PROJECT: ARDEBIL GAS TURBINE POWER PLANT
IN HOUSE REVISION
D C B A 0 D C B A
DOCUMENT REVISION
FIRST ISSUE
M.R
6/4/2008 M.R
DATE
6/4/2008
DATE
SMT
6/4/2008
DATE
FIRST ISSUE
M.R
CHK.
APP.
CHK.
DATE
APP.
DATE
MAPNA Co.
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.
PALA TARH ENERGY CO. Client Doc. No.: GT3-AD-29EE-08-YBQ-001 Rev. 0 File No.:
TEP
NAPEEC
Page 1 of 5
MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY
I.P.D.C.
PROJECT: ARDEBIL GAS TURBINE POWER PLANT
PAG E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50MAPNA 51 Co. 52
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.
0 x x x x x x
REVISION C D E
REMARKS
PAGE
REVISION C D
REMARKS
PALA TARH ENERGY CO. Client Doc. No.: GT3-AD-29EE-08-YBQ-001 Rev. 0 File No.:
TEP
NAPEEC
Page 2 of 5
MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY
I.P.D.C.
PROJECT: ARDEBIL GAS TURBINE POWER PLANT CONTENTS
1.0 2.0 3.0 ABBREVIATIONS BASIC INFORMATION CALCULATION PROCEDURE
MAPNA Co.
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.
PALA TARH ENERGY CO. Client Doc. No.: GT3-AD-29EE-08-YBQ-001 Rev. 0 File No.:
TEP
NAPEEC
Page 3 of 5
MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY
I.P.D.C.
PROJECT: ARDEBIL GAS TURBINE POWER PLANT
ABBRIVATIONS Required continuous active power (KW) Required continuous reactive power (KVAR) Power factor Cable resistance per kilometer (/km) Cable reactance per kilometer (/km) BASIC INFORMATION
The basic information for calculation of Cable Calculation will be extracted from Load List. The main parameters are as follows: - Nominal power of motors or feeders - Nominal phase to phase voltage -One-way length of cables (km) -Efficiency of motors or feeders () Panel boards =100%, Motors=determine from manufacturer catalogue 3.0 A) CALCULATION PROCEDURE Calculation of Sin Sin = 1 Cos 2
MAPNA Co.
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.
V = 400V
PALA TARH ENERGY CO. Client Doc. No.: GT3-AD-29EE-08-YBQ-001 Rev. 0 File No.:
TEP
NAPEEC
Page 4 of 5
MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY
I.P.D.C.
PROJECT:
B)
C)
Calculation of Start-up current According to starting method calculate as follow: D.O.L starting STAR-DELTA starting For Feeders Is=In Is=6xIn (line current) Is=2xIn (phase current)
D) E)
Determining of grouping & conversion factors(GF & CF) from standard Calculation of apparent current ApparentCurrent = Current GF CF
F) tables
G)
Select the suitable cable that able to carryout above current from standards cable specification Calculate voltage drop for normal & startup states(V & Vs) V = Vs = 3 L I ( Rw Cos + XL Sin ) 100 Un 3 L Is ( Rw Cos + XL Sin ) 100 Un
V not be exceed from 3% for MCCs & lighting panels or 2% for motors Vs not be exceed form 10% for motors If its not accrued, a greater cable must be choose and repeat until above conditions was happened. According to above mentioned procedure the required cross section of calculated which presented in
MAPNA following page. (Attachment) Co.
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.
PALA TARH ENERGY CO. Client Doc. No.: GT3-AD-29EE-08-YBQ-001 Rev. 0 File No.:
TEP
NAPEEC
Page 5 of 5