Power sector scenario Fuel Options Coal as viable fuel Issues and way forward
55.60%
25.90%
5.00% 2.70%
0.90%
54500
71900
97500
Mar '03
Mar '07
Mar ''12
Capacity to increase to 2,12,000 MW by the year 2012 to meet the peak demand of 1,57,107 MW
Type Hydro
Thermal Indigenous Coal Imported Coal Lignite Gas/ LNG Nuclear
Total
62065
Lignite Gas
Domestic LNG Transnational piped gas
Hydro Nuclear
100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0%
92.5
117
76
103.5
35.5
16.5 Proved
13.5 Indicated
2.1 Inferred
At the present rate of extraction, coal and lignite resources in India are expected to last for about 140 years
22.21
52.24
Others
Total
LIGNITE
Reserves
Around 30,300 million tes
Location
About 88% of reserves located in state of Tamil Nadu
Balance (about 12%) located in Rajasthan, Gujarat, J&K & Kerala
1400 1200 1000 800 600 400 200 0 06-07 11-12 16-17 21-22 473.18 629.63 828.16 1078.54
1267.01
24-25
2006-07
2011-12
2016-17
2021-22
2024-25
484
332 301
87 31 21
COAL AVAILABILITY vis--vis SHORTAGE Coal shortage envisaged due to: Long term linkage accorded on normative PLF of 68.5% and 80% for stations coming after 1996, whereas the national average is +70% PLF. (some of the stations like those of NTPC operating at +90% PLF) Delay in development of linked mines
RESULT - NEED TO AUGMENT COAL AVAILABILITY
BALANCE RECOVERABLE RESERVE (As of 1st April 2005) 340 BCM 761 BCM 1101 BCM
(MOP&NG Basic statistics)
GAS RESERVES ARE ADEQUATE ONLY FOR ABOUT 34 YEARS AT PRESENT LEVEL OF GAS CONSUMPTION.
Demand (MMSCMD)
350 300
200
100
20 01 -0 2
15 1
150
20 06 -0 7
23 1
250
20 11 -1 2
31 3
Against the current demand of about 150 MMSCMD, supply is about 92 MMSCMD only. Gas/RLNG availability and prices of available Gas/RLNG/imported piped natural gas are two major constraints for gas based power generation
20 24 -2 5
39 1
400
contd
Figs in Rs/kwh
0.875
Fuel cost (paise/ kwh)
3.6 Washed Raw 3.1 2.6 2.1 1.6 1.1 0.5 0.0
Coal Proj.
Gas Proj.
Assumptions: Proj
Capital Cost (Rs Million /MW) Life (Years)
Coal Proj
42 25
Gas
32 15
100
500
1000
1500
Fixed cost of Generation for coal based & Gas Based Plants are comparable. Thus,for Gas/R LNG to compete it has to be on fuel cost component basis