Вы находитесь на странице: 1из 9

In Name : Prashant Jain. JOB RESPONSIBILITIES. A.

To look after day to day activity of Yashwant Industries, W-38 such as material procurement, bill passing, production, quality, dispatch, payments etc. B. Currently Working on ERP.

Name : Amol G. Dadape.


Desn. : Q.A In-charge. Dept. : Quality assurance. JOB RESPONSIBILITIES : 1. Calibration of inspection measuring & test equipment as per determined procedure. 2. Keep inspection equipment safety and properly. 3. Raw material testing from out side mat. Lab as per determined procedure. 4. To maintain the drawing of components & guage. 5. Quality assurance activity for incoming & per dispatch production. (Approval) 6. Interaction with customer to attend quality complaints. 7. Approval of change management activity by customer. 8. Supplying to new gauges as per requirement to store & production. 9. Vendor interaction for quality improvements and trouble shoting. 10. Approval of new vendor and part supplied by it. 11. Vendor quality rating as per determined procedure. 12. Making of quality control process chart as per format given by customer. 13. Audit of process at our end and at vendor end as per Q.C.P.C. 14. Approval of in-process inspection activity (Report). 15. Analysis of non conforming product at our end. 16. Analysis of customers line rejection and lot rejection and take corrective action and preventive action. 17. Making report of corrective action taken and approved it by G.M. 18. Making report of stastical quality control related to customer rejection, line rejection. 19. I.S.O. documentation and its implantation (Q.A.Dept.). 20. Proper record keeping of quality control & quality system. 21. Training of workers about quality work (incresse quality mindness in workers mind). 22. Process parameter approval from out side lab as per given procedure. 23. Responsible for granting of deviation.

Name : T.H. Nawale.


JOB RESPONSIBILITIES: 1. To note down daily schedule from customer. 2. To plan & carry out the daily production as per schedule. 3. To plan and arrange the raw material as per schedule. 4. To release to production plan to shop floor. 5. Production planning and control. 6. To check on line components. If found defective, check where/ why the defect occurs. 7. To dispatch material as per schedule. 8. Preventive & break down maintenance follow up to maintenance agency/ department. 9. Maintain the minimum level of inventory. 10. To maintain departmental ISO document. 11. To carry out the preventive and break down main. of jig and fixers. 12. to provide the necessary training to operators. 13. To keep control over all consumable items and prepared the all reports related to production. 14. To keep and maintain the house keeping. 15. To attend the customer complaints related the production.

Name : N.M. Patil.


JOB RESPONSIBILITIES: 1. To note down daily schedule from BAL, Waluj & Akurdi. 2. To plan & arrange the raw material as per schedule for vendor. To give sub components for item. 3. Production planning & control. 4. To check on line components. 5. To dispatch on line material. 6. Preventive & break down maintenance follow up to maintenance department. 7. Maintain the minimum level of inventory. 8. Preventive & break down maintenance of jigs & fixture. 9. To attained the customer complaints. 10. Responsible for eliminator, M-80 4s & BM-40 any problem. (Production, quality, dispatch)

Name : G.B.Pholane.
JOB RESPONSIBILITIES : 1. To note down daily schedule from customer. 2. To plan and carry forward to the production department as per requirement of customer. 3. To give the schedule item wise & bin wise to paramount Ind. 4. To give the schedule item wise & bin wise to unit II. 5. To collect the invoice, ch. & floppy then E-mail send to BAL. 6. To write a PDI of all component & attached to invoice ch. 7. To planning a vehicle of a item wise dispatch in BAL. 8. To maintain of all powder coated item in Paramount Industries. 9. To maintain departmental ISO document. 10. To all actives, knowledge & experience of production, quality department. 11. To made a GRN & QC passing a 57 F 4. 12. To discus production supervisor & operator, when customer plan should be changed. 13. To attend the vendor complaints related to powder coating item. 14. Daily dispatches as per the customer requirement. 15. Return of non moving & rejection material send to party.

Name : D.S. Pawar.


Job responsibilities: 1. To release schedule as per req. of dispatch to shop floor. 2. To plan the production as per requirement of customer. 3. To check the welding parameter. 4. To check the component at equal interval to relation guage. 5. Check the welding quality. 6. To carry out the daily break down of m/c with the help of maintenance department. 7. To maintain all document related to maintenance department. 8. To attained all complaints of worker related to production . 9. To make available spares of m/c to maintenance department. 10. Maintain ISO document. 11. To keep and maintain the house keeping. 12. Check the buffing quality. 13. To arrange the raw material if required. 14. To carry out the daily in process inspection. 15. To provide the necessary training to operators. 16. To arrange the vehicle for remeaning dispatch. 17. To dispatch semi finished material for powder coating.

Name : Dhananjay Balkrishna Saste.


Dept. : Quality Assurance. JOB RESPONSIBILITIES: 1. To check in word material & prepare SIR. 2. In case of rejection or found any thing unsatisfied inform to senior for strong dicission. 3. To verify whether the accepted material gives reliable fitments in manufacturing or not. 4. To check whether processed material satisfy the given satisfaction during in process. 5. To check whether production is according to process parameters or not. 6. To collect the line rejection data. 7. To rework the quality as possible that is rejected by customers. 8. To store and dispatch the line rejection to concern vendor. 9. To fill up the P.D.I.R. 10. To check whether available gauges are in tolerance or not. 11. To check gauges calibration date. 12. To keep vendor follow record. 13. To keep drawing record. 14. To keep customer complaints record & customer interaction record. 15. To check finished product with respect to quality ( Final inspection) 16. To maintain quality record as per senior/ in-charge suggestion. 17. Preventive maintenance of gauges. 18. Detailed S.I.R. of any one component a day. 19. Discussion with operators about quality in order to get quality proof inspection. 20. If found any break down in production make contact with maintenance concern. 21. To give the proper identification to each & every component on shop floor. 22. To give proper instruction to operators & workers in order to have good house keeping. 23. To interact with customer, in absence of unit head, if found any problem at customers end with respect to quality.

Name : Prashant T. Sonekar.


Dept. : Quality Assurance. JOB RESPONSIBILITIES: SAME AS D.B. SASTE.

Name : D.M. Karle.


JOB RESPONSIBILITIES : 1. Preparation of GRN of inward material. 2. Q.C. passing of GRN. 3. Printing of GRN. 4. Bill passing of purchase. 5. Preparation of 57 F 4 of material issuing to job work vendors. 6. Bill passing of job work monthly. 7. Material accounting of material issued to job work. 8. Helping to supervisor to preparation of consumption report. 9. Stock report, daily production report & other report. 10. Time to time helping to staff member for e-mail & other computer related work. 11. Submission of electricity bill, telephone bill, water bill, mobile bill & cheques deposit at city. 12. Whenever need helping the material related to production. 13. Clearing the 57 f 4 of customer. 14. 15. 16. 17. 18. 19. 20. 21. My contribution to Yashshree group of companies. Material accounting of job work for OM Enginrring. 57 f 4 clearing of customers for OM Enginrring. Accounting of OM Enginrring 3 month after joining. Bank reconsilation of B-48 3 month after joining. Accounting of W-38 for half year of 2000-2001. Taking modwat & senvelt entries related work for the year of 2001-2002. Also I have worked for ISO, ERP. Cash expenditure from jully 02 to aug. 02.

Вам также может понравиться