Вы находитесь на странице: 1из 5

MINISTRY OF ENERGY

IRAN POWER DEVELOPMENT COMPANY

I.P.D.C.
PROJECT: ARDEBIL GAS TURBINE POWER PLANT

SEWAGE TREATMENT PACKAGE CABLE SIZING

IN HOUSE REVISION
D C B A 0 D C B A

DOCUMENT REVISION

FIRST ISSUE

M.R

6/4/2008 M.R
DATE

6/4/2008
DATE

SMT

6/4/2008
DATE

FIRST ISSUE

M.R

6/4/2008 M.R 6/4/2008 SMT 6/4/2008


DATE

REV. DESCRIPTION PREP.

CHK.

APP.

REV. DESCRIPTION PREP.

CHK.

DATE

APP.

DATE

MAPNA Co.
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.

PALA TARH ENERGY CO. Client Doc. No.: GT3-AD-29EE-08-YBQ-001 Rev. 0 File No.:

TEP

Contractor Doc. No.: 1020-05-EL-7201 MF Code: SE Code:

NAPEEC

Page 1 of 5

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

I.P.D.C.
PROJECT: ARDEBIL GAS TURBINE POWER PLANT

PAG E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50MAPNA 51 Co. 52
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.

0 x x x x x x

REVISION C D E

REMARKS

PAGE

REVISION C D

REMARKS

PALA TARH ENERGY CO. Client Doc. No.: GT3-AD-29EE-08-YBQ-001 Rev. 0 File No.:

TEP

Contractor Doc. No.: 1020-05-EL-7201 MF Code: SE Code:

NAPEEC

Page 2 of 5

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

I.P.D.C.
PROJECT: ARDEBIL GAS TURBINE POWER PLANT CONTENTS
1.0 2.0 3.0 ABBREVIATIONS BASIC INFORMATION CALCULATION PROCEDURE

MAPNA Co.
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.

PALA TARH ENERGY CO. Client Doc. No.: GT3-AD-29EE-08-YBQ-001 Rev. 0 File No.:

TEP

Contractor Doc. No.: 1020-05-EL-7201 MF Code: SE Code:

NAPEEC

Page 3 of 5

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

I.P.D.C.
PROJECT: ARDEBIL GAS TURBINE POWER PLANT

1.0 -P -Q - Cos -Rw - XL 2.0

ABBRIVATIONS Required continuous active power (KW) Required continuous reactive power (KVAR) Power factor Cable resistance per kilometer (/km) Cable reactance per kilometer (/km) BASIC INFORMATION

The basic information for calculation of Cable Calculation will be extracted from Load List. The main parameters are as follows: - Nominal power of motors or feeders - Nominal phase to phase voltage -One-way length of cables (km) -Efficiency of motors or feeders () Panel boards =100%, Motors=determine from manufacturer catalogue 3.0 A) CALCULATION PROCEDURE Calculation of Sin Sin = 1 Cos 2
MAPNA Co.
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.

V = 400V

The procedure of calculation of cable size is as follows:

PALA TARH ENERGY CO. Client Doc. No.: GT3-AD-29EE-08-YBQ-001 Rev. 0 File No.:

TEP

Contractor Doc. No.: 1020-05-EL-7201 MF Code: SE Code:

NAPEEC

Page 4 of 5

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

I.P.D.C.
PROJECT:
B)

ARDEBIL GAS TURBINE POWER PLANT

Calculation of nominal current(In) Current = P 3 U Cos

C)

Calculation of Start-up current According to starting method calculate as follow: D.O.L starting STAR-DELTA starting For Feeders Is=In Is=6xIn (line current) Is=2xIn (phase current)

D) E)

Determining of grouping & conversion factors(GF & CF) from standard Calculation of apparent current ApparentCurrent = Current GF CF

F) tables
G)

Select the suitable cable that able to carryout above current from standards cable specification Calculate voltage drop for normal & startup states(V & Vs) V = Vs = 3 L I ( Rw Cos + XL Sin ) 100 Un 3 L Is ( Rw Cos + XL Sin ) 100 Un

V not be exceed from 3% for MCCs & lighting panels or 2% for motors Vs not be exceed form 10% for motors If its not accrued, a greater cable must be choose and repeat until above conditions was happened. According to above mentioned procedure the required cross section of calculated which presented in
MAPNA following page. (Attachment) Co.
(PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT Co.

PALA TARH ENERGY CO. Client Doc. No.: GT3-AD-29EE-08-YBQ-001 Rev. 0 File No.:

TEP

Contractor Doc. No.: 1020-05-EL-7201 MF Code: SE Code:

NAPEEC

Page 5 of 5