CHAPTER-1 MATERIALS

Note :- The rates except fot Item 2, 3, 38 & 39 are exclusive of Contractor's profits 5% Contractor's Profit may be given while takin supply through some agency otherthen a direct supplier. The rates include Octori, Royalty and sales tax etc. and cartage up Km. (5 miles). Sl. No. 1 1 Materials 2 Brick a) Bricks (Ist class) b) Bricks (Iind class or straight over burnt) c) Bricks (III class d) Bricks (sundried) Ballast (1st class or over burnt Brick Ballast. a) 5.00 cm gauge b) 4.00 cm. gauge c) . 2.50 cm. gauge Ballast (Hard stone graded) a) 1.00 cm.to 1.3 cm. gauge b) 2.00 cm. gauge. c) 4.00 cm. gauge. d) 5.00 cm: gauge. Bolts and nuts, etc. a) upto 6 mm. dia. b) above 6 mm. and upto 13 mm. dia, c) above 13 mm. and upto 25 mm. dia Bottle nuts 13mm.to 22 mm.dia.15cm.long Beeswax Bamboos a) 2.5 cm. upto 4 cm. dia b) above 4 cm. and upto 8 cm. dia Bailies Sal a) 8 cm. (Mean) dia. b) 10 cm. c) 12.5 cm. d) 15.00 cm. e) 20.00 cm. Cement Portland (Ordinary) Cement (White) Coal Tar Cusstic soda Cinder Cotton (string) a) Distemper (oil) in paste of best quality b) Dry Distemper ordinary of best quality Glass ordinary a) 21 oz. b) 18oz. c) 16 oz. Unit 3 per per per per % % % % Rate 4 2.70 2.60 c) Bricks (III class d) Bricks (sundried)

per per per

cu. cu. cu.

m. m. m.

a) 5.00 cm gauge 19.82 21.23

per per per per

cu. cu. cu. cu.

m. m. m. m.

35.38 37.88 43.13

per per per

kg. kg. kg. each kg. % % % % % % % 50 50 liter kg. cu. kg. 50 1.5 sq. sq. sq. run.m. run.m. run.m. run.m. run.m. run.m. run.m. kg bag. kg bag.

a) upto 6 mm. dia. b) above 6 mm. and u c) above 13 mm. and

5 6 7

per per per per per per per per per per per per per per per per per per per

Bottle nuts 13mm.to 2 Beeswax Bamboos a) 2.5 cm. upto 4 cm. b) above 4 cm. and up Bailies Sal a) 8 cm. (Mean) dia. b) 10 cm. c) 12.5 cm. d) 15.00 cm. e) 20.00 cm.

9 10 11 12 13 14 15 16

m. kg tin
kg packet

m. m. m.

225.00 575.00 Coal Tar Cusstic soda Cinder Cotton (string) a) Distemper (oil) in p b) Dry Distemper ord Glass ordinary a) 21 oz. b) 18oz. c) 16 oz.

17

Insulating Materials (a) Fibrs glass Resin.bonded slabs and rolls in standard slab and rolls sizes.) i) Fibre-glass (density 24 kg/m2) of 25 mm. per sq. m. thickness for ceiling ii) - do 40 mm. per sq. m. iii)- do 50 mm. per sq. m.

i) Fibre-glass (densit ii) - do iii)- do

18 19

iv)- do 65 mm. v)- do 75 mm. vi) Fibre-glass (density 32 kg/m2) of 25mm. thickness for walls vii)- do 40 mm. viii)-do 50 mm. ix)- do 65 mm. x)- do 75 mm. (b) Thermocole insulation a) Lime white (unsulaked) b) Lime kankar of besT quality a) Lead white best qualiry (safeda) b) Lead red powder (sindoor) a) M S Flat angles Tand like wise.. b) M.S. Rounds up to 12 mm dia c) M.S. Romnds above 12 mm. dia d) R. S. Joits e) G. I. Barbed wire f) Sheet Galvanized plain 20 B. W. G g) Sheet Galvanized Corrugated 24 B. W. G. plain h) Sheet black iron plain i) upto 8 mm. dia. i) upto 8 mm. dia. ii) above 8 mm. and upto 14 mm iii) above 13 mm. and upto 50 mm j) Galvanized iron wire gauge k) Expanded metal 2.00 cm. mesh 1.6/17 gauge Marble chips 3 mm. size. Marble chips 3mm. size. a) white b) Black Marble dust Masonite sheet 3 mm. thick Nails (country) Nails (wire) a) Oil (linseed double boiled) b) Oil (Turpentine) Paints (of superior quality ) a) Paint (Anti corrosive Bituminous). b) Paint Black Japan c) Superior ready mixed, paints for wood or steel (All colours) d) Ordinary quality ready mixed paint e) Paint Ready mixed (Enamel) for floors. f) Dry colours for cement floors. i) Dark green oxide ii) Deep black oxide iii)Blue oxide iv)Chocolate exide g) i) Red oxide primer surfacer for steel ii) Red lead paint ready mixed for roofs. h) Paint enamel (synthetic) i) Paint (aluminium) j) i) Paint primer for wood ii) Paint primer for metal k) Road marking paint (spirit base) l) i) Cement primer ii) Water proof cement paint m) Varnishes i) Clear synthetic.

per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per per

sq. sq. sq. sq. sq. sq. sq. cu. quin. cu. kg. kg. quin. quin. quin. quin. quin. quin. quin. quin. quin. quin. quin. quin. sq. sq. quin. quin. quin. sq. kg. kg. liter liter liter liter liter liter liter 20 20 20 20 liter liter liter liter liter liter liter liter kg. liter

m. m. m. m. m. m. m. m. m.

iv)- do v)- do

vi) Fibre-glass (densi

vii)- do viii)-do ix)- do x)- do (b) Thermocole insula 550.00 110.99 a) Lead white best q b) Lead red powder a) b) c) d) e) f)

20

M S Flat angles Ta M.S. Rounds up to M.S. Romnds abov R. S. Joits G. I. Barbed wire Sheet Galvanized

g) Sheet Galvanized

m. m.

h) Sheet black iron pl i) upto 8 mm. dia. i) upto 8 mm. dia. ii) above 8 mm. an iii) above 13 mm. a j) Galvanized iron wir

k) Expanded metal 2.0

21

22 23 24 25 26 27

m.

(in 20 lit. (in 20 lit. (in 20 lit. (in 20 lit.


(in one lit.

drum drum drum drum drum

Marble chips 3mm. siz a) white b) Black Marble dust Masonite sheet 3 mm Nails (country) Nails (wire) a) Oil (linseed double b) Oil (Turpentine) Paints (of superior qu a) Paint (Anti corrosiv b) Paint Black Japan

c) Superior ready mixe

kg bag. kg bag. kg bag. kg bag. (in 20 lit. (in 20 lit. (in 20 lit. (in 20 lit. (in 20 lit. (in 20 lit. (in 20 lit. (in 20 lit. (in 50kg. (in 20 lit.

drum drum drum drum drum drum drum drum drum drum

d) Ordinary quality rea e) Paint Ready mixed f) Dry colours for cem i) Dark green oxide ii) Deep black oxide iii)Blue oxide iv)Chocolate exide g) i) Red oxide prime ii) Red lead paint re h) Paint enamel (synth i) Paint (aluminium) j) i) Paint primer for w ii) Paint primer for m k) Road marking pain l) i) Cement primer ii) Water proof ceme m) Varnishes i) Clear synthetic.

28 29 30

ii) Copal iii) Ordinary Water proofing compound Polish (Mansion or wax) a) Pipe (A.C. Rain water) 8 cm.internal dia. of 6' length each b) do 10 cm dia c) do 15 cm dia a) Pipe (A. C. Bend and shoes) 8 cm. dia. Plain b) do 10 cm. dia c) do 15 cm. dia d) Pipe(A. C. Bend with access door)8 cm. dia e) do 10 cm. dia f) do 15 cm. dia

per per per per

liter liter kg. kg. each each each each each each each each each each

(in 20 lit. (in 20 lit.

drum drum

ii) Copal iii) Ordinary Water proofing compo Polish (Mansion or wa

a) Pipe (A.C. Rain wa b) c) do do

31

a) Pipe (A. C. Bend an b) c) do do

d) Pipe(A. C. Bend wi e) f) m. m. do do

32

a) SheetsfAsbestos corrugated)grey 6 mm. thick b) do (Asbestos plain) grey do c) do(A. C. Ridges) d) (Gutters) a) Pipe Rain water (Cast iron) 5 cm. dia. b) do 10 cm. dia a) Pipe Rain water(C. I. Rose) 5 cm. dia. b) do 10 cm. dia. c) Pipe Rain water(C. I. Head) 5 cm. dia. d) do do 10 cm. dia. e) Pipe Rain water (C. I. Shoes) 5 cm. dia. f) do do 10 cm. dia. g) Pipe Rain water(C. I. Bend) 5 cm^ dia. h) do do ' 10 cm. dia a) Rope (Moonj) b) do (Hemp) c) do (Cotton) d) do (G. I. Wire) 7 ply 2.5 cm. dia. Rivets Sheet(celotex or equivalent) 13 mm. thick Sand (coarse) approved Fine sand of fineness modulus 1.25 Surkhi a) Stone (Mirzapur) undressed b) Stone (Mirzapur) upto 5 cm. thick flag .. Whiting? a) Washer (limpet) b) Washer (Bitumen) c) Washer (G. 1.) Wood preservative a) Wood Chaukhat sections (CP Teak) b) Wood Chaukhat sections (Shisham) c) Wood Chaukhat sections (Indian sal) d) Wood Chaukhat sections (Deodar) e) Wood Chaukhat sections (Kail) f) Wood Chaukhat sections (Country) g) Wood Chaukhat sections (Chir) a) Wood Planks (C.P.Teak)

per per per

sq. sq. pair each run. run. each each each each each each each each kg. kg. kg. m. 50 sq. cu. cu. cu. cu. sq. 50 doz. doz. doz. liter cu. cu. cu. cu. cu. cu. cu. cu.

a) SheetsfAsbestos co

b) do (Asbestos plain) c) do(A. C. Ridges) d) (Gutters)

33 34

per per

m. m.

a) Pipe Rain water (C b) do a) Pipe Rain water(C. b) do c) Pipe Rain water(C. d) do do e) Pipe Rain water (C f) do do g) Pipe Rain water(C. h) do do '

35

per per per per per per per per per per per per per per per per per per per per per per per per

a) Rope (Moonj) b) do (Hemp) c) do (Cotton) d) do (G. I. Wire) 7 p kg. m. m. m. m. m. m. kg.

36 37 38 39 40 41 42 43

Rivets Sheet(celotex or equiv

44 45

(in 20 lit. m. m. m. m. m. m. m. m.

tin

19.11 12.74 9.91 a) Stone (Mirzapur) un b) Stone (Mirzapur) up Whiting? a) Washer (limpet) b) Washer (Bitumen) c) Washer (G. 1.) Wood preservative

46

a) Wood Chaukhat se b) Wood Chaukhat se c) Wood Chaukhat se d) Wood Chaukhat se e) Wood Chaukhat se f) Wood Chaukhat sec g) Wood Chaukhat se a) Wood Planks (C.P.

b) Wood Planks (Shisham) c) Wood Planks (Indian-sal) d) Wood Planks (Deodar) e) Wood Planks (Kail) f) Wood Planks (Country) g) Wood Planks (Chir wood)

per per per per per per

cu. cu. cu. cu. cu. cu.

m. m. m. m. m. m.

b) Wood Planks (Shis c) Wood Planks (India d) Wood Planks (Deo e) Wood Planks (Kail) f) Wood Planks (Cou g) Wood Planks (Chir

CHAPTER-2 Labour
Sl. No. 1 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 Mistri Mason Carpenter Blacksmith Hammer man Fitter Thateher Painter Plumber Stone cutter Mate Beldar Mazdoor (Coolie) Bhishti Well sinker Bullockcart with two Bullocks and Driver Mote or charsa including two bullocks, one driver and one puller Sawyer per pair White washer Beldar for bitumen or Tar work Glazier Rivetter Cane-man Brick Moulder Materials 2 per per per per per per per per per per per per per per per per per per per per per per per per day day day day day day day day day day day day day day day day day day day day day day day day Unit 3 170.00 160.00 160.00 170.00 105.00 110.00 100.00 140.00 150.00 160.00 110.00 100.00 100.00 130.00 Well sinker 400.00 Rate 4

Mote or charsa includ Sawyer per pair 140.00 105.00 120.00 120.00 100.00 105.00

CHAPTER-3 Cartage
Sl. Description of Item of Work Analysis No. 1 2 3 231 (a) Cartage of ballast, Kanker, coal grit or sand etc. including loading and unloading but excluding stacking on Pucca Roads. Assume that 7 tonner truck will carry 4 cu. Metre of material. As per statement 11.65 cost per cu. Metre 1st km. 2nd & 3rd km. 4th & 5th km. 6th to 10th km. 11th & 20th km. As per statement 2.23 cost per cu. Metre As per statement 1.70 cost per cu. Metre As per statement 1.24 cost per cu. Metre As per statement 0.83 cost per cu. Metre

11.65 4.00 2.23 4.00 1.70 4.00 1.24 4.00 0.83

4.00 0.67 4.00 As per statement 0.65 cost per cu. Metre 0.65 Beyond 30th km. 4.00 (b) For Kachcha Roads :- Add 331/3% on the above rates as per U.P. Parivahan Ayukta(Tech) U.P. letter no. 7329 TR dt. Ja 1962. 21th & 30th km. As per statement 0.67 cost per cu. Metre (c) For Bricks 1000 Nos. Reduce the above rates by 15%

232 (a) As in item (231) above but for cement, Steel or other such material. 1st km. As per statement 11.65 cost per ton 11.65 7.00 Say 2.23 7.00 Say 1.70 7.00 Say 1.24 7.00 Say 0.83 7.00 Say 0.67 7.00 Say 0.65 7.00 Say

2nd & 3rd km.

As per statement 2.23 cost per cu. Ton

4th & 5th km.

As per statement 1.70 cost per cu. Ton

6th to 10th km.

As per statement 1.24 cost per cu. Ton

11th & 20th km.

As per statement 0.83 cost per cu. Ton

21th & 30th km.

As per statement 0.67 cost per cu. Ton

Beyond 30th km.

As per statement 0.65 cost per cu. Ton

(b) For Kachcha Roads : Add 33 1/3% on the above rates 233 (a) As in item 231 above but forTar,Bitumen.Asphalt,Mobile oil or other such material. Note:- One truck will carry 22 Tar drums or 26Mexphalt drums. The average weight carted shall be 5 Tons per 7 Tonner Truc trip. 1st km. As per statement 11.65 cost per ton 11.65 5.00 Say 2.23 5.00 Say 1.70 5.00 Say 1.24 5.00 Say 0.83 5.00 Say 0.67 5.00 Say 0.65 5.00 Say

2nd & 3rd km.

As per statement 2.23 cost per cu. Ton

4th & 5th km.

As per statement 1.70 cost per cu. Ton

6th to 10th km.

As per statement 1.24 cost per cu. Ton

11th & 20th km.

As per statement 0.83 cost per cu. Ton

21th & 30th km.

As per statement 0.67 cost per cu. Ton

Beyond 30th km.

As per statement 0.65 cost per cu. Ton

(b) For Kachcha Roads

Add 33 1/3% on the above rates.

234 Cartage of Ballast, kankar, coal, grit or sand etc. by head load upto 90 metres (3 chains only including loading and unloading but excluding stacking.

Coolie 1/4 for loading and 1/2 for carriage i. e. 3/4 ccolie at Rs. 2.50 per day T&P L. S.

Contractor's profit 10% Total : 2.16 cft. per chain Say Rs. 2.20 or Rs. 0.75 per cu.metre per 30 metre 235 Loading and unloading of material like Ballast, Loading :-Four Beldars will take one hour in loading kankar. coal or grit. etc. excluding their 100 cft. of material. Beldars 4/8 nos, at Rs.3.25 per day Unloading :- 4 Beldars will take one hour in unloading stacking Beldar 4/8 on at Rs. 3.25 per day Total Contractor's profit 10% Total Rs. 127 per cu. metre. Say Rs. 1.25 per cu. Metre Reduce the above rate by 15 percent (b) For brick 1000 nos. 236 (a) Unloading of cement. Tar, or Bitumen drums, lighter ;teel sections and other such materials from wagons and stac king the same on platform.

Five Beldars will suffice for this job for one day per Wagon, Beldars 5 nos. at Rs. 3.25 per day Contractors profit 10% Total Rs. 18.00 per wagon. (Taking wagon capacity 22 tons) Rate per ton

(b) As in item 236 above but for heavy articles like joists etc. machineries and Eight Beldar will suffice for this job at Rs. 3.25 per day unwieldy structures. Contractor's profit 10% Total (Taking wagon capacity 22 tons) (C) As in item 236 above but for R. C. C. Hume pipe 30 cm. to 46 cm. dia and 1.8 M. to 2.5 M. in length Rate per ton 28.60/22...Rs. 1.30 per ton Weight of 30 cm. dia. H. P. In a length of 8...51x8 Collar weight average half 32/2 Total (including necessary collars for which nothing extra will be paid). Hence rate 424x080 2240 (d) As in item No. 236 (c) above but for Hume Weight o'r 77 cm. dia. hume pipe in a length of 2.5 m. = 182x8=1,456 lbs pipes of 50 cm. to 95 cm.dia. Collar weight average half 134/2=67 Total Hence rate 237 (a) Stacking of bricks on edge in rows of two to a height of ten bricks and in a length of 100 bricks after dressing l evelling as required where bricks are to be stacked

Beldar 1/4 no. at Rs. 3.25 per day Contractor's profit at10% Total Say Rs.

(b) Stacking of coal, surkhi, sancf, lime stone, grit, stone/brick ballast and boulders etc. to the required sizes of stacks after necessary dressing of site where such materials are to be stacked.

Dressing, levelling, ramming side berms including, filling. Coolie 1 /5 no. at. Rs. 2.50 per day Stacking Beldar Contractors profit @ 10 % including T & P. Total Say

(c) As in item 237 above but when the 3 Beldars will take one hour in stacking 1 Ton 3/8 no. at Rs. 3.25 per day materials are either cement/steel. Contractor's profit @ 10 % 238 (a) Loading of cement. Tar, Bitumen drums. 4 Beldars will suffice Rs. 3.25 per day Lighter sections of steel and other such materials into wagons. Contractor's profit @ 10% Total (b) As in item 238 (a) above but for heavy articles like joists ect. Machineries and unwieldy structures. 12 Beldars will suffice for this job at Rs. 3.25 per day

Contractor's profit @ 10 % Total Rate per ton 239 (a) Cartage of heavy articles like joists etc. One Buffalow thela with driver etc, will carry one ton machineries and unwieldy structure including and will take 4 hours for covering a distance of average loading, unloading but excluding stacking. (0 8 km. no. at Rs. 25.00 per day to 8 km. by thela) Contractor's profit 10% Total Average rate per km. Reduce the rate of item (b) As in item No. 239 (a) above but when the distance exceeds 8 km. (c) Cartage of R.C.C. Hume pipe 30 cm. to 46 cm.dia.and 1.8 M.to 2.5 M.in length (including collars for which nothing extra will be paid) including loading & unloading. 239 (a) by 50 per cent for subsequent Kilo metre beyond 8 km.

One truck will carry 16 hume pipes per trip. Hence all rates as per schedule item No.

1st km.

11.65 16.00 2.23 16.00 1.70 16.00 1.24 16.00 0.83 16.00

2nd & 3rd km.

4th & 5th km.

6th to 10th km.

11th & 20th km.

21th & 30th km.

0.67 16.00 0.65 16.00

Beyond 30th km. (d) As in item No. 239 (c) above but for R.C;C. Hume pipes 50 cm. to 95 cm. dia &1.8M. to One truck will carry 5 hume pipe per 7 tonner truck per trip. As per statement. 2.5 M. in length. Carriage to be done by truck or by thela.

1st km.

11.65 5.00 2.23 5.00 1.70 5.00 1.24 5.00 0.83 5.00 0.67 5.00

2nd & 3rd km.

4th & 5th km.

6th to 10th km.

11th & 20th km.

21th & 30th km.

CHAPTER-4 Earth Work and Excavation


Sl. No. 1 251 Item of Work Unit Qnty Rate

3 4 2 5.00 Excavation in foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m. (100 including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sid foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge u distance of 30 M. (100 fts) from the foundation trenches. Mistri Beldars Coolie Blacksmith for sharpening Tools, etc T & P and Basket etc. L.S. Contractor's profit @ 10% Rate per 1000 Cuft Rate per 100 Cum per per per per day day day day
1/8

6 7
1/8

no. no. no. no.

170.00 100.00 170.00 170.00

Total

252

As in item no. (251) above but excavation in soil mixed with moorum/shingle kankar requiring the use of special T & P such as pickaxes, subbals etc. 1/8 Mistri per day no. 170.00 Beldars per day 8 no. 100.00 Coolie per day 7 no. 100.00 1/6 Blacksmith for sharpening Tools, etc per day no. 170.00 T & P and Basket etc. L.S. Contractor's profit @ 10% Rate per 1000 Cuft Total Rate per 100 Cum

253

Earthwork in cutting or in embarkment In ordinary soil, excavation to be in the form of regular pits not exceeding metre (20") depth and earthwork in embankment to be in 20 cm. (8") layers, including ramming & dressing the surface to required levels an slopes and also including 1.5 metre (5 ft) lifts and 30 m. (100") lead. The earth from cutting to be used in making embankment be deposited as spoil banks within 30 metres (100 ft.) distance as directed by the Engineer-in-charge. Mate Beldar Coolie Blacksmith Dressing Beldar T & P, L S. Coolie Contractor's profit @ 10% Rate per 1000 Cuft Rate per 100 Cum per per per per per per day day day day day day
1/10

2 3
1/8 1/8

no. no. no. no. no. no.

110.00 100.00 100.00 170.00 100.00 100.00 Total

554

Add to items (251-253) for every additional 30 m. (100') lead or part of 30 m. (100 ft.) or for every additional 1.5 m. (5 ft.) lift o part of 1.5 m. (5 ft).

255

Coolies per day 2 no. 100.00 T & P L.S. Contractor's profit @ 10% Rate per 1000 Cuft Total Rate per 100 Cum Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from the sit work and includhg watering, dressing etc. Rate to include cost of all materials. labour and T & P etc. required for proper completion of the work. Local sand 1000 per % cft. cft. Beldar per day 3 no. 100.00 Coolie per day 5 no. 100.00

Bhisti T & P etc LS Contractor's profit @ 10% Rate per 1000 Cuft Rate per 100 Cum 256

per

day

3/4

no.

130.00

Total

Same as in item i no. 251 above but excavation in Skeleton analysis based on hill soil mixed with gravel and boulder. Sched of rate s P.W.D.sl. no. 157 Mistri Beldar Coolie Blacksmith for sharpening Tools, etc. T & Pand Basket etc. L. S. Contractor's profit @ 10% Rate per 1000 Cuft Rate per 100 Cum per per per per day day day day
1/8 10 7 1/4

no. no. no. no.

170.00 100.00 100.00 170.00

Total

257

As in item 251 above but excavation in black cotton soil in Bundelkhand area requiring use of special tools and plants such as axes and sabbal etc. For 1000 cft. Mistri Beldar Coolie Blacksmith for sharpening Tools etc. T & P and Basket etc. L S. Contractor's profit @ 10% Rate per 1000 Cuft Rate per 100 Cum Extra rate for quantities of work executed under (a) In or under water and or liquid mud. (b) In or under foul position. per per per per day day day day
1/8 8 6 1/6

no. no. no. no.

170.00 100.00 100.00 170.00

Total

258

per per

%o %o

cft. cft.

Note: The extra in rates is applicable in respect of each item but to limited quantities of work excavated in these difficult conditions. 259

Clearing jungla including uprooting of rank vegetations grass,bush,wood trees and saplings of girth upto 30 cm. measured height of 1 metre above ground level & removal of rubbish upto a distance of 50 metres out side the periphery of area cle Analysis of rates on the basis of item 41 of CPWD analysis of 1S55 schedule). Take 1000 cft. Beldar Coolie T & P and Basket etc. L. S Contractor's profit @ 10% Rate per 1000 Cuft Rate per 100 Cum per per day day
1 0.5

no. no.

100.00 100.00

Total

CHAPTER-5 Concrete
Sl. No. 1 271 Item of Work Unit Qnty Rate 3 2 Concrete with 4 cm. (1.5") gauge brick ballast and kankar lime, in foundations and labour and T&P etc. required for proper completion of the work. Materials 100 Brick Ballast per % cft. 33 Kankar Lime per % cft. Labour 1/8 Mistri per day 1/3 Mason per day Beldar per day 3 Coolie per day 3 Bhisiti per day 0.5 1/8 Blacksmith per day T&P and Sundries L. S. 1. Materials 2. Labour Total 1.50 % water charges Add contractor's profit @ 10% except on cost of Brick Ballast i.e. on Rs. Rate per 100 Cft Rate per Cum 272

4 5.00 under floors, including supply of all mate

cft. cft. no. no. no. no. no. no.

19.82 110.99 170.00 160.00 100.00 100.00 130.00 170.00 Total

Total

Concrete with 4 cm. (1.5") gauge brick ballast, white lime and surkhi in foundations and under floors in the proportions of 100 32, including supply of all materials. labour and T&P etc. required for proper completion of the work (unslacked lime broug powder at site to be used). Materials Brick Ballast White Lime Surkhi Labour Mistri Mason Beldar Coolie Bhisiti Blacksmith T&P and Sundries L. S. 1. Materials 2. Labour Total 1 .5% water charges Add contractor's profit @ 10% except on cost of Brick Ballast i.e. on Rs. 74.50 Rate per 100 Cft Rate per Cum

per per per per per per per per per

% % % day day day day day day

cft. cft. cft.

100 15 30 1/8 1/3 3 3 0.5 1/8

cft. cft. cft. no. no. no. no. no. no.

19.82 550.00 9.91 170.00 160.00 100.00 100.00 130.00 170.00 Total

Total

273

Concrete with 4 cm. (1.5") gauge brick ballast, Fine local sand of 1.25 Fineness modulous and cement in proportion of 12:6 foundations and under floors, including supply of all materials, labour and T & P etc. required for proper completion of the work

Materials Brick Ballast Fine Sand of 1.25 (F.M.)

per per

% %

cft. cft.

100 48

cft. cft.

19.82 12.74

Cement Add 2.5% wastage on cement and sand i.e.on Rs. 81.60

per

50

kg.bag.

6.4

bag.

225.00 Total

Total Labour Mistri Mason Beldar Coolie Bhisiti Blacksmith T&P and Sundries etc, hire of C.C. Mixer, Lubricants e.c. including wastage of materials at 2.5% L.S. 1- Materials 2.Labour Total 1.5% water charges Add contractor profit 10% on Rs. 36.00 except on cost of cement brick ballast and sand. Rate per 100 Cft Rate per Cum 274 As in item (273) above but in the proportion of 10:5:1 Materials Brick Ballast per Fine Sand of 1.25 (F.M.) per Cement per Add 2.5% wastage on cement and sand. Total Labour:Same as in item 273 1. Materiasl 2. Labour including stacking Total 1.5% water charge Add Contractor's profit @ 10% on Rs. 36.00 except on cost of cement, sand and Brick ballast. Rate per 100 Cft Rate per Cum As in item (273) above, but in the proportion of 8:4:1. Materials Brick Ballast per Fine Sand of 1.25 (F.M.) per Cement per Add 2.5% wastage Total Labour:Same as in item 273 1. Materiasl 2. Labour including stacking Total 1.5% water charge Contractor's profit @ 10% on Rs. 36.00 except on cost of cement, sand and brick ballast. Rate per 100 Cft Rate per Cum Total Total per per per per per per day day day day day day
1/8 1/3 3 3 1 1/8

no. no. no. no. no. no.

170.00 160.00 100.00 100.00 130.00 170.00

Total

% % 50

cft. cft. kg.bag.

100 50 8

cft. cft. bag.

19.82 12.74 225.00

Total

275

% % 50

cft. cft. kg.bag.

100 50 9.3

cft. cft. bag.

19.82 12.74 225.00 Total

276

As in item (271) above but for haunch filling. Rate as per item no. 271. 129.67 per%cft Extra labour for lift and pinning. Beldar Coolie T & P and scaffolding etc. L.S. Rate as per item No. 271 Extra labour etc. for lift & pinning Add 1.5% water charges on Rs. 10% contractor's profit on Rs. Rate per 100 Cft Rate per Cum As in item (271) above but for roof terracing'with Engineer-in-charge. Rate as in item 276 Add difference in cost of 4 cm. and 2.5 cm. gauge. Brick ballast Cost of Extra Kankar Lime 45-33-12 cft. 1.5% water charges on tnis extra cost. Bail and Gur L.S. Contractor's profit @ 10% on A Total per per day day
1 4

no. no.

100.00 100.00 Total

538.40 538.40 Total

277

2.5 cm. (1") gauge including raking a shallow drain on the edge if desired b

per per

% %

cft. cft.

100 12

cft. cft.

21.23 110.99

278

Concrete with 4cm. (1") gauge brick ballast, white lime and surkhi in the proportion of 100:18:36 in roof terracing, including s of all materials, labour, and T&P etc. required for proper completion of the work (Unslacked lime brought to powder to be used Materials Brick Ballast White Lime (unslacked lime brought to powder at site) Bail, Gur etc. L.S. Surkhi Labour Mistri Mason Beldar Coolie Bhisiti Blacksmith T&P and basker etc. L.S. 1- Materials 2.Labour Total 1.5% water charges Total Add contractor profit 10% on except on cost of cement brick ballast and sand. Rate per 100 Cuft Rate per 100 Cum

per per

% %

cft. cft.

100 15

cft. cft.

19.82 110.99

per

cft.

30

cft.

9.91 Total

per per per per per per

day day day day day day

1/8 1/3 4 6 0.5 1/8

no. no. no. no. no. no.

170.00 160.00 100.00 100.00 130.00 170.00 Total

Total

279

Cement concrete with 4 cm. (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion of 4 : including supply of all materials, labour and T&P etc. required for proper completion of the work. Materials Stone ballast 1.5" gauge Coarse sand

per per

% %

cft. cft.

90 45

cft. cft.

43.13 19.11

Cement

per

50

kg.bag.

18.9

bag.

225.00 Total Total

Add 2 and 1/2 % wastage on coarse sand and cement Labour Labour : Mistri Mason Beldar Coolie Bhisti Blacksmith T & P and sundries etc. hire of C.C. Mixer, lubricant etc. L.S. 1. Materials 2. Labour Total 1.5% water charges Contractor's profit @ 10% on Rs. 46.20 except on cost of cement, sand and stone ballast Rate per 100 Cft Rate per Cum Total

per per per per per per

day day day day day day

1/10 0.5 4 4 2 1/10

nos. nos. nos. nos. nos. nos.

170.00 160.00 100.00 100.00 130.00 170.00

Total

280

As in item (279) above but in the proportion of 6 : 3 : 1. Materials Stone ballast Coarse sand Cement Add 2.5% wastage on coarse sand and cement. Labour - Same as in item 279 1. Materials 2. Labour Total 1.5% water charges Contractor profit @ 10% on Rs. 46.20 Except on cost of cement, coarse sand and stone ballast. Total per per per % % 50 cft. cft. kg.bag.
92 46.5 12.7

cft. cft. bag.

43.13 19.11 225.00

Total

281

As in item No. (279) above but in the proportion of 8 : 4 : 1. Materials Stone ballast Coarse sand Cement Add 2.5% wastage on cement and coarse sand Labour - Same as in item No. 279 1. Materials 2. Labour Total 1.5% water charges Add Contractor's profit @ 10 % except on cement, sand and stone ballast i.e. on Rs. 46.20 Total per per per % % 50 cft. cft. kg.bag.
94 48 9.8

cft. cft. bag.

43.13 19.11 225.00 Total

282

Cast cement concrete door sills, chaukhats boundry posts, shelves and similar small work with cement, approved coarse sand 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:2:4, excluding supply of reinforcement and its binding but incl its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including the cost of binding wire, moulds and all materials, labour and T & P etc. required for proper completion of the work. 1. Cost of 1 : 2 : 4 C.C. as per item 279 2. Add difference in cost of 1and 1/2" gauge and 3/4" gauge ballast. 3. Blacksmith for binding & fixing reinforcement 4. Cost of mould & extra cement and labour for floating coat etc. L. S. 5. Binding wire and wastage of steel L. S. 1.5% water charges on Rs. 99.00 Total Contractor's profit @ 10 % on Rs. 73.48 except on cost af grit and the rate of S.I. (No. 279) Total

per per

% day

cft.

90 4

cft. nos.

37.88 170.00

Total

283

R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:2:4 in l of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same wi B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labou T & P etc. required for proper completion of the work. Binding wire cost being included in the item. 1. Same as in item No. 279 above, 2. Add difference in cost of 1 A" gauge and 3/4" gauge stone ballast. 3. Blacksmith for binding & fixing reinforcement 4. Cost of binding wire & extra cement & labour for floating coat etc. L.S. 5. Cost of centering etc. with extra labour. 1.5% water charges on Rs. 88.00 Total Contractor's profit @ 10% on Rs. 62.32 except on rate of S. I. No. 279 and on ballast. Total

per per

% day

cft.

90 2

cft. nos.

37.88 170.00

Total

284

As in item No. 283 above but for slabs. Rate as per S.I. 283 Add extra cost of centering and shuttering Add 10% contractors profit on Rs. 0.80 Total

285

As in item (283) above but in the lighter beams, i.e. having spans above 6 m. (20') Rate as in item 283 above Add for ordinary brick or bailie supports L.S. 10% Contractor's profit on Rs. 1.30 Total

286

As in item (283) above but in heavier beams, i.e. having spans above 6 m. (20'). Rate as in item (283) above Add for masonry or bailie supports and stronger shuttering 10% Contractor's profit on Rs. 1.85 Total

287

As in item (283) above but in R. C. C. Raft foundation and footing with 4 cm. (1.5") gauge approved stone ballast.

Rate as in item No. 279 above Blacksmith for binding and reinforcement. Cost of binding wire, pumping out of water if any L.S. Contractor'profit @ 10% on Rs. 42.75

per

day

0.5

nos.

170.00

Total 288 As in item (283) above but in R.C.C. T beam and slab roofs and R. C. C. columns. Rate as in item No. (283) above Add for masonary or bailie supports and stronger shuttering Contractor's profit @ 10% on Rs. 1.40 Total 289 As in item no. (283) but on R. C. C. columns in 1 : 1and 1/2 : 3. Rate as in item No. 288 above Add difference in cost of materials to bo used. Stone Ballast Coarse sand Cement 1.5% water charges on Rs. 36.57 Total 290 As in item (282 to 288) above but when shingles are used. Deduct from item 282 to 6.3 Stone Ballast 2 cm. (3/4") per % cft. 3.2 Coarse sand per % cft. 1.32 Cement per 50 kg.bag. Difference in rate of shingle and stone grit. Contractor's protit 10% on Rs. 38.00 Total 291 per per per % % 50 cft. cft. kg.bag.
5 2.5 4.65

cft. cft. bag.

37.88 19.11 225.00

cft. cft. bag.

37.88 19.11 225.00

Deduct rate of concrete for using 5 cm. (2") gauge brick ballast in schedule item no.272 to 276, instead of 4 cm. (1.5") gauge ballast. Rate of 1.5" gauge brick ballast. Rate of 2" gauge brick ballast. Add for water charges 1.5% Total Rs. 5.07 per % cft. or Rs. 1.79 per cu. metre. Say Rs. 1.80 per cu. Metre per per % % cft. cft.
100 100

cft. cft.

a) 5.00 cm gauge
Difference

292

Deduct rato of concrete for using 5 cm. (2") gauge stone ballast in schedule item no. 279 to 281 instead of 4 cm. (1 and gauge stone ballast. Rate of 1and 1/2 gauge stone ballast. Rate of 2" gauge stone ballast. So difference for 90 cft. ballast to be used in 100 cft. of concrete =10x9/10=9.00 Add for Water charges 1.5 % Total per per % % cft. cft.
100 100

cft. cft.

0.00
Difference

CHAPTER - 6 BRICK WORK


Sl. No. 1 301Item of Work Unit Qnty Rate

3 4 2 5.00 First class brick work in kankar lime in foundation and plinth including supply of all materials, labour and T & P etc. require proper completion of the work. Materials : Bricks 1300 per %o 2.70 30 Kankar lime per % cft. cft. 110.99 Total Labour : Mistri Mason Beldar Coolies Bhisti T & P etc., L.S. Materials Labour Add 1.5% water charges for curing Contractor's profit @ 10% Total per per per per per day day day day day
1/6 2 2 2 1/2

no. nos nos nos nos

170.00 160.00 100.00 100.00 130.00 Total

302-

First class brick work in one white lime and two surkhi mortar in foundation and plinth including supply of all materials, labou T & P etc. required for proper completion of the work. Materials : Bricks Surkhi White lime Labour : Same as in item No. 301 Materials Labour Add 1.5% water charges Contractor's profit @ 10% Total per per per 27.45 % % % nos. cft. cft.
1300 22 11

cft. cft.

2.70 9.91 550.00 Total

Total

(a)

First class brick work in one white lime and three surkhi mortar in foundation and plinth including supply of all materials, labou T & P etc. required for proper completion of the work. Materials : Bricks Surkhi White (lime brought to powder at site from unslacked lime) Labour : Same as in item No. 301 Materials Labour Add for water charges 1.5% Contractor's profit @ 10% Total per per per 27.45 % % % nos. cft. cft.
1300 24 8

nos. cft. cft.

2.70 9.91 550.00 Total

Total

303-

First class brick work in 1 : 6 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all mate labour and T & P etc. required for proper completion of the work. Materials : Bricks per % nos.
1300

nos.

2.70

Fine sand of 1.25 F.M. Cement Labour : Same as in item No. 301 Materials Labour Add 1.5%% water charges

per per 27.45

% 50

cft. kg bag.

27 3.75

cft. bag.

12.74 225.00 Total

Total Total 10% Contractor's profit on Rs. 107.73 Total 304As in item (303) above but in 1 : 5 cement and fine sand of 1.25 F.M. mortar. 1300 Materials : Bricks per % nos. 27 Fine sand of 1.25 F.M. per % cft. 4.5 Cement per 50 kg bag. Labour : Same as in item No. 303 Materials Labour Add for water charges 1.5% Total Contractor's profit @ 10% on Rs. 107.85 (excluding cost of cement and sand) 305As in item 303 above but in 1 : 4 cement and fine sand of 1.25 F.M. mortar. Materials : Bricks per % nos. Fine sand of 1.25 F.M. per % cft. Cement per 50 kg bag. Labour : Same as in item No. 303 Materials Labour Add 1.5% water charges Total Contractor's profit @ 10% on Rs. 107.97 (excluding cost of cement and sand) Total 27.45 Total 27.45

nos. cft. bags.

2.70 12.74 225.00 Total

Total

1300 27 51/4

nos. cft. bags.

2.70 12.74 225.00 Total

Total

306-

As in item 303 above but in 1 : 3 cement and fine sand of 1.25 F.M. mortar. Materials : Bricks per % nos. Fine sand of 1.25 F.M. per % cft. Cement per 50 kg bag. Labour : Same as in item No. 303 Materials Labour Add 1.5% water charges 27.45

1300 27

7.5

nos. cft. bags.

8.9

2.70 12.74 cft. 225.00 Total

Total Total Contractor's profit @ 10% on Rs. 108.33 (except on cost of cement and sand) Total

307-

As in item 303 above but in 1 : 3 cement and coarse sand mortar. Materials : Bricks per % nos. Coarse sand per % cft. Cement per 50 kg bag. Labour : Same as in item No. 303 27.45

1300 27

7.5

nos. cft. bags.

2.70 19.11 225.00 Total

Materials Labour Total Add 1.5% water charges Total Contractor's profit @ 10% on Rs. 108.73 (excluding cost of cement and sand) Total

308-

First class brick work in mud mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for 1300 Materials : Bricks per % nos. nos. 2.70 30 Earth per % cft. cft. Total Labour : Same as in item No. 303 27.45 Materials Labour Total Contractor's profit @ 10% Total

309-

As in item (301) to (304) above but in the super-structure including necessary cutting and moulding of bricks as required and including honey comb brick, work thickness of wall not to be less than 1 brick thick. Add for extra labour to above items. Extra labour required : 1. Mason 2. Coolie 3. Scaffolding etc. L.S.

per per

day day

1 1

no. no.

160.00 100.00 Total

Add 1.5% water charges Total Contractor's profit @ 10% Total

310-

As in item (309) above but for wall of one brick thick. Add for extra labour. Mason per day Coolie per day

1 1

no. no.

160.00 100.00 Total

Add 1.5% water charges Total Contractor's profit @ 10% Total

310(a)

As in item (309) above but for wall of half brick(4") thick. Add for extra labour. Extra labour over item no. 310. Mason Coolie

per per

day day

0.5 0.5

no. no.

160.00 100.00 Total

Add 1.5% water charges Total Contractor's profit @ 10% Total Rate of item no. 310 Total

310(b)

As in item (309) above but wall up to 3" thick. Add for extra labour. Extra labour over item no. 310 (a). Mason Coolie

per per

day day

0.5 1

no. no.

160.00 100.00 Total

Add 1.5% water charges Total Contractor's profit @ 10% Total Rate of item no. 310 (a) Total

311-

For second class brick work deduct from items (301) to (310) (310) Difference in cost of bricks. per % nos. Water charges 1.5% Contractor's profit @ 10%

1300

nos. Total Total

312-

For third class brick work in mud mortar deduct from item (301) to (310). Difference in cost of bricks. per % nos. Deduct cost of 1300-1200=100 1st class per % nos. bricks. Less workmanship required L.S. Add contractor's profit @ 10%

1200

nos.

Total Total

313-

Sundried Brick work in mud mortar in foundation and plinth, including supply of all materials, labour and T & P etc. require proper completion of the work. Materials : Bricks including wastage Earth Labour : Mistri Mason Beldar Coolie Bhisti T & P etc. Material Labour Total Contractor's profit @ 10% Total per per per per per per per % % day day day day day nos. cft.
1300 30 1/6 2 2 2 1/4

nos. cft. no. nos. nos. nos. no. Total 170.00 160.00 100.00 100.00 130.00 Total

314-

First class brick work in arches including shuttering and centering add to items (301 required. 2 Mason per day 1 Beldar per day 2 Coolie per day Centering and Shuttering etc. L.S. Add 1.5% water charges

- 307). Extra labour, centering and shutt nos. nos. nos. 160.00 100.00 100.00 Total

Total Contractor's profit @ 10% Total 315-

As in item 314 above but in jack arches, including shuttering & centering add to item 301-307. Extra labour, centering shuttering required. 2 Mason per day nos. 160.00 1 Beldar per day nos. 100.00 2.5 Coolie per day nos. 100.00 Centering and Shuttering etc. L.S. Total Add 1.5% water charges Total Contractor's profit @ 10% Total

316-

As in item 314 above but in well steining with ordinary bricks, add to item 301-307. Extra cost of labour, centering and shutt etc. 2.5 Mason per day nos. 160.00 1 Beldar per day nos. 100.00 3 Coolie per day nos. 100.00 Centering and Shuttering etc. Total Add 2.5% water charges Total Contractor's profit @ 10% Total

317-

As in item 316 above but in well steining but with specially moulded bricks. Add to item 316. Extra labour required for workma and handling. 0.5 Mason per day nos. 160.00 2 Beldar per day nos. 100.00 Total Add 1.5% water charges Total Contractor's profit @ 10% Total

318-

11.5cm. (4") thick string or drip course with 6 cm. (2.1/4") projection of first class brick in kankar lime including 12mm (") lime plastering with simple moulding and cutting drip notch as required and including supply of all materials, labour and T & P required for proper completion of the work. Bricks required for projected portion, 100rft. 3/16x3/8x100x1300/100=91 nos. Wastage at the rate of 10% = 9nos. Bricks total : 100 bricks. Bricks
Kankar lime masonary3/16x3/8x100x30/100 =

For plaster 100x3/4=75 cft. 5cft. Kankar lime Labour : Mistri Mason Coolie Bhisti T & P scaffolding etc.

= Total =

per 2.10 3.75 5.85 per per per per per per

% cft. cft. cft. % day day day day day

nos.

100

nos.

2.70

cft.

5.85 1/50 3.5 2 1/12

cft. nos. nos. nos. no.

110.99 170.00 160.00 100.00 130.00 Total

Add 1.5% water charges Total Contractor's profit @ 10% Total

319-

As in item (318) above but both masonary and laster in 1:6 cement and fine sand of 1.25 F.M. Labour as per item no. 318 abo Bricks same as in item no. 318 above Cement plaster (75sft.@83cft.per%sft. Masonary (7cft. @ 4.2cft. Per%cft. Fine sand of 1.25 F.M. 2.70 = = Total = per 0.62 0.29 0.91 per 50 cft. cft. cft. % kg.bag.
0.77

bag.

cft.

cft.

12.74 Total

Add 1.5% water charges Contractor's profit @ 10% on Rs. 40.23-6.75= 33.48 (except cost of cement and sand)

Total

320-

As in item (318) above but in 23cm. (9") cornice in three courses with 6 cm. (21/4") projection in each course in kankar lime 12mm. thick lime, plaster or pointing take length of 100 rft. Brick work in 1st course=1/4x3/16x100 = 4.70 2nd course = 2x4.7 = 9.40 3rd course = 3x4.7 = 14.10 Total = 28.20 Plaster = 100x(221/4") 1/12 = 187.50 Bricks = 28.2x1300/100+10% = 402.00 Kankar lime In masonary 28.2x30/100 = 8.46 In plaster 187-5x5/100 = 9.37 Total = 17.83 Bricks per Kankar lime per Labour : Mistri per Mason per Coolie per Bhisti per T & P scaffolding etc. cft. cft. cft. cft. sft. say cft. cft. cft. % % day day day day
400

nos.

say nos. cft.

18.00 400 18 1/20 6.5 4 1/8

cft. nos. cft. nos. nos. nos. no.

2.70 110.99 170.00 160.00 100.00 130.00 Total

Add 1.5% water charges Total Contractor's profit @ 10% Total

321-

As in item 320 above but both masonary and plaster and pointing in 1.6 cement and local sand mortar. 400 Materials Bricks per % nos. nos. 2.70 Local sand of 1.25 F.M. including 25 wastage per % cft. cft. 2.32 Cement per 50 kg.bag. bag. 225.00 Cement : In Brick work in 1.6 cement an local sand 28.2/100x4.2=1.186 cft. In plaster 187.5cft.=8/5/100x0.83=1.554/ 2.740 cft. = 2.32 bag. Labour as per item 320 above Total

Add 1.5% water charges Contractor's profit @ 10% on Rs. 76.55 (except on cement and sand)

Total

322-

Extra cutting of bricks for moulding as required for cornice, etc, including rubbed finish not exceeding 11.5 cm. (4.5") with (la only take 100 rft.) Wastage of bricks @ 10% Mason for cutting bricks Labour for rubbing & carriage (coolie) T & P etc. L.S. per per per % day day nos.
7 4 3

nos. nos. nos.

160.00 100.00 Total

Contractor's profit @ 10% Total

323-

Making opening through walls in lime or cement mortar for doors and windows or enlarging existing opening or cutting out work for under pinning including necessary supports staging etc. cleaning site and stacking the dismantled materials at the as directed by the Engineer-in-charge within a distance of 60 metres (200ft.). Assuming size of opening 5ft. wide and 7 feet h and 1 1/8 ft. thick = 40cft. Labour for making holes for pins, fixing pins for proper safety of super structure and removing the c after completion of the job pins na holes. Beldar Coolie Hire of pins and struts L.S. per per per day day day
1 1

nos. nos.

100.00 100.00

Total Cutting opening, cleaning of bricks and stacking them within 2 chain as directed by the Engineer-in-charge. 1.5 Beldar per day nos. 100.00 2 Coolie per day nos. 100.00 1/12 Mistri per day nos. 170.00 T&P etc. L.S. Total Contractor's profit @ 10% Total 324-

Laying reinforced brick work in sunshades with first class brick laid in cement and approved coarse sand mortar 1:3 excl supply of reinforcement and its bending but including its fixing in position and binding the same with 24 B.W.G.I. Binding wire including all centering and shuttering etc. and curing and also including cost of binding wire, supply of all materials labour and etc. required for proper completion of the work. Rate for R.B. slab as per item no. 535 Deduct for less cost of centering materials 10% on Rs. 12.92 (from item 535) Less 1.5% water charges Less Contractor's profit @ 10% Total

325-

As in item (324) but in lintels As in item 324 above Deduct : less labour required due less cost of centering and staging including 10% contractor's profit Total

326-

Encasing rolled steel sections as in beams and columns in 1:3 brick work in cement and approved coarse sand with 10mm. thick cement plaster in 1:3 cement and approved coarse sand including supply and fixing of wire netting of required gauge w necessary including supply of all material, labour and T&P etc. required for proper completion of the work. Details of cost for a single l section 8'x3"x6"

Brick work in 1:3 1x8x1/6x5/12=1.1 cft. Ditto Wire gauge including wastage : 8x1.5=12 sft. Ditto Cost of binding and placing wire gauge Blacksmith Beldar Cement plaster in 1:3 (cement and approved coarse sand). 8x1 1/4=10sft. Labour as per item 320 above

per

cft.

1.1

cft.

per per per

% day day

sft.

12 1/4 1/4

sft. nos. nos. 170.00 100.00 Total

per

sft.

10

sft. Total Total

1.5% water charges on Rs. 14.48 Contractor's profit @ 10% on Rs. 14.48 Total 327Add to all items of brick work in superstructure extra for brick work in circular pillar. Details of cost per % cft. 4 Extra Bricks per %o Labour for cutting and dressing bricks etc. 4 Mason per day 1 Coolie per day 1.5% water charges Contractor's profit @ 10% Total

no. nos. nos. 160.00 100.00 Total

CHAPTER - 7
DAMP COARSING
Sl. No. 1 360Item of Work Unit Qnty Rate

3 4 2 5.00 2cm. (3/4") thick damp proof coarse with cement and approved coarse sand 1:2 with and including water proofing materia ordered by the Engineer-in-charge in the proportion as specified by the manufacturers, including supply of all materials, labou T&P etc. required for proper completion of the work and including proper curing and shuttering as necessary. Materials : Coarse sand Cement Water proofing compound as specified by the manufactures Labour : Mistri Mason Beldar Coolies Bhisti Sundries L.S. 1.5% water charges Contractor's profit @ 10% on Rs. 16.62 Total per per per per per per per per % 50 kg. day day day day day cft. kg.bag.
6.25 2.6 3.4

cft. bag. kg. no. nos nos nos nos

19.11 225.00

1/20 1/4 1/4 1/4 1/8

Total 170.00 160.00 100.00 100.00 130.00 Total

361-

As in item (360) above but 2.5 cm. (1") thick and of cement concrete consisting of one part cement 1.5 parts approved coarse and 3 parts approved 13mm. (1.5") graded stone grit and including water proofing materials as ordered by the Engineer-in-ch in the proportion as specified by the manufacturers. Materials : Stone ballast Cement Water proofing compound as specified by the manufactures Labour : Mistri Mason Beldar Bhisti Sundries L.S. 1.5% water charges Contractor's profit @ 10% on Rs. 25.66 except on cost of cement, sand and ballast. per per per per per per per % 50 kg. day day day day cft. kg.bag.
7.5 2.3 2.3

cft. bag. kg. no. nos nos nos

37.88 225.00

1/16 1.5 1.5 1/8

Total 170.00 160.00 100.00 130.00 Total

Total

CHAPTER - 8
STONE WORK
Sl. No. 1 370Item of Work Unit Qnty Rate

3 4 2 5.00 Supply and fixing of Mirzapur or other approved stone fine dressed, as in door sills chaukhats etc. laid in mortar consisting part cement and 6 part approved fine sand of 1.25 F.M. including supply of all materials, labour and T&P etc. required for p completion of the work. Cost of 2" thick stone at site including carriage 1 per % cft. cft. Dressing Charges : Stone mason Blacksmith Beldar Coolie Fixing Charges : Stone mason Beldar Blacksmith Bhisti Scaffolding materials and water charge L.S. Contractor's profit @ 10% Total per per per per per per per per day day day day day day day day
1/10 1/36 1/48 1/48 1/48 1/32 1/336 1/96

no. no. no. no. no. nos nos nos

160.00 170.00 100.00 100.00 160.00 100.00 170.00 130.00 Total

371-

Supply and fixing of Mirzapur or other approved stone slabs 4cm. (1.5") thick with plain moulding on one edge and fine dresse all exposed surfaces as in steps and shelves laid in cement mortar consisting of one part cement and 6 parts approved fine of 1.25 F.M. including supply of all materials, labour and T&P etc. required for proper completion of the work. Take stone r 12.5x12" each. Stone Cement Fine sand of 1.25 F.M. Coolie Bhisti Blacksmith and Mason Beldar Sundries, scaffolding and water charge L.S. Contractor's profit @ 10% on Rs. 141.51 Total per per per per per per per % 50 % day day day day sft. kg.bag. cft.
106 2 15 12 1/4 1 1.5

sft. bag. cft. no. nos no. nos

43.13 225.00 12.74 100.00 130.00 170.00 100.00 Total

372-

Supply and fixing of Mirzapur or other approved stone chajjas 4cm. (1.5") thick with but joint and with exposed surfaces dressed set in cement mortar consisting of one part cement and 6 parts approved fine sand of 1.25 F.M. including supply materials, labour and T&P etc. required for proper completion of the work. Details of cost of 22.5 sft. Taking 100rft. And 2 1/4 ft. projection and 6" bearing. Area 10x2.75 = Wastage at 10% = Total = Stone Mortar for pointing 1:2 with one part of cement and 2 parts of stone dust. Cement Stone dust Pigment L.S. Stone mason Beldar Bhisti Dresser Scaffolding Sundries and mortar L.S.

27.50 2.75 30.25 per

sft. sft. sft. %

say sft.

30.00
30.25

sft. sft.

per per per per per per

50 % day day day day

kg.bag. cft.

4/45 2/9 1/8 3/4 1/8 1

bag. cft. no. no. no. no

225.00

160.00 100.00 130.00

Total Contractor's profit @ 10% on Rs. 36.26 Total 373-

Supply and fixing of Mirzapur or other approved stone rushades upto 4cm. (1.5") thick over doors and windows including brackets of same stone 5cm. (2") thick with plain moulding in edges of brackets all exposed surfaces to be fine dressed and to project upto 0.6m. (2ft.) and set well into walls to a depth of 15cm. (6") (minimum) with cement mortar consisting of one cement and 6 parts approved fine sand of 1.25 F.M. including supply of all materials, labour and T&P etc. required for p completion of the work. Stone chisel 1.5" thick over all width 2"-6"=2.5ft. Total area 5'-3"x2'-6" =
Brackets(chisel dressed)Length1'-6"+9"=2.5ft.

13.12 = = Total = 5.00 1.81 19.93 per per per per per

Area 2x1x2.5 Wastage at 10% Stone Stone mason : Ornamental Beldar Bhisti Dressing Stone : Dresser Contractor's profit @ 10%

sft. sft. sft. sft. sft. % day day day day

say sft.

20 20 1/2 1/2 1/8 1

sft. sft. no. no. no. no 170.00 100.00 130.00 160.00 Total

374-

Supply and fixing of pierced tracery panels of Mirzapur or other approved stone 5cm. to 6cm. (2" to 2.5") thick fixed in ce mortar consisting for 1 part cement and 3 part approved corase sand including supply of all materials, labour and T&P etc. req for proper completion of the work. Cost of 2" thick stone at site including carriage Stone Wastage 10% Dressing Charges : Stone mason Blacksmith L.S. Beldar Coolie Fixing Charges : Stone mason for plain work Beldar Blacksmith Bhisti Scaffolding materials and mortar etc.L.S. Contractor's profit @ 10% on Rs. 7.30 Total per % sft.
1

sft.

per per per per per per per

day day day day day day day

1/2 1/2 1/12 1/12 1/8 4/56 x1/6 4/16 x1/6

no. no. no. no. no. no. no.

160.00 100.00 100.00 160.00 100.00 170.00 130.00

CHAPTER - 9
WOOD WORK
Sl. No. 1 401 Item of Work Unit Qnty Rate 3 4 2 5.00 C.P. Teak wood wrought tramed and fixed including simple mouldings, straight works as in Chaukhats, including supply materials, labour and T&P etc. required for proper completion of the work. Take a size of opening as 4'47' section of Chaukhat 4"x3". Wood 1x18x1/3x1/4 = Wastage 5% = Total = Wood Carpenter Mistri Carpenter Beldar Sundries L.S. Contractor's profit @ 10% on Rs. 61.69

1.500 0.075 1.575 per per per per

cft. cft. cft. % day day day

say cft.

1.6
1.6 1/16 1/2 1/4

cft. cft. no. no. no.

a) Wood Chaukhat s 170.00 160.00 100.00

Total 402As in item 401 above but with shisham wood. Same as in item 401 above Deduct difference in cost of wood (35-24.05)=10.95 Contractor's profit @ 10% on Rs. 17.52

per

cft.

1.6

cft. Total

403-

As in item 401 above but in indian sal wood. Same as in item 401 Deduct difference in cost of wood (35-17.55) = 17.45 Contractor's profit @ 10% on Rs. 27.92

per

cft.

1.6

cft. Total

404-

As in item 401 above but with Deodar wood. Same as in item 401 above Deduct difference in cost of wood (35-24.90) = 10.10 Contractor's profit @ 10% on Rs. 16.16

per

cft.

1.6

cft. Total

405-

As in item 401 above but with Kail wood. Same as in item 401 above Deduct difference in cost of wood (35-14.15) = 20.85 Contractor's profit @ 10% on Rs. 33.36

per

cft.

1.6

cft. Total

406-

As in item 401 above but with country wood. Same as in item 401 above Deduct difference in cost of wood (35-9.92) = 25.08 Contractor's profit @ 10% on Rs. 40.12

per

cft.

1.6

cft. Total

407408-

As in item (401-406) but for curved work, add to the above item 25% above per cu.m.

Wood work worught framed and fixed plain work as in roof trusses, pulins, ceiling joists, etc. including supply of all mate labour and T&P etc. required for proper completion of the work. Deduct from the item (401-406).

Less labour required Carpenter Beldar Contractor's profit @ 10% on Rs. 3.24

per per

day day

1/4 1/2

no. no.

160.00 100.00 Total

409-

Supply & fixing of 4.5cm. (1 3/4") thick C.P Teak wood part panelled & part glazed door and window shutters including supply fixing of wooden cleats and stops and including fixing and adjustment of hinses, bolts, locks, handles, springs, and/or other but excluding their supply and including painting with two coats of Black Japan on all iron fittings if necessary & including fixin glass panes with putty & brad. Glass to be 0.64 kg (21oz.) fittings with necessary screws to be supplied departmentally. Take a door size 4"x7", size of shutter 3.2/3x6.3/4"= 24.75 sft. Wood required including 10% wastage Glass panes 12"x8" Putty and brad L.S. Mistri Carpenter Beldar Glazier Sundries such as glue black Japan etc. Contractor's profit @ 10% on Rs. 171.01

per

% each day day day day

cft.

3.25

16
1/8 4 1 1/5

cft. no. no. no. no. no. 170.00 160.00 100.00 120.00

per per per per

Total 410-

Additional cost for fixing glass panes with C.P. Teak wood beading and felt as directed by Engineer-in- charge instead of putt brad including cost of all materials, labour and T&P etc. required for proper completion of the work. Take 10nos. Glass panes C.P. Teak wood 5x1/3x1/32 = Wastage 10% = Total = Wood Screws Carpenter Beldar Contractor's profit @ 10% on Rs. 6.87

0.05 0.005 0.055 per per per per

cft. cft. cft. %


gross

say cft.

day day

0.06 0.06 10 1/4 1/8

cft. cft. doz. no. no.

a) Wood Chaukhat s 160.00 100.00 Total

411-

As in item no. 409 above but fully panneled. Wood 24.75x7/48 = Wastage 10% = Total = C.P. Teak Wood Labour as above in item no 409 including 10% contractor's profit Contractor's profit @ 10% on cost of C.P. Teak Wood only.

3.61 0.36 3.97 per

cft. cft. cft. %

say cft.

4.00
4

cft. cft.

a) Wood Planks (C.P

Total 412As in item no. 409 above but fully glazed. C.P. Teak wood including wastage Glass panes 12"x8" Brad and Putty L.S. Labour as in item no. 409 Deduct Carpenter Contractor's profit @ 10% on Rs. 162.19

per

% each

cft.

3 28

cft. no.

a) Wood Planks (C.P

per

day

no.

160.00 Total

413-

As in item no. 409 above but 4cm. (1.5") thick. Rate as in item no. 409 above

Deduct difference in quantity of wood Contractor's profit @ 10% on difference in quantity of wood

per

cft.

0.01

cft.

Total 414As in item no. 411 above but 4cm. (1.5 ") thick. Rate as in item no. 411 above Deduct difference due to less wood required as in item 413 including Contractor's profit @ 10% Total 415As in item no. 412 above but 4cm. (1.5") thick. Rate as in item no. 412 above Deduct difference due to less wood required as in item 413 including Contractor's profit @ 10% Total 416As in item no. 409 above but 2.5cm. (1") thick. Rate as in item no. 409 above Deduct difference in quantity of wood Contractor's profit @ 10% on Rs. 0.78

per

cft.

0.02

cft. Total

417-

As in item no. 411 above but 2.5cm. (1") thick. Rate as in item no. 411 above Deduct difference due to less wood required as in item 416 including Contractor's profit @ 10% Total

418-

As in item no. 412 above but 2.5cm. (1") thick. Rate as in item no. 412 above Deduct difference due to less wood required as in item 416 including Contractor's profit @ 10% Total

419-

Same as in item no. 409 above but of Shisham Wood. Rate as in item no. 409 Deduct difference in cost of wood=3.25/ per 24.75=0.13 cft. at Rs. 39.05-26.90=12.15 Contractor's profit @ 10%

cft.

0.13

cft. Total

420-

Same as in item no. 411 above but of Shisham Wood. Rate as in item no. 411 Deduct difference in cost of wood 4/24.75 = 161 cft. Contractor's profit @ 10% Total

421-

As in item no. 412 above but of Shisham Wood. Rate as in item no. 412 Deduct difference in cost of wood 3/24.75 = 121 cft. Contractor's profit @ 10% Total

422-

As in item no. 419 above but of Shisham Wood. Rate as in item no. 419 Deduct difference in quantity of wood

per

cft.

0.01

cft.

Contractor's profit @ 10% Total 423As in item no. 420 above but 4cm. (1.5") thick. Rate as in item no. 420 Deduct difference due to less wood required as in item 422 including Contractor's profit @ 10% Total 424As in item no. 421 above but 4cm. (1.5") thick. Rate as in item no. 421 Deduct difference due to less wood required as in item 422 including Contractor's profit @ 10% Total 425Same as in item no. 409 above but of Indian Sal Wood. Rate as in item no. 409 Deduct difference in cost of wood at Rs. per (39.05-20.10) = 18.95 Contractor's profit @ 10%

cft.

0.13

cft. Total

426-

As in item no. 411 above but of Indian Sal Wood. Rate as in item no. 411 Deduct difference in cost of wood per Contractor's profit @ 10%

cft.

0.161

cft. Total

427-

As in item no. 412 above but of Indian Sal Wood. Rate as in item no. 412 Deduct difference in cost of wood per Contractor's profit @ 10%

cft.

0.121

cft. Total

428-

As in item no. 425 above but 4cm. (1.5") thick. Rate as in item no. 425 Deduct difference in quantity of wood Contractor's profit @ 10%

per

cft.

0.01

cft. Total

429-

As in item no. 426 above but 4cm. (1.5") thick. Rate as in item no. 426 Deduct difference due to less wood required as in item 428 including Contractor's profit @ 10% Total

430-

As in item no. 427 above but 4cm. (1.3") thick. Rate as in item no. 427 Deduct difference due to less wood required as in item 428 including Contractor's profit @ 10% Total

431-

As in item no. 409 but of Deodar wood. Details of 24.75 sft. of door shutter : Deodar wood Glass panes Putty and brads L.s Mistri

per

% each day

cft.

3.25 16 1/8

cft. no. no.

d) Wood Planks (Deo

per

170.00

Carpenter Beldar Glazier Sundries L.S. Contractor's profit @ 10% on Rs. 128.01

per per per

day day day

3 1 1/4

no. no. no.

160.00 100.00 120.00

Total 432Same as in item no. 411 above but of Deodar wood. Wood 24.75x7/48 = 3.61 Wastage 10% = 0.36 Total = 3.97 Deodar wood per Labour as in item no. 431 Contractor's profit @ 10% on Rs. 188.13

cft. cft. cft. %

say cft.

4.00
4

cft. cft.

Total 433Deodar wood including wastage Glass panes 12"x8" Brad and Putty L.s Labour : Same as in item no. 431 Deduct Carpenter Contractor's profit @ 10% on Rs. 121.94 per % each cft.
3 28

cft. no.

per

day

no.

160.00 Total

434-

As in item no. 431 but of 4cm. (1.5") thick. Rate as in item no. 431 Deduct difference in quantity of wood Contractor's profit @ 10%

per

cft.

0.01

cft. Total

435-

As in item no. 432 above but 4cm. (1.5") thick. Rate as in item no. 432 Deduct difference due to less wood required as in item 434 including Contractor's profit @ 10% Total

436-

As in item no. 433 above but 4cm. (1.5") thick. Rate as in item no. 433 Deduct difference due to less wood required as in item 434 including Contractor's profit @ 10% Total

437-

As in item no. 431 above but 2.5cm. (1") thick. Rate as in item no. 431 Deduct difference in quantity of wood Contractor's profit @ 10%

per

cft.

0.02

cft. Total

438-

As in item no. 432 above but 2.5cm. (1") thick. Rate as in item no. 432 Deduct difference due to less wood required as in item 437 including Contractor's profit @ 10% Total

439-

As in item no. 433 above but 2.5cm. (1") thick. Rate as in item no. 433 Deduct difference due to less wood required as in item 437 including Contractor's profit @ 10%

Total 440Same as in item no. 409 above but of Kail wood or Chir Wood. Rate as in item no. 431 Deduct difference in cost of wood 3.25/ 24.75 per % =13cft. @ Rs. (28.05-16) = 12.05 Contractor's profit @ 10%

cft.

0.13

cft. Total

441-

As in item no. 411 above but of Kail wood or Chir Wood. Rate as in item no. 432 Deduct difference in quantity of wood per Contractor's profit @ 10%

cft.

0.161

cft. Total

442-

As in item no. 412 above but of Kail wood or Chir Wood. Rate as in item no. 433 Deduct difference in quantity of wood per Contractor's profit @ 10%

cft.

0.121

cft. Total

443-

As in item no. 440 above but of 4cm. (1.5") thick. Rate as in item no. 440 Deduct difference in quantity of wood per Contractor's profit @ 10%

cft.

0.01

cft. Total

444-

As in item no. 441 above but 4cm. (1.5") thick. Rate as in item no. 441 Deduct difference due to less wood required as in item 443 including Contractor's profit @ 10% Total

445-

As in item no. 442 above but 4cm. (1.5") thick. Rate as in item no. 442 Deduct difference due to less wood required as in item 443 including Contractor's profit @ 10% Total

446-

As in item no. 440 above but 2.5cm. (1") thick. Rate as in item no. 440 Deduct difference in quantity of wood Contractor's profit @ 10%

per

cft.

0.02

cft. Total

447-

As in item no. 441 above but 2.5cm. (1") thick. Rate as in item no. 441 Deduct difference due to less wood required as in item 446 including Contractor's profit @ 10% Total

448-

As in item no. 442 above but 2.5cm. (1") thick. Rate as in item no. 442 Deduct difference due to less wood required as in item 446 including Contractor's profit @ 10% Total

449-

Supply & fixing of 20 B.W.G. black iron sheet panelled door and window shutters in 4cm. (1.5") thick Indian Sal Wood f including supply and fixing of wooden cleats and stops and including fixing and adjustment of hinses, bolts, locks, handles, sp and/or other fitting but excluding their supply and including painting with tow coats of Black Japan on all iron fittings if neces Fitting with necessary screws to be supplied departmentally. Details of 24.75 sft. Sal wood 20 B.W.G.Black panel 12sft.@1.6lbpersft.= Wastage 10% = Total = Rs 160.00 per quintal Mistri (Carpenter) Carpenter Beldar Contractor's profit @ 10% on Rs. 89.01 per 19.20 1.92 21.12 per per per per % lb lb lb kg. day day day cft.
2.5

cft.

say

21 9.5 1/8 3 1

lb kg. no. no. no.

Total 170.00 160.00 100.00 Total

450-

Supply & fixing of 4cm. (1.5") thick C.P. Teal Wood door and window shutters with panels of heavy quality galvanized iron gauge 2.5 mm. or 2 mm. or 1.5 mm. (1/10 or 1/12 or 1/6 inch.) mesh or any other size with necessary beading, including s and fixing of wooden cleats and stops and including fixing and adjustment of hinses, bolts, locks, handles, springs, and/or fitting but excluding their supply and including two coats of Black Japan on all iron fittings if necessary. (Fitting with nece screws to be supplied departmentally). Details of door shutter of size 3'-6'x6'-9' Area = 23.62 sft. Styles 4x6 3/4x5/12x1/8 = 1.40 cft. Rails, tops and middle rail 6x1 3/4x6/12x 1/8 = 0.50 cft. Bottom Rail 2x1 2/3x2/3x1/8 = Beading 4x5 1/8x1/24x1/24 12x1 1/3x1/24x1/24 = Total = Wastage 10% = Total = C.P. Teak wood
Wire gauge6x1 3/4x1 1/3x1.1=15.4say 16sft.

1.40 0.50 0.30 0.06 2.26 0.23 2.49 per per

cft. cft. cft. cft. cft. cft. cft. cft. cft.

say

2.50 2.5 0.1

cft. cft. cft.

a) Wood Planks (C.P Total

Labour same as ing item 431 Contractor's profit @ 10% on Rs. 139.56 Total 451As in item no. 450 above but in Shisham Wood. Rate as in item no. 450 Deduct difference in cost of wood 2.5/23.62=0.105cft. @ Rs. 39.05-26.90=12.15 Contractor's profit @ 10% Total 452As in item no. 450 above but in Indian Sal Wood. Rate as in item no. 450 Deduct difference in cost of wood 0.1 cft. @ per Rs. 39.05-20.10=18.95 Contractor's profit @ 10%

per

cft.

0.1

cft.

cft.

0.1

cft. Total

453-

As in item no. 450 above but in Deodar Wood. Rate as in item no. 450 Deduct difference in cost of wood 0.1 cft. @ Rs. 39.05-28.05=11.00 Contractor's profit @ 10%

per

cft.

0.1

cft. Total

454-

As in item no. 450 above but in Kail wood or Chir Wood. Rate as in item no. 450 Deduct difference in cost of wood 0.1 cft. @ per Rs. 39.05-16.00=23.05 Contractor's profit @ 10%

cft.

0.1

cft. Total

455-

Supplying & fixing galvanized mosquitos proof heavy quality iron wire gauge or expended metal of heavy quality over windows including supply and fixing of C.P. Teak wood battens 8cm.x1cm. (3"x3/8") and including supply of necessary screws, all mate labour and T&P etc. required for proper completion of the work. Taking a size 3'x4' = 12 sft.
Wooden Battens 14x1/4x1/24x2.5'x1/6x1/24 =

Wastage 10%

= Total =

C.P. Teak Wire gauge Carpenter Beldar Sundries Contractor's profit @ 10% on Rs. 25.57

0.15 0.02 0.17 per per per per

cft. cft. cft. % % day day

cft. sft.

0.17 14 1/4 1/4

cft. sft. no. no.

a) Wood Planks (C.P 160.00 100.00

Total 456As in item no. 455 above but with in Shisham Wood battens. Rate as in item no. 455 Deduct difference in cost of inferior quality of per % wood used 0.017/12= 0.014 cft. @ Rs. 39.0526.90=12.15 Contractor's profit @ 10%

cft.

0.014

cft.

Total 457As in item no. 455 but Indian Sal Wood battens. Rate as in item no. 455 Deduct difference in cost of inferior quality of wood used 0.014 cft. @ Rs. 39.0520.10=18.95 Contractor's profit @ 10%

per

cft.

0.014

cft.

Total 458As in item no. 455 but with Deodar Wood battens. Rate as in item no. 455 Deduct difference in cost of inferior quality of per wood used 0.014 cft. @ Rs. 39.0528.05=11.00 Contractor's profit @ 10%

cft.

0.014

cft.

Total 459As in item 409 but braced and battened 4cm. (1.5") thick of shisham wood including supply of necessary screws. Size of door 3.5x6.5 = 19.5 sft. Battens 8x5/12x6.5x1/8 2x3x1/4x18 Braces 4x3.5x1/4x1/8

= = = Total = Wastage 10% = Total = So cost of wood per sft.=3.56x26.90/19.5 Rs. 4.91 per sft. Wood Screws 2.5" long Mistri

2.60 0.20 0.44 3.24 0.32 3.56

cft. cft. cft. cft. cft. cft.

per per per

%
gross

cft.

day

3.56 4 1/8

cft. doz. no.

170.00

Carpenter Beldar Sundries L.S. Contractor's profit @ 10% on Rs. 110.44

per per

day day

1 0.5

no. no.

160.00 100.00

Total 460As in item no. 459 above but of Indian Sal Wood. Rate as in item no. 459 Deduct difference in cost of inferior quality of per wood used 3.56/19.5=0.18cft. @ Rs. 26.9020.10 = 6.80 Contractor's profit @ 10%

cft.

0.18

cft.

Total 461As in item no. 459 above but of Country Wood. Rate as in item no. 459 Deduct difference in cost of inferior quality of wood used 0.18cft. @ Rs. 26.90-11.90 = 15.00 Contractor's profit @ 10%

per

cft.

0.18

cft.

Total 462As in item no. 459 above but of Deodar Wood. Rate as in item no. 459 Deduct difference in cost of inferior quality of wood used 0.18cft. @ Rs. 26.90-28.05=1.15 Contractor's profit @ 10% Total 463As in item no. 459 above but of Kail Wood or Chir Wood. Rate as in item no. 459 Deduct difference in cost of inferior quality of per wood used 0.18cft. @ Rs. 26.90-16.00= 10.90 Contractor's profit @ 10% Total 464As in item no. 461 above but of 2.5 cm. (1") thick. Rate as in item no. 461 Deduct difference in quality of wood used 3.56per 2.4/19.5=0.061cft. @ Rs. 26.90-11-90= 15.00 Contractor's profit @ 10% Total 465-

per

cft.

0.18

cft.

cft.

0.18

cft.

cft.

0.06

cft.

Supply & fixing of 4cm. (1.5") thick C.P. Teak Wood door and window shutters with 1cm. (3/8) thick ply wood rae pressed panels and fixing C.P. Teak wood cleats and stops and including fixing and adjustment of hinses, bolts, locks, handles, sp and/or other fitting but excluding their supply and including two coats of Black Japan on all iron fittings if necessary. Fitting necessary screws to be supplied departmentally. C.P. Teak wood 1cm. (3/8) thick ply wood panels Mistri (Carpenter) Carpenter Beldar Sundries L.S. Contractor's profit @ 10% on Rs. 133.84 per per per per per % % day day day cft. sft.
2.5 14 1/8 3 1

cft. sft. no. no. no.

a) Wood Planks (C.P 170.00 160.00 100.00

Total 466As in item no. 465 above but Shisham Wood. Rate as in item no. 465

Deduct difference in cost of inferior quality of wood used 2.5/23.62=0.10cft. @ Rs. 39.0526.90= 12.15 Contractor's profit @ 10%

per

cft.

0.10

cft.

Total 467As in item no. 465 above but Indian Sal Wood. Rate as in item no. 465 Deduct difference in cost of inferior quality of wood used 0.10cft. @ Rs. 39.05-22.10= 18.95 Contractor's profit @ 10% Total 468Sawing wood excluding carriage (Teak wood and Shisham or Sal wood etc.). Sawyers per day Sundries L.S. Contractor's profit @ 10% on Rs. 11.75

per

cft.

0.10

cft.

pair

Sawyer per pair

Total 469As in item above but softer wood (like Kail, Chir or Country wood of Deodar). Sawyers per day Sundries L.S. Contractor's profit @ 10% on Rs. 8.50

3/4

no.

Sawyer per pair

Total 470-

As in item 411 above but of commerical quality (Kanju) Sitapur ply or other approved ply wood flush shuters 3cm. (11/4") thick. Company Rate at Sitapur Cartage Charge L.S. Labour for fixing : Carpenter Beldar Contractor's profit @ 10% on Rs. 4.73

per per

day day

1/24 1/42

no. no.

160.00 100.00 Total

471 to Approximate cost of fittings with screws for door and windows etc. 474These rates are provided in the schedule of rates for Estimating purpose. Fittings are to be supplied departmentally. 471- Rs. 7.50 per sq. metre. 472- Rs. 10.75 per sq. metre. 473- Rs. 32.00 per sq. metre. 474- Rs. 37.60 per sq. metre. 475-

As in item 409 to 488 above but when 0.55 kg. ( 18oz) of glass is used instead of 0.65 kg. (21oz) Deduct from items (409 to Glass panes. 16 Rs. 0.62-0.47 = 0.15 each no. Contractor's profit @ 10% Total As in item 470 above but for 4cm. (1.5") thick Add : Extra to item 470 Difference in company rate 4.38-4.08 = 0.30 per sft. Contractor's profit @ 10% Total

476-

477-

As in item 470 but of C.P. Teak decorative type ( one side only) and commerical lipping approved ply wood flush shutters (1.5.") thick Company Rate at Sitapur

Cartage Charge L.S. Labour for fixing : Carpenter Beldar Contractor's profit @ 10% on Rs. 6.65

per per

day day

1/20 1/20

no. no.

160.00 100.00 Total

478-

As in item 477 but both sides decorating (C.P. Teak) Add extra to item 477. Difference in company rate 7.37-5.87=150 per sft. Contractor's profit @ 10% Total

479-

As in item 478 but with Teak lipping single leaf door. Add extra charges as per company rate Contractor's profit @ 10% Total

480-

As in item 478 but with Teak lipping double leaf. Extra charges as per company rate Contractor's profit @ 10% Total

481-

Providing and fixing 12mm (0.5") thick and 100m. (4") wide pelmet with 25mm. (1") diameter wooden curtain rod and bracket covered with same wood planks 12mm. (0.5") thick including fixing with 25x3m. (1"x1/8") M.S. Flat 10cm. (4") long and plug complete with painting polishing or oiling as required. Take a plemet of 5 1/4 rft. with 4 1/4 front and 6" on each side. Materials wood required 0.5" thick planking Front 1x4 1/4'x1/3'x1/24' = side 2x0.5'x1/3.5.x1/24' = Top 1x4 1/4'x0.5'x1/24' = Rod. 1x4.3'x1/12'x1/12'x22/7'x1/4' = Add wastage 10% = Total = Teak wood cost of plank Cost of flats 4"x1"x1/8" L.S. Cost of wooden plugs including cutting brick work and fixing with cement mortar Labour : Carpenter Mason Beldar Materials Labour Painting and polishing or oiling L.S. Contractor's profit @ 10% on Rs. 12.88 Total

(a)

0.060 0.014 0.090 0.022 0.020 0.206 per

cft. cft. cft. cft. cft. cft. % each

say cft.

0.20 0.20

cft. cft. no. no. no. no. Total 160.00 160.00 100.00 Total

per per per

day day day

1/8 1/10 1/8

(b)

Shisham wood rate as per item no. 481 (a) Deduct difference in cost of 0.20 cft. Of wood @ Rs. 39.05-26.10= 12.15 per cft. Deduct Contractor's profit @ 10% on Rs. 2.43

per per

% %

rft. cft.

5.25 0.20

rft. cft.

b) Wood Planks (Shi

Total (c) Deodar wood rate as per item no. 481 (a) Deduct difference in cost of 0.20 cft. Of wood @ Rs. 39.05-28.05=11.00 per cft. per per % % rft. cft.
5.25 0.20

rft. cft.

d) Wood Planks (Deo

Deduct Contractor's profit @ 10% on Rs. 2.20 Total (d) Kail wood rate as per item no. 481 (a) Deduct difference in cost of 0.20 cft. Of wood @ Rs. 39.05-16.00=23.05 per cft. Deduct Contractor's profit @ 10% on Rs. 4.61 per per % % rft. cft.
5.25 0.20

rft. cft.

e) Wood Planks (Kai

Total 482-

(a)

Same as in Sl. no. 481 but 150m. (6") wide pelmets] Take a pelment of 51/4 rft. with 4/1/4' front and 6" on each side wood req 0.5" thick planking. Front 1x4 1/14'x0.5'x1/24' = 0.09 cft. side 2x0.5'x0.5"x1/24' = 0.02 cft. Top 1x4 1/4'x0.5'x1/24' = 0.09 cft. Rod. 1x4 1/4'x1/12'x1/12'x22/7'x1/4' = 0.02 cft. Add wastage 10% = 0.02 0.02 cft. Total = 0.24 cft. 0.24 Teak wood cost of plank per % cft. cft. a) Wood Planks (C.P Cost of flats 4"x1"x1/8" L.S. Cost of wooden plugs including cutting brick 2 each no. work and fixing with cement mortar Total 1/6 Labour : Carpenter per day no. 160.00 1/10 Mason per day no. 160.00 1/6 Beldar per day no. 100.00 Painting & varnishing of oiling etc. L.S. Total Materials Labour Contractor's profit @ 10% on Rs. 14.82 Total Shisham wood rate as per item no. 482 (a) Deduct difference in cost of 0.24 cft. @ Rs. 39.05-26.10= 12.15 per cft. Deduct Contractor's profit @ 10% on Rs. 2.92 per per % % rft. cft.
5.25 0.24

(b)

rft. cft.

Total (c) Deodar wood rate as per item no. 482 (a) Deduct difference in cost of 0.24 cft. @ Rs. 39.05-28.05=11.00 per cft. Deduct Contractor's profit @ 10% on Rs. 2.64 per per % % rft. cft.
5.25 0.24

rft. cft.

Total (d) Kail wood rate as per item no. 482 (a) Deduct difference in cost of 0.24 cft. @ Rs. 39.05-16.00=23.05 per cft. Deduct Contractor's profit @ 10% on Rs. 5.53

per

cft.

0.24

cft.

Total 483(a)

Extra for providing curtain rods of Aluminium with brackets instead of wooden curtain rod, in pelmets in Sl. No. 481 and 482 ab 12mm. dia.rod (18 gauge) Cost or aluminium rod per rft. or pelmet Deduct average cost of wooden rod per rft. of pelmet So extra cost

per per

% %

rft. rft.

1 1

rft. rft.

Contractor's profit @ 10% Total (b) 19mm. dia.rod (18 gauge) Cost or aluminium rod per rft. or pelmet Deduct average cost of wooden rod per rft. of pelmet So extra cost Contractor's profit @ 10%

per per

% %

rft. rft.

1 1

rft. rft.

Total (c) 25mm. dia.rod (16 gauge) Cost or aluminium rod per rft. or pelmet Deduct average cost of wooden rod per rft. of pelmet So extra cost Contractor's profit @ 10%

per per

% %

rft. rft.

1 1

rft. rft.

Total 484-

Extra for providing in pelmets, aluminium curtain rails of heavy quality 6x9x15mm. With rollers, stop ends and brackets inste wooden curtain rods and bracket. 1 Cost of rails. Rollers etc per rft. of pelmet per % rft. rft. Deduct average cost of wooden rod and 1 per % rft. rft. Brackets per rft. of pelmet So extra cost per rft. of pelmets Contractor's profit @ 10% Total

485(a)

Providing and fixing 25mm (1") diametre curtain rod with brackets, plugs etc. wherever required including painting, polishi oiling as required. Taking rod of 4.5" length. Teak wood cost of wood Cost of wooden plugs, brackets including cutting brick work & fixing with cement mortar Painting etc. L.S. Contractor's profit @ 10% on Rs. 2.61 Total per % each cft.
0.022 2

cft. no.

(b)

Shisham wood cost of wood Cost of wooden plugs, brackets including cutting brick work & fixing with cement mortar Painting etc. L.S. Contractor's profit @ 10% on Rs. 2.34

per

% each

cft.

0.022 2

cft. no.

Total 486(a)

Providing and fixing curtain rods of aluminium with brackets and wooden plugs etc. wherever necessary complete. Take length. 12mm. dia.rod (18 gauge) Cost or aluminium rod per % rft. 4.5' rft. Cost of wooden plugs, brackets including 2 each no. cutting of brick & fixing with cement Contractor's profit @ 10% on Rs. 4.69 Total 19mm. dia. Cost or aluminium rod Cost of wooden plugs, brackets including cutting of brick & fixing with cement Contractor's profit @ 10% on Rs. 5.75

(b)

per

% each

rft.

4.5'
2

rft. no. Total

(c)

25mm. dia. Cost or aluminium rod Cost of wooden plugs, brackets including cutting of brick & fixing with cement Contractor's profit @ 10% on Rs. 6.81

per

% each

rft.

4.5'
2

rft. no. Total

CHAPTER - 10
MILD STEEL & IRON WORK
Sl. No. 1 501(a) Item of Work Unit Qnty Rate

3 4 2 5.00 Rolled steel joists fixed in position excluding cost of joists which will be supplied free at site but including all labour in handling hoisting and including hire etc. of necessary T&P. Light section, i.e. not exceeding 300kg. (6cwt.) in weight and upto 7.5 metre (24ft.) in height. 1/20 Rate per cwt. Peshraj (Beldar) per day no. 1/10 Mason per day no. 1/2 Beldar per day no. 1 Coolie per day no. Ropes T&P L.S. Contractor's profit @ 10% on Rs. 5.18 100.00 160.00 100.00 100.00

Total (b) Same as above but heavy section, i.e. exceeding 300kg. (6cwt.) in weight and upto 7.5 metre (24ft.) in height. Rate per cwt. Peshraj (Beldar) Mason Beldar Coolie Hire of pulley & tackle Ropes T&P L.S. Contractor's profit @ 10% on Rs. 7.88 per per per per day day day day
1/20 1/10 1/2

1.5

no. no. no. no.

100.00 160.00 100.00 100.00

Total (c) Add to item 501(a) and 501(b) for heights beyond 7.5 metre (24ft.). Extra Beldar per day Coolie per day Extra for Rope etc. Contractor's profit @ 10% on Rs. 3.07

1/2 1/2

no. no.

100.00 100.00

Total 502-

Mild steel or iron work of small sizes and sections such as holding down bolts, hold fasts, tie, rods, gratings etc. (when not inc in an over all rates) wrought to required form, including supply of steel, bolts nuts and wastage etc. and their fixing require proper completion of the work. Rate per cwt. Blacksmith Hammer man Coolie Coal T&P L.S. Contractor's profit @ 10% on Rs. 12.75 Cost of steel Wastage 2.5% on steel per per per day day day
1 1 1

no. no. no.

170.00 105.00 100.00

per

cwt.

cwt. Total

503-

Mild steel or iron work in heavy sizes such as trusses ; built up gates, door frames, record racks, roof work, gates etc. wroug required form including drilling holes, rivetting or welding where necessary and also including supply of steel, bolts nuts etc their fixing required for proper completion of the work. Rate per cwt. Blacksmith Hammer man Rivetter Coolie Coal and other sundries L.S. Hoisting & welding L.S. Contractor's profit @ 10% on Rs. 19.75 Cost of steel Wastage 2.5% on steel per per per per day day day day
1 1 1/4 1

no. no. no. no.

170.00 105.00 120.00 100.00

per

cwt.

cwt. Total

504-

Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and over all r wrought to required shape as necessary including bending for proper completion of the work and including supply of all stee wastage & over lapping & hooks. Rate per cwt. Blacksmith Coolie T&P L.S. Contractor's profit @ 10% on Rs. 9.55 Cost of steel Wastage 5% on the steel per per day day
1 1.5

no. no.

170.00 100.00

per

cwt.

cwt. Total

505-

Cutting rolled steel joints below 22.5cm. X 10cm. (9"x4"). Labour for cutting joist 9" deep. Blacksmith per Coolie per T&P L.S. Contractor's profit @ 10% on Rs. 2.30

day day

1/4 1/4

no. no.

170.00 100.00

Total 506Cutting rolled steel joints above 22.5cm. X 10cm. (9"x4"). Labour for cutting joist 15" deep=38.10 cm.. Blacksmith per Coolie per T&P L.S. Contractor's profit @ 10% on Rs. 4.56

day day

1/2 1/2

no. no.

170.00 100.00

Total 507Cutting plates & angles : Take an angle 4'x4'x1/2'. Area 3.75 sq. inch. = 24.20 sq.cu.m. 1/8 Blacksmith per day no. 1/8 Helper (Beldar) per day no. Contractor's profit @ 10% on Rs. 1.10

170.00 100.00 Total

508-

Cutting rounds. Take 10 cutting of 5/8" dia. Sectional area 0.307x10=3.07 sq. inch. = 19.8 sq.m. Blacksmith Helper (Beldar) T&P L.S.etc. Contractor's profit @ 10% on Rs. 0.47

per per

day day

1/20 1/20

no. no.

170.00 100.00

Total 509-

Boring holes in mild steel or iron not exceeding 10mm. (3/8") dia & thickness of plate not exceeding 6mm. (1/4"). Labour fo holes. 3.5 Blacksmith per day no. 170.00 3 Coolie per day no. 100.00 1 Beldar per day no. 100.00 T&P L.S. Contractor's profit @ 10% on Rs. 30.75 Total

510-

As in item 509 above but holes exceeding 10mm. (3/8") dia but not exceeding 20mm. (3/4") dia. and thickness exceeding 6 (3/8") but not exceeding 13mm. (1/2") dia.Labour for 100 holes. 6 Blacksmith per day no. 170.00 6 Coolie for helping and handing per day no. 100.00 Contractor's profit @ 10% on Rs. 48.00 Total

511-

Providing and fixing 10cm. (4") dia C.l. down pipe complete with rose, heads, bends with eye hole, shoes and gratings etc. fix walls with suitable clamps as directed by the Engineer-in-charge.

Assuming 30ft. Height C.l. pipes in 6 length. Piece per rft. 5 pieces (6') Rose Head Shoe (splash proof) Bend with eye hole Bolts L.S. Clamps L.S. Labour Mason Beldar Mortar etc. L.S. Contractor's profit @ 10% on Rs. 145.00

each each each each

1 1 1 1

no. no. no. no.

per per

day day

1/2 1

no. no.

160.00 100.00

Total 512Mild steel or iron work in purlins and rafters including drilling holes and fixing in required for proper completion of the work. Take a 10' length of purlin at 10' apart, angle 3"x3"x1/2" should doBlacksmith Hammer man Drilling holes L.S. Contractor's profit @ 10% on Rs. 7.16 Rate per cwt. 7.88x112/9.35x10=9.46 Cost of steel Wastage 2.5% on the steel

per per

day day

1/3 1/3

no. no.

170.00 105.00

Total per cwt.


1

cwt. Total

513-

Providing barbed iron wire fencing including fixing it to post after stretchins it, including labour and T&P etc. required for p completion of the work, but excluding supply of posts and wire. Take 100 ft. length of fencing six lins. Blacksmith Helper (Beldar) Coolie Contractor's profit @ 10% on Rs. 6.44 per per per day day day
1/2 3/4 1/2

no. no. no.

170.00 100.00 100.00 Total

514-

Welding by Cass plant including supply of all materials, labour etc. complete. Take welding per day. Rent of welding. Machine per day Welder's pay per day Beldar for cutting & help per day Carbide stone L.S. Oxygen Gass L.S. Welding Road L.S. Sundries L.S. Contractor's profit @ 10% on Rs. 35.00

1 1 2

day day no.

100.00

Total 515-

Same as in item no. 514 but by Electric plant. In case of electric welding, per rent and cost of machine will be more and outpu be also some what more. The extra cost is estimated at 20%. So rate per rft. = Rs. 2.88 per rft. Say 2.30 per rft. or Rs. 7.5 metre.

516-

Add extra to item no. 514 when the welding is required to be done at roof height 10% extra is estimated to account for less o and shuttering etc.

517-

Providing and fixing 1 mm thick M.S. sheet garage door with from of 40x40x6mm. (1.5"x1.5"x1/4") angle iron, 3.15 mm. (1/8") M.S. gusset plates at the junctions and corners including supply and fixing of necessary fittings, lock rail or 15" length of oxised and including pintels, hooks at the top and applying a priming coat of red lead paint on all sides complete. Using M.S. angle 40x40x6mm (1.5"x1.5"x1/4") for diagonal braces.

(a)

1-

2-

Details of cost of a double leaf door size 2.4mx2.4m= 5.76 sq. metre. Materials M.S. Sheet 1mm. Thick, 5.76 sq.m.@ 7.85 kg. Per sq.m. = Wastage 10% = Total = Gusset plates, Area of one gusset plate (They are 08 no.) 0.3x04 = 0.12 sq.m. 1/2x0.26(0.04+0.03) = 0440sq.m. 8x0.0562 = 0.4496 sq.m. 2x4x32 = 0.1414 sp.m. @ 24.73 kg. per sq.m. = 14.62 kg. Wastage 10% = 1.46 kg.

5.76
45.216 4.522 49.738

sqm.
sqm.

kg.=

0.1200 0.0440 0.4496 0.1414 14.62 1.46 Total = 16.08 9.60 4.80 5.00 4.90 2.43 26.73 93.56

sqm. sqm. sqm. sqm.

kg. kg. = m. m. m. m. m. kg. each each

0.161

3-

4-

Angle iron 40x40x6mm.@ 3.5kg.Per m. Sides 4x2.4 = Top and bottom 4x1.2 = Diagonals 2x2.5 = 2x2.45 = 4.9 m. Wastage 10% on 24.3 = Total = @ 3.5 kg. Per metre = 93.56 kg. Pintels including bolts and nuts for them and fixing in position Hooks Locking arrangement & handles etc. L.s. Cement concrete L.S. Rivets L.S. Priming coat M.S. sheet both side-11.52 Angle iron 16x24.3 = 3.89 sq.m. Labour Fitter Blacksmith Mason Beldar Mazdoor Sundries L.S. Contractor's profit @ 10% on Rs. 355.00

936q 4 2 no. no.

each each each each each

2 7 1/8 2 3

no. no. no. no. no.

Total 517(b) Using M.S. flat 40x6 mm (1.5"x1/4") for diagonal bracings and central cross piece. . Details of cost of a double leaf door size 2.4mx2.4m= 5.76 sq. metre. Materials M.S. Sheet 1mm. Thick as in item no. 517 (a). Gusset plates, vide item (2) in 517(a) = At mid height 4x0.0623 = Wastage 10% on 8022m2 = Total = @ 24.73 kg. per m. = Angle iron 40x40x6mm.@ 3.5kg.Per m. Sides 4x2.4 = Top and bottom 4x1.2 = Wastage 10% on 14.40m. = Total = @ 3.5 kg. Per metre = Flats 30x6 mm. @ 1.4 kg. /m. 4x2.45=9.80 2x1.20 = 2.40 Wastage 10% on 12.20m. = 1.22 Total =

12-

0.5910 0.2112 0.0800 0.8822 21.82 9.6 4.8 1.44 15.84 55.44 9.80 2.40 1.22 13.42

m2 m2 m2 m2 kg. m. m. m. m. kg. m. m. m. m.

3-

4-

5-

@ 1.4 kg. Per metre13.42x1.4=18.788 kg. 18.788 Pintels including bolts and nuts for them and fixing in position Hooks Locking arrangement & handles. L.s. Cement concrete L.S. Rivets L.S. Applying puming cost M.S. sheet 1 = 11.52 Angle iron 0.16x4.40 = 2.30 Flats 0.072x1.22 = 0.88 Total = 14.70 Labour Same as in item 517(a) Sundries L.S. Contractor's profit @ 10% on Rs. 324.08

kg.= each each

0.188

Q 4 2 no. no.

Total 518-

Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2mm (3/4"x3/8"x1/12) & braced with fla diagonals 20x5mm (3/4"x3/16") size with top & bottom rails fo Tiron 40x40x6mm. (1.5"x1.5"x1/4") with 38 mm. dia. steel pu with bolts, nuts locking arrangement, stoppers, handles, complete including applying a priming coat of approved red lead paint (Skelton analysis based on item no. 4 of 1962 CPWD analysis of rates). Details of cost of a gate of 2.4mx1.5m = 3.6 sq. metre. Materials M.S. channels 18nos. on both sides. 20x10x2mm. @ 0.56 kg./m. 2x18x24 = 86.40 m. Wastage 10% = 8.64 m. Total = 95.04 m. @ 0.56kg. per m. = 53.22 kg.= 0.53 M.S.T. 40x40x6m. for Bottom = 1.570 m. Top = 1.725 m. Total = 3.30 m. @ 3.5 kg. per m. = 11.55 m. Wastage 10% = 1.155 m. Total = 12.705 kg.= 0.13 20x5mm. Flat iron diagonal 4 nos. 68.275 m. x32x0.5334m. = @ 0.8 kg. Per metre = 54.62 kg. Wastage 10% = 5.46 kg. Total = 60.08 kg.= 0.60 Cost of rivets,fixing hooks and washers L.S. Cost of locking arrangment & handles L.S. Pullyes 38mm. dia.metre each Priming coat channel 26x076x2.4 = 6.57 6.57 sqm. sq.m.M.S. sheet both side-11.52 sqm. Top 0.16x0.33 = 0.53 sq.m. 0.53 sqm. Flats 0.05x0.68 = 3.40 3.40 sqm. Total = 10.50 Labour Fitter each Blacksmith each Mason each Beldar each Mazdoor each Sundries L.S. Contractor's profit @ 10% on Rs. 284.95

10

no.

3 12 1 4 4

no. no. no. no. no.

110.00 170.00 160.00 100.00 100.00

Total

519-

Providing and fixing 1m. thick M.S. sheet sliding shutters with frame and daigonal braces of 40x40x6mm. (1.5"x1.5"x1/4") iron, 3.15mm. (1/8") gusset plates at the junctions & corners, hooks at top, 25mm. (1") dia. pullyes at bottom 40x40x6 (1.5"x1.5"x1/4") angles & T iron guides at top & bottom respectively including locking arrangement with handles etc. complete applying one priming coat of approved lead paint. (Skelton analysis based on item no. 5 of 1962 CPWD analysis of rates). Details of cost for one double leaf door. Size 2.4x2.4m. = 5.76 sq.m. Materials (1) M.S. sheet 1mm. Thick same as in item 517(a) Gusset plates,same as in item 517(a) (2) Angle iron 40x40x6mm.@ 3.5kg.Per m. Sides 4x2.4 = 9.60 m. Top and bottom 4x1.2 = 4.80 m. Diagonals 2x2.5 = 5.00 m. 2x2.45 = 4.90 m. Top and Bottom guides 2x4.8 = 9.60 m. Top guides support 7x0.3 = 2.10 m. Total = 36.00 m. 36x3.5= So wt. = Bottom 2.4x3.05= Channels 25x25x6mm. @ 3.05 kg./m. = Channels 40x40x6mm. @ 5.56kg./m. Bottom 0.5x5.56= = Wastage 10% on 136.10 kg. = Total =
Say

23-

126.00 7.32 2.78 13.61 149.71 1.50

kg. kg. kg. kg. kg. qnt.

456789-

Pulley guide blocks including drilling holes L.S. 15mm. dia pulleys Handles and locking arrangement L.s. Bolts and rivets L.s. Cement concrete L.s. Printing coat M.S. Sheet 2x5.76 Angle iron 0.16x36 Channel 0.15x0.24 0.24x0.05 each 8 no.

= = = = Total =

17.76 sq.m. say 18sq.m. Labour Fitter Blacksmith Beldar Mazdoor Mason Sundries Contractor's profit @ 10% on Rs. 376.23

11.52 5.76 0.36 0.12 17.76 per

sqm. sqm. sqm. sqm. sqm.

sq. each each each each each

m.

18 2 7 2 2 1/8

sq.m. no. no. no. no. no.

110.00 170.00 100.00 100.00 160.00

Total 520-

Supplying and fixing rolling shutters of approved make of 80x125mm.(3"x3.5") guage cold rolled M.S. laths inter locked throug their entire length and jointed together at the end by end locks and mounted on specially designed pipe shaft with brackets guides and arrangements for inside and outside locking with push and pull operations complete but excluding the cost of top c and spring. (Skelton analysis based on item no. 7 of 1962 CPWD analysis of rates). Details of cost 3x2.5 metre door =7.5 sq.m. Cost of rolling shutters including top cover etc. complete sq.m. (Market rate Rs. 8.00 per sq.m. ft. or 86.00 per sq.m. ) Deduct for the cost of top cover Deduct for the cost of coiled springs L.S. Labour Fitter each 2 1/4 no. Total 110.00

Beldar Mason Contractor's profit @ 10% on Rs. 558.93

each each

2 6/4 1/4

no. no.

100.00 160.00 Total

521-

Providing and fixing 27.5 cm. Long wire spring grade no. 2 for rolling shutters. (Skelton analysis based on item no. 8 of 1962 CPWD analysis of rates). Details of cost for 1 no. 27.5 cm. long wire each 1 spring grad no. 2 Sundries Contractor's profit @ 10% on Rs. 46.00

no.

Total 522Providing and fixing top cover for rolling shutters. (Skelton analysis based on item no. 9 of 1962 CPWD analysis of rates). Details of cost for 1 shutter 2.5 metre width each top cover Sundries L.S. Contractor's profit @ 10% on Rs. 61.00

no.

Total 523Providing and fixing ball bearing for rolling shutters. (Skelton analysis based on item no. 10 of 1962 CPWD analysis of rates). Details of cost for 1 no.l each Sundries Contractor's profit @ 10%

no.

Total 524Extra add to Sl. No. 520 for providing mechanical devise, chain & cranks operation for operating rolling shutters (Skelton analysis based on item no. 11 of 1962 CPWD analysis of rates). Shutters exceeding 11.2 m2 (120 sq.ft.) in area and up to 16.80 m2 (180sq.ft.) in area average area 14 sq. m. Mechnical devise chain, crank etc. (Market rate) Contractor's profit @ 10% Total (b) Area exceeding 16.8 sq. m. (180sq.f.) Taking details of cost for 20m2 area. Mechnical devise chain, crank etc.L.S. Contractor's profit @ 10% Total

(a)

CHAPTER - 11
ROOF WORK
Sl. No. 1 531Item of Work Unit Qnty Rate

3 4 2 5.00 Supply and fixing single Allahabe tiling with and including supply of hips, ridges and eaves and includings laying them for roof & setting in white lime & Surkhi Mortar in ratio of 1.2 or pure kankar lime and also including supplying and laying of Sal wo battens and white washing two coats bottom surface or tiles. Assuming length of 100ft. And stop of 12ft. On either side. Roof area 2x12x100sft. = 2400 Length of ridge = 100 Length of valley = 14 Flat tiles = 2420 10% Wastage = 240 Total = 2660 Flat tiles Half round Flate ridge = 100+10=110 no. Hips = 14+4=18 no. Scanding(Indian sal)Batterns 24x100x1/12x1/8= 25.00 Batterns 2x100x1/6x1/8 = 4.30 Hip Battens 2x14x1/6x1/8 = 0.50 Wastage at 10% on 29.8 = 2.98 Total = 32.78 Hip Battens per Nails at 5/2.2 kg. Per% sft. On 2400sft. per Cealtar two coats 24x100x5/12 2x100x7/12 2x14x7/12 = 1000 117 17 1134 per per per per per per per per per
sq.ft.

ft. ft.

%o %o

no. no.

2660 2660

no. no.

ft.

% kg. sft. sft. sft. sft. % % % day day day day day day

cft.

32.78 54.05

cft. kg. Total

= = Total = Coaltar two coats, Coalter (sl. No. 652 & 653) White washing two coats (sl.no. 672) Lime mortar at 4 cft. % sft. = 96 cft. Carriage of materials L.S. Mason Mistri Mason for laying Beldar Coolie Carpenter Sundries Bhisti Contractor's profit @ 10% on Rs. 252.91

sft. sft. cft.

1200 2000 100 2 24 24 48 8 1

sft. sft. cft. no. no. no. no. no. no. 170.00 160.00 100.00 100.00 160.00 130.00 Total

532-

As in item (531) above but for double Allahabad tiling roof. As above. Add 2.3 cost of extra materials and labour. Total

533-

Supply and fixing large contry tile roofing on and including bambod frames containing not less than 4 (40) Bamboos per s (Per%s.ft.) and Chatai supplied and fixed position including supply of all materials, labour and T&P etc. required for p completion of the work and including two coats of coaltarring of bamboo frame and chatai. Flat rules including wastage Rate per % sft. Segmental Bamboos Channel B.N. Hemp Nail L.s. Layers for laying the tiles %o %o each % kg. day no. no. sft. 110 110 40
120

per per per

5
2

no. no. no. sft. kg. no.

Coolie Contractor's profit @ 10% on Rs. 88.00 Coaltarring as per item no. 653 & 652

per per

day % sft.

2 100

no. sft.

100.00

Total 534As in item no 533 above but small size country titles. Rate per % sft. Segmental Bamboos Nail L.s. Bans etc. Thacher per Tile layer per Coolie per Contractor's profit @ 10% on Rs. 62.60 Coaltarring as per item no. 653 & 652 per

%o %o each

no. no.

500 500 20

no. no. no.

day day day % sft.

1 2 2 100

no. no. no. sft.

100.00 100.00

Total 535-

Laying rainforced brick slab with and including supply of first class bricks laid in cement mortar consisting of one part cem three parts approved coarse sand excluding supply of reinforcement and its bending but including its fixing in position and bi the same with 24 B.W.G.I. binding wire & including centering and shuttering and necessary & also including cost of binding supply of all materials, labour & T&P etc. required for proper completion of the work. Taking a roof ares = 12'x8'=96 sft. Height of roof slab = 12' Cubical contents 96x3/8 = 36 cft. Bricks first claff. 36x1200/100 Cement Coarse sand Mason mistri Mason Beldar Coolie Bhisti Centering Ballies 5no. 12ft. Length & 4" dia 60rft. Ballies 4" dia. 15no. of 12ft. each 180rft. Total Planking 96 sft. X 1/8" thick Cost of centering Ballies 4" dia %rft. Planks of country wood The materials can be used 25 times 285.60/25 Nail etc. L.s. Erection and dismantling Carpenter Beldar Coolie Fixing reinforcement in position Blacksmith Coolie 1.5% water charges Contractor's profit @ 10% on Rs. 63.14 (excluding cost of cement & sand) Total per per % % rft. cft.
240 12

per per per per per per per per

%o 50 % day day day day day

no. kg. bag cft.

432
3.6 12 1/6 3/4 3/4 1 1/4

no. bad cft. no. no. no. no. no.

170.00 160.00 100.00 100.00 130.00 Total

rft. cft.

per per per per per

day day day day day

1/2 1 1 1/4 1/4

no. no. no. no. no.

Total 160.00 100.00 100.00 170.00 100.00 Total

536-

Supply & fixing Galvanised corrugated iron roofing 24 BWG in position including supply of all materials, labour and T& required for the proper completion of the work and including wastage. 1982.50 Considering a roof area 61x32 1/2 = sft. 2x27x8x8/3 = 0.613 tons 2x27x9x8/3 = 0.692 tons

Wastage at 10% on 1.305

= Total =

0.065 1.370 per per per per per per

tons tons doz doz doz doz day day 50 40 90 90 12 12 doz. doz. doz. doz. no. no.

Carriage to site L.s. 1"x1/4" G.I. Bolts 6"x1/4" J. Hooks Limper Washer Bitumen Washer Carpenter Beldar Sundries L.S. Contractor's profit @ 10% on Rs.3368.80

160.00 100.00

Total 537-

Supply & fixing 22 B.W.G. Ridges, valleys and gutters for iron roofing fixed with jor U bolts 10mm. (3/8") dia. with G.I. Limpe bitumen washers complete including supply of all materials, labour and T&P ect required for the proper completion of the work including wastage. Take a length of 56 rft. G.I. Plain sheet 4 nos. 8'x3' Cartage Bolts 1"'x1/4" Limper Washer Bitumen Washer Blacksmith Beldar Contractor's profit @ 10% on Rs.169.39 per per per per per per cwt. doz doz doz day day 1.1
6.5 6.5 6.5

cwt. doz. doz. doz. no. no.

3 3

170.00 100.00 Total

538-

Supplying and laving complete 4cm. (1.5") thick insulation layer of sand & clay over jackarch. Reinforced brick or reinfo cement concrete roof. Rate per 100 sft.1.5" earth with 505 sand 100x1/8=12.5+2 for wastage=14.5cft. Labour for palverizing and laying in even course of 1.5" and ramming Mason Beldar Contractor's profit @ 10% on Rs.5.07 per % cft.
14.5

cft.

per per

day day

1/4 1/4

no. no.

160.00 100.00 Total

539-

Making contraction joints in terraced roof lip type including supply of necessary qnty. of filler, brick tile, all materials , labour & etc. required for proper completion of the work. Take a length of 100 rft. Brick tiles for 109 rft. Length. Tiles - 133.0 Wastage 10% = 13.3 Total : 146.3 nos. Maxphalt 30/40 Tarmastic Fuel and other T&P Mortar regarding making Gola etc. Making groove and gola on either side with surface neatly and floated Mason Beldar For filling joint. Mason Coolie Contractor's profit @ 10% on Rs. 73.67

per per per

% lbs lbs

150 37 40

no. lds lds

per per per per

day day day day

1/2 1/2 1 1

no. no. no. no.

160.00 100.00 160.00 100.00 Total

540-

As in item 539 above but of parapet type. Take a length of 100 rft. Brick tiles including 10% wastage 100x8/3 =2.93 nos. % Brick 1x100x3/4x1.1 = 147 1x100x2x4x1.1 = 880

1x100x4/3x3x1.1

= Total =

Maxphalt 30/40 Tarmastic Fuel, Tools and plants Kankar lime Throating and Champhering Mason Coolie Making joint & applying premix and tarmastic Mason Beldar Parapet making mason Beldar Plastering with cement mortarr 1.5, 100"x2.5" (Sl. No. 585) Contractor's profit @ 10% on Rs.301.82

440 1467 per per per per per

say lbs lbs % day day cft.

1470 67 80 30 2 1

nos. lds lds cft. no. no.

160.00 100.00

per per per per per

day day day day % sft.

1.5 1.5 4 2 250

no. no. no. no. sft.

160.00 100.00 160.00 100.00

Total 541As in item 536 above but with 6mm. Thick grey corrugated asbestos sheet . Take a roof area of 61x32.5 = 1982.50 sft. 2x19nos.x8x3 = 1051.30 2x19x9"x3-5" = 1182.80 Wastage at 10% on Rs. 2234.10 = 223.41 Say 2458 Total = 2457.51 2458 Cost of sheet per % sft. Carriage to site 34 Hook bolts per doz. 34 G.I. Washer per doz. 34 Bitumen washer per doz. Sundries L.S. 2 Mistri per day 10 Carpenter per day 8 Beldar per day Contractor's profit @ 10% on Rs.2672.24

sft. sft. doz. doz. doz. no. no. no. 170.00 160.00 100.00 Total

542-

As in item 537 above but with ridges, valleys and gutters of asdestos sheets. 33 Take a length of 100 rft. 3"x6" long per pair Carriage end scaffolding L.S. Ridges shall be fixed with the same hooks and bolts as already provided. Mistri Carpenter Carpenter Beldar Contractor's profit @ 10% on Rs.388.37

pairs Total

per per per

day day day

1 1 1.5

no. no. no.

170.00 160.00 100.00 Total

543-

Spreading over leaky roofs with bitumen paint @ 10lbs. Per % sft. or 1lbs. sq.m. including sweeping, cleaning the roof brushes, heating of the paint upto the required temperature, pouring it on th surface, spreading of necessary quantity of appr coarse sand @ 1cft. per 100 sft. and including supply of all materials, labour and T&P etc. required for proper completion o work. 10 Materials, Bitumen 10lbs. per lds lds 1 Coarse sand 1cft. per % cft. cft. 0.5 Labour Beldar per day no. 100.00 T&P L.S. Contractor's profit @ 10% on Rs.6.67 Total

544-

Supplying and laying one layer of tarfelt or any other equivelent approved materials at the junction of wall and roof or at any as per direction of the Engineer-in-charge including necessary overlap, giving a coat of approved mastic paint below the tarfe including supply of all materials, labour and T&P etc. required for proper completion of the work. Rate % sft. Tarfelt One coat of approved Mastic Paint Labour Mistri Beldar for hot work Beldar Sundries Contractor's profit @ 10% on Rs.62.61 per per per per % lds each day day sft.
100 25 1/4 0.5 1.5

sft. lds cft. no. no.

100.00 100.00

Total 545-

Supplying and laying one layer of tarfelt of other equivelent approved materials over roofs as per direction of the Engine charge including necessary overlap, giving a coat of approved mastic paint on the bottom and top of tarfelt, spreading of nece quantity of approved coarse sand or small size bajri and including supply of all materials, labour and T&P etc. required for p completion of the work. 110 Material 100sft. Tarfelt 110sft. per % sft. sft. 50 Two coat of approved Mastic Paint per lds lds 1/4 Labour Mistri each cft. 1 Beldar for hot work per day no. 100.00 2 Beldar per day no. 100.00 Sundries L.S. Contractor's profit @ 10% on Rs. 76.87 Total

546-

Making expansion joints with 24 gauge 6" wide aluminium sheet in walls with necessary cutting shaping of bricks if any covering joints, by means of 3/8" thick ply wood 5" wide and match painted as per direction of the Engineer-in-charge incl supply of all materials, labour and T&P etc. required for proper completion of the work. Rater per rft. Aluminium Plate 6/12 sft. Labour for cutting, shaping and fixing or plate in position L.S. 3/8" thick ply wood with gutkas and screws etc. L.s. Contractor's profit @ 10% on Rs. 1.85 per % sft.
0.5

sft.

Total 547-

Making expansion joints with 24 gauge 5" wide aluminium sheet & 8" wide tarfelt fixed with termastic in roof or floors joints approved bitumen as per direction of the Engineer-in-charge including supply of all materials, labour and T&P etc. require proper completion of the work. Rater per rft. Aluminium Plate 5/12 sft. Labour for cutting, shaping and fitting plate L.S. Providing Tarmastic and filling joints with maxphalt 30/40 L.S. Contractor's profit @ 10% on Rs. 1.72 per % sft.
5/12

sft.

Total

CHAPTER - 12
CEILING
Sl. No. 1 551Item of Work Unit Qnty Rate

3 4 2 5.00 Supply and fixing of 2.5 cm. (1") thick Deodar wood planks, ceiling including supply of beading 2.5 cm.x4 cm. (1"x1.5") of De wood over joints, but excludings cost of ceiling joint if & when necessary but including cost of all materials, labour & T&P required for proper completion of the work. Cost of 300 sft. ceiling i.e. for a room 20"x15". Planks 1" thick 300x1/12 Add for rebates 20% Beading 400x1/12x1/8 Add for overlap at 10% Add for wastage 5% on 34.62 = = = = = Total = 25.00 5.00 4.20 0.42 1.73 36.35 per per per per per cft. cft. cft. cft. cft. cft. %
gross

Materials. Deodar planks Screws 1.5" long Carriage of materials L.S. Labour Mistri Carpenter Beldar Scaffolding L.S. Sundries L.Sl Contractor's profit @ 10%on Rs. 1108.00

cft.

36.35 8 2 2 4

cft. gross no. no. no. 170.00 160.00 100.00

day day day

Total 552As in item no. 551 above but of C.P. Teak wood. Rate as per item no. 551. Add extra cost of Teak wood @ Rs. 39.0528.05 = 11.00 per cft. Contractor's profit @ 10% Total 553As in item no. 551 above but of Kail or Chir wood. Rate as per item no. 551. Deduct difference of cost of Deopar and Kail 36.35 per % cft. or Chir Wood i.e. @ Rs. 28.05-16.00 = 12.05 per cft. Contractor's profit @ 10%

cft.

Total 554-

Supply and fixing A.C. plain sheets ceiling including beadings 2.5cm.x4cm. (1"x1.5") of Deodar wood, screws. bolts an materials, labour & T&P etc. complete excluding cost of ceiling joints if any required for proper completion of the work. Take a of 20"x15"=300sft. A.C. Sheets = 300sft. Wastage 5% = 15sft. Take 5sq.ft. panel for beading 5x20+4x15 = 160 Wood required 160x1/8x1/12 = 1.67 Add wastage 10% = 0.17 Say 2.00 Total = 1.84 cft. 315 A.C. sheets per % sft. sft. 2 Deodar wood per % cft. cft. gross 3 Screws 1.5" per gross Carriage of materials L.S. 2 Labour Carpenter per day no. 160.00 2 Beldar per day no. 100.00 Scaffolding L.S. Sundries L.S. Contractor's profit @ 10%on Rs. 395.88 Total As in item no. 554 above but with C.P. Teak beading. Rate with Deodar wood (as in item 554)

555-

Add difference in rate of Deodar and Teak wood (per sft.) 2x11/300 = 0.07 Carriage L.s. Contractor's profit @ 10% on Rs. 0.09

per

cft.

36.35

cft.

Total 556As in item 554 above but of 6" thick masonite or celotax with Deodar beading 20x15 = 300 sft. 315 Masonite or celotax 1/4" thick per % sft. sft. Deodar wood required for panels of 2.5 sft. 300x1/12x1/8 = 3.12 Wastage 10% =0.31 3.5 Materials, Deodar wood per % cft. cft. gross 3 Screws per gross Labour etc. same as in item 554 Contractor's profit @ 10%on Rs. 664.75 Total 557As in item 556 above but with C.P. Teak wood beading. Rate as per item 556 Add difference in cost C.P. Teak wood and 3.5 per % cft. Deodar wood 39.05-28.05 = Rs. 11.00 per cft. Contractor's profit @ 10% Total 558-

cft.

Supply and fixing 10mm. (3/8") thick plaster of paris (Gypsum) anhyadrous ceiling including providing Kail or Chir wood fra base consisting of 2"x5" battens at 2'-6" apart cross battens of 1.5" x2" at 1'-3" apart & wooden strips 1"x1/4" with 3/8' g between with rabbit wire mest reinforcement fixed to wooden frame and applying one coat of solignum paint or other appr wood preservative to wooden frame including cost of all materials labour and tools and plants etc. required for proper comp of the work. (Skelton analysis based on CPWD analysis of rates 1955 Sl. No. 41). Details of cost for % sft. for a room 10'x10' Materials 5'x2"x5"x11" = 3.82 cft. 9x1.5"x2"x10' = 1.88 cft. Strips 88x1"x1/4"x10' = 1.53 cft. Wastage 5% on 7.23 = 0.36 cft. Total = 7.59 cft. say Labour Carpenter per day Beldar per day Cutting holes in walls for supporting main battens and also repairing afterwards l.s. Solignum painting or wood preservative applying 5x2x2"x11" = 18 sft. 5x2x5"x11" = 46 sft. 9x2x1.5x10" = 23 sft. 9x2x2"x10" = 30 sft. 88x2.5"x10" = 183 sft. Total = 300 sft. Hesian cloth for mixing in plaster 100/9 yds. per yds. Plaster of paris for 100 sft. of area per mds Cost of rabbit wire mest per % sft. Labour for manufacturing required size of tiles Mason Coolie For fixing in the roof Carpenter Beldar Iron screws 1" size Sundries moulds for tiles and Scaffolding L.S. 1.5% water charges on Rs. 371.29 each each each each
gross

7.6
3 3

cft. no. no.

160.00 100.00

300 100/9 5 100

sft. mds. sft.

3 3 1 1 1 5/6

no. no. no. no. gross

Contractor's profit @ 10%on Rs. 360.27 (except item no. 4) Total 559Same as in item 558 but plaster of paris to be 12mm. Thick ("). Cost per Sl. No. 558 per % Add extra cost of plaster of paris per md. 1.5% water charges on extra cost Add 10% over this extra cost of Contractor's profit

sft.

100 1.25

sft. md.

Total

CHAPTER - 13
PLASTER AND POINTING
Sl. No. 1 571(a) Item of Work Unit Qnty Rate

3 4 2 5.00 Struck pointing with kankar lime on brick work including supply of all materials, labour and T&P ect. Required for proper comp of the work. Raking and washing surface Mason Coolie Bhisti Labour for pointing Mason Coolie Bhisti Materials K. lime Scaffolding L.S. Add 1.5% water charges Contractor's profit @ 10% on Rs. 18.83 per per per per per per per day day day day day day %
1/4 1/4 1/10 1.5 1.5 1/4 2

(b)

cft.

no. no. no. no. no. no. cft.

160.00 100.00 130.00 160.00 100.00 130.00

Total 572As in item no. 571 above but for flush pointing. Raking and washing surface same as in item 571. Labour for flush pointing Mason Coolie Bhisti Materials Kankar lime Scaffolding L.S. 1.5% water charges on Rs. 15.38 Contractor's profit @ 10% on Rs. 15.61

per per per per

day day day %

cft.

1.3 1 1/4 1.5

no. no. no. cft.

160.00 100.00 130.00

Total 573-

Rubbing with kankar lime or with white lime and surkhi on brick work including supply of all materials, labour T&P etc. require proper completion of the work. Labour Mason Coolie Bhisti Scaffolding L.S. Materials Kankar lime Add 1.5% water charges on Rs. 8.78 Contractor's profit @ 10% on Rs. 8.91 per per per per day day day % cft.
1/2 1/2 1/4 3.5

no. no. no. cft.

160.00 100.00 130.00

Total 574As in item (571) above but with cement mortar consisting of one part cement & two parts of fine sand of 1.25 F.M. Raking and washing surface Mason Coolie Bhisti Labour for pointing Mason Coolie Bhisti Materials Cement Fine sand of 1.25 F.M. Finishing by Iron Trowal L.S. Add 1.5% water charges on 22.06 Contractor's profit @ 10% on Rs. 17.58 per per per per per per per per day day day day day day 50 %
1/4 1/4 1/10 1.5 1.5 1/4 0.43 1

kg. bag cft.

no. no. no. no. no. no. bag cft.

160.00 100.00 130.00 160.00 100.00 130.00

Total 575As in item no. 574 above but for flush pointing deduct form item 574.. Labour Mason per day Coolie per day

1/3 1/3

no. no.

160.00 100.00

Add 1.5% water charges on Rs. 2.83 Contractor's profit @ 10% on Rs. 2.87 Total 576As in item no. 574 and 575 above but in flush deduct form item 574 and 575. 1/3 Labour Mason per day 1/3 Coolie per day 1/10 Bhisti per day Add 1.5% water charges on Rs. 3.25 Contractor's profit @ 10% on Rs. 3.30

no. no. no.

160.00 100.00 130.00

Total 577-

Raised pointing with cement and Fine sand of 1.25 F.M. mortar on brick work in proportion of 1:2, including supply of all mate labour and T&P etc. required for proper completion of the work. Raking and washing surface Mason Coolie Bhisti Labour for pointing Mason Coolie Bhisti Scaffolding L.S. Mortar including wastage : Cement Fine sand of 1.25 F.M. Add 1.5% water charges on Rs. 26.67 Contractor's profit @ 10% on Rs. 16.19 (except on cost of cement & sand) per per per per per per per per day day day day day day 50 % kg. bag cft.
1/4 1/4 1/10 1.33 1.33 1/3 1 1.3

no. no. no. no. no. no. bag cft.

160.00 100.00 130.00 160.00 100.00 130.00

Total 578-

Struck cement pointing 1:2 with colouring materials to match the brick work colour including supply of all materials, labour and etc. required for proper completion of the work. Raking and washing surface Mason Coolie Bhisti Labour for pointing including mixing : Mason Coolie Bhisti Materials Cement Fine sand of 1.25 F.M. Scaffolding L.S. Finishing by Iron Trowal L.S. Colouring materials for 100sft. L.S. Add 1.5% water charges on Rs. 22.9 Contractor's profit @ 10% on Rs. 18.58 (except on cost of cement & sand) per per per per per per per per day day day day day day 50 %
1/4 1/4 1/10 1.5 1.5 1/4 425 1

kg. bag cft.

no. no. no. no. no. no. bag cft.

160.00 100.00 130.00 100.00 130.00

Total 579-

12mm. Thick plaster with kankar lime over brick work minimum thickness not to be less than 3/8" (10mm.) thick including sup all materials, labour and T&P etc. required for proper completion of the work. Raking and washing surface. Same in above item 578. Labour for Plastering : Mason Coolie Bhisti Scaffolding L.S. Materials : Kankar lime Add 1.5% water charges on Rs. 14.73 Contractor's profit @ 10% on Rs. 14.96

per per per per

day day day % cft.

3/4 3/4 1/4 5

no. no. no. cft.

160.00 100.00 130.00

Total 580As in item 579 above but with cement mortar in proportion of 1:2 cement & fine sand of 1.25 F.M.

Raking and washing surface. Same in above item 579. Labour for Plastering. Same as in item no. 579. Materials Cement Fine sand of 1.25 F.M. Add 1.5% water charges on Rs. 34.24 Contractor's profit @ 10% on Rs. 10.99 (except on cost of cement & sand)

per per

50 %

kg. bag cft.

2.5 5

cft. cft.

Total 581As in item 579 above but with cement mortar consisting one part cement and two parts of approved coarse sand. Labour for raking, washing and plastering. Same in above item 579. Materials Cement Coarse Sand Extra labour required L.S. Add 1.5% water charges on Rs. 40.74 Contractor's profit @ 10% on Rs. 12.59 (except on cost of cement & sand)

per per

50 %

kg. bag cft.

2.5 5

cft. cft.

Total 582As in item 589 above but with cement and fine sand of 1.25 F.M. mortar in 1:3. Labour for raking, washing and plastering. Same in above item 580. 1.67 Materials Cement per 50 kg. bag 5 Fine sand of 1.25 F.M. per % cft. Add 1.5% water charges on Rs. 26.89 Contractor's profit @ 10% on Rs. 10.88 (except on cost of cement & sand)

cft. cft.

Total 583As in item 579 above but with cement and approved coarse sand in 1:3.. Labour for raking, washing and plastering. Same in above item 581. Materials Cement per 50 kg. bag Coarse Sand per % cft. Add 1.5% water charges on Rs. 21.41 Contractor's profit @ 10% on Rs. 12.48 (except on cost of cement & sand)

1.42 5

bag cft.

Total 584As in item 579 above but with cement and fine sand of 1.25 F.M. mortar in 1:4. Labour for raking, washing surface as above. Labour for plastering as above. Materials Cement Fine sand of 1.25 F.M. Add 1.5% water charges on Rs. 23.11 Contractor's profit @ 10% on Rs. 10.83 (except on cost of cement & sand)

per per

50 %

kg. bag cft.

1.25 5

cft. cft.

Total 585As in item 579 above but with cement and fine sand of 1.25 F.M. mortar in 1:5. Labour for raking, washing surface as above. Labour for plastering as above. Materials Cement Fine sand of 1.25 F.M. Add 1.5% water charges on Rs. 20.90

per per

50 %

kg. bag cft.

0.85 5

cft. cft.

Contractor's profit @ 10% on Rs. 10.79 (except on cost of cement & sand) Total 586As in item 579 above but with cement and fine sand of 1.25 F.M. mortar in 1:6. Labour for raking, washing as above. Labour for plastering as above. 0.7 Materials Cement per 50 kg. bag 5 Fine sand of 1.25 F.M. per % cft. Add 1.5% water charges on Rs. 19.33 Contractor's profit @ 10% on Rs. 10.76 (except on cost of cement & sand)

cft. cft.

Total 586(a) As in schedule item 579 above but with cement, white lime, coarse sand and (per%sft.). Labour for raking, washing surface as above. Same as in item no. 586. 0.7 Materials Cement per 50 kg. bag 0.8 White lime per % cft. 0.8 Coarse sand per % cft. 0.4 Local sand per % cft. Add 1.5% water charges on Rs. 21.83 Contractor's profit@10%on Rs.12.57 (except on cement,coarse sand & local sand)

local sand in proportion of 1:1:2:5 com

cft. cft. cft. cft.

Total 586(b) As in item 579 above but with cement, white lime, coarse sand and local sand in proportion of 1:1:2:4. Labour as in item no. 586(a). 0.7 Materials Cement per 50 kg. bag cft. 0.8 White lime per % cft. cft. 1.6 Coarse sand per % cft. cft. 0.4 Local sand per % cft. cft. Add 1.5% water charges on Rs. 22.87 Contractor's profit @ 10% on Rs. 12.58 (except on cement, coarse sand & local sand) Total 587Add for extra labour to all items of plaster if done in ceiling. Extra labour : Mason per day Extra of scaffolding Wastage for mortar L.S. 1.5% water charges Contractor's profit @ 10%

1/4

no.

160.00

Total 588As in item 579 above but with cement, white lime and fine of 1.25 F.M. mortar in proportion of 1:1:6. Labour for raking, washing as above. Labour for plastering as above 0.7 Materials Cement per 50 kg. bag bag 5 Fine sand of 1.25 F.M. per % cft. cft. 0.7 White lime per % cft. cft. Add 1.5% water charges on Rs. 20.87 Contractor's profit @ 10% on Rs. 12.33 (except on cost of cement & sand) Total 589-

Mud plastering over brick walls including supply of all materials, labour and T&P etc. rquired for proper completion of the work. Labour : Mason per day
0.5

no.

160.00

Beldar Coolie Bhisti Cost of mud and other sundries L.S. Contractor's profit @ 10% on Rs. 6.69

per per per

day day day

0.5 0.5 1/10

no. no. no.

100.00 100.00 130.00

Total 590-

2cm. (3/4") thick stucco plaster resembling marble finish, 1st coat 10mm. (3/8") thick with 1:4 cement and approved coarse intermediate coat 5mm. Thick with cement and marble dust 1:1 and final coat 5mm. (3/16") thick with rich lime throughtly slak passed through fine sieve and mixed and grinded with white marble dust or gypsum alongwith required quantity of matelic ox give desired tint in ratio 1:1:3 including supply of all materials, labour and T&P etc. rquired for proper completion of the work. Materials Cement Coarse sand Labour for raking, joints, washing and polishing Mason Coolie Bhisti Intermediate coat 1/4" thick 1:1 cement and marble dust. Cement Marble Labour : Mason Coolie Final Coat : White lime Marble dust or gypsum Linseed (orcinary) Chali Muslin Labour for rendering final coat including rubbing and polishing. Mason Coolie Bhisti Beldar special for polishing Cost of rubbing stones L.S. Add 1.5% water charges on Rs. 112.37 Contractor's profit @ 10% on Rs. 89.30 (except on cost of cement & sand) per per 50 % kg. bag cft.
1 4.5

bag cft.

per per per

day day day

1.3 1.3 1/4

no. no. no.

160.00 100.00 130.00

per per per per per per per per per

50 % day day % % gall. kg. yard

kg. bag cft.

cft. cft.

0.8 1 3/4 3/4 1 1 0.5 2 2

bag cft. no. no. cft. cft. gall. kg. yds

160.00 100.00

per per per per

day day day day

2 2 1/4 5

no. no. no. no.

160.00 100.00 130.00 100.00

Total 591-

2cm. (34/") thick plaster finished with marble chips on walls, pillars and steps etc. rubbed & polished to granolithic finish, base to be 15mm. (9/16") thick with one part of cement and 2 parts approved coarse sand & top coat 5mm. (3/16") thick with one p ordinary cement & 2 marble chips of required colour including supply of all materials, labour and T&P etc. rquired for p completion of the work. Same as in item 592 below. Deduct Difference in cost of whit cement including water charges and contractor's profit and in ordinary cement=(0.8x27.00+ 11.5%0.8x10.50 or 24.11-8.40 Add 1.5% water charges on Rs. 15.71 Total

592-

Same as in item 591 above but with top 5 cm. (3/16") thick coat of white cement and marble chips. Labour and materials per % Base coarse 0.5" thick with 1:2 cement and coarse sand. Labour and materials same as in foregoing item no. 581. White Cement Marble chips

per per

bag. cft.

0.8 2.5

bag cft.

Sundries including carborandum and polishing L.S. Labour : Mason Coolie Bhisti Beldar for rubbing and polishing Add 1.5% water charges on Rs. 139.21 Contractor's profit @ 10% on Rs. 112.55 (except on cost of cement)

per per per per

day day day day

1.3 1.5 0.5 9

no. no. no. no.

160.00 100.00 130.00 100.00

Total 593Same as in item 591 above but with 5mm. (3/16") thick top coat coloured as desired by the Engineer-in- charge. Same as in item 590. Colour including contractor's profit @ 10%

per

kg.

kg. Total

594-

2cm. (3/4") thick pebble dash plaster with base coat 1.5cm. (9/16") thick in one cement & 4 approved coarse sand. The final co be with cement & washed fine gravel or pabbedashed on to the green plaster and pressed with large trowel, rubbing mate labour and T&P etc. required for proper completion of the work. Cost of 100 sft. Base coat with 1:4 cement and coarse sane 1.5 cm. (9/16"). Materials Cement Coarse sand Labour same as in item no. 592 Final Coat : Cement Pebble and fine gravels Brush L.S. Labour : Mason Coolie Bhisti Scaffolding L.S. Add 1.5% water charges on Rs. 50.15 Contractor's profit @ 10% on Rs. 23.49 (except on cost of cement & coarse sand)

per per per per per per per

50 % 50 % day day day

kg. bag cft. kg. bag cft.

1.13 5.5 0.8 2.5 1/2 1 1/4

bag cft. bag cft. no. no. no. 160.00 100.00 130.00

Total 595Rough cost finish to plaster of different mortar. Add extra to plaster items. Extra materials for rough cost finish. Cement per 50 kg. bag Labour : Mason per day Coolie per day Bhisti per day Sundries such as Muslin pad to raise grains L.s. Add 1.5% water charges on Rs. 13.43 Contractor's profit @ 10% on Rs. 5.23 (except on cost of cement)

0.8 0.5 0.5 1/8

bag no. no. no.

160.00 100.00 130.00

Total 596Add extra labour and materials for plaster over rough face of one brick walls. Extra cost of cement or lime L.S. Mason per day Coolie per day Add 1.5% water charges on Rs. 2.21 Contractor's profit @ 10% on Rs. 1.09 (except on cost of cement)

1/8 1/8

no. no.

160.00 100.00

Total

597-

2cm. (3/4") thick cement plaster in dedo or skirting in 1:2 consisting of one part yf cement and 2 parts of approved coarse san in panels, finished with 3mm. (1/8") floating coat of neat cement or cement and marble dust in ratio of 5:1 including supply materials, labour and T&P etc. required for proper completion of the work. Cement Coarse sand Raking and washing surface : Mason Coolie Bhisti Finishing coat cement Mason Coolie Bhisti Add 1.5% water charges on Rs. 44.07 Contractor's profit @ 10% on Rs. 13.30 (except on cost of cement & sand) per per per per per per per per per 50 % day day day 50 day day day kg. bag cft.
2 6 1/4 1/4 1/10 0.25 1 1 3/8

kg. bag

bag cft. no. no. no. bag no. no. no.

160.00 100.00 130.00 160.00 100.00 130.00

Total 598-

Engraving lines in the plaster of outer face well vertically and horizontally to display the surface as stone facing as directed b Engineer-in-charge including labour & T&P etc. required for proper completion of the work. Add for extra labour to all item plaster. 2/3 Mason per day no. 160.00 1/8 Coolie per day no. 100.00 Add 1.5% water charges on Rs. 4.00 Contractor's profit @ 10% Total

599-

Providing and fixing water proofing materials in cement mortar for plastering or in concrete work in the proportion recomme by the Manufacturer. 1 Cost of water proofing materials per kg. kg. Extra labour for mixing L.S. 1.5% water charges Contractor's profit @ 10% Total

CHAPTER - 14
FLOORING
Sl. No. 1 600Item of Work Unit Qnty Rate

3 4 2 5.00 2.5 cm. (1") thick 1:2:4 plain cement concrete floor with cement, approved coarse sand and 2cm. (3/4") graded approved ston in panels finished with 3 mm. (1/8") flooring coat of neat cement or cement and marble dust in 5:1 as specified over & includ cm. (3") thick base concrete consisting of cement, local sand and brick ballast 4 cm. (1.5") gauge in the proportion of 1:4:8 removing any over lapping mortar at the joints of panels if any and giving them a uniform finish including supply of all mate labour and T & P etc. required for proper completion of the work. Stone grit 2 cm. gauge Coarse sand Cement including wastage Mistri Mason Beldar Coolie Bhisti Sundries and phanties etc. L.S. Add 1.5% water charges on Rs. 51.86 Contractor's profit @ 10% on Rs. 13.02 except on cement, sand and ballast. Add brick ballast 3" base concrete in 1:4:8 as per item no. 275 per per per per per per per per % % 50 day day day day day cft. cft. kg. bag
7.5 3.7 2.4 1/8 1 0.5 0.5 1/4

cft. cft. cft. or no. no. no. no. no.

bag 170.00 160.00 100.00 100.00 130.00

per

cft.

25

cft. Total

601-

(a) As in item no 601 above but without base concrete. Rate of 1" C.C. floor with 3" base concrete as per Sl. No. 601. Deduct cost of 3" base concrete 1:4:8 cement local sand and 1.5" brick ballast as per Sl. No. 275

per per

% %

cft. cft.

100 25

sft. cft. Total

602-

As in item no. 601 above but with the base concrete consisting of brick ballast, white lime and surkhi in ratio of 100.16:32 Same as in item 601 for 1" C.C. floor Add 3" base concrete in lime and surkhi (272)

per

cft.

25

cft. Total

603-

As in item no. 601 above but with base concrete consisting of brick ballast & kankar lime. As in item no. 601 for 1" C.C. floor Add brick ballast 3" base concrete in kankar lime (271)

per

cft.

25

cft. Total

604-

As in item no. 601 but floor shall be 5 cm. (2") thick instead of 2.5 cm. (1") thick and proportion of concrete 1:1.5:3 instead of 1 Cement Stone grit 2 cm. Coarse sand Mistri Mason Beldar Coolie per per per per per per per 50 % % day day day day kg. bag cft. cft.
475 15 7.5 1/8 1.5 3/4 3/4

bag cft. cft. no. no. no. no.

170.00 160.00 100.00 100.00

Bhisti Sundries and phanties etc. L.S. Add 1.5% water charges on Rs. 105.77 Contractor's profit @ 10% on Rs. 20.05 except on cost of cement and ballast Add brick ballast 7.5cm. Base concrete in 1:4:8(275) per% 25 cft.

per

day

1/3

no.

130.00

per

25

cft. Total

604(a)

As in item no. 604 above but without base concrete. Rate 2" C.C. floor with 3" base concrete as per Sl. No. 604 Deduct cost of 3" base concrete 1:4:8 cement, local sand and 1.5" brick ballast as per Sl. no.275 per per % % sft. cft.
100 25

sft. cft.

Total 605As in item no. 601 above but floors shall be 4 cm. (1.5") thick instead of 2.5 cm. (1") thick and without base concrete. Cement Coarse sand Stone Ballast 3/4" Mistri Mason Beldar Coolie Bhisti Sundries and phanties etc. L.S. Add 1.5% water charges on Rs. 77.23 Contractor's profit @ 10% on Rs. 17.65 except on cost of cement and ballast per per per per per per per per 50 % % day day day day day kg. bag cft. cft.
2.75 6.5 13 1/8 1.3 1 3/4 1/4

bag cft. cft. no. no. no. no. no.

170.00 160.00 100.00 100.00 130.00

Total

606-

Add in item 601 to 603 and 605 when floors are polished including supply of extra cement, chapra batti, carborndum ston other materials, labour and T & P etc. required for proper completion of the work. Marble dust shall be added in the floating c ratio of 5:1 (Marble dust and cement) if necessary but no extra amount will be paid for it. This includes final finish with fr mansion pollish or other approved polish. Extra cement or cement & marble dust mortar Polishing and rubbing materials L.S. Labour for polishing and cutting : Beldar 1.5% water charges on Rs. 34.25 Contractor's profit @ 10% on Rs. 29.51 except on cost of cement per per 50 day kg. bag
0.5

bag nos. 100.00

Total 607Add to item no. 601 to 603 and 605 when coloured polished floors are laid. Polishing as in item no. 606 Cost of colour (Deep Bluish) per kg. Contractor's profit @ 10% on Rs. 15.00 Deduct 4 kg. cement 10.50x4/50=0.84

kg.

Total

608-

Stone floors 4 cm. (1.5") thick of Mirzapur or othere approved stone flags, set in kankar lime over and including 1 cm. (8") concrete consisting 4 cm. (1.5") gauge brick ballast & kankar lime stone flags to be of standard size with and including b stone as specified or as directed by Engineer-in-charge. Stone should be fine dressed on upper surface and all edges, joints n exceed 3 mm. (1/8") Rate to include cost of stone dressed as specified, all other materials, labour & T&P etc. required for p completion of the work. Rater per 100 sft. lime concrete bas 3" thick. As per item no. 271 1" thick stone of standard size with top surface finally dressed including 15% wastage Lime mortar (Kankar lime) for bedding Carriage of stone L.S. Cement slurry for joints L.S. Mestri Mason Beldar Bhisti Add 1.5% for water charges on Rs. 215.93 Contractor's profit @ 10% on Rs. 181.87 (except on cost of base concrete & cement slurry). per per per % % % cft. sft. cft.
25 115 6

cft. sft. cft.

per per per per

day day day day

1/8 4 4 1/8

no. no. no. no.

170.00 160.00 100.00 130.00

Total 609-

As in item no. 608 above but with stone flags laid in 1:4 cement and fine sand of 1.25 F.M. mortar with base concrete consisti on part of cement and four parts of local sand and 8 parts brick of ballast. As in item no. 608. Deduct for line concrete base Lime mortar for setting including contractor's profit

10% Total

Add 3" base with cement concrete 1:4:8 Sl. No. 275 Cement Fine sand of 1.25 F.M.

per per per

% 50 %

cft. kg. bag cft.

25 1 4

cft. bag cft. Total

610-

As in item no. 608 above but stone flags laid in white lime and surkhi 1:2 and base concrete consisting of brick ballast, in one lime and 2 surkhi mortar. As in item no. 609. Deduct for cement concrete base Add 3" base concrete in one white lime and two surkhi mortar (272) per per % % cft. cft.
25 25

cft. cft. Total

611-

As in item no. (608, 609 and 610) above but upper surface and edges chiesel dressed and joints upto 6 mm. (1/4") thick. D from items (608, 609 and 610). Same as in item 608 above Deduct lime concrete 3" base Stone flags of standard size chiesel dressed including 110 10% wastage per % cft. cft. 6 Cost of lime mortar per % cft. cft. 4 Mason per day no. 160.00 Cement slurry for joints L.S. 4 Beldar per day no. 100.00 1/8 Bhisti per day no. 130.00 Sundries L.S. Contractor's profit @ 10% on Rs.135.49 except on lime concrete & cement slurry cost of cement and ballast So net deduction to be made 237.37per % sft. 198.96=Rs. 38.38

Total 612-

First class brick on edge floor laid in cement mortar consisting one part of cement & six parts of fine sand of 1.25 F.M. & po with cement mortar 1:2 over and including 8 cm. (3") brick ballast base concrete with kankar lime including supply of all mate labour & T&P etc. required for proper completion of the work. Rate per sft.-3" base concrete in kankar Lime as per item no. 271 1st class bricks Cement Fine sand of 1.25 F.M. Cement pointing 1:2 cement and local sand mortar (item 574-576) Mestri Mason Beldar Coolie Bhisti Add 1.5% water charges on Rs. 113.87 Contractor's profit @ 10% on Rs. 46.97 except on cost of cement, sand, base concrete and pointing.

per per per per per per per per per per

% 30 50 % % day day day day day

cft. no. kg. bag cft. sft.

25 530 1.25 8.5 100 1/10 1 1 1 1/4

cft. no. bag cft. sft. no. no. no. no. no. 170.00 160.00 100.00 100.00 130.00

Total 613-

As in item no. 612 above but with 8 cm. (3") base concrete consisting of brick ballast white lime and surkhi in ratio of 100:16:32 in item no. 612. Deduct cost of 3" base concrete in kankar lime as per item 271 Add cost of 3" base concrete in birck ballast, white lime and surkhi in ratio of 100:16:32 as per item 273 per per % % cft. cft.
25

cft. cft. Total

25

614-

As in item no. 612 above but with 8 cm. (3") base concrete consisting of one part of cement four parts of fine sand of 1.25 F.M eight parts of brick ballast. As in item no. 612. Deduct cost of 3" base concrete in kankar lime as per item 271 Add cost of 3" base concrete in 1:4:8 cement, fine sand of 1.25 F.M. and birck ballast. per per % % cft. cft.
25

cft. cft. Total

25

615-

First class brick on edge floor laid dry joints sand filled including preparation of base to proper slope and its ramming and incl supply of all materials, labour and T & P etc. required for proper completion of the work. Preparation of base, dressing, ramming and sprinking water. Beldar Coolie Bricks Sand Mason Beldar Contractor's profit @ 10% on Rs. 46.92

per per per per per per

day day % % day day

o no. cft.

0.5 0.5 530 10 1 1

no. no. no. cft. no. no.

100.00 100.00

160.00 100.00 Total

616-

As in item no. 612 above but bricks , laid flat. Rate for 100 sft. :- 3' base concrete in kankar. Lime as per item no. 271 1st class bricks per per % % cft. no.
25 350

cft. no.

Cement Fine sand of 1.25 F.M. Cement pointing 1:2 cement and fine sand of 1.25 F.M. mortar Mistri Mason Beldar Coolie Bhisti Add 1.5% water charges on Rs. 95.67 Contractor's profit @ 10% on Rs. 31.18 (except on base concrete, pointing cement and sand.

per per per per per per per per

50 % % day day day day day

kg. bag cft. sft.

0.9 7 100 1/10 3/4 0.5 1 1/4

bag cft. sft. no. no. no. no. no. 170.00 160.00 100.00 100.00 130.00

Total 617As in item no. 613 above but bricks laid flat. As in item no. 616 Deduct cost of 3" base concrete kankar lime Add cost of 3" base concrete in brick ballast, white lime and surkhi in ratio of 100:16:32 (item no. 272)

per per

% %

cft. cft.

25

cft. cft. Total

25

618-

As in item no. 614 above but bricks laid flat. As in item no. 616 Deduct cost of 3" base concrete in kankar lime Add cost of 3" base concrete in 1:4:8 cement, fine sand of 1.25 F.M. and brick ballast.

per per

% %

cft. cft.

25

cft. cft. Total

25

619-

As in item no. 615 above but bricks , laid flat. Rate for 100 sft. :- 3' base concrete in kankar. Bricks Sand Mason Beldar Contractor's profit @ 10% on Rs. 32.65 per per per per % % day day o no. cft.
350 8 1 1

no. cft. no. no.

160.00 100.00 Total

620-

Granolithic marble flooring 2.5 cm. (1") thick consisting of one part cement, two parts of approved coarse sand and 4 parts of (3/4") graded approved stone chips including 6 mm. (1/4") thick surface coat with ordinary cement black, white or grey or m marble chips passing 3 mm. (1/8") but retained on 1.5 mm. (1/6") mesh screen in proportion of 1:2 as specified or directe Engineer-in-charge and polished by hand or machine and finally finished with french manson polish or other approved p including 8 cm. (3") kankar lime concrete base, including supply of all materials, labour and T & P etc. required for p completion of the work. Base : Lime concrete base 3" thick as per item 25 per % cft. cft. 271 7 3/4"C.C. Stone chips 3/4" granite per % cft. cft. 4 Coarse sand per % cft. cft. 1.75 Cement per 50 kg. bag bag quintal 1.4 1/4" Granolithic chips : Marble chips per quintal 1 Cement per 50 kg. bag bag Sundries for rubbing and polishing L.S. 1/8 Mistri per day no. 170.00 2 Mason per day no. 160.00 2 Beldar per day no. 100.00 1/4 Bhisti per day no. 130.00 15 Beldar for cutting & polishing per day no. 100.00

Sundries L.S. like phanties etc. Add 1.5% water charges on Rs. 185.62 Contractor's profit @ 10% on Rs. 109.29 (except on base concrete, cement, sand and ballast) Total 621As in item no. 620 above but when white cement is used in top 5 mm. (1/4") layer instead of ordinary cement. Rate per % sft. as per item no. 620 Deduct :- Cost of grey cement Add cost of white cement from market Add Contractor's profit @ 10% on Rs. 27.00 per per 50 50 kg. bag kg. bag
1 1

bag bag Total

622-

As in item no. 620 above but when coloured floors are to be made. Rate per sft. as per item no. 620 Add cost of colour (Deep bluish) per kg. Add Contractor's profit @ 10% on Rs. 15.00 Add 1.5% water charges on Rs. 15.00 Deduct Cost of 4 kg. cement per 50 kg. bag

kg.

kg. Total

623-

As in item no. (620 to 622) above but base concrete consisting of one part of cement 4 parts of local sand and 8 part of ballast. Add extra :- Difference in kankar lime, concrete and 1:4:8 base concrete per sft. 58.16-32.42/100 Total

624-

As in item no. (620 to 622) above but base concrete consisting of brick ballast, white lime and surkhi in ratio of 100:16:32. Add extra:-Difference in kankar lime and one white lime and two surkhi mortar base concrete per sft.=37.99-32.42/100 Total

625-

Granolithic marble dado 2 cm. (3/4") thick consisting of 15 mm. (9/16") thick layer of one part cement, 2 part of approved co sand including 5 mm. (3/16") thick surface coat with ordinary cement, black or white or grey or mixed marble chips passing 3 (1/8") but retained on 1.5 mm. (1/16") mesh screen in proportion of 1:2 as specified or directed by Engineer-in-charge & pol by hand or machine and finally finished with french mansion polish or other approved polish including supply of all materials, la and T&P etc. required for proper completion of the work. Base 12 mm. thick cement plaster 1:2 as base coat with cement and coarse. 100 sand (as per item 581) per % sft. quintal 1.4 3/8" thick rubbed to 1/4" marble chips per 1 Cement per 50 kg. bag Sundries L.S. quintal 1.4 1/4" Granolithic chips : Marble chips per 1 Cement per 50 kg. bag Sundries for rubbing and polishing L.S. 1/6 Mason Mistri per day 3/4 Mason per day 3/4 Beldar per day 1/4 Bhisti per day 15 Beldar for cutting & polishing per day Add 1.5% water charges on Rs. 142.34 Contractor's profit @ 10% on Rs. 91.36 (except on cost of cement and plaster)

sft. quintal bag quintal bag no. no. no. no. no. 170.00 160.00 100.00 130.00 100.00

Total

626-

As in item no. 625 above but when white cement is used in top 5mm. (3/16") thick layer instead of ordinary cement. Rate per % sft. as per item no. 625 Deduct cost of grey cement Add cost of white cement from market Add Contractor's profit @ 10% on Rs. 27.00

per per

50 50

kg.bag kg.bag

1 1

bag bag Total

627-

As in item no. 625 above but when coloured dados are to be made. Rate per % sft. as per item no. 625 Add cost of colour (Deep bluish) per kg. Add Contractor's profit @ 10% on Rs. 15.00 Add 1.5% water charges on Rs. 15.00 Deduct Cost of 4 kg. cement per 50 kg. bag

kg.

kg. Total

628-

Supply & fixing 6 mm. (1/4") China white glazed in flooring or dado laid with 1:3 cement and approved coarse and mortar fin with white cement slurry jointing & polishing complete including supply of all materials, labour and T&P etc. required for p completion of the work. Take an area of 12sq. Yards- 108 sq.ft 36 Tiles required per doz. doz. 3.2 Cement per 50 kg. bag bag 12 Coarse sand per % cft. cft. 1 White cement per bag bag 4 Marble dust per cft. cft. 4 Tile layers per day no. 2 Women coolie per day no. 100.00 Sundries L.S. Add 1.5% water charges on Rs. 782.81 Contractor's profit @ 10% on Rs. 747.24 (except on cost of grey cement and sand) Total

629-

As in item no. 628 above but when NITCO or equivalent quaintity of tiles with mosaic work in light shades are used in floors dados. Take as area of 12sq. yards= 108sq.ft. Tiles required 110sft. at 2.50 per sft. 1 Total mortar required 5cft. Cement per 50 kg. bag bag 4 Coarse sand per % cft. cft. Add 1.5% water charges on Rs. 290.70 Contractor's profit @ 10% on Rs. 279.35 Total

630(a)

Providing & fixing aluminium strips of 16" gauge in joints of floors & skirtings at the time of laying floors, flash with floor including labour and T&P etc. complete of 2.5cm. (1") depth. Details of cost of 144rft. of Skeletion analysis as per S.l. aluminium stirps 16" gauge 1" depth wt. - 10.8 no. 20, 1962 CPWD analysis Materials, Aluminium sheet cut into streps=10.88lbs. Wastage 5% = 00.54lbs. Total = 11.37 lbs. or 5.16kg. Cost of strips (Market rate) per Carriage of Strips L.S. per Labour for fixing and finishing Mason per Beldar per Sundries L.S. Add 1.5% water charges on Rs. 58.45 Contractor's profit @ 10% on Rs. 59.32 kg. kg. day day
5.16 1 1

kg. no. no. 160.00 100.00

Total (b)

of 1/4 cm. (1.5%) depth. Take 144rft. 16' gauge 1.5' depth aluminium strip, weight = 16.25 lbs. Materials. Aluminium sheet cu strips=16.25 lbs. Wastage 5% = 0.81lbs. Total = 17.06 lbs. or 7.75kg. Cost of strips per Cartage of Strips L.S. kg.
7.75

kg.

Labour for fixing and finishing same as in (a) above 1.5% water charges on Rs. 82.43 Contractor's profit @ 10% on Rs. 88.66 Total (c)

of 5cm. (2") depth. Take 144rft. 16' gauge 2' depth aluminium strips weight = 21.67 lbs. Materials. Aluminium sheet cu strips=21.67 lbs. Wastage 5% = 1.08lbs. Total = 22.75 lbs. or 10.34 kg. Cost of strips per Cartage of Strips L.S. Labour for fixing and finishing same as in (a) per above 1.5% water charges on Rs. 106.39 Contractor's profit @ 10% on Rs. 107.98 kg. day
10.34

kg. no. 100.00

Total 631 (a)

Providing & fixing glass strips of 3.15mm. (1/8") thickness in joints of floors & skirtings at the time of laying floors, flash with level, including labour and T&P etc. complete of 2.5cm. (1") depth. Details of cost of 144rft. or glass strips 1/8" thick. 144 Cost of strips (Market rate) per rft. rft. Carriage of Strips L.S. Labour for fixing and finishing same as in 630 (a) above Add 1.5% water charges on Rs. 22.27 Contractor's profit @ 10% on Rs. 22.60 Total of 4 cm. (1.5%) depth. Details of cost of 144rft. of glass strips 3.5mm. (1/8") thick. 144 Cost of strips (Market rate) per rft. Carriage of Strips L.S. Labour for fixing and finishing same as in 630 (a) above Add 1.5% water charges on Rs. 28.03 Contractor's profit @ 10% on Rs. 28.45

(b)

rft.

Total (c) of 5cm. (2") depth. Details of cost of 144rft. of glass strips 1/8" thick. Cost of strips (Market rate) per rft. Carriage of Strips L.S. Labour for fixing and finishing same as in 630 (a) above Add 1.5% water charges on Rs. 32.35 Contractor's profit @ 10% on Rs. 32.83

144

rft.

Total 632-

Extra for making cheques of approved pattern on Skeleton analysis based on S.l.no. cement concrete, floor, steps, landing including 12 of 1962CPWD analysis of rates labour and T&P etc. complete. Take 100sft.Area. 1/3 Labour : Mason per day no. 160.00 1/3 Beldar per day no. 100.00 Chequered plates L.S. Add Contractor's profit @ 10% on Rs. 3.68 Total

633-

Providing & fixing aluminum angle shape, nosings (Skeleton analysis taken from 30x12x2.2mm., (1.5"x0.5"1/10" approx) fixed 25x3 mm. an extra item sanctioned in C.(1"x1/8") flat iron hold fasts 180 mm. (7") long placed at PWD kanpur office). 150 mm apart and screwed with 1"x1/8" screwes and nuts, including supply of all materials, labour and T&P complete. Take 100ft. le materials. Aluminium nosings = 100ft. Wastage 5%=5ft. Total 1.5ft. Cost of nosings (Market rate) per rft.
105

rft.

M.S. flats 1"x1/8"x7" long 200no.=117rft. @ 0.21 lbs./rft. = 24.57lbs=11.13kg. Screws and nuts 1"x1/6" Carriage L.S. Labour : Mason Hammer man Add Contractor's profit @ 10% on Rs.157.30

per per per per

kg.
gross

11.13 200 6 6

kg. no. no. no. 160.00 105.00 Total

day day

CHAPTER - 15
PAINTING AND DISTEMPERING
Sl. No. 1 641Item of Work Unit Qnty Rate

3 4 2 5.00 Painting or varnishing on iron works in small areas or new wood work with one coat or ready mixed priming painting & one co approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P required for proper completion of work. Paint to be used should conform to the I.S.I. no. 103-1950. Details of cost for an ar 650sf. (Priming coat on wood work). 1 Primer per gal. gal. 1.5 Painter per day no. 140.00 1.5 Coolie per day no. 100.00 Brushes, T&P and other Sundries L.S. Add Contractor's profit @ 10% on Rs. 41.25 Total Details of cost for 650sft. Painting one coat over priming coat. Paint per litre Painter per day Coolie per day Sundries, brushes etc. L.S. Add Contractor's profit @ 10% on Rs. 65.24

4 1.8 1.8

litre no. no.

Paints (of superior q 140.00 100.00

Total 642Same as in item 641 above but for every coat after 1st coat. Details of cost for 650 sft. area. 3.5 Superior paint ready mixed per litre litre 1.5 Painter per day no. 1.5 Coolie per day no. Sundries, brushes etc. L.S. Add Contractor's profit @ 10% on Rs. 56.00

c) Superior ready mi 140.00 100.00

Total
643As in item 642 above but for every coat on previously painted old wood or steel work. 4.5 Take cost of 650 sft. Paint per litre litre 2.1667 Painter per day no. 2.1667 Coolie per day no. Sundries, brushes etc. L.S. Add Contractor's profit @ 10% on Rs. 73.99

Paints (of superior q 140.00 100.00

Total 644-

Painting roofs or other iron work in large area with one coat of ready mixed paint priming one coat of approved paint (B ANTISOL or equivalent) including supply of all materials, labour & T&P etc. required for proper completion of the work. Paint used should confirm I.S.I. no. 103-1950. Cost for area of 650 sft. priming coat. Paint Painter Coolie Brushes T&P scaffolding and sundries etc. L.S. Contractor's profit @ 10% on Rs. 38.25 Painting coat for 1050 sft. Paint Painter Coolie Sundries scaffolding etc. Contractor's profit @ 10% on Rs. 67.50 per per per gal. day day
1 1 1

gal. no. no.

Paints (of superior q 140.00 100.00

per per per

litre day day

4 3 3

litre no. no.

Total Paints (of superior q 140.00 100.00

Total 645As in item no. 644 above but every cost after the first coat. For 1050 sft. Paint per litre Painter per day Coolie per day

3.5 2.3 2.3

litre no. no.

Paints (of superior q 140.00 100.00

Sundries scaffolding etc. Contractor's profit @ 10% on Rs. 55.85 Total 646Same as in item no. 615 above but for every coat on previously painted old surface. 4.5 Paint per litre 3.5 Painter per day 3.5 Coolie per day Sundries scaffolding etc. Contractor's profit @ 10% on Rs. 77.38

litre no. no.

Paints (of superior q 140.00 100.00

Total 647-

Painting or varnishing with superial or other approved high grade enamel or superior synthetic clear varnish complete one over previously painted surface, including supply of all materials, labour nad T&P etc. required for proper completion of the Enamel or varnish to be used should confirm to I.S.I. no. 105/106/133-1950. Cost for an area of 400 sft. Enamel Painter Coolie Sundries L.S. Contractor's profit @ 10% on Rs. 45.37 per per per litre day day
2.25 1.33 1.33

litre no. no.

h) Paint enamel (syn 140.00 100.00

Total 648As in item no. 647 above but for every subsequent coat on previously treated surface. 1.06 Cost for an area of 400 sft. Enamel per litre litre 1 Painter per day no. 1 Coolie per day no. Contractor's profit @ 10% on Rs. 30.60

h) Paint enamel (syn 140.00 100.00 Total

649-

One priming coat & one coat oil distemper on new work including supply of all materials, labour and T&P etc. Required for p completion of the work. 1 Painting coat, whiting per kg. kg. 1/8 Painter per day no. 140.00 1/8 Coolie per day no. 100.00 Contractor's profit @ 10% on Rs. 1.36 1.5 Distempering oil distemper in paste per kg. kg. Sundries L.S. 3/8 Painter per day no. 140.00 3/8 Coolie per day no. 100.00 Sundries, brushes etc. Contractor's profit @ 10% on Rs. 1.36 Contractor's profit @ 10% on Rs. 13.26 Total As in item no. 649 above but for every coat after the first coat. Oil Distemper in paste per kg. Sundries and putty etc. L.S. Painter per day Coolie per day Sundries, brushes etc. Contractor's profit @ 10% on Rs. 6.79

650-

0.75 1/5 1/5

kg. no. no. 140.00 100.00

Total 651As in item no. 650 above but for every coat on previously old distempered surface. 0.75 Oil Distemper in paste per kg. Sundries and putty etc. L.S. 1/4 Painter per day 1/4 Coolie per day Sundries, brushes etc. Contractor's profit @ 10% on Rs. 7.51

kg. no. no. 140.00 100.00

Total

652-

One cost hot coaltar on new surface including supply of all materials, labour and T&P etc. required for proper completion o work. 0.91 Coaltar per litre litre 1/3 Beldar per day no. 100.00 Sundries L.S. Contractor's profit @ 10% on Rs. 2.33 Total As in item no. 652 above but every coat after first coat or on previously treated surface. 0.75 Coaltar per litre litre 1/5 Beldar per day no. Sundries L.S. Contractor's profit @ 10% on Rs. 1.64

653-

100.00

Total 654-

One coat solignum or other approved preservative on new wood work, including supply of all materials, labour and T&P required for proper completion of the work. 0.75 Wood preservative per litre litre 1/5 Painter per day no. 140.00 1/5 Coolie per day no. 100.00 Sundries L.S. Contractor's profit @ 10% on Rs. 5.03 Total As in item no. 654 above but for every coat after first coat on previously treated surface. 0.45 Wood preservative per litre litre 1/5 Painter per day no. 1/5 Coolie per day no. Sundries L.S. Contractor's profit @ 10% on Rs. 2.58

655-

140.00 100.00

Total 656-

Oiling wood work with double boiled linseed oil including supply of all materials, labour & T&P etc. required for proper complet the work. Details for and area of 700 sft. 3.75 Linseed Oil per litre litre 3/4 Painter per day no. 140.00 3/4 Coolie per day no. 100.00 Sundries Contractor's profit @ 10% on Rs. 27.53 Total Removing paint or varnish with paint remover orr caustic proper completion of the work. Caustic Soda per Coolie per Beldar per Sundries Contractor's profit @ 10% on Rs. 3.28

657-

soda, including supply of all matrials, labour and T&P etc. require kg. day day
3.80 1/3 1/3

kg. no. no.

100.00 100.00

Total 658Wax polishing new wood work with approved ready made wax polish or approved french polish after, rubbing down with paper including supply of all materials, labour and T&P etc. required for proper completion of the work. Manson (Wax) polish Painter Coolie Sundries L.S. Contractor's profit @ 10% on Rs. 11.25 per per per kg. day day
0.50 0.50 0.50

kg. no. no.

140.00 100.00

Total

659-

As in item no. 658 aboe but repolishing wood work already wax or french polished with approved realy made wax poli approved french polish including supply of all materials, labour and T&P etc. required for proper completion of the work. Manson (Wax) polish or French Polish Painter Coolie Sundries L.S. Contractor's profit @ 10% on Rs. 5.70 per per per kg. day day
0.30 0.30 0.30

kg. no. no.

140.00 100.00

Total 660-

Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even sh including supply of all materials, labour & T&P etc. required for proper completion of the work. (Skeleton analysis based on CPWD analysis of rates item no. 97(a). 3.40 Details of cost for 100 sft. Snowcem powder per kg. kg. 3/10 Labour :Painter per day no. 140.00 3/10 Coolie per day no. 100.00 3/8 Bhisti per day no. 130.00 Scaffoliding and Sundries etc. L.S. Add 1.5% water charges on Rs.14.90 Contractor's profit @ 10% on Rs. 15.11 Total

661-

Same as in item no. 660 but for each coat of water proof cement paint after the first two coats to give an even shade. (Ske analysis based on 1962 CPWD analysis of rates item no. 97(a). Take 100sq.ft. of area 1.70 Snowcem powder per kg. kg. 3/40 Labour :Painter per day no. 140.00 3/40 Coolie per day no. 100.00 1/8 Bhisti per day no. 130.00 Scaffoliding and Sundries etc. L.S. Add 1.5% water charges on Rs.6.54 Contractor's profit @ 10% on Rs. 6.64 Total

Note- Rate approved by S.E., 6th Circle vide letter no. 2817CB/131CB-6/67, dated 15.1.1968 for two coats and three coats are Rs. 1 and 24.00 per % sq.ft. respectively. 662-

Finishing walls with one coat of water proof cement paint of approved quality on previouslly old treated surface with this pa give and even shade including supply of all materials, labour and T&P etc. required for the proper completion of the (Skeleton analysis based on item no. 98 of 1962 PWD analysis of rates) Cost per %sft. Materials : Snowcem powder Labour :Painter Coolie Bhisti Sundries L.S. Add 1.5% water charges on Rs.8.56 Contractor's profit @ 10% on Rs. 8.69 per per per per kg. day day day
2 1/5 1/5 1/8

kg. no. no. no.

140.00 100.00 130.00

Total

CHAPTER - 16
WHITE AND COLOUR WASHING
Sl. No. 1 671Item of Work Unit Qnty Rate 3 4 2 5.00 White washing on coat, including supply of all materials, labour and T&P etc. required for proper completion of the work. Materials : White lime Carriage of lime L.S. Labour : White washer Helper (Coolie) Sundries, gum, ladder etc. L.S. Contractor's profit @ 10% on Rs. 0.71 per per per kg. day day
1 1/15 1/15

kg. no. no. 140.00 100.00

Total 672As in item no. 671 above but two coats. White lime Carriage of lime L.S. White washer Helper (Coolie) Sundries, gum, ladder etc. L.S. Contractor's profit @ 10% on Rs. 1.16

per per per

kg. day day

2 1/10 1/10

kg. no. no. 140.00 100.00

Total 673As in item no. 671 above but 3 coats white washing 2 coats as per item 672. Add difference in cost of one additional coat (1.28-0.78) Total 674-

Colour washing one coat using approved colouring materials of buff, blue, grey or brown shade, including supply of all mate labour and T&P etc. required for proper completion of the work. Rate for white washing on coat 671 0.25 Add cost of 0.25 kg. colouring material per kg. kg. Add extra labour required L.S. Contractor's profit @ 10% on Rs. 0.42 Total As in item 674 above but 2 coats. Rate for white washing 2 coats 672. Add cost of 0.5 kg. colouring material per kg. Add extra labour required L.S. Contractor's profit @ 10% on Rs. 0.85

675-

0.50

kg.

Total 676As in item 674 above but using approved colouring materials of pink, green or yellow shades. Rate as per item (674). Add extra cost of manufactured colour L.S. Contractor's profit @ 10% on Rs. 0.18 Total 677As in item 676 above but two coats. Rate for colour washing 2 coats (675) Add extra cost of 2 coats colouring materials L.S. Contractor's profit @ 10% on Rs. 0.32 Total 678As in item 676 above but colour washing with copper or iron sulphate on coat. Same as per colour washing on coat as per item 676 Add extra cost of colour Contractor's profit @ 10% on Rs. 0.16

Total 679As in item 678 above but two coats. Rate same as per colour washing two coats as item 677 Add extra cost of colour Contractor's profit @ 10% on Rs. 0.32 Total 680Cement washing, including supply of all materials, labour and T&P etc.required for proper completion of the work. 3.6 Material : Cement per 50 kg. bag kg. Carriage of cement L.S. 1/12 Labour : White washer per day no. 140.00 1/12 Helper (Coolie) per day no. 100.00 Sundries, gum, ladder L.S. Contractor's profit @ 10% on Rs. 1.44 Total One priming coat and one coat of dry distemper on new proper completion of the work. Details of cost of 100 sft. Whiting per Vinegar L.S. Labour : Painter per Coolie per Distempering Dry-distemper per Painter per Coolie per Sundries L.S. Contractor's profit @ 10% on Rs. 6.33

681-

work, including supply of all materials, labour and T&P etc. require kg. day day kg. day day
1.0 1/8 1/8 3/4 1/5 1/5

kg. no. no. kg. no. no. 140.00 100.00 140.00 100.00

Total 682As in item 681 above but for each coat of distemper after the first coat. Distemper per kg. Painter per day Coolie per day Sundries L.S. Contractor's profit @ 10% on Rs. 3.90

0.6 1/6 1/6

kg. no. no.

140.00 100.00

Total

CHAPTER - 17
DEMOLITION & DISMANTLING
Sl. No. 1 691Item of Work Unit Qnty Rate

3 4 2 5.00 Dismantling sundried brick work including stacking of dismantled materials as directed by the Engineer-in- charge within a dis of 60 metres (200 ft.) 3/4 Coolie per day no. 100.00 Sundries L.S. Contractor's profit @ 10% Total

692-

Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engine charge within a distance of 60 metres. 2 (200 ft.) Beldar per day no. 100.00 2 Coolie per day no. 100.00 Contractor's profit @ 10% on Rs. 11.50 Total As in item 692 above but in mud mortar. Beldar Coolie Contractor's profit @ 10% on Rs. 5.75

693-

per per

day day

1 1

no. no.

100.00 100.00 Total

694-

Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed b Engineer-in-charge within a distance of 60 metres (200 ft.) . 4 Beldar per day no. 100.00 4 Coolie per day no. 100.00 1/3 Blacksmith per day no. 170.00 Sundries L.S. Contractor's profit @ 10% on Rs. 26.33 Total

695-

Dismantling jack arched or wooden beam & bargas roofs, including beams & roof concrete & including stacking of disma materials as directed by the Engineer-in-charge within a distance of 60 metres (200 ft.) Beldar Coolie Contractor's profit @ 10% on Rs. 11.50 per per day day
2 2

no. no.

100.00 100.00 Total

696-

As in item 695 above but only roof concretes. Beldar Coolie Contractor's profit @ 10% on Rs. 8.62

per per

day day

1.50 1.50

no. no.

100.00 100.00 Total

697-

Dismantling cement concrete or brick or granolithic floors, including base concrete & including stacking of dismantled materia directed by the Engineer-in-charge within a distance of 60 metres (200 ft.) 3/4 Beldar per day no. 100.00 3/4 Coolie per day no. 100.00 Contractor's profit @ 10% on Rs. 4.32 Total As in item 697 above but floors to be stone flagged or tiled floor. Beldar per day Coolie per day Contractor's profit @ 10% on Rs. 5.75

698-

1 1

no. no.

100.00 100.00 Total

699-

Dismantling single tiled roof, any kind, including perlin and battens & including stacking of dismantled materials as directed b Engineer-in-charge within a distance of 60 metres (200 ft.) 1/10 Mistri per day no. 170.00 1 Beldar per day no. 100.00 1 Coolie per day no. 100.00 Contractor's profit @ 10% on Rs. 6.40 Total

700-

As in item 699 above but double tiled roof. Mistri Beldar Coolie Contractor's profit @ 10% on Rs. 10.90

per per per

day day day

1/10 2 1.50

no. no. no.

170.00 100.00 100.00 Total

701-

Dismantling corrugated iron roof walls and patiotions including purlin battens and vertical supports and including stacki materials as directed by the Engineer-in-charge within a distance of 60 metres (200 ft.) 0.50 Blacksmith per day no. 170.00 0.50 Coolie per day no. 100.00 Contractor's profit @ 10% on Rs. 4.00 Total

702-

Dismantling of griders, trusses & other steel work including stacking of dismantled materials as directed by the Engineer-in-ch within a distance of 60 metres (200 ft.) 0.50 Blacksmith per day no. 170.00 1.50 Beldar per day no. 100.00 Sundries L.S. Contractor's profit @ 10% on Rs. 8.78 Total

703-

Dismantling doors & windows. Including chowkhats with hold fast and including stacking of materials as directed by the Engine charge within a distance of 60 metres (200 ft.) 1/10 Mason per day no. 160.00 0.50 Carpenter per day no. 160.00 1 Coolie per day no. 100.00 Contractor's profit @ 10% on Rs. 6.35 Total Dismantling doors & windows leaves, including stacking of materials as directed by the Engineer-in-charge within a distance metres (200 ft.) 1/3 Carpenter per day no. 160.00 1/3 Beldar per day no. 100.00 Sundries L.S. Contractor's profit @ 10% on Rs. 3.65 Total

704-

705-

Dismantling doors & windows. Including chowkhats but excluding hold fast and including stacking of materials as directed b Engineer-in-charge within a distance of 60 metres (200 ft.) 1/3 Carpenter per day no. 160.00 1/8 Mason per day no. 160.00 1 Coolie per day no. 100.00 Sundries L.S. Contractor's profit @ 10% on Rs. 6.57 Total

706-

Dismantling existing plaster including disposal of refuse as directed by the Engineer-in-charge within a distance of 60 metres ft.) 1 Coolie per day no. 100.00 1/16 Bhisti per day no. 130.00

Contractor's profit @ 10% on Rs. 2.77 Total 707-

Racking out joints of brick work in cement or lime mortar to a depth of 1cm. (3/8") including disposal of refuse as directed b Engineer-in-charge within a distance of 60 metres (200 ft.) 3/4 Beldar per day no. 100.00 Contractor's profit @ 10% Total

708-

Scarping old white or colour wash including disposal of refuse as directed by the Engineer-in-charge within a distance of 60 m (200 ft.) 1/3 Coolie per day no. 100.00 Contractor's profit @ 10% Total

CHAPTER - 18
WELL WORK
Sl. No. 1 711Item of Work Unit Qnty Rate

3 4 2 5.00 R.C.C. work in 1:2:4 in well curbs with cement, approved coarse sand & 2cm. (3/4") gauge well graded grit, including shutte placing & fixing, of reinforcement in position, but excluding cost of reinforecement & its bending but including its binding to req shape & including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire (24B.W wire) to be supplied by the contractor free of cost. As in item 285 Cost of extra labour including contractor's profit @ 10% Total

712-

Mild steel or iron work in cutting edge of well work, wrought to required shape & joined as necessary including supply of stee its cutting, bending and welding etc. for proper completion of work as directed by Engineer-in-charge. Blacksmith Hammer man Helper Beldar Sundries T&P cartage etc. L.S. Contractor's profit @ 10% on Rs. 22.25 Cost of steel Wastage 2% per per per day day day
1 2 2

no. no. no.

170.00 105.00 100.00

per

cwt.

cwt. Total

713-

Mild steel or iron work in well steining, including supply of steel and its cutting, bending and welding etc. & including cost of nuts required for proper completion of work as directed by Engineer-in-charge. 1 Blacksmith per day no. 170.00 1 Helper Beldar per day no. 100.00 1 Hammer man per day no. 105.00 2 Bottle nuts each no. Sundries T&P cartage etc. L.S. Contractor's profit @ 10% 1 Cost of steel per cwt. cwt. Wastage 5% Total

714-

Sinking of well of 2.5m(8') external diametre in ordinary soil below spring level, including supply, erection & working of all p required, as well as loading & unloading of weight bailing & unloading of weight bailing & pumping out water with machine otherwise as required 0m to 1.5m (0'-5'). 1/3 Sinker per day no. Well sinker 1.50 Skilled labour per day no. 4 Coolie per day no. 100.00 T&P and load etc. L.S. Contractor's profit @ 10% on Rs. 19.75 Total As in item 714 above but from 1.5m to 3.0m. (5'-10'). Sinker per Skilled labour per Coolie per T&P and load etc. L.S. Contractor's profit @ 10% on Rs. 29.75

715-

day day day

1 1.50 5

no. no. no.

Well sinker 100.00

Total 716As in item 714 above but from 3m to 5m. (10'-20'). Sinker per Skilled labour per Coolie per T&P and load etc. L.S.

day day day

1 2 7

no. no. no.

Well sinker 100.00

Contractor's profit @ 10% on Rs. 39.50 Total 717As in item 714 above but from 7m to 9m. (20'-30'). Sinker per Skilled labour per Coolie per T&P and load etc. L.S. Contractor's profit @ 10% on Rs. 56.00

day day day

2 2 10

no. no. no.

Well sinker 100.00

Total 718As in item 714 above but from 9m to 12m. (30'-40'). Sinker per Skilled labour per Coolie per T&P and load L.S. Contractor's profit @ 10% on Rs. 71.00

day day day

3 2 10

no. no. no.

Well sinker 100.00

Total 719As in item 714 above but from 12m to 15m. (40'-50'). Sinker per Mate with driver per Skilled labour per Driver per T&P and load etc. Contractor's profit @ 10% on Rs. 88.00

day day day day

2 1 4 1

no. no. no. no.

Well sinker 110.00 400.00

Total
719-(a)

For the diametra (External) other than above the rates shall be calculated proportionatly to their areas.

(b)

For soils other than the average soil as indicated above an increase as given below shall be allowed according to the nature o soil and work. Soft Clay 25% Hard clay 50% Kankar shingle 0.75

CHAPTER - 19
MISCELLANEOUS
Sl. No. 1 725Item of Work Unit Qnty Rate 3 2 Blocks of C.P. Teak 8cmx8cmx12cm (3"x3"x4.5") supplied & fixed in wall mortar in the proportion of 1.3 and including making a hole for the same. C.P. Teak Block 3"x3"x4.5" per cft. Cement per 50 kg. bag Coarse sand per % cft. Mason per day Beldar per day Contractor's profit @ 10% on Rs. 1.33 4 5.00 with & including cement and approved coarse
3/128 0.5 0.03 1/25 1/25

cft. bag cft. no. no.

160.00 100.00 Total

726-

Supply of approved brass cleats for clerestory window cords including their fixing to Teak wood plates 10cmx10cm (4"x4"x3/8") over blocks of C.P. Teak 8cmx8cmx12cm (3"x3"x4.5") supplied and fixed in wall with & including cement & appr coarse sand mortar in proportion of 1:3 and screws etc. and including making a hole for the same. Cost of 12 cleats Teak wood blocks Teak plates 4"x4"x3/8" Brass cleats Iron screws 2.5" Brass screws1" Carpenter Cement mortar and fixing. Same as in item (725) 0.51x12 Contractor's profit @ 10% on Rs. 45.71 each per per per per per
12 1/20 1 1 2 0.50

cft. doz. doz. doz. day

nos. cft. doz. doz. doz. no.

160.00

Total 727As in item 726 but with approved oxidised iron cleats. As in item 726 Deduct difference in cost of brass and iron cleats L.S. Total 728Supply of cotton cord for clerestory window including fixing in position. Rate for cotton cord per kg. Fixing charges L.S. Contractor's profit @ 10% on Rs. 7.75

kg.

Total 729-

Supply and fixing of C.P. Teak wood doors and windows cleat 10cmx7.5cmx5cm(4"x3"x2") with 5cm. (2") brass hignes incl fixing & supply of screws bings & including supply of all materials, labour & T&P etc. required for proper completion of the work Details of 12 cleats. Teak wood 12x0.5"x3"x2" Brass hinges 2" Carpenter Brass screws 1" Contractor's profit @ 10% on Rs. 29.99 per per per per cft. doz. day doz.
1/6 1 1/3 4

cft. doz. no. doz. 160.00

Total 730-

Supply and fixing of 10cm(4") internal dia. A.C. down pipes complete with rose head., bends and gratings & includings sup necessary M.S. clamps 2.5cmx3mm(1"x1/8") fixed to walls, with & including supply of 15cm. (6") long 6mm(1/4") dia, na including supply of all materials, labour and T&P etc. required for proper completion of the work and also inclucing repair of pla pointing etc. if damaged during fixing of pipes. Details of 30' length. 5 Cost of 6' pipe each nos. 5 Add for M.S. clamps each nos. Cement mortar L.S. 1/4 Fitter per day no. 110.00

Mason Beldar Contractor's profit @ 10% on Rs. 83.37

per per

day day

3/4 1

no. no.

160.00 100.00 Total

(b)

Shoes, shoe Holder label Contractor's profit @ 10% on Rs. 5.00

each

1 1

no. no. Total

(c)

Head including rose Carriage and fixing charges L.S. Contractor's profit @ 10% on Rs. 6.18

each

no.

Total (d) Bends, Construction of Bends Carriage and fixing charges L.S. Contractor's profit @ 10% on Rs. 5.00 Grand total (a+b+c+d) each
1

no.

Total 731-

Supply and fixing of C.P. Teak wood per rack (8cmx8cmx2.5cm)(3"x3"x1") over blocks of C.P. Teak 8Cmx8cmx12cm(3"x3"x with three brass pegs of approved design supplied and fixed in wall with & including cement & approved coarse sand mortar proportion of 1:3 and screws etc. & including making a hole for the same. Teak wood 1x5/2x4/12x1/12 Brass hole peg Brass screws 3/4" Carpenter Beldar Teak wood block 3"23"24" (two) Cement mortar and labour L.S. Sundries L.S. Contractor's profit @ 10% on Rs. 9.45 per each per per per per cft. doz. day day cft.
0.07 3 6 1/12 1/12 3/64

cft. nos. nos. no. no. cft.

160.00 100.00

Total 732-

Fire bricks laid in fire clay mortar including supply of fire bricks and fire clay, labour and T&P etc. required for proper completi the work . Details of cost per % cft. 1300 Fire clay bricks per % no. 14 Fire clay mortar per cwt. cwt. Sundries L.S. 4 Mason per day no. 160.00 2 Beldar per day no. 100.00 1/4 Bhisti per day no. 130.00 Sundries T&P etc. L.S. Contractor's profit @ 10% on Rs.1352.31 Total

733-

Providing & fixing at site 4cm. (1.5") C.P. Teak wood panelled partition complete with teak wood frames 10cmx8cm(4"x3" botton and side vertical at 1.5m (5') apart including supply of all brass screws, cleats, bolts, etc. all materials, labour and T&P required for proper completion of the work. Details of cost for partitions of panels 6'-8' high and 5" wide 6x5=33.33 sft. materi Styles 1x4x6x1/4x1/8 Rails 1x4x5x1/4x1/8 Panels 3x3x2x1.5x5/96 Add wastage 10% on 2.87 Carriage L.S. Carpanter Beldar = = = = Total = 0.83 0.63 1.41 0.29 3.16 per per day day

3.16 3.50 1.50

cft. no. no. 160.00 100.00

Mistri Carpanter Screws etc. L.S. Contractor's profit @ 10% on Rs.178.21

per per

day day

1/8 1.75

no. no.

170.00 160.00

Total Teak wood frames 4"x3" take a length of 15" (As per item of straight works in wood work). 2x15"4/12"x3/12" = 2.5 4x6x4/12x3/12 = 2.2 Wastage 10% on 4.7 = 0.5 5.2 As per item no. 401 = 5.2 per cft. cft. Add cost of bolts etc. L.S. Total

734-

Providing & fixing plain asbestos sheets partition with 5cmx1cm )2"x3/8") deodar or Shisham wood beading including erect fixing complete with deodar or shisham frames 10cmx8cm(4"x3") top bottoms and sides verticals at 1.5m(5') apart & incl supply of all screws, bolts, nuts and cleats etc. all materials, labour and T&P etc. required for proper completion of work. Details of cost for 12'x7' Deodar wood 3x12x1/6x1/24 4x6x1/24 Wastage 5% on 0.44 = = = = Total = 84 0.25 0.19 0.02 0.46 sft.

sft.

0.46

cft.

Carriage L.S. Plain asbestos sheets 1/4" thick = 84sft. Wastage 5% Carriage L.S. Carpanter Mason Beldar Sundries screws L.S. Contractor's profit @ 10% on Rs. 111.44

per per per per

sft. day day day

88.2 1.33 1 1.50

cft. no. no. no. 160.00 160.00 100.00

Total Deodar wood frame as above (As per item of straight work and wood work). As per item no. 404 per cft. Add cost of bolts etc. L.S.

5.2

cft. Total

735-

As in item 734 above but with masonite board partition as above Add extra cost of masonite board including contractor's prolit @ 10% Total

CHAPTER - 20
ROAD WORK
Sl. No. 1 751Item of Work Unit Qnty Rate

3 4 2 5.00 Consolidation of kankar by hand rammers including opening out stacks, sorting kankar into three sizes repairing patch in ex road surface with kankar, picking up old surface, spreading kankar, making medhi to retain water and ramming and also incl carriage of metal upto 30m (100'). Carriage of water 200m. (1 furlong) supply & maintenance of barrier, caution posts, light at & including all T&P etc. required for proper completion of the work, kankar to be supplied to the contractor free at site. Taking up a length of 220'x12'=2640sft. Kankar required 2640x3/8 = 990cft. Beldar for cris cross lines and sweeping and per day taking out kankar dug Preparing earth & making medhi mazdoor per day Opening out stack & sooting into sizes beldar per day Mazdoor Carriage of kankar & spreading on surface, Mazdoor Hand packing Beldar Supply of water, Mazdoor Consolidation Head Hammer man Hammer man Basi chot Beldar Leak katai L.S. T&P and night light L.S. Contractor's profit @ 10% on Rs. 120.25 per per per per per per per day day day day day day day

2 1 2 2 4 6 8 1 11 2

nos. no. nos. nos. nos. nos. nos. nos. nos. nos.

100.00 100.00 100.00 100.00 100.00 100.00 100.00 105.00 105.00 100.00

Total

752-

As in item 751 above but for consolidation by R/R including hire and fuel of the roller. As in item 751 Deduce for labour involved in consolidation (A) 1 Add for hire charges of roller per day no. 1/4 Steam coal per day nos. 2 Beldar per day nos. Contractor's profit @ 10% on Rs. 6.50 except on roller & coal

100.00

Total 753As in item 752 above but for 12cm. (4.5") thick coat of brick ballast. As in item 752 Extra for labour for providing building materials. Beldar per day Contractor's profit @ 10% on Rs. 1.62

0.50

nos.

100.00 Total

754-

As in item no. 752 above but 8cm. (3") thick coat of brick ballast. As in item 753 Add difference in item 755/756 Total

755-

As in item 752 above but for 12cm. (4.5") thick stone ballast. As in item 752 Extra for labour for providing building materials in excess including. 10% contractor's profit Beldar per day Add for extra coat to be used L.S. Contractor's profit @ 10% on Rs. 2.94

3/4

nos.

100.00

Total

756-

As in item 752 above but for 6cm (2.3") to 8cm. (3") thick, stone ballast. Consider a length of 220 rft. Materials requir 220x12x0.3=660 cft. For ctis cross lines, sweeping and taking out 2 per day nos. 100.00 kankar dug. Beldar 1 Preparing earth & making medhi mazdoor per day no. 100.00 Opening out stack, carriage and spreading on 3 per day nos. 100.00 raod surface : Beldar 8 Hand packing Beldars per day nos. 100.00 6 Supply of water, Mazdoor per day nos. 100.00 1 Consolidation Roller charges per day day 1/6 Coal per ton ton 2 Beldar per day nos. 100.00 2 Binding Beldar per day nos. 100.00 Leak katai L.S. T&P night lanterns L.S. Contractor's profit @ 10% except on coal and roller i.e. on Rs. 77.25 Total Water allowance to be allowed on item no. 751 to 756 between 15 Nov. to 31 May. 3/4 Beldar per day Contractor's profit @ 10% on Rs. 2.68

757-

no.

100.00 Total

758-

Digging kankar including breaking, cleaning and proper stacking. Royalty to villagers Indication (digging) Beldar Coolie For hundred cft. Kankar 110 cft. of kankar as the quary will have to be dug.

royalty as well as the cost of boring to fined kankar strata excluding cartage

per per per

day day day

1/8 4 3

no. nos. nos.

100.00 100.00

Total 759Making mud tree guards 1 m (3'-4') internal diameter and 1m (3'-4') high above ground level. 3/4 Mason per day no. 3/4 Coolie per day no. Sundries L.S. Contractor's profit @ 10% on Rs. 6.50

160.00 100.00

Total 760Dag-belling 15cm. (6") deep in one line aligned, with flags and jhandies as directed by th Engineer-in-charge. Mate Beldar Contractor's profit @ 10% on Rs. 32.75 per per day day
1 9

no. nos.

110.00 100.00 Total

761-

Painting white traffic lines 8cm. (3") wide in three coats with approved road marking paint (spirit base) as directed by the Engi on-charge, including all materials, labour and T&P etc. required for proper completion of the work. Take an area of 100 sft. line Paint (Road marking paint) Painter Beldar Sundries L.S. Contractor's profit @ 10% per per per litre day day
4.5 5 5

litre no. no.

140.00 100.00

Total

762-

(a) Brick soling with straight overburnt bricks laid flat and dry including preparation of subgrade to prescribed cambre and incl supply of bricks, filling joints with local earth spreading a blinding coat of 1cm. (3/8") depth of local earth of P.I. 5 to 7 or sand the entire surface & including labour & T&P etc. required for proper completion of the work. Bricks per Rate of preparing subgrade and laying as per per Contractor's profit @ 10% on Rs. 19.25 (b) As in item 762(a) but with bricks laid on edge. Bricks per Rate of preparing subgrade and laying as per per Contractor's profit @ 10% on Rs.30.25 %o day
350

nos. no. Total

%o day

550

nos. no. Total

763-

Bricks on edge pavement on patries with bricks laid dry, joints filled with local sand including preparation of base to proper and its ramming, spreading a layer of 1cm. (3/8") depth of local sand over the subgrade and including supply of all mate labour and T&P etc. required for proper completion of the work. As item no. 762(b) above Extra cost of labour and 10cft. Local sand, including Contractor's profit @ 10% ( Rs. 3.00+1.00+0.40) Total

764-

Renewing patries 3metre (10') wide including dressing surface filling upto 8cm. (3") depth and making namunas at every 1 (50') apart on either side of the road true to patri template with side slopes 1:2 etc. for taking the earth to be so dug that they fo continuous side drain at road boundry. Take a length of 1 furlong. Mate Diggers Dressers Coolie Baskets String L.S. Coal Beldar T&P L.S. Contractor's profit @ 10% Rs. 78.25 per per per per per per per day day day day no. ton day
1 10 2 12 4 1/6 2

no. no. no. no. no. ton nos.

110.00

100.00

100.00

Total 765-

Bricks edging on both sides of the road of first class bricks 8cm. (3") wide and 12cm. (4.5") deep laid with mud mortar incl labour & supply of bricks finished to required template and in proper alignment and also including dressing & rammin excavated earth as directed by the Engineer-in-charge. Take a stip of 0.5 furlong 2x330=660 rft.
8/5 Bricks per %o 1 Mason per day 1 Beldar per day 2 Coolie per day Dressing and throwing surplus materials includings stacking of road materials. 2 Coolie per day T&P Baskets and other sundries L.S. Contractor's profit @ 10% Rs. 72.50

no. no. no. no. no.

160.00 100.00 100.00 100.00

Total 766-

Stacking of road metal to the required templete after screening at road side including dressing of side berms as required, w metal is to be stacked and including a lead upto 60 metres (200'). 1/5 Screeing Coolie per day no. 100.00 Dressing, levelling, side berms, including filling. 1/5 Coolie per day no. 100.00 1/2 Stacking Beldar per day no. 100.00 Sundries L.S.

Contractor's profit @ 10% Rs. 2.82 Total 767-

Bitumen painting (labour only) over W.B. surface (1st coat) excluding supply of paint & grit including maintenance of side p and watering them during operation for proper completion of the work as directed by Engineer-in-charge and excluding charges and its fuel but including the wages of fire-man & tar-boiler man. Take a strip of 0.5 furlong area 330x12=3960 sft. Cleaning grit : Mazdoor Cleaning sub-grade : Mazdoor Coolie Tar heating & spreading on road: Hot Belder Grit spreading Beldar Diversion watering : Beldar Misce. : Mate Work agent Tar boiler man & Fireman Sundries L.S.

per per per per per per per per per

day day day day day day day day day

1 10 8 7 5 2 1 1/2 1

no. no. no. no. no. no. no. no. no.

100.00 100.00 100.00 100.00 100.00 110.00

Total 768-

As in item 767 above but subsequent coat or painting over previously painted surface. The above labour will make an outp double the area i.e. the same labour can do the painting of 1 furlong. Hence rate for % sft. 3 00/2 = Rs. 1.50 or Rs.0.16 per me

769-

As in item 767 above but cold cmulsion in 2nd coat painting with bitumen covering on furlong. (As per item no. 767). Deduct labour for heating paint not required in this operation as in item 767 Extra labour required for operation L.S. Total

770-

As in item 767 above but with tar in first coat painting with bitumen furlong Deduct less labour required for heating Tarper day beldar

no.

100.00 Total

771-

As in item 767 but with Tar in 2nd coat or other subsequent coats of painting over previously painted surface. The above labou make an output double the area i.e. the same labour can do the painting of one furlong. Hence rate for % sft. = 1.30 or Rs. 0.1 sq.m.

772-

Scrapping old painted surface including disposal of all scraped material to a distance of 30m. (100') as desired by Engine charge. 1 Beldar per day no. 100.00 Contractor's profit @ 10% Total

773-

Laying C.C. Road slab 10cm. (4") thick consisting of 1:2:4 cement, coarse sand & approved 4cm. (1.5") gauge stone ballast, prepared sub grade after its rectifications & bringing it to proper camber & including supply of all meterials, labour and T&P required for proper completion of work, finished to required templete as directed by Engineer-in-charge but excluding cost of required for rectification of the subgrade. Take a slab length of 33rft. & 4' in depth. qnty. of work involved 33x1.2x1/3=132 cft. Stone ballast 1.5" gauge Coarse sand Cement bag Empty bag Tar and other side forms etc. L.S. Laying of C.C. and putting forma and temping etc. Mistri Mason Mate per per per each per per per cft. % 50
119 60 25 15

cft. kg. bag

cft. cft. no. no. no. no. no. 170.00 160.00 110.00

day day day

1/6 2 1

Beldar Coolie Sub grade rectification etc. Mason Beldar Coolie Curing : Mate Coolie Diversion : Beldar Chowkidar Misce.: Supervision W/Agent Driver C.C. Mixer etc. Cleaner Beldar Coolie Water Charges 1.5% on Rs. 656.16 Contractor's profit @ 10% on 147.00

per per per per per per per per per per per per per per

day day day day day day day day day day day day day day

12 2 1/2 1 1 1 8 1 2 1/3 1/6 1/6 3 3

no. no. no. no. no. no. no. no. no. no. no. no. no. no.

100.00 100.00 160.00 100.00 100.00 110.00 100.00 100.00

100.00 100.00

Total 774As in item no 773 above but excluding supply of cement coarse sand & stone ballast (labour only) As in item no. 773 including forms work Contractor's profit @ 10% Total 775-

Blinding of water bound stone or kankar lime with local earth by spreading evently to an average depth of 1.5 cm (9/16") & the intersticks of the road metal. The trenches to be so dug for taking the earth that they form continuous side drain at boundary. Take a length of one furlong 1x660x12x1/24=330 Say 300cft. 300 Rate for earth work per cft. cft. Add 50% for small work Total

776-

Earth work in edging of the painted of C.C. miles in a width of 0.5m. (20") on either side according to patri template incl dressing ramming etc. The trenches to be so dug for taking the earth that they form a continuous side drain at road boundary. Take a length of one furlong : Earth work to be done (average) say 380 cft. Rate for earth work Add 50% for small work

per

cft.

380

cft. Total

777-

Joint and other small cracks filling in C.C. miles after racking out the joints & removing the old Tar and other material with su materials as directed by Engineer-in-charge (Labour only) Total Joints at every 33' joints to be filled would be 5280/33 = 160 no Add 25% for other cracks = 40 nos Total : 200 nos. say 200 joints would be attended to Mate Beldar Coolie Contractor's profit @ 10% Rs. 24.62

per per per

day day day

3/4 6 1

no. no. no.

110.00 100.00 100.00 Total

778-

Consolidation of kankar in patch repair from 1st June to 14 Nov. by hand rammer including opening out stacks, picking ou surface upto 8cm (3") in a rectangular form, making 5cm. (2") wide drain around the patch upto depth of 12cm. (4.5") incl carriage of kankar and water, but exclucding supply of kankar & including stacking the unserviceable materials & basi-chot day & blinding the same as directed by the Engineer-in-charge. Take a patch of 5'x5' fresh metal to be used 5x5x1/4'=6.3 cft. Mate Beldar Coolie Contractor's profit @ 10% Rs. 1.24 per per per day day day
1/30 4/15 1/10

no. no. no.

110.00 100.00 100.00 Total

779-

As in item no 778 above but from 15 nov. to 31 may. As in item no. 778 Add for water allwoance as in item 757 Total

780-

Patch repair of painted miles with tar & bitumen (labour only) including heating of paint upto required temperature, pouring it surface spreading th necessary qnty of grit & ramming hard with hand roller or rammer & also including cleaning with brush et existing surface after sacrifying it to the W.B. surface in rectangular shape & spreading the dismantled material on the patrie directed by the Engineer-in- charge. As per CE's circular patch work is carried out upto a stage when 0.5 ton tar is used per per mile (6/4 surface to be treated by 1.5 ton in year 3360/12=10,000 sft. Grit to be consumed 120x2.25-270 cft. Hence consumption per mile per month = 270x12=22.50 cft. Say 25 cft. Mate per day Beldar per day Coolie per day

1 4 4

no. no. no.

110.00 100.00 100.00 Total

781-

Cleaning of existing painted surface & laying premix 2cm. (3/4") thick over a tack coat with graded approved grit & bitumen (La Only) including heating the paint to required temp. mixing either in mixer or in hand drum including cartage of material mainten of side patries & watering them during operation for proper completion of work as directed by the Engineer-in-charge. Ta length of 0.5 furlong 330x12=3960 sft. Labour for cleaning : Mazdoor Coolie Tack coat heating & spreading:Beldar Premixing, screening grit : Beldar Heating the tar & mixing grit : Beldar Coolie Spreading the premix & making into camber Beldar Diversion & watering : Mazdoor Misc.: Mate W/Agent Tar, Bitumen and fireman Sundries cartage and other T&P etc.L.S. per per per per per per per per per per per day day day day day day day day day day day
6 6 4 1 5 3 15 2 2 1 2

no. no. no. no. no. no. no. no. no. no. no.

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 110.00 105.00 Total

782-

As in item 781 above but in patches labour required for the work when 25cft. of grit is concumed. 1 1/4 Mate per day litre 4 Beldar (Hot) per day no. 4 Coolie per day no. Sundries L.S.

110.00 100.00 100.00 Total

783-

Cleaning the premix surface & laying seal coat with approved 6mm (1/4") graded grit & bitumen (labour only) including heatin paint to required temperature including cartage of material & including maintenance of side patries & watering them d operation as directed by Engineer-in-charge. Take a length of 0.5 furlong. Area covered 330x12=3960 sft. Labour for cleaning : Mazdoor Coolie Heating and spreading : Beldar Screening graded grit 1/4" : Beldar Spreading grit : Beldar Misc.: Mate Work Agent Tar, Boilerman and fireman Sundries cartage and other T&P etc.L.S. per per per per per per per per day day day day day day day day
2 2 4 1 2 1 1/4 1

no. no. no. no. no. no. no. no.

100.00 100.00 100.00 100.00 100.00 110.00

Total 784As in item 781 above but on water bound surface. Take a length of 1/2 furlong area 330x12=3960 sft.

Labour for cleaning : Mazdoor Coolie Tack coat Heating and spreading:Beldar Premixing, Screening grit, Beldar Heating and Tar mixing grit : Beldar Coolie Spreading the premix & making into camber Beldar Diversion and watering : Beldar Misc.: Mate Work Agent Tar, Boilerman and fireman etc. Sundries cartage and T&P etc.L.S.

per per per per per per per per per per per

day day day day day day day day day day day

10 10 6 1 5 3 15 2 3 1 2

no. no. no. no. no. no. no. no. no. no. no.

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 110.00

Total 785-

Brick soling with straight over burnt bricks lade flat & dry (labour only) including preparation of sub grade to prescribed ca filling joints with local earth spreading blinding coat, 1cm. (3/8") depth of local earth over the entire surface & including labo T&P etc. required for proper completion of the work. 100sft. preparation of sub grade. Mazdoor Laying bricks : Mason Mazdoor Spreading earth : Mazdoor Contractor's profit @ 10% Rs. 6.00 per per per per day day day day
1 1/6 1/2 1/2

no. no. no. no.

100.00 160.00 100.00 100.00 Total

786-

As in item 785 above but with brick laid on edge. Same as in item 785 Add extra mason for laying per Contractor's profit @ 10% Rs. 1.25

day

1/5

no.

160.00 Total

CHAPTER - 21
ANNUAL REPAIRS
Sl. No. 1 791Item of Work Unit Qnty Rate

3 4 2 5.00 Maintenance of terraced roofs filling up cracks before rains with approved bituminous filler & stopping leaks during rains incl supply of all materials, labour & T&P etc. required for proper completion of the work. Take an area of %o sft. Cleaning : Coolie Bitumen filling and other minor repairs Contractor's profit @ 10% Rs. 4.50 per day
1

no.

100.00

Total 792-

Maintenance of Allahabad or Frizoni tiled roofs including replacing of broken tiles not exceeding 2% and adjusting misplaced before rains and stopping leaks during rains including supply of all materials, labour and T&P etc. required for proper complet work. Take an area of 100sft. Replacing broken tiles flat 2% of 105 nos. = 2.10 Flat round = 2.10 5 Total = 4.20 per %o no. 1/20 Mason per day no. 160.00 1/20 Coolie per day no. 100.00 Mortar and other sundries L.S. Contractor's profit @ 10% Rs. 1.66 Total

793-

Maintenance of roofs of large size country tiles including replacing broken tiles not exceeding 5% and adjusting misplaced before rains and stopping leaks during rains including supply of all materials, labour and T&P etc. required for proper complet the work. Take an area of 100 sft. Replacing broken tiles flat 5% of 110 nos. = 5.50 Segmental = 5.50 11 Total = 11.00 per %o no. 1/30 Mason per day no. 160.00 1/30 Coolie per day no. 100.00 Mortar and other sundries L.S. Contractor's profit @ 10% Rs. 1.09 Total As in item 793 above but for roofs of small size country tiles. Same as in item 793 Add 25% above for small size Total

794-

795-

Relaying large size country tiles roofs with old and new materials including taking down tiles and bamboo, framing, rene framing with upto 5% new materials & relaying tiles with upto 25% new tiles including supply of new Bamboos tiles, all mat labour and T&P etc. required for proper completion of the work. Take an area of 100sft. Dismantling as per item no. 699 Materials:Flat tiles 25% of 110no. Segmental 25% Bamboos 5% of 40nos. Chatai 5% of 120 sft. Relaying: Thatcher Coolie Contractor's profit @ 10% Rs. 23.61

= = Total =

27 28 55 per per per

no. no. per each %o day day

%o sft.

55 2 6 1.50 2

no. no. Sqft no. no.

100.00 100.00 Total

796-

Taking down and relaying single Allahabad or frizoni tiled roofs after repairs to raftes & batters including mortar, labour & T&P required for proper completion of the work (cost of any new wood work, iron work on new tiles required will be paid separately) Dismantling-50% of item (699) as wood work is not to be dismantled. 1/4 Relaying Mason per day no. 160.00 1/2 Beldar per day no. 100.00 1 Coolie per day no. 100.00 1/8 Carpenter per day no. 160.00 Sundries mortar nails etc. Contractor's profit @ 10% Rs. 10.70 Total As in item no. 796 above but for double tiled roof. Dismantling-50% of item (700) as wood work is not to be dismantled. Relaying per day Beldar per day Coolie per day Carpenter per day Sundries mortar nails etc. Contractor's profit @ 10% Rs. 20.12

797-

1 1 1 1/4

no. no. no. no.

100.00 100.00 160.00

Total 798-

Filling eaves and ridges of Allahabad tiled roof with cememnt mortar consisting of one part of cement and 6 parts of fine sa 1.25 F.M. including supply of all materials, labour and T&P etc. required for proper completion of the work. Mason Coolie Carpenter Mortar Sundries L.S. Contractor's profit @ 10% Rs. 0.37 per per per day day day
1/40 1/40 1/4

no. no. no.

160.00 100.00 160.00

Total 799-

Filling eaves and ridges of country tiled roof with mud including mud, labour and T&P etc. required for proper completion o work. 1/40 Beldar per day no. 100.00 1/4 Carpenter per day no. 160.00 Mud mortar and Sundries L.S. Contractor's profit @ 10% Rs. 0.11 Total

800-

Repair to plaster or pointing in patches including removal of old plaster, racking out joints to 1cm(3/8") depth. Watering the and then replastering or repointing with the same mortar in proportion of mortar as the existing surface, including supply materials, labour and T&P etc. required for proper completion of the work. Add to the respective item in chapter 13 for plaster and pointing. Add 25% more to the existing respective rate being work in patches.

801-

Repair to 2.5cm.(1") cement concrete flooring patches including digging upto 10cm (4") depth renewing 8cm. (3") base con consisting of the part cement, 4 parts approved fine sand of 1.25 F.M. and 8 parts of 1.5" gauge brick ballast as in C.C. consisting of 1 part cement 2 parts approved coarse sand & 4 parts approved stone grit including supply of all materials, la and T&P etc. required for proper completion of the work. Add to item 601 in chapter 14 for flooring. Add 25% more to the rate of the item 25%.

802-

Cleaning silt from road culvert upto 6 metre (20') span & in length of 18 metre (60') & throwing the earth silt to the place within boundary including dressing leveling & ramming the same as directed by the Engineer-in-charge. Take a culvert of 10' span in width & the depth of silt 1ft. average of each work 60x10x1=600cft. 1/8 Labour for %ocft. Mistri per day no. 170.00 8 Beldar per day no. 100.00 10 Coolie per day no. 100.00

Dressing and Ramming L.S. T&P and other Sundries L.S. Contractor's profit @ 10% Rs. 54.81 Total 803-

Cleaning of well and throwing the silt to the place as directed by Engineer-in-charge including dressing leveling and rammin same. Take a well of 3' internal dia. Sinker Beldar Coolie T&P and Sundries L.S. Contractor's profit @ 10% Rs. 12.00 per per per day day day
1/2 1 2

no. no. no.

Well sinker 100.00 100.00

Total 804Sweeping coimney and throwing the refuse etc. beyond a distance of 60metre (200ft.) as directed by Engineer-in-charge . Coolie Sundries L.S. Contractor's profit @ 10% Rs. 1.08 per day
1/3

no.

100.00

Total 805-

Blinding panes of glass including supply of all materials, labour and T&P etc. required for proper completion of the work. Tak area of 100 sft. Rate of ordinary paint 1 coat (Based as S.I. 100 per sft. sft. 641) Add 25% being smaller work Total

806-

Renewing panes of glass including supply of glass 64kg (21oz) with putty & brad including supply of all materials labour & T&P required for proper completion of the work. 1 21oz. Ground glass per sft. sft. Breakage 5% Fixing L.S. Contractor's profit @ 10% Rs. 1.22 Total

807-

Cleaning doors and windows with ordinary oil and water including supply of all materials, labour and T&P etc. required for p completion of work. 1/4 Beldar per day no. 100.00 1/8 Mustared oil per day sees Sundries T&P L.S. Contractor's profit @ 10% Rs. 1.41 Total Taking down punkhas (Labour only) Beldar Sundries T&P L.S. Contractor's profit @ 10% Rs. 0.67

808-

per

day

1/5

no.

100.00

Total 809Hanging punkha (Labour only) Beldar Sundries T&P L.S. Contractor's profit @ 10% Rs. 1.10

per

day

1/3

no.

100.00

Total 810Easing doors and windows Carpenter Sundries T&P L.S. Contractor's profit @ 10% Rs. 0.75

per

day

1/9

no.

160.00

Total

811-

Renewing door cleats including supply of all materials labour and T&P etc. required for proper completion of the work. Iron Hings with Screws Cleat with labour etc. L.S. Contractor's profit @ 10% Rs. 0.57 each
1

no.

Total 812-

Fixing panes of glass with and including putty and brads and including supply of all materials, labour and T&P etc. require proper completion of the work. Glazer can fix 30 glasses of 1'x1'. Hence for 1sft.1/30 Glazer is required. 1/30 Glazer per day no. 120.00 Sundries , putty and brad etc. L.S. Contractor's profit @ 10% Rs. 0.28 Total

813-

As in item no. 812 above but with wooden beading. Carpenter can fix 25 Glasses of 1'x1'. Hence for 1sft. 1/25 carpen required. 1/25 Carpenter per day no. 160.00 Sundries, Beading and Screws L.S. Contractor's profit @ 10% Rs. 0.62 Total

814-

Cleaning panes of glass with sorit and or caustic soda including supply of all materials labour and T&P etc. required for p completion of the work. Glazer can clean 60 glasses of 1'x1'. Hence for 1sft.1/60 Glazer is required. 1/60 Glazer per day no. 120.00 Spirit, Caustic soda etc. Contractor's profit @ 10% Rs. 0.10 Total

815-

Labour for fixing door bolts on hinges or tower bolts or hasp and stopels or handles etc. to doors and windows. Carpenter c 24 such type or doors or windows fiting in a day. Hence for one fiting 1/24 carpenter is required. Carpenter Contractor's profit @ 10% per day
1/24

no.

160.00 Total

816-

Opening and refixing 10cm (4") rain water down pipes after cleaning including supply of all materials, labour and T&P etc. req for proper completion of the work. 1/8 Take a length of 6 rft. Carpenter per day no. 160.00 1/8 Coolie per day no. 100.00 Sundries, nails etc. L.S. Contractor's profit @ 10% Rs. 1.42 Total

817-

Painting letters upto 25cm. (1") size including supply of all materials labour and T&P etc. required for proper completion o work. One painter can write 250 letter in a day, hence cost per letter comes. 250 Brush, Paint, Sundries etc. per day no. 140.00 Contractor's profit @ 10% Total As in item 817 above but size above 2.5 cm. (1") but upto 8cm. (3"), one painter can write 125 letters in a day hence cost per comes at Rs. 5.00 per day. Brush, Paint, Sundries etc. Contractor's profit @ 10% Total As in item 817 above but size above 8 cm. (3") but upto 15cm. (6"), one painter can write 100 letters in a day hence cost per comes at Rs. 5.00 per day.

818-

819-

Brush, Paint, Sundries etc. Contractor's profit @ 10% Total 820-

Repainting letters upto 2.5cm. (1") size including supply of all materials labour and T&P etc. required for proper completion o work. One painter will re-write 500 letter in a day, hence cost per letter comes at Rs. 5.00 per day. Brush, Paint, Sundries etc. Contractor's profit @ 10% Total

821-

As in item 820 above but size above 2.5 cm. (1") but upto 8cm. (3"), one painter will re-write 250 letters in a day hence cos letter comes at Rs. 5.00 per day. Brush, Paint, Sundries etc. Contractor's profit @ 10% Total

822-

As in item 820 above but size above 8 cm. (3") but upto 15cm. (6"), one painter will re-write 150 letters in a day hence cos letter comes at Rs. 5.00 per day. Brush, Paint, Sundries etc. Contractor's profit @ 10% Total

823-

Varnishing or polishing furniture with high grade varnish or polish after sand papering, including supply of all materials labou T&P etc. required for proper completion of the work. Take different type of furniture in working out the average rate. Name of furniture Table Chair Stool Towel rack Pillar (Bed) Tea Table Wash hand Basin Total Add 25 per% for smaller area Total

824-

Repainting road direction posts (including) lettering with super varnish or valspar or enamel paint, including supply of all mat labour and T&P etc. required for proper completion of the work. Post to be painted in alternate stips of 20 cm. (9") with black and white paint. Painting angle 3"x3"x3/8" in a height 9ft. Area of paint 11/12x1x9 Direction plates 2x2x1/2x5/2 Total Add 10% extra 15 say 15 sft. per % sft. sft. 25 Re-painting letters up to 3" each no. Total Contractor's profit @ 10% Total

825-

Repainting of road caution Boards or village name plates, including lettering with super varnish or valspar or enamel pa including supply of all materials labour and T&P etc. required for proper completion of the work. Post to be painted in alternate stips of 20 cm. (9") with black and white paint. Painting angle 3"x3"x3/8" in a height 9ft. 11/12x1x9 Traingle portion 2x1/2x15/12x15/12 Ractangular Plate 2x1x2x15/12x18/12

Total Add 10% extra Total 826As in item 825 above but when plates are enamelled Area of paint would be Add 10% extra Total Contractor's profit @ 10% Total 827-

Repainting and relettering of furlong stones of P.W.D. standard design with approved enamel paint of superior quality, incl supply of all materials labour and T&P etc. required for proper completion of the work. Area of painting of a standard Furlong stone 5/3x1 Add 10% Total 2 Say 2 sft. per % sft. sft. 1 Relettering letters up to 6" each no. Total

828-

Repainting and relettering of milestones of P.W.D. standard design with approved enamel paint of superior quality, including s of all materials labour and T&P etc. required for proper completion of the work. Repainting 2x1.3/4"x1/3" 1x2x31/3 Total 50 Relettering (average) each no. Total

829-

Repainting and relettering number plates on ends of parapets of culverts in letters from 2.5cm. To 8cm. (1" to 3") with s varnish or valspar, or enamel paint, including supply of all materials labour and T&P etc. required for proper completion of the 3 Area of painting 4x1.5x0.5 per % sft. sft. 12 Relettering letters up to 3" each no. Total As in item 827 above but for furlong stones of I.R.C., standard design as prescribed for national highway. 3 Painting (9"+4")2x1.3" = 2.7 per % sft. sft. 6 Relettering (average) each no. Total

830-

831-

As in item 828 above but for large size miles stones of I.R.C., standard design as specified for every fifth mile stone of na highway. Repainting 2x4x3=24 0.5x4x2= 4 Relettering (average) Contractor's profit @ 10% per % each sft.
28 60

sft. no. Total

CHAPTER-1

exclusive of Contractor's profits 5% Contractor's Profit may be given while taking the ect supplier. The rates include Octori, Royalty and sales tax etc. and cartage up to 8

c) Bricks (III class d) Bricks (sundried)

a) 5.00 cm gauge

a) upto 6 mm. dia. b) above 6 mm. and upto 13 mm. dia, c) above 13 mm. and upto 25 mm. dia Bottle nuts 13mm.to 22 mm.dia.15cm.long

a) 2.5 cm. upto 4 cm. dia b) above 4 cm. and upto 8 cm. dia a) 8 cm. (Mean) dia. c) 12.5 cm. d) 15.00 cm. e) 20.00 cm.

Cusstic soda Cotton (string) a) Distemper (oil) in paste of best quality b) Dry Distemper ordinary of best quality Glass ordinary

in standard slab and rolls sizes.) i) Fibre-glass (density 24 kg/m2) of 25 mm. thickness for ceiling ii) - do iii)- do 40 mm. 50 mm.

iv)- do v)- do

65 mm. 75 mm.

vi) Fibre-glass (density 32 kg/m2) of 25mm. thickness for walls vii)- do viii)-do ix)- do x)- do (b) Thermocole insulation 40 mm. 50 mm. 65 mm. 75 mm.

a) Lead white best qualiry (safeda) b) Lead red powder (sindoor) a) b) c) d) e) f) M S Flat angles Tand like wise.. M.S. Rounds up to 12 mm dia M.S. Romnds above 12 mm. dia R. S. Joits G. I. Barbed wire Sheet Galvanized plain 20 B. W. G

g) Sheet Galvanized Corrugated 24 B. W. G. plain h) Sheet black iron plain i) upto 8 mm. dia. i) upto 8 mm. dia. ii) above 8 mm. and upto 14 mm iii) above 13 mm. and upto 50 mm j) Galvanized iron wire gauge k) Expanded metal 2.00 cm. mesh 1.6/17 gauge Marble chips 3 mm. size. Marble chips 3mm. size.

Marble dust Masonite sheet 3 mm. thick Nails (country) Nails (wire) a) Oil (linseed double boiled) b) Oil (Turpentine) Paints (of superior quality ) a) Paint (Anti corrosive Bituminous). b) Paint Black Japan c) Superior ready mixed, paints for woodor steel (All colours) d) Ordinary quality ready mixed paint e) Paint Ready mixed (Enamel) for floors. f) Dry colours for cement floors. i) Dark green oxide ii) Deep black oxide iii)Blue oxide iv)Chocolate exide g) i) Red oxide primer surfacer for steel ii) Red lead paint ready mixed for roofs. h) Paint enamel (synthetic) i) Paint (aluminium) j) i) Paint primer for wood ii) Paint primer for metal k) Road marking paint (spirit base) l) i) Cement primer ii) Water proof cement paint m) Varnishes i) Clear synthetic.

iii) Ordinary Water proofing compound Polish (Mansion or wax) a) Pipe (A.C. Rain water) 8 cm.internal dia. of 6' length each b) c) do do 10 cm dia 15 cm dia

a) Pipe (A. C. Bend and shoes) 8 cm. dia. Plain b) c) do do 10 cm. dia 15 cm. dia

d) Pipe(A. C. Bend with access door)8 cm. dia e) f) do do 10 cm. dia 15 cm. dia

a) SheetsfAsbestos corrugated)grey 6 mm. thick b) do (Asbestos plain) grey c) do(A. C. Ridges) d) (Gutters) do

a) Pipe Rain water (Cast iron) 5 cm. dia. b) do 10 cm. dia a) Pipe Rain water(C. I. Rose) 5 cm. dia. b) do 10 cm. dia. c) Pipe Rain water(C. I. Head) 5 cm. dia. d) do do 10 cm. dia. e) Pipe Rain water (C. I. Shoes) 5 cm. dia. f) do do 10 cm. dia. g) Pipe Rain water(C. I. Bend) 5 cm^ dia. h) do do ' 10 cm. dia a) Rope (Moonj) b) do (Hemp) c) do (Cotton) d) do (G. I. Wire) 7 ply 2.5 cm. dia.

Sheet(celotex or equivalent) 13 mm. thick

a) Stone (Mirzapur) undressed b) Stone (Mirzapur) upto 5 cm. thick flag .. a) Washer (limpet) b) Washer (Bitumen) c) Washer (G. 1.) Wood preservative a) Wood Chaukhat sections (CP Teak) b) Wood Chaukhat sections (Shisham) c) Wood Chaukhat sections (Indian sal) d) Wood Chaukhat sections (Deodar) e) Wood Chaukhat sections (Kail) f) Wood Chaukhat sections (Country) g) Wood Chaukhat sections (Chir) a) Wood Planks (C.P.Teak)

b) Wood Planks (Shisham) c) Wood Planks (Indian-sal) d) Wood Planks (Deodar) e) Wood Planks (Kail) f) Wood Planks (Country) g) Wood Planks (Chir wood)

CHAPTER-2
Rate 4

Well sinker

Mote or charsa including two bullocks, one driver and one puller Sawyer per pair

CHAPTER-3
Rate

4.00 d etc. including loading and unloading but excluding stacking on Pucca Roads.

2.91 0.56 0.43 0.31 0.21

0.17 0.16

e above rates as per U.P. Parivahan Ayukta(Tech) U.P. letter no. 7329 TR dt. Jan 27 Reduce the above rates by 15%

1.66 1.65 0.32 0.35 0.24 0.25 0.18 0.20 0.12 0.15 0.10 0.10 0.09 0.09

Asphalt,Mobile oil or other such material. 26Mexphalt drums. The average weight carted shall be 5 Tons per 7 Tonner Truck per 2.33 1.65 0.45 0.35 0.34 0.25 0.25 0.20 0.17 0.15 0.13 0.10 0.13 0.09

0.73

0.14

0.11

0.08

0.05

0.04

0.04

2.33

0.45

0.34

0.25

0.17

0.13

CHAPTER-4 Earth Work and Excavation


Cost

6.00 am clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m. (100 fts) & avated earth into the trenches or into the space between the building and the sides of emoval and disposal of surplus earth as directed by the Engineer-in-charge upto a n trenches. 21.25 600.00 1190.00 21.25 23.00 185.55 2041.05 72.10

soil mixed with moorum/shingle kankar requiring the use of special T & P such as 21.25 800.00 700.00 28.33 46.10 159.57 1755.25 62.00

nary soil, excavation to be in the form of regular pits not exceeding metre (20") in 20 cm. (8") layers, including ramming & dressing the surface to required levels and and 30 m. (100") lead. The earth from cutting to be used in making embankment or to (100 ft.) distance as directed by the Engineer-in-charge. 11.00 200.00 300.00 21.25 12.50 12.30 600.00 115.71 1272.76 45.00

0 m. (100') lead or part of 30 m. (100 ft.) or for every additional 1.5 m. (5 ft.) lift or 200.00

6.10 163.96 1803.52 63.70 sary quantity of sand from a distance not exceeding 8 km. (5 miles) from the site of te to include cost of all materials. labour and T & P etc. required for proper 0.00 300.00 500.00

97.50 15.40 97.66 1074.26 37.90

on in Skeleton analysis based on hill soil mixed with gravel and boulder. Schedule 21.25 1000.00 700.00 42.50 15.40 177.92 1957.07 69.10 cotton soil in Bundelkhand area requiring use of special tools and plants such as pick

21.25 800.00 600.00 28.33 15.40 146.50 1611.48 56.90 0.00 0.00

er

ach item but to limited quantities of work excavated in these difficult conditions.

egetations grass,bush,wood trees and saplings of girth upto 30 cm. measured at a oval of rubbish upto a distance of 50 metres out side the periphery of area cleared. PWD analysis of 1S55 schedule). 100.00 50.00 15.40 16.54 181.94 6.40

CHAPTER-5 Concrete
Cost

6.00 st and kankar lime, in foundations and under floors, including supply of all materials, letion of the work. 1982.00 3662.67 21.25 53.33 300.00 300.00 65.00 21.25 46.10 806.93 5644.67 806.93 6451.60 96.77 654.84 7203.21 2544.17

t, white lime and surkhi in foundations and under floors in the proportions of 100 : 16 : and T&P etc. required for proper completion of the work (unslacked lime brought to

1982.00 8250.00 297.30 21.25 53.33 300.00 300.00 65.00 21.25 46.10 806.93 10529.30 806.93 11336.23 170.04 1150.63 12656.90 4470.42

st, Fine local sand of 1.25 Fineness modulous and cement in proportion of 12:6:1 in y of all materials, labour and T & P etc. required for proper completion of the work.

1982.00 611.52

1440.00 4033.52 100.838 4134.36 21.25 53.33 300.00 300.00 130.00 21.25

124.00 949.83 4134.36 949.83 5084.19 76.26

516.05 5676.50 2004.94

f 10:5:1 1982.00 637.00 1800.00 4419.00 110.48 4529.48 949.83 4529.48 949.83 5479.31 82.19

556.15 6117.66 2160.76

of 8:4:1. 1982.00 637.00 2092.50 4711.50 117.79 4829.29 949.83 4829.29 949.83 5779.12 86.69

586.58 6452.40 2279.00

Rate as per item no. 271. 129.67 per%cft Extra labour for lift and pinning.

100.00 400.00 38.40 538.40 7203.21 538.40 8.076 53.84 7803.52 2756.2 with 2.5 cm. (1") gauge including raking a shallow drain on the edge if desired by the

2123.00 1331.88

white lime and surkhi in the proportion of 100:18:36 in roof terracing, including supply for proper completion of the work (Unslacked lime brought to powder to be used).

1982.00 1664.85 269.20 297.30 4213.35 21.25 53.33 400.00 600.00 65.00 21.25 69.10 1229.93 4213.35 1229.93 5443.28 81.65 5524.93 552.49 6077.42 2146.50

proved stone ballast, approved coarse sand and cement in the proportion of 4 : 2 : 1 &P etc. required for proper completion of the work.

3881.70 859.95

4252.50 8994.15 127.81 9121.96 17.00 80.00 400.00 400.00 260.00 17.00 322.40 1496.40 9121.96 1496.40 10618.36 159.28

1077.76 11855.41 4187.30

f 6 : 3 : 1. 3967.96 888.62 2857.50

on of 8 : 4 : 1. 4054.22 917.28 2205.00

oundry posts, shelves and similar small work with cement, approved coarse sand and the proportion of 1:2:4, excluding supply of reinforcement and its binding but including W.G.G.I. binding wire, and including the cost of binding wire, moulds and all other proper completion of the work.

3409.20 680.00

and and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:2:4 in lintels reinforcement and its binding but including its fixing and binding the same with 24 ary centering and shuttering etc. and also including supply of all materials, labour and he work. Binding wire cost being included in the item.

3409.20 340.00

as per S.I. 283

ms, i.e. having spans above 6 m. (20')

i.e. having spans above 6 m. (20').

undation and footing with 4 cm. (1.5") gauge approved stone ballast.

and slab roofs and R. C. C. columns.

n 1 : 1and 1/2 : 3.

189.40 47.78 1046.25

les are used. Deduct from item 282 to 238.64 61.15 297.00

auge brick ballast in schedule item no.272 to 276, instead of 4 cm. (1.5") gauge brick #VALUE! 0.00

) gauge stone ballast in schedule item no. 279 to 281 instead of 4 cm. (1 and 1/2f) 0.00 0.00

CHAPTER - 6 BRICK WORK


Cost

6.00 dation and plinth including supply of all materials, labour and T & P etc. required for 3510.00 3329.70

28.33 320.00 200.00 200.00 65.00

wo surkhi mortar in foundation and plinth including supply of all materials, labour and he work. 3510.00 218.02 6050.00

hree surkhi mortar in foundation and plinth including supply of all materials, labour and he work. 3510.00 237.84 4400.00

e sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, pletion of the work. 3510.00

343.98 843.75

d fine sand of 1.25 F.M. mortar. 3510.00 343.98 1012.50

fine sand of 1.25 F.M. mortar. 3510.00 343.98 #VALUE!

fine sand of 1.25 F.M. mortar. 3510.00 343.98 1687.50

coarse sand mortar. 3510.00 515.97 1687.50

tion and plinth including supply of all materials, labour and T & P etc. required for 3510.00 0.00

per-structure including necessary cutting and moulding of bricks as required and also f wall not to be less than 1 brick thick. Add for extra labour to above items.

160.00 100.00

k thick. Add for extra labour. 160.00 100.00

k(4") thick. Add for extra labour.

80.00 50.00

Add for extra labour.

80.00 100.00

s (301) to (310) (310) 0.00

ct from item (301) to (310). 0.00 0.00

ation and plinth, including supply of all materials, labour and T & P etc. required for 0.00 0.00 28.33 320.00 200.00 200.00 32.50

ttering and centering add to items (301 - 307). Extra labour, centering and shuttering 320.00 100.00 200.00

ncluding shuttering & centering add to item 301-307. Extra labour, centering and 320.00 100.00 250.00

h ordinary bricks, add to item 301-307. Extra cost of labour, centering and shuttering 400.00 100.00 300.00

with specially moulded bricks. Add to item 316. Extra labour required for workmanship 80.00 200.00

6 cm. (2.1/4") projection of first class brick in kankar lime including 12mm (") thick ing drip notch as required and including supply of all materials, labour and T & P etc.

270.00

649.29 3.40 560.00 200.00 10.83

d laster in 1:6 cement and fine sand of 1.25 F.M. Labour as per item no. 318 above.

0.00

63.70

nice in three courses with 6 cm. (21/4") projection in each course in kankar lime with gth of 100 rft.

0.00

0.00 1080.00 1997.82 8.50 1040.00 400.00 16.25

plaster and pointing in 1.6 cement and local sand mortar. 1080.00 0.00 522.00

ed for cornice, etc, including rubbed finish not exceeding 11.5 cm. (4.5") with (labour 0.00 640.00 300.00

ment mortar for doors and windows or enlarging existing opening or cutting out brick upports staging etc. cleaning site and stacking the dismantled materials at the place a distance of 60 metres (200ft.). Assuming size of opening 5ft. wide and 7 feet height holes for pins, fixing pins for proper safety of super structure and removing the came

100.00 100.00

ng them within 2 chain as directed by the Engineer-in-charge. 150.00 200.00 14.17

with first class brick laid in cement and approved coarse sand mortar 1:3 excluding ncluding its fixing in position and binding the same with 24 B.W.G.I. Binding wire and curing and also including cost of binding wire, supply of all materials labour and T&P k.

nd columns in 1:3 brick work in cement and approved coarse sand with 10mm. (3/8") oved coarse sand including supply and fixing of wire netting of required gauge where our and T&P etc. required for proper completion of the work.

0.00

0.00 42.50 25.00

0.00

e extra for brick work in circular pillar.

640.00 100.00

CHAPTER - 7
DAMP COARSING
Cost

6.00 ment and approved coarse sand 1:2 with and including water proofing materials as portion as specified by the manufacturers, including supply of all materials, labour and e work and including proper curing and shuttering as necessary. 119.44 585.00 0.00 8.50 40.00 25.00 25.00 16.25

and of cement concrete consisting of one part cement 1.5 parts approved coarse sand tone grit and including water proofing materials as ordered by the Engineer-in-charge urers. 284.10 517.50 0.00 10.63 240.00 150.00 16.25

CHAPTER - 8
Cost

6.00 ved stone fine dressed, as in door sills chaukhats etc. laid in mortar consisting for 1 of 1.25 F.M. including supply of all materials, labour and T&P etc. required for proper 0.00 16.00 4.72 2.08 2.08 3.33 3.13 0.51 1.35

ed stone slabs 4cm. (1.5") thick with plain moulding on one edge and fine dressed on laid in cement mortar consisting of one part cement and 6 parts approved fine sand , labour and T&P etc. required for proper completion of the work. Take stone rough 4571.78 450.00 191.10 1200.00 32.50 170.00 150.00

oved stone chajjas 4cm. (1.5") thick with but joint and with exposed surfaces fine one part cement and 6 parts approved fine sand of 1.25 F.M. including supply of all oper completion of the work.

0.00 0.00

20.00 0.00 20.00 75.00 16.25 0.00

oved stone rushades upto 4cm. (1.5") thick over doors and windows including two lain moulding in edges of brackets all exposed surfaces to be fine dressed and stone walls to a depth of 15cm. (6") (minimum) with cement mortar consisting of one part 1.25 F.M. including supply of all materials, labour and T&P etc. required for proper k over all width 2"-6"=2.5ft.

0.00

of Mirzapur or other approved stone 5cm. to 6cm. (2" to 2.5") thick fixed in cement t approved corase sand including supply of all materials, labour and T&P etc. required

0.00

80.00 50.00 8.33 13.33 12.50 #VALUE! #VALUE!

CHAPTER - 9
WOOD WORK
Cost

6.00 including simple mouldings, straight works as in Chaukhats, including supply of all oper completion of the work.

#VALUE! 10.63 80.00 25.00

0.00

0.00

0.00

0.00

0.00

to the above item 25% above per cu.m.

work as in roof trusses, pulins, ceiling joists, etc. including supply of all materials, letion of the work. Deduct from the item (401-406).

40.00 50.00

eak wood part panelled & part glazed door and window shutters including supply and ing fixing and adjustment of hinses, bolts, locks, handles, springs, and/or other fitting ing with two coats of Black Japan on all iron fittings if necessary & including fixing the 64 kg (21oz.) fittings with necessary screws to be supplied departmentally.

0.00 0.00 21.25 640.00 100.00 24.00

P. Teak wood beading and felt as directed by Engineer-in- charge instead of putty and d T&P etc. required for proper completion of the work.

#VALUE! 0.00 40.00 12.50

#VALUE!

#VALUE! 0.00

160.00

k.

0.00

k.

k.

k. 0.00

m Wood. 0.00

m Wood.

od.

od. 0.00

Sal Wood. 0.00

ood. 0.00

ood. 0.00

. 0.00

#VALUE! 0.00 21.25

480.00 100.00 30.00

wood.

0.00

0.00 0.00

160.00

0.00

. 0.00

od or Chir Wood. 0.00

Chir Wood. 0.00

Chir Wood. 0.00

ick. 0.00

. 0.00

eet panelled door and window shutters in 4cm. (1.5") thick Indian Sal Wood frame and stops and including fixing and adjustment of hinses, bolts, locks, handles, springs, and including painting with tow coats of Black Japan on all iron fittings if necessary. departmentally. 0.00

#VALUE! 21.25 480.00 100.00

l Wood door and window shutters with panels of heavy quality galvanized iron wire r 1/12 or 1/6 inch.) mesh or any other size with necessary beading, including supply ncluding fixing and adjustment of hinses, bolts, locks, handles, springs, and/or other ng two coats of Black Japan on all iron fittings if necessary. (Fitting with necessary

#VALUE! 0.00

od.

0.00

ood. 0.00

d. 0.00

Chir Wood. 0.00

of heavy quality iron wire gauge or expended metal of heavy quality over windows and d battens 8cm.x1cm. (3"x3/8") and including supply of necessary screws, all materials, letion of the work.

#VALUE! 0.00 40.00 25.00

Wood battens.

0.00

ns.

0.00

ens.

0.00

(1.5") thick of shisham wood including supply of necessary screws.

0.00 0.00 21.25

160.00 50.00

ood.

0.00

d.

0.00

d.

0.00

Chir Wood.

0.00

hick.

0.00

k Wood door and window shutters with 1cm. (3/8) thick ply wood rae pressed wood d stops and including fixing and adjustment of hinses, bolts, locks, handles, springs, y and including two coats of Black Japan on all iron fittings if necessary. Fitting with ally. #VALUE! 0.00 21.25 480.00 100.00

0.00

d.

0.00

and Shisham or Sal wood etc.). #VALUE!

hir or Country wood of Deodar). #VALUE!

ty (Kanju) Sitapur ply or other approved ply wood flush shuters 3cm. (11/4") thick.

6.67 2.38

oor and windows etc.

g. ( 18oz) of glass is used instead of 0.65 kg. (21oz) Deduct from items (409 to 448) 0.00

ype ( one side only) and commerical lipping approved ply wood flush shutters 4cm.

8.00 5.00

. Teak) Add extra to item 477.

f door.

af.

00m. (4") wide pelmet with 25mm. (1") diameter wooden curtain rod and brackets top ") thick including fixing with 25x3m. (1"x1/8") M.S. Flat 10cm. (4") long and plugs etc. equired.

0.00 0.00 20.00 16.00 12.50

#VALUE! 0.00

#VALUE! 0.00

#VALUE! 0.00

elmets] Take a pelment of 51/4 rft. with 4/1/4' front and 6" on each side wood required

#VALUE! 0.00 26.67 16.00 16.67

0.00 0.00

0.00 0.00

0.00

with brackets instead of wooden curtain rod, in pelmets in Sl. No. 481 and 482 above.

0.00 0.00

0.00 0.00

0.00 0.00

tain rails of heavy quality 6x9x15mm. With rollers, stop ends and brackets instead of 0.00 0.00

rtain rod with brackets, plugs etc. wherever required including painting, polishing or 0.00 0.00

0.00 0.00

um with brackets and wooden plugs etc. wherever necessary complete. Take 4.5"

#VALUE! 0.00

#VALUE! 0.00

#VALUE! 0.00

CHAPTER - 10
Cost

MILD STEEL & IRON WORK

6.00 cost of joists which will be supplied free at site but including all labour in handling and T&P. 5.00 16.00 50.00 100.00

) in weight and upto 7.5 metre (24ft.) in height.

ding 300kg. (6cwt.) in weight and upto 7.5 metre (24ft.) in height. 5.00 16.00 50.00 150.00

ond 7.5 metre (24ft.). 50.00 50.00

ions such as holding down bolts, hold fasts, tie, rods, gratings etc. (when not included m, including supply of steel, bolts nuts and wastage etc. and their fixing required for 170.00 105.00 100.00

s trusses ; built up gates, door frames, record racks, roof work, gates etc. wrought to g or welding where necessary and also including supply of steel, bolts nuts etc. and he work. 170.00 105.00 30.00 100.00

nforced concrete or reinforced brick work (when not included in and over all rates) uding bending for proper completion of the work and including supply of all steel and 170.00 150.00

0.00

cm. (9"x4"). 42.50 25.00

cm. (9"x4"). 85.00 50.00

1/2'. Area 3.75 sq. inch. = 24.20 sq.cu.m. 21.25 12.50

8.50 5.00

ing 10mm. (3/8") dia & thickness of plate not exceeding 6mm. (1/4"). Labour for 100 595.00 300.00 100.00

0mm. (3/8") dia but not exceeding 20mm. (3/4") dia. and thickness exceeding 6mm. our for 100 holes. 1020.00 600.00

pipe complete with rose, heads, bends with eye hole, shoes and gratings etc. fixed to Engineer-in-charge.

0.00 0.00 0.00 0.00

80.00 100.00

cluding drilling holes and fixing in required for proper completion of the work.

56.67 35.00

0.00

fixing it to post after stretchins it, including labour and T&P etc. required for proper of posts and wire. 85.00 75.00 50.00

materials, labour etc. complete. 0.00 0.00 200.00

. In case of electric welding, per rent and cost of machine will be more and output will estimated at 20%. So rate per rft. = Rs. 2.88 per rft. Say 2.30 per rft. or Rs. 7.50 per

s required to be done at roof height 10% extra is estimated to account for less output

arage door with from of 40x40x6mm. (1.5"x1.5"x1/4") angle iron, 3.15 mm. (1/8") thick rs including supply and fixing of necessary fittings, lock rail or 15" length of oxised iron plying a priming coat of red lead paint on all sides complete.

") for diagonal braces.

0.00

#VALUE!

0.00 0.00

0.00 0.00 0.00 0.00 0.00

nal bracings and central cross piece. .

0.00

0.00

#VALUE! 0.00 0.00

eel shutters with vertical channels 20x10x2mm (3/4"x3/8"x1/12) & braced with flat iron & bottom rails fo Tiron 40x40x6mm. (1.5"x1.5"x1/4") with 38 mm. dia. steel pulleys s, handles, complete including applying a priming coat of approved red lead paint.

2 CPWD analysis of rates).

330.00 2040.00 160.00 400.00 400.00

ding shutters with frame and daigonal braces of 40x40x6mm. (1.5"x1.5"x1/4") angle unctions & corners, hooks at top, 25mm. (1") dia. pullyes at bottom 40x40x6mm. p & bottom respectively including locking arrangement with handles etc. complete and aint.

2 CPWD analysis of rates).

0.00

0.00

220.00 1190.00 200.00 200.00 20.00

ved make of 80x125mm.(3"x3.5") guage cold rolled M.S. laths inter locked through out end by end locks and mounted on specially designed pipe shaft with brackets, side de locking with push and pull operations complete but excluding the cost of top cover

2 CPWD analysis of rates).

247.50

350.00 40.00

g grade no. 2 for rolling shutters. 2 CPWD analysis of rates). 0.00

ers. 2 CPWD analysis of rates). 0.00

utters. 62 CPWD analysis of rates). 0.00

nical devise, chain & cranks operation for operating rolling shutters

62 CPWD analysis of rates).

CHAPTER - 11
ROOF WORK
Cost

6.00 nd including supply of hips, ridges and eaves and includings laying them for roof work io of 1.2 or pure kankar lime and also including supplying and laying of Sal wooden surface or tiles.

n either side.

0.00 0.00

0.00 0.00

340.00 3840.00 2400.00 4800.00 1280.00 130.00

ad tiling roof. As above.

and including bambod frames containing not less than 4 (40) Bamboos per sq. m. position including supply of all materials, labour and T&P etc. required for proper s of coaltarring of bamboo frame and chatai. 0.00 0.00 0.00 0.00 0.00 0.00

200.00 0.00

y titles. 0.00 0.00 0.00

100.00 0.00 200.00

ng supply of first class bricks laid in cement mortar consisting of one part cement & supply of reinforcement and its bending but including its fixing in position and binding cluding centering and shuttering and necessary & also including cost of binding wire, uired for proper completion of the work.

0.00 0.00 0.00 28.33 120.00 75.00 100.00 32.50

0.00 0.00

80.00 100.00 100.00 42.50 25.00

roofing 24 BWG in position including supply of all materials, labour and T&P ect k and including wastage.

0.00 0.00 0.00 0.00 0.00 1920.00 1200.00

nd gutters for iron roofing fixed with jor U bolts 10mm. (3/8") dia. with G.I. Limper and of all materials, labour and T&P ect required for the proper completion of the work and

0.00 0.00 0.00 0.00 510.00 300.00

thick insulation layer of sand & clay over jackarch. Reinforced brick or reinforced 0.00

40.00 25.00

ype including supply of necessary qnty. of filler, brick tile, all materials , labour & T&P k. Take a length of 100 rft. Brick tiles for 109 rft. Length.

0.00 0.00 0.00

80.00 50.00 160.00 100.00

e a length of 100 rft.

0.00 0.00 0.00 0.00 320.00 100.00

240.00 150.00 640.00 200.00

ey corrugated asbestos sheet .

0.00 0.00 0.00 0.00 0.00 340.00 1600.00 800.00

and gutters of asdestos sheets. 0.00

170.00 160.00 150.00

aint @ 10lbs. Per % sft. or 1lbs. sq.m. including sweeping, cleaning the roof with ed temperature, pouring it on th surface, spreading of necessary quantity of approved ng supply of all materials, labour and T&P etc. required for proper completion of the 0.00 0.00 50.00

ny other equivelent approved materials at the junction of wall and roof or at any place luding necessary overlap, giving a coat of approved mastic paint below the tarfelt and &P etc. required for proper completion of the work. 0.00 0.00 0.00 50.00 150.00

other equivelent approved materials over roofs as per direction of the Engineer-incoat of approved mastic paint on the bottom and top of tarfelt, spreading of necessary ze bajri and including supply of all materials, labour and T&P etc. required for proper 0.00 0.00 0.00 100.00 200.00

wide aluminium sheet in walls with necessary cutting shaping of bricks if any, and ood 5" wide and match painted as per direction of the Engineer-in-charge including quired for proper completion of the work. 0.00

ide aluminium sheet & 8" wide tarfelt fixed with termastic in roof or floors joints with ngineer-in-charge including supply of all materials, labour and T&P etc. required for 0.00

CHAPTER - 12
CEILING
Cost

6.00 r wood planks, ceiling including supply of beading 2.5 cm.x4 cm. (1"x1.5") of Deodar ing joint if & when necessary but including cost of all materials, labour & T&P etc. ost of 300 sft. ceiling i.e. for a room 20"x15".

0.00 0.00 340.00 320.00 400.00

od. Rate as per item no. 551.

ood. Rate as per item no. 551. 0.00

including beadings 2.5cm.x4cm. (1"x1.5") of Deodar wood, screws. bolts and all ng cost of ceiling joints if any required for proper completion of the work. Take a room

0.00 0.00 0.00 0.00 320.00 200.00

beading.

0.00

or celotax with Deodar beading 20x15 = 300 sft. 0.00

0.00 0.00

d beading. Rate as per item 556 0.00

of paris (Gypsum) anhyadrous ceiling including providing Kail or Chir wood frames art cross battens of 1.5" x2" at 1'-3" apart & wooden strips 1"x1/4" with 3/8' gap in fixed to wooden frame and applying one coat of solignum paint or other approved g cost of all materials labour and tools and plants etc. required for proper completion

f rates 1955 Sl. No. 41).

0.00 480.00 300.00

0.00 #VALUE! 0.00 0.00

0.00 0.00 0.00 0.00 0.00

12mm. Thick ("). 0.00 0.00

CHAPTER - 13
Cost

PLASTER AND POINTING

6.00 k including supply of all materials, labour and T&P ect. Required for proper completion 40.00 25.00 13.00 240.00 150.00 32.50

g.

208.00 100.00 32.50

and surkhi on brick work including supply of all materials, labour T&P etc. required for 80.00 50.00 32.50

r consisting of one part cement & two parts of fine sand of 1.25 F.M. 40.00 25.00 13.00 240.00 150.00 32.50

g deduct form item 574.. 53.33 33.33

deduct form item 574 and 575. 53.33 33.33 13.00

f 1.25 F.M. mortar on brick work in proportion of 1:2, including supply of all materials, letion of the work. 40.00 25.00 13.00 212.80 133.00 43.33 0.00 0.00

terials to match the brick work colour including supply of all materials, labour and T&P k. 40.00 25.00 13.00 0.00 150.00 32.50 0.00 0.00

ick work minimum thickness not to be less than 3/8" (10mm.) thick including supply of proper completion of the work.

120.00 75.00 32.50 0.00

in proportion of 1:2 cement & fine sand of 1.25 F.M.

0.00 0.00

consisting one part cement and two parts of approved coarse sand.

0.00 0.00

e sand of 1.25 F.M. mortar in 1:3.

0.00 0.00

proved coarse sand in 1:3..

0.00 0.00

e sand of 1.25 F.M. mortar in 1:4.

0.00 0.00

e sand of 1.25 F.M. mortar in 1:5.

0.00 0.00

e sand of 1.25 F.M. mortar in 1:6.

0.00 0.00

cement, white lime, coarse sand and local sand in proportion of 1:1:2:5 complete

0.00 0.00 0.00 0.00

te lime, coarse sand and local sand in proportion of 1:1:2:4. 0.00 0.00 0.00 0.00

one in ceiling. 40.00

me and fine of 1.25 F.M. mortar in proportion of 1:1:6.

0.00 0.00 0.00

ply of all materials, labour and T&P etc. rquired for proper completion of the work. 80.00

50.00 50.00 13.00

marble finish, 1st coat 10mm. (3/8") thick with 1:4 cement and approved coarse sand, nd marble dust 1:1 and final coat 5mm. (3/16") thick with rich lime throughtly slaked & nded with white marble dust or gypsum alongwith required quantity of matelic oxide to of all materials, labour and T&P etc. rquired for proper completion of the work. 0.00 0.00

208.00 130.00 32.50

0.00 0.00 120.00 75.00 0.00 0.00 0.00 0.00 0.00

320.00 200.00 32.50 500.00

chips on walls, pillars and steps etc. rubbed & polished to granolithic finish, base coat ment and 2 parts approved coarse sand & top coat 5mm. (3/16") thick with one part of ed colour including supply of all materials, labour and T&P etc. rquired for proper

. (3/16") thick coat of white cement and marble chips. Labour and materials per % sft. oarse sand.

0.00 0.00

208.00 150.00 65.00 900.00

16") thick top coat coloured as desired by the Engineer-in- charge.

0.00

e coat 1.5cm. (9/16") thick in one cement & 4 approved coarse sand. The final coat to bbedashed on to the green plaster and pressed with large trowel, rubbing materials, letion of the work.

0.00 0.00 0.00 0.00 80.00 100.00 32.50

r. Add extra to plaster items. 0.00 80.00 50.00 16.25

er rough face of one brick walls. 20.00 12.50

irting in 1:2 consisting of one part yf cement and 2 parts of approved coarse sand laid coat of neat cement or cement and marble dust in ratio of 5:1 including supply of all oper completion of the work. 0.00 0.00 40.00 25.00 13.00 0.00 160.00 100.00 48.75

ell vertically and horizontally to display the surface as stone facing as directed by the etc. required for proper completion of the work. Add for extra labour to all items of 106.67 12.50

in cement mortar for plastering or in concrete work in the proportion recommended 0.00

CHAPTER - 14
FLOORING
Cost

6.00 floor with cement, approved coarse sand and 2cm. (3/4") graded approved stone laid coat of neat cement or cement and marble dust in 5:1 as specified over & including 8 ement, local sand and brick ballast 4 cm. (1.5") gauge in the proportion of 1:4:8 and ts of panels if any and giving them a uniform finish including supply of all materials, pletion of the work. 0.00 0.00 0.00 21.25 160.00 50.00 50.00 32.50

0.00

0.00 0.00

ncrete consisting of brick ballast, white lime and surkhi in ratio of 100.16:32

0.00

ete consisting of brick ballast & kankar lime.

thick instead of 2.5 cm. (1") thick and proportion of concrete 1:1.5:3 instead of 1:2:4 0.00 0.00 0.00 21.25 240.00 75.00 75.00

43.33

0.00

ncrete.

0.00 0.00

cm. (1.5") thick instead of 2.5 cm. (1") thick and without base concrete. 0.00 0.00 0.00 21.25 208.00 100.00 75.00 32.50

s are polished including supply of extra cement, chapra batti, carborndum stone, all d for proper completion of the work. Marble dust shall be added in the floating coat in essary but no extra amount will be paid for it. This includes final finish with french 0.00 800.00

oured polished floors are laid. 0.00

r othere approved stone flags, set in kankar lime over and including 1 cm. (8") lime k ballast & kankar lime stone flags to be of standard size with and including border -in-charge. Stone should be fine dressed on upper surface and all edges, joints not to stone dressed as specified, all other materials, labour & T&P etc. required for proper e concrete bas 3" thick. 0.00 0.00 0.00

21.25 640.00 400.00 16.25

laid in 1:4 cement and fine sand of 1.25 F.M. mortar with base concrete consisting of and 8 parts brick of ballast. As in item no. 608.

0.00 0.00 0.00

in white lime and surkhi 1:2 and base concrete consisting of brick ballast, in one white

upper surface and edges chiesel dressed and joints upto 6 mm. (1/4") thick. Deduct

0.00 0.00 640.00 400.00 16.25

mortar consisting one part of cement & six parts of fine sand of 1.25 F.M. & pointed cm. (3") brick ballast base concrete with kankar lime including supply of all materials, ion of the work.

0.00 0.00 0.00 0.00 0.00 6956060.00 160.00 100.00 100.00 32.50

ase concrete consisting of brick ballast white lime and surkhi in ratio of 100:16:32 . As 0.00 0.00

ase concrete consisting of one part of cement four parts of fine sand of 1.25 F.M. and 0.00 0.00

and filled including preparation of base to proper slope and its ramming and including equired for proper completion of the work.

50.00 50.00

160.00 100.00

0.00 0.00

0.00 0.00 0.00 17.00 120.00 50.00 100.00 32.50

0.00 0.00

0.00 0.00

0.00 0.00 160.00 100.00

consisting of one part cement, two parts of approved coarse sand and 4 parts of 2 cm. g 6 mm. (1/4") thick surface coat with ordinary cement black, white or grey or mixed ned on 1.5 mm. (1/6") mesh screen in proportion of 1:2 as specified or directed by r machine and finally finished with french manson polish or other approved polish base, including supply of all materials, labour and T & P etc. required for proper 0.00 0.00 0.00 0.00 0.00 0.00 21.25 320.00 200.00 32.50 1500.00

ent is used in top 5 mm. (1/4") layer instead of ordinary cement. 0.00 0.00

loors are to be made. 0.00

0.00

concrete consisting of one part of cement 4 parts of local sand and 8 part of brick

ncrete consisting of brick ballast, white lime and surkhi in ratio of 100:16:32.

nsisting of 15 mm. (9/16") thick layer of one part cement, 2 part of approved coarse oat with ordinary cement, black or white or grey or mixed marble chips passing 3 mm. screen in proportion of 1:2 as specified or directed by Engineer-in-charge & polished rench mansion polish or other approved polish including supply of all materials, labour of the work.

e coat with cement and coarse. 0.00 0.00 0.00 0.00 0.00 0.00 28.33 120.00 75.00 32.50 1500.00

ent is used in top 5mm. (3/16") thick layer instead of ordinary cement.

0.00 0.00

dados are to be made. 0.00

0.00

zed in flooring or dado laid with 1:3 cement and approved coarse and mortar finished complete including supply of all materials, labour and T&P etc. required for proper

0.00 0.00 0.00 0.00 0.00 0.00 200.00

r equivalent quaintity of tiles with mosaic work in light shades are used in floors and . 0.00 0.00

auge in joints of floors & skirtings at the time of laying floors, flash with floor level,

of Skeletion analysis as per S.l. aluminium stirps 16" gauge 1" depth wt. - 10.88 lbs. nium sheet cut into streps=10.88lbs. 5.16kg. 0.00 160.00 100.00

ge 1.5' depth aluminium strip, weight = 16.25 lbs. Materials. Aluminium sheet cut into

7.75kg. 0.00

2' depth aluminium strips weight = 21.67 lbs. Materials. Aluminium sheet cut into

10.34 kg. 0.00 100.00

/8") thickness in joints of floors & skirtings at the time of laying floors, flash with floor

or glass strips 1/8" thick. 0.00

t. of glass strips 3.5mm. (1/8") thick. 0.00

glass strips 1/8" thick. 0.00

rn on Skeleton analysis based on S.l.no. cement concrete, floor, steps, landing etc. abour and T&P etc. complete. Take 100sft.Area. 53.33 33.33

sings (Skeleton analysis taken from 30x12x2.2mm., (1.5"x0.5"1/10" approx) fixed with 1/8") flat iron hold fasts 180 mm. (7") long placed at PWD kanpur office). 150 mm. (6") nuts, including supply of all materials, labour and T&P complete. Take 100ft. lenght

0.00

0.00 0.00 960.00 630.00

CHAPTER - 15
Cost

INTING AND DISTEMPERING

6.00 areas or new wood work with one coat or ready mixed priming painting & one coat of t of clear synthetic varnish including supply of all materials, labour and T&P etc. t to be used should conform to the I.S.I. no. 103-1950. Details of cost for an area of 0.00 210.00 150.00

ver priming coat. #VALUE! 252.00 180.00

after 1st coat. Details of cost for 650 sft. area. #VALUE! 210.00 150.00

eviously painted old wood or steel work. #VALUE! 303.33 216.67

ea with one coat of ready mixed paint priming one coat of approved paint (British ll materials, labour & T&P etc. required for proper completion of the work. Paint to be for area of 650 sft. priming coat. #VALUE! 140.00 100.00

#VALUE! 420.00 300.00

the first coat. #VALUE! 322.00 230.00

coat on previously painted old surface. #VALUE! 490.00 350.00

approved high grade enamel or superior synthetic clear varnish complete one coat pply of all materials, labour nad T&P etc. required for proper completion of the work. to I.S.I. no. 105/106/133-1950. #VALUE! 186.20 133.00

quent coat on previously treated surface. #VALUE! 140.00 100.00

n new work including supply of all materials, labour and T&P etc. Required for proper 0.00 17.50 12.50 0.00 52.50 37.50

ter the first coat. 0.00 28.00 20.00

n previously old distempered surface. 0.00 35.00 25.00

ng supply of all materials, labour and T&P etc. required for proper completion of the 0.00 33.33

first coat or on previously treated surface. 0.00 20.00

ervative on new wood work, including supply of all materials, labour and T&P etc. 0.00 28.00 20.00

ter first coat on previously treated surface. 0.00 28.00 20.00

il including supply of all materials, labour & T&P etc. required for proper completion of 0.00 105.00 75.00

er orr caustic soda, including supply of all matrials, labour and T&P etc. required for 0.00 33.33 33.33

ed ready made wax polish or approved french polish after, rubbing down with sand and T&P etc. required for proper completion of the work. 0.00 70.00 50.00

ood work already wax or french polished with approved realy made wax polish or materials, labour and T&P etc. required for proper completion of the work. 0.00 42.00 30.00

t of approved make and quality on new work with two coats to give an even shade, P etc. required for proper completion of the work. (Skeleton analysis based on 1962 0.00 42.00 30.00 48.75

f water proof cement paint after the first two coats to give an even shade. (Skeleton tes item no. 97(a). 0.00 10.50 7.50 16.25

no. 2817CB/131CB-6/67, dated 15.1.1968 for two coats and three coats are Rs. 16.50

cement paint of approved quality on previouslly old treated surface with this paint to ll materials, labour and T&P etc. required for the proper completion of the work. 962 PWD analysis of rates) Cost per %sft. 0.00 28.00 20.00 16.25

CHAPTER - 16
Cost 6.00 materials, labour and T&P etc. required for proper completion of the work. 0.00 9.33 6.67

HITE AND COLOUR WASHING

0.00 14.00 10.00

ashing 2 coats as per item 672.

ouring materials of buff, blue, grey or brown shade, including supply of all materials, letion of the work. 0.00

ite washing 2 coats 672. 0.00

ouring materials of pink, green or yellow shades.

copper or iron sulphate on coat.

rials, labour and T&P etc.required for proper completion of the work. 0.00 11.67 8.33

mper on new work, including supply of all materials, labour and T&P etc. required for 0.00 17.50 12.50 0.00 28.00 20.00

emper after the first coat. 0.00 23.33 16.67

CHAPTER - 17
Cost

EMOLITION & DISMANTLING

6.00 cking of dismantled materials as directed by the Engineer-in- charge within a distance 75.00

or cement mortar and including stacking of materials as directed by the Engineer-in200.00 200.00

100.00 100.00

reinforced brick work, including stacking of dismantled materials as directed by the etres (200 ft.) . 400.00 400.00 56.67

bargas roofs, including beams & roof concrete & including stacking of dismantled ge within a distance of 60 metres (200 ft.) 200.00 200.00

150.00 150.00

olithic floors, including base concrete & including stacking of dismantled materials as stance of 60 metres (200 ft.) 75.00 75.00

agged or tiled floor. 100.00 100.00

ing perlin and battens & including stacking of dismantled materials as directed by the etres (200 ft.) 17.00 100.00 100.00

17.00 200.00 150.00

patiotions including purlin battens and vertical supports and including stacking of ge within a distance of 60 metres (200 ft.) 85.00 50.00

work including stacking of dismantled materials as directed by the Engineer-in-charge 85.00 150.00

wkhats with hold fast and including stacking of materials as directed by the Engineer-in) 16.00 80.00 100.00

ng stacking of materials as directed by the Engineer-in-charge within a distance of 60 53.33 33.33

wkhats but excluding hold fast and including stacking of materials as directed by the etres (200 ft.) 53.33 20.00 100.00

al of refuse as directed by the Engineer-in-charge within a distance of 60 metres (200 100.00 8.13

lime mortar to a depth of 1cm. (3/8") including disposal of refuse as directed by the etres (200 ft.) 75.00

isposal of refuse as directed by the Engineer-in-charge within a distance of 60 metres 33.33

CHAPTER - 18
WELL WORK
Cost

6.00 nt, approved coarse sand & 2cm. (3/4") gauge well graded grit, including shuttering, but excluding cost of reinforecement & its bending but including its binding to required our and T&P etc. required for proper completion of the work. Binding wire (24B.W.G.I. cost.

work, wrought to required shape & joined as necessary including supply of steel and r completion of work as directed by Engineer-in-charge. 170.00 210.00 200.00

0.00

ing supply of steel and its cutting, bending and welding etc. & including cost of bottle s directed by Engineer-in-charge. 170.00 100.00 105.00

0.00

in ordinary soil below spring level, including supply, erection & working of all plants weight bailing & unloading of weight bailing & pumping out water with machinery or #VALUE! 0.00 400.00

(5'-10'). #VALUE! 0.00 500.00

-20'). #VALUE! 0.00 700.00

-30'). #VALUE! 0.00 1000.00

0'-40'). #VALUE! 0.00 1000.00

40'-50'). #VALUE! 110.00 0.00 400.00

the rates shall be calculated proportionatly to their areas.

ated above an increase as given below shall be allowed according to the nature of the

CHAPTER - 19
MISCELLANEOUS
Cost

6.00 x4.5") supplied & fixed in wall with & including cement and approved coarse sand making a hole for the same. #VALUE! 0.00 0.00 6.40 4.00

story window cords including their fixing to Teak wood plates 10cmx10cmx1cm cmx12cm (3"x3"x4.5") supplied and fixed in wall with & including cement & approved crews etc. and including making a hole for the same. 0.00 0.00 0.00 0.00 0.00 80.00

n cleats.

cluding fixing in position. 0.00

and windows cleat 10cmx7.5cmx5cm(4"x3"x2") with 5cm. (2") brass hignes including pply of all materials, labour & T&P etc. required for proper completion of the work. 0.00 0.00 53.33 0.00

.C. down pipes complete with rose head., bends and gratings & includings supply of ) fixed to walls, with & including supply of 15cm. (6") long 6mm(1/4") dia, nails & &P etc. required for proper completion of the work and also inclucing repair of plaster, . Details of 30' length. 0.00 0.00 27.50

120.00 100.00

0.00 0.00

0.00

0.00

k (8cmx8cmx2.5cm)(3"x3"x1") over blocks of C.P. Teak 8Cmx8cmx12cm(3"x3"x4.5") pplied and fixed in wall with & including cement & approved coarse sand mortar in the making a hole for the same. 0.00 0.00 0.00 13.33 8.33 0.00

pply of fire bricks and fire clay, labour and T&P etc. required for proper completion of

0.00 0.00 640.00 200.00 32.50

eak wood panelled partition complete with teak wood frames 10cmx8cm(4"x3") top luding supply of all brass screws, cleats, bolts, etc. all materials, labour and T&P etc. etails of cost for partitions of panels 6'-8' high and 5" wide 6x5=33.33 sft. materials.

0.00 560.00 150.00

21.25 280.00

(As per item of straight works in wood work).

0.00

ition with 5cmx1cm )2"x3/8") deodar or Shisham wood beading including erection & mes 10cmx8cm(4"x3") top bottoms and sides verticals at 1.5m(5') apart & including c. all materials, labour and T&P etc. required for proper completion of work.

0.00

0.00 212.80 160.00 150.00

straight work and wood work). 0.00

CHAPTER - 20
ROAD WORK
Cost

6.00 cluding opening out stacks, sorting kankar into three sizes repairing patch in existing ace, spreading kankar, making medhi to retain water and ramming and also including f water 200m. (1 furlong) supply & maintenance of barrier, caution posts, light at night mpletion of the work, kankar to be supplied to the contractor free at site.

ar required 2640x3/8 = 990cft. 200.00 100.00 200.00 200.00 400.00 600.00 800.00 105.00 1155.00 200.00

R/R including hire and fuel of the roller.

A) 0.00 0.00 200.00

k coat of brick ballast.

s. 50.00

oat of brick ballast.

k stone ballast.

s in excess including. 75.00

o 8cm. (3") thick, stone ballast. Consider a length of 220 rft. Materials required = 200.00 100.00 300.00 800.00 600.00 0.00 0.00 200.00 200.00

1 to 756 between 15 Nov. to 31 May. 75.00

and royalty as well as the cost of boring to fined kankar strata excluding cartage and

0.00 400.00 300.00

ameter and 1m (3'-4') high above ground level. 120.00 75.00

ed, with flags and jhandies as directed by th Engineer-in-charge. 110.00 900.00

hree coats with approved road marking paint (spirit base) as directed by the EngineerT&P etc. required for proper completion of the work. Take an area of 100 sft. lines. 0.00 700.00 500.00

laid flat and dry including preparation of subgrade to prescribed cambre and including spreading a blinding coat of 1cm. (3/8") depth of local earth of P.I. 5 to 7 or sand over tc. required for proper completion of the work. 0.00 0.00

dge. 0.00 0.00

cks laid dry, joints filled with local sand including preparation of base to proper slope (3/8") depth of local sand over the subgrade and including supply of all materials, letion of the work.

g dressing surface filling upto 8cm. (3") depth and making namunas at every 15cm. atri template with side slopes 1:2 etc. for taking the earth to be so dug that they form a a length of 1 furlong. 110.00 0.00 0.00 1200.00 0.00 0.00 200.00

rst class bricks 8cm. (3") wide and 12cm. (4.5") deep laid with mud mortar including ed template and in proper alignment and also including dressing & ramming the n-charge. Take a stip of 0.5 furlong 2x330=660 rft. 0.00 160.00 100.00 200.00 200.00

dings stacking of road materials.

ete after screening at road side including dressing of side berms as required, where pto 60 metres (200'). 20.00 g. 20.00 50.00

face (1st coat) excluding supply of paint & grit including maintenance of side parties per completion of the work as directed by Engineer-in-charge and excluding roller of fire-man & tar-boiler man. sft. 100.00 1000.00 800.00 0.00 500.00 200.00 110.00 0.00 0.00

r painting over previously painted surface. The above labour will make an output of he painting of 1 furlong. Hence rate for % sft. 3 00/2 = Rs. 1.50 or Rs.0.16 per metre.

d coat painting with bitumen covering on furlong.

painting with 400.00

er subsequent coats of painting over previously painted surface. The above labour will labour can do the painting of one furlong. Hence rate for % sft. = 1.30 or Rs. 0.14 per

osal of all scraped material to a distance of 30m. (100') as desired by Engineer-in100.00

sting of 1:2:4 cement, coarse sand & approved 4cm. (1.5") gauge stone ballast, over bringing it to proper camber & including supply of all meterials, labour and T&P etc. ed to required templete as directed by Engineer-in-charge but excluding cost of metal e a slab length of 33rft. & 4' in depth. qnty. of work involved 33x1.2x1/3=132 cft. 0.00 0.00 0.00 0.00 28.33 320.00 110.00

1200.00 200.00 80.00 100.00 100.00 110.00 800.00 100.00 0.00 0.00 0.00 0.00 300.00 300.00

of cement coarse sand & stone ballast (labour only)

e with local earth by spreading evently to an average depth of 1.5 cm (9/16") & filling hes to be so dug for taking the earth that they form continuous side drain at road x12x1/24=330 Say 300cft. 0.00

miles in a width of 0.5m. (20") on either side according to patri template including dug for taking the earth that they form a continuous side drain at road boundary.

0.00

es after racking out the joints & removing the old Tar and other material with suitable Labour only) Total Joints at every 33' joints to be filled would be 5280/33 = 160 nos.

82.50 600.00 100.00

1st June to 14 Nov. by hand rammer including opening out stacks, picking out old making 5cm. (2") wide drain around the patch upto depth of 12cm. (4.5") including g supply of kankar & including stacking the unserviceable materials & basi-chot next ngineer-in-charge. Take a patch of 5'x5' fresh metal to be used 5x5x1/4'=6.3 cft. 3.67 26.67 10.00

1 may.

en (labour only) including heating of paint upto required temperature, pouring it on th ramming hard with hand roller or rammer & also including cleaning with brush etc. the . surface in rectangular shape & spreading the dismantled material on the patries as CE's circular patch work is carried out upto a stage when 0.5 ton tar is used per year n year 3360/12=10,000 sft. Grit to be consumed 120x2.25-270 cft.

0x12=22.50 cft. Say 25 cft. 110.00 400.00 400.00

premix 2cm. (3/4") thick over a tack coat with graded approved grit & bitumen (Labour emp. mixing either in mixer or in hand drum including cartage of material maintenance ation for proper completion of work as directed by the Engineer-in-charge. Take a 600.00 600.00 400.00 100.00 500.00 300.00 1500.00 200.00 220.00 0.00 210.00

quired for the work when 25cft. of grit is concumed. 137.50 400.00 400.00

at with approved 6mm (1/4") graded grit & bitumen (labour only) including heating the tage of material & including maintenance of side patries & watering them during Take a length of 0.5 furlong. Area covered 330x12=3960 sft. 200.00 200.00 400.00 100.00 200.00 110.00 0.00 0.00

ace. 60 sft.

1000.00 1000.00 600.00 100.00 500.00 300.00 1500.00 200.00 330.00 0.00 0.00

ade flat & dry (labour only) including preparation of sub grade to prescribed camber ng coat, 1cm. (3/8") depth of local earth over the entire surface & including labour & e work. 100sft. preparation of sub grade. 100.00 26.67 50.00 50.00

ge. 32.00

CHAPTER - 21
ANNUAL REPAIRS
Cost

6.00 ks before rains with approved bituminous filler & stopping leaks during rains including uired for proper completion of the work. Take an area of %o sft. 100.00

fs including replacing of broken tiles not exceeding 2% and adjusting misplaced tiles ncluding supply of all materials, labour and T&P etc. required for proper completion of

0.00 8.00 5.00

les including replacing broken tiles not exceeding 5% and adjusting misplaced tiles ncluding supply of all materials, labour and T&P etc. required for proper completion of

0.00 5.33 3.33

ze country tiles.

old and new materials including taking down tiles and bamboo, framing, renewing ng tiles with upto 25% new tiles including supply of new Bamboos tiles, all materials letion of the work. Take an area of 100sft.

0.00 0.00 0.00 150.00 200.00

or frizoni tiled roofs after repairs to raftes & batters including mortar, labour & T&P etc. ost of any new wood work, iron work on new tiles required will be paid separately). is not to be dismantled. 40.00 50.00 100.00 20.00

oof. is not to be dismantled. 0.00 100.00 100.00 40.00

of with cememnt mortar consisting of one part of cement and 6 parts of fine sand of our and T&P etc. required for proper completion of the work. 4.00 2.50 40.00

with mud including mud, labour and T&P etc. required for proper completion of the 2.50 40.00

ding removal of old plaster, racking out joints to 1cm(3/8") depth. Watering the area same mortar in proportion of mortar as the existing surface, including supply of all roper completion of the work.

g patches including digging upto 10cm (4") depth renewing 8cm. (3") base concrete oved fine sand of 1.25 F.M. and 8 parts of 1.5" gauge brick ballast as in C.C. floor d coarse sand & 4 parts approved stone grit including supply of all materials, labour of the work.

20') span & in length of 18 metre (60') & throwing the earth silt to the place within road ing the same as directed by the Engineer-in-charge. Take a culvert of 10' span & 60' h work 60x10x1=600cft. 21.25 800.00 1000.00

place as directed by Engineer-in-charge including dressing leveling and ramming the #VALUE! 100.00 200.00

tc. beyond a distance of 60metre (200ft.) as directed by Engineer-in-charge . 33.33

ll materials, labour and T&P etc. required for proper completion of the work. Take an 0.00

glass 64kg (21oz) with putty & brad including supply of all materials labour & T&P etc. 0.00

l and water including supply of all materials, labour and T&P etc. required for proper 25.00 0.00

20.00

33.33

17.78

materials labour and T&P etc. required for proper completion of the work. 0.00

ty and brads and including supply of all materials, labour and T&P etc. required for

1sft.1/30 Glazer is required. 4.00

beading. Carpenter can fix 25 Glasses of 1'x1'. Hence for 1sft. 1/25 carpenter is 6.40

austic soda including supply of all materials labour and T&P etc. required for proper

or 1sft.1/60 Glazer is required. 2.00

er bolts or hasp and stopels or handles etc. to doors and windows. Carpenter can fix ay. Hence for one fiting 1/24 carpenter is required. 6.67

wn pipes after cleaning including supply of all materials, labour and T&P etc. required 20.00 12.50

g supply of all materials labour and T&P etc. required for proper completion of the y, hence cost per letter comes. 35000.00

(1") but upto 8cm. (3"), one painter can write 125 letters in a day hence cost per letter

3") but upto 15cm. (6"), one painter can write 100 letters in a day hence cost per letter

ding supply of all materials labour and T&P etc. required for proper completion of the day, hence cost per letter comes at Rs. 5.00 per day.

. (1") but upto 8cm. (3"), one painter will re-write 250 letters in a day hence cost per

(3") but upto 15cm. (6"), one painter will re-write 150 letters in a day hence cost per

ade varnish or polish after sand papering, including supply of all materials labour and e work. the average rate.

ttering with super varnish or valspar or enamel paint, including supply of all materials letion of the work.

0.00 0.00

e name plates, including lettering with super varnish or valspar or enamel painting &P etc. required for proper completion of the work.

amelled

of P.W.D. standard design with approved enamel paint of superior quality, including quired for proper completion of the work.

0.00 0.00

W.D. standard design with approved enamel paint of superior quality, including supply or proper completion of the work.

0.00

n ends of parapets of culverts in letters from 2.5cm. To 8cm. (1" to 3") with super supply of all materials labour and T&P etc. required for proper completion of the 0.00 0.00

I.R.C., standard design as prescribed for national highway. 0.00 0.00

s stones of I.R.C., standard design as specified for every fifth mile stone of national 0.00 0.00