Sl. No.

AREA

PROBLEM P.A.System not working skirt rubber damaged on CB-1,CB-4B CB-2B belt should be changed Screen House Area poor lightining Scraper should be changed on CB-2,CB-3A,CB-3B Staircase required on waighbin-3A & 3B Iron ore fines chute # 1 Inspection door required

DEPARTMENT

1 R.M.H.S.

Electrical Mech. Mech. Electrical Mech. Mech. Mech. Mech. Electrical Electrical Mech. Mech. Mech. Mech. Mech. Electrical Electrical Electrical Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Electrical mech Electrical Electrical Mech. Electrical Electrical Electrical Electrical

2 G.C.P.

3 P.C.M.

4 P.L.C.

Softner resin should be changed Emergency light required in pump house All pressure gauge were not working Gland leakage on saturator,ventury,tuyere,shell etc. S.G.P. sump #2 cleaning SGP net should be changed Reservoir sump cleaning Setteling tank valve leakage Saturator pump # 1 not available thickner # 1 cleaning saturator # 1& 2 drain pump not working pump house area should be lighted P.A.system not working G.C.P.pump area should be lighted staircase required for sealpot pcm#1 discharge chute cylinder not working lime transfer pump 1 no. required, 1 no. not working pcm#1 splasher blade damaged Roof shade required plateform railing required for pcm# 1,2 & 3 railing required for Splasher plateform # 1,2 & 3 return chute puncher on pcm # 1 & 2 splasher # 1 gland leakage lime filter not working mould changed in pcm # 1,2 & 3 Pin & bush should be changed in pcm # 2 & 3 submersible pump 1 no required window glass should be changed in pcm control room launcing pipe arrangement should be modified mancooler for pcm # 1 required stock rod 1(MBF# 1) not working stock rod 2(MBF# 2) not working MBF# 2, stove # 2 dome thermocouple damaged MBF# 1, venury # 1 not working P.A.system not working thermocouple TT128 B not working MCV# 1,2 not working Emergency light required in control room

DATE

AREA

PROBLEM

WIND REDUCTION FROM

TIME

TIME TO

OPER

S/I MECH/ELECT

Sl. No.

AREA

PROBLEM P.A.System not working Screen House Area poor lightining Emergency light required in pump house All pressure gauge were not working pump house area should be lighted P.A.system not working G.C.P.pump area should be lighted mancooler for pcm # 1 required stock rod 2(MBF# 2) not working MBF# 2, stove # 2 dome thermocouple damaged P.A.system not working Mbf-2 hotblast thermocouple not working MCV# 1,2 not working Emergency light required in control room

DEPARTMENT

1 R.M.H.S. 2 G.C.P.

3 P.C.M. 5 P.L.C.

Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical

Sl. No.

AREA

PROBLEM skirt rubber damaged on CB-1,CB-4B CB-2B belt should be changed Scraper should be changed on CB-2,CB-3A,CB-3B Staircase required on waighbin-3A & 3B Iron ore fines chute # 1 Inspection door required Softner resin should be changed Gland leakage on saturator,ventury,tuyere,shell etc. SGP net should be changed Setteling tank valve leakage Saturator pump # 1 not available saturator # 1& 2 drain pump not working staircase required for sealpot pcm#1 discharge chute cylinder not working lime transfer pump 1 no. required, 1 no. not working pcm#1 splasher blade damaged Roof shade required plateform railing required for pcm# 1,2 & 3 railing required for Splasher plateform # 1,2 & 3 return chute puncher on pcm # 1 & 2 splasher # 1 gland leakage lime filter not working mould changed in pcm # 1,2 & 3 Pin & bush should be changed in pcm # 2 & 3 submersible pump 1 no required launcing pipe arrangement should be modified stock rod 1(MBF# 1) not operated MBF# 1, venury # 1 not working

DEPARTMENT

1 R.M.H.S.

2 G.C.P.

3 P.C.M.

4 P.L.C.

Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech. Mech.