Saudi Aramco 2616-ENG (3/99)

OPERNS.

SAUDI ARAMCO OIL COMPANY


SECTION 02281 TERMITE CONTROL PART 01 GENERAL 1.01 SECTION INCLUDES A. Termite control material and its application including complete preconstruction and post-construction soil treatment under and adjacent to buildings to provide uniform toxic barrier in all routes of termite entry.

1.02

RELATED SECTIONS A. Section 02200 Section 02210 Section 02220 Earthworks. Excavating, Trenching, Backfilling and Compacting Structural Excavation and Backfill

B. C.

1.03

REFERENCES A. EPA Environmental Protection Agency - Federal Insecticide, Fungicide and Rodenticide Act.

DISCIPLINE ENGINEER
__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

1.04

RELATED DOCUMENTS A. Drawings and general provision of contract.

CERTIFIED _ __________
DATE: ________

1.05

SUBMITTALS A. B. Comply with Section 01340. Product Data: Indicate toxicants to be used, composition by percentage, dilution schedule, intended application rate. Test Reports: required. Indicate regulatory agency approval reports when

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

C.

D.
Date:

Manufacturer's Application Instructions: and method of application. Manufacturer's Certificate: specified requirements.

Indicate caution requirements

E. F.

Certify that toxicants meet or exceed

Submit an application and safety plan, which includes the following information:
SECTION 02281

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILIDNGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55
JOB/EWO#

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

1 OF 7

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

REV. NO.

DATE JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY

ENGG

CERT

1. 2. 3.

A list of protective equipment to be used in the mixing and application process. A procedure to be followed for safely mixing the chemicals at the jobsite. A procedure for the application of the chemicals, which minimizes the exposure of other workers to the chemical treatment. A procedure to be followed if a worker accidentally comes in contact with concentrated chemicals.

4. 1.06

MAINTENANCE DATA A. Maintenance Data: Indicate re-treatment schedule and procedures.

1.07

QUALIFICATIONS A. Applicator: A professional pest control company specialized in performing the work of this Section with minimum five years documented experience approved by manufacturer and who is licensed in accordance with regulations of the local governing authorities.

DISCIPLINE ENGINEER
__ ________ _ DATE: ________

1.08

REGULATORY REQUIREMENTS A. Conform to applicable code for requirements for application, in accordance with EPA. Provide certificate of compliance from authority having jurisdiction indicating approval of toxicants.

PROJECT ENGINEER
____________ DATE

B.

CERTIFIED _ __________
DATE: ________

1.09

SEQUENCING A. Apply toxicant 12 hours prior to installation of vapor barrier under slabs-on-grade and finished grading work outside foundations.

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

1.10

WARRANTY A. Provide 10 years warranty from date of substantial completion signed by the Applicator and the Contractor. Warranty: Furnish written warranty certifying that the applied soil treatment will prevent infestation of subterranean termites, and that if subterranean termite activity is discovered during the warranty period, the contractor will re-treat the soil and repair or replace such damage. Include coverage for damage and repairs to building and building contents caused by termites.
SECTION 02281

B.
Date:

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILIDNGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55
JOB/EWO#

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

2 OF 7

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

REV. NO.

DATE JOB/EWO

DESCRIPTION

PMT

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


PART 02 PRODUCTS 2.01 MATERIALS A. General: Use an emulsifying, concentrated termiticide that dilutes with water, specially formulated to prevent termite infestation. Fuel oil shall not be permitted as a diluent. Provide a solution consisting of one of following chemical elements. Available Products: Subject to compliance with local regulations and requirements, products that may be incorporated in the Work include, but are not limited to, the following: 1. Chloropyrifos: Dursban TC, Dow Chemical Co. or approved and equal under Project Manufacturers List. Permathrin Dragnet FT, FMC Corp. or approved and equal under Project Manufacturers List. Torpedo, ICI Americas, Inc. or approved and equal under Project Manufacturers List. 3. Cypermethrine Prevail FT, FMC Corp. or approved and equal under Project Manufacturers List. Demon, ICI Americas, Inc. or approved and equal under Project Manufacturers List. 4. Fenvalerate: Gold Coast Tribut, DuPont. or approved and equal under Project Manufacturers List. Isofenphose: Pryfon, Mobay Corp. or approved and equal under Project Manufacturers List.

B.

__ ________ _ DATE: ________

____________ DATE

_ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

REV. NO.

DATE JOB/EWO

2.

DISCIPLINE ENGINEER

PROJECT ENGINEER

CERTIFIED

5.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

C. D.
Date:

Dilute with water to concentration level recommended by manufacturer. Use other solutions as recommended by Applicator if approved for intended application by local authorities having jurisdiction and Companys Representative. Use only soil treatment solutions that are not harmful to plants.

2.02

MIXES A. Mix toxicant to manufacturer's instructions.


SECTION 02281

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILIDNGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55
JOB/EWO#

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

3 OF 7

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


B. C. Contractor shall have all required safety equipment necessary for chemical treatment on the site prior to mixing of chemical treatment. Areas ready to receive treatment shall be graded and have all soil compaction testing (if required) completed prior to mixing of chemical treatment.

2.03
DESCRIPTION

PRODUCT HANDLING A. Protection and Storage 1. 2. Handle chemicals in such a manner as to avoid contamination of the site. Store and protect chemicals for termite treatment as follows: a. Construct on the site, a shaded, lockable temporary holding area for storage of the chemicals and any equipment to be used in their mixing and application. Remove this facility when work is completed. b. Place warning signs on the chemical storage area warning workers that poisonous materials are stored within. c. Do not store any materials within this storage area which are not directly used in the chemical treatment process. d. The foreman for the chemical treatment subcontractor and the Contractor's safety officer shall be the only individuals authorized to have access to the chemical storage area. B. C. Labeling: All chemicals used shall be identified with individual labels securely attached to each container. Shipment and Delivery: All chemical concentrates shall be delivered to the job site in sealed drums or sealed cans.

DISCIPLINE ENGINEER
__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

PART 03 EXECUTIONS 3.01 A. EXAMINATION Verify site conditions, remove foreign matter that could decrease treatment effectiveness on areas to be treated. Loosen, rake, and level soil to be treated, except previously compacted areas under slabs, foundations and road pavement foundation. Apply toxicants before placing compacted fill under slabs if recommended by toxicant manufacturer and before placing of road pavement layer works. Verify that soil surfaces are unfrozen, sufficiently dry to absorb toxicant, and ready to receive treatment.
SECTION 02281

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

B.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILIDNGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55
JOB/EWO#

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

4 OF 7

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

REV. NO.

DATE JOB/EWO

ENGG

CERT

PMT

Date:

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY

CERT

C. 3.02

Verify final grading is complete. APPLICATION A. Spray apply toxicant in accordance with manufacturer's instructions. Application Rates: Subject to local regulations and requirements, apply soil treatment solution as follows: 1. Under slab-on-grade structures and foundations, treat soil before concrete slabs are placed, using the following application rates: a. Apply 5.1 L of chemical solution per meter to soil in critical areas under slab, including entire inside perimeter of foundation walls, along both sides of interior partition walls, around plumbing pipes, electric conduit penetrating slab and around interior column footers. Apply 4.1 L of chemical solution per sq. m as an overall treatment under slab and attached slab areas where fill is soil or unwashed gravel. Apply 6.1 L of chemical solution per m2 to areas where fill is washed gravel or other coarse absorbent material. Apply 5.1 L of chemical solution per meter of trench for each 300 mm of depth from grade to footing, along outside edge of building. Dig a trench 150 to 200 mm wide along outside of foundation to a depth of not less than 300 mm. Punch holes to top of footing at not more than 300 mm on center and apply chemical solution. Mix chemical solution with the soil as it is being placed in the trench.

b.

DISCIPLINE ENGINEER
__ ________ _ DATE: ________

c.

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

2.

Under basement structure, treat soil along exterior and interior walls of foundations with shallow footings as specified above for exterior of slab-on-grade structures. At grade beams, or at hollow masonry foundations treat voids at rate of 2.6 L per meter, poured directly into the hollow spaces. At expansion joints, control joints, and grade areas where slabs will be penetrated, use solution at a rate of 5 L per meter. Under road pavement layers, treat top of fill before the sub base and base courses are placed using a power sprayer as directed by the Companys Representative.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

3.

4.
Date:

5.

SECTION 02281

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILIDNGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55
JOB/EWO#

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

5 OF 7

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

REV. NO.

DATE JOB/EWO

DESCRIPTION

ENGG

PMT

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


a. Apply the chemical solution at the rate recommended by the manufacturer to the top of the fill layer for the full width of the roadway including shoulder and pavement areas. Where termite nests are located within the road reserve, they shall be removed and burnt. The excavation shall be treated with the recommended chemical solution as directed by the manufacturer before the excavation is backfilled with the specified material and compacted to the required density as specified for the road subgrade.

b.

B. C.

Apply toxicant at locations indicated in Schedule at end of Section. Apply extra treatment to structure penetration surfaces such as pipe or ducts, and soil penetrations such as grounding rods or posts. Post signs in areas of application to warn workers that soil termiticide treatment has been applied. Remove signs after areas are covered by other construction. Re-treat disturbed treated soil with same toxicant as originally done. If inspection or testing identifies the presence of termites, re-treat soil and re-test. Avoid spillage, especially of concentrates, and do not contaminate wells and water sources, etc. Contractor shall decontaminate any spillage of concentrates with a "Clorox"-type product or other material as recommended by the manufacturer. Contractor shall also use absorbent material, which can be used to remove the spillage to a dumpsite.

DATE JOB/EWO

D.

REV. NO.

E. F.

DISCIPLINE ENGINEER
__ ________ _ DATE: ________

G. H.

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

3.03 A. B.

PROTECTION OF FINISHED WORK Vapor barrier is to be placed over the treated soil immediately following treatment. There is to be a minimum of disturbance of the soil after treatment, since undue disturbance could compromise the integrity of the chemical barrier.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

SECTION 02281

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILIDNGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55
JOB/EWO#

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

6 OF 7

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

Date:

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY

CERT

3.04 A.

SCHEDULES Locations: 1. 2. Under Slabs-on-Grade. Crawl Spaces. Both Sides of Foundation Surface and grade beams. Road Pavement. Basement Structure.

3. 4. 5.

__ ________ _ DATE: ________

____________ DATE

_ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

REV. NO.

DATE JOB/EWO

END OF SECTION 02281

DISCIPLINE ENGINEER

PROJECT ENGINEER

CERTIFIED

OPERATIONS

SECTION 02281

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILIDNGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55
JOB/EWO#

VE-417361 BI-25-00002

RABIGH

SAUDI ARABIA

7 OF 7

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.