M.

RM

E- Depth beyond 15.00 Mt, upto 20.00 M.

RM

10082.00 (Rupees Ten thousand eighty two only) 9.00 14741.00 (Rupees forteen thousand seven hundred forty one only) 12.00 20928.00 (Rupees twenty thousand nine hundred twenty eight only) 15.00 24284.00 (Rupees twenty four thousand two hundred eighty four only) 12.00 30994.00 (Rupees thirty thousand nine hundred ninty four only)

9.00

90738.00

132669.00

251136.00

364260.00

371928.00

J.E.

S.D.O.

E.E.

BILL OF QUANTITY FOR CONSTRUCTION OF THREE NO. WELL FOUNDATION FOR CROSSING OF 220KV ROZA-BADAUN (D/C) TRANSMISSION LINE OVER GARRA RIVER (SHAHJAHANPUR) Sl.No. Item of work 7 Supply cutting bending to the shape, welding fixing placing uncoated HYSD/TMT bar Fe415 of approved make ISI marked reinforcement in Pile cap, well, Beam and Chimney etc. above ground level complete as per drawing and technical specification IRC 13-70 page 460 8 Unit MT Qty. 34.00 Rate 70493.00 (Rupees seventy thousand four hundred ninety three only) Amount 2396762.00

Sand filling in well foundaiton available from CUM. 630.00 82.00 site including watering , dressing etc. Rate to (Rupees Eighty include of all materials, labour & T&P etc. Two only) required for proper completion of work. Standared data book of I.R.C. Sl. No. 12.21 page 422 Same as item no. 5 above but in M-20 grade CUM. 24.00 6382.00 (Rupees Six concrete in Top Plug of well foundation with thousand three coarse sand (F.M. 1.8 to 2.5) and approved hundred eighty two only) graded hard stone ballast complete. Standard data book of IRC SL. No. 12.11 (E) page-362(

51660.00

153168.00

cement content shall be 400 kg/cum) 10 RCC work with cement ( cement content shall CUM. 153.00 8319.00 (Rupees eight be 400 Kg. per Cum.) approved Coarse sand thousand three (FM 1.8 to 2.5) and 2 CM gauge graded hard hundred stone ballast) in M-20 grade concrete in RCC nineteen only) Beam Chimney, Well cap excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 BWG G.I. binding wire and including necessary centering & shuttering including supply of all materials ) labour and T&P etc. required for proper completion of work M-20 grade 11 Providing and constructing temporary island Sqm. 300.00 2113.00 (Rupees two 4.5 m. average height for construction with thousand one wooden with wooden ballies, sand bages, hundred thirteen compacted earth etc. including supply of all only materials labor and T&P etc. required for proper completion of work. Standard data book of IRC SL No. 12.9 (A) page-348

1272807.00

633900.00

J.E.

S.D.O.

E.E.

BILL OF QUANTITY FOR CONSTRUCTION OF THREE NO. WELL FOUNDATION FOR CROSSING OF 220KV ROZA-BADAUN (D/C) TRANSMISSION LINE OVER GARRA RIVER (SHAHJAHANPUR) Sl.No. Item of work Unit 12 Providing and constructing 5.0 m. wide RM service road tyo reach island locations with sand bags and compacted earth including supply of all materials labour and T&P etc. required for proper completion of work. Standard data book of IRC SL. No. 12.9 (A) page -349. In case of change of width of road the same will be paid on the pre-rata basis. 13 Fixing of templete for slub for tower in correct Job position, level and alignment including setting of slub supplied by the department free of cost. Templete shall also be provided by the department free of cost. Qty. 250.00 Rate 1262.00 (Rupeese one thousand two hundred sixty two only) Amount 315500.00

3.00

15000.00 (Rupees fifteen thousand only)

45000.00

Total 14414637.00 (Rupees One crore forty four lacs forteen thousand six hundred thirty seven only)

J.E.

S.D.O.

E.E.

TO BE FILLED BY THE TENDERER


I/Weresident of ..submit my/ our rates as .......%(in figure) ...(in words) Below/ Above the estimated rates mentioned in the bill of quantities.

SIGNATURE OF TENDERER (SEAL)

J.E.

S.D.O.

E.E.