Distribution Substation
Primary Feeders
Compensating Voltage PU +1 PU +1
Restored Voltage
PU +1 0 -1
0 -1
0 -1
Customer Sensitive Load Utility Distribution Feeder 3 Distribution Transformers Total 30 kVA (or other reliable station supply)
3 MOV Arresters
3 MOV Arresters
3 CT's 0.3% Accuracy
Interconnection Equipment
n Bypass switch protects DVR MV n Shorting switch protects power electronics
Bypass Breaker
Interconnect Equipment
Isolation Breakers
AC Filter
Westinghouse DVR
n Isolation breakers remove DVR MV from system n Auxiliary power from load side
Load
VT
VT
To Other Slaves
Master
Slave
Slave
Inverter
Inverter
Inverter
Voltage Regulator
Current Regulator
Current Regulator
Current Regulator
Optical Interface
Optical Interface
Optical Interface
Optical Fibers
UPM
UPM
n 3x2MVA power electronic modules per DVR system (master + 2 slave) n 1.8MJ capacitor energy storage per system n Inserted voltage: 23, 26, 30, 35% on 26, 23, 20, or 17 MVA taps
12.47 kV (15 kV Class) 3 phase, 3 or 4 wire 600 KVA load 50% injection (300KVA) -40 to 40C ambient operating range Available: 3Q99
Prototype Installation
n Demonstration project on BC Hydro system at Dawson Creek, BC n Protects Northern Lights Community College sensitive load (computers, etc.) n Ambient temperature range extended to -40C site conditions n In service February, 1999. (Photo shows installation in progress.)
Prototype System
High voltage Electromechanical Bypass switch Line Energy Supply Transformer
3 S i n g l e -
n Compact power electronics module includes control and injected voltage waveform synthesis n Three independent single-phase injection capability n Hybrid solid-state & mechanical bypass system for overcurrent protection
Load
Input PT
Output PT
n Compact mechanical design to apply on overhead systems n Ratings suited to individual commercial & small industrial critical customer loads n Low maintenance, high reliability
Power Electronics Module local operator interface telephone line power & signals to optional monitoring package Lineman's Switch In Service Out of Service Power ON
V o l t s (pu)
n Actual results from prototype PMDVR field demonstration project n Cause: Lightning arrester failure on adjacent distribution feeder at 0230 hrs on Wednesday, March 3, 1999
V o l t s (pu)
Time
n Substation feeder breaker on affected feeder cleared the fault n Two phases sag; third swells (7%)
Time
V o l t s (pu)
Phase C
Source Voltage, Phase C 45 % Sag, .61 sec
1.25 1.00
V o l t s (pu)
Time
V o l t s (pu)
Time
1.25
1.25 1.00 0.75 0.50 0.25 0.00 -0.25 -0.50 -0.75 -1.00 -1.25
1.00
V o l t s (pu)
0.75
0.50
0.25 0.00
Time
-0.25 -0.50
Time
-0.75
-1.00
-1.25
V o l t s (pu)
Time
V o l t s (pu)
Time