A. Prelims 1 2 3 4 Rubble removal - cost per load. Skip permits for durations of works Parking for various vehicles during works Supply scaffolding tower to front of property for remedial roofing and pointing works. Also scaffold tower to rear to allow for safe working during construction of mansard 5 Strip out complete house including all wall paper, bathrooms, kitchen, carpets, rotten and water damaged ceilings. Knock out wall at room 3, and side wall at room 2 and allow for temporary shoring and propping of building 6 Insurance - contractors all risk for duration of works Total B. Structural 1 Excavate foundations to external walls of extension, including side wall abutting party fence, supply shuttering ply and allow for bridge over 4 inch soil using PCLs and packed with pea shingle, to Building control requirements. Pour using Gen 3 concrete mix 2 Excavate foundations for stantion bases (1.2 x 1 x 0.6). Pour using Gen 3 concrete mix 3 Supply and fit 3 steel frames, between rooms 3 and 4, between rooms 3 and garden and to side walls of room 2. Supply steel beam between rooms 9 and 10 4 Lay class B Engineering bricks to DPC level, then lay cavity insulated walls with thermalite blocks internally and faced with second hand London stock bricks. 5 Excavate existing manhole, allow for new underground orange pipework and reform inspection chamber with tile on double sealed manhole cover 6 Pour concrete slab to new extension area. 150mm blinding, DPM, insulated and reinforced concrete slab, vapour barrier and screed 7 Supply and fit twice weathered coping stones to both side of extension 8 Allow for brick infill at room 8 floor level in positions of new sash windows 9 Supply and fit catnic lintels for windows at rear of room 2 10 Remove chimney stack through rooms 1, 7 and 12, allow for any remedial works at roof line if required 11 Supply and pour concrete waterproof slab to basement floor Total C. Electrical 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Supply and fit low voltage downlights with integrated smoke hoods Supply and fit low voltage IP65 downlights with integrated smoke hoods to bathroom Supply and fit extractor fan, extractor vent pipe and external grille Supply and fit extractor isolator switch Supply and fit mains linked smoke and heat alarms Fit only exterior light fittings Supply and fit MK Logic 1 gang dimmer switch and backing box Supply and fit MK Logic 2 gang dimmer switch and backing box Supply and fit 1 gang switch Supply and fit 2 gang switch Supply and fit intermediate switch Fit only kitchen extractor fan. Fit all supplied vent pipe and external grille, supply all boxing Supply and fit MK Logic plus 2 gang power Sockets Supply and fit 12 panel kitchen isolator grid, WM, Hob, Oven, DW, TD, underunit lights, fridge and extractor and 3 spares Supply and fit Honeywell programmer and thermostat to new boiler controls Supply and fit TV Points Supply and fit telephone master or slave sockets Supply and fit 5amp socket points in reception rooms Supply and fit exterior power socket Supply and fit upgraded fuse boards to comply with current regulations with MCBs and RCDs allow for all new wiring Total

CPU

Qty

Total

D. Plumbing 1 Supply and fit 225 litre megaflow and C50 Keston boiler and flues. Allow for all associated pipework, megaflow to go in Loft next to stairs and boiler location to be confirmed 2 Supply and lay new waste pipework throughout property, include soil stack and all new fittings to bathrooms and kitchen 3 Allow for all copper pipework to bathrooms, kitchens and new radiator circuits 4 Allow for all guttering and rainwater pipework to new extension area, connect to existing pipework on roof and allow for rainwater run into hoppers 5 Supply and fit heatline double convecting radiators and thermostatic radiator valves 6 Fit only concealed cistern, toilet and seat. Supply and fit flexible waste if required 7 Fit only basins, taps and waste, 8 Fit only bath, wooden bathframe, taps and waste 9 Fit only shower mixers, rising head and arms 10 Fit only chrome towel radiators 11 Fit only kitchen sink 12 Plumb in kitchen appliances 13 Supply and fit new gas line from meter to hob, supply bayonet fitting hose and chain 14 Supply and fit Sanivite water pump to pump away megaflow overflow Total E. Carpentry and Glazing 1 Supply and fit hip shaped roofing joists to extension area, minimised to allow as much light as possible. Allow for insulation to roof (140mm) and ply decking on run off from roof to be used as guttering run 2 Supply and fit all roofing timbers to form dormer window at room 13. Allow for insulation, ply lining and vapour barrier 3 Supply and fit 980 x 780 velux windows and flashing kits to roof of room 8 4 Supply and fit folding sliding hardwood doors and glazing to rear of property. This is listed as a PCSUM as there are too many variables and styles of doors 5 Supply and fit architectural glazing panels to roof of extension as detailed to neighbour. This is listed as a PCSUM as there are many differing types of glazing 6 Supply and fit door liner, architrave, hinges and 4 panel fire door to new locations 7 Supply and fit double doors from rooms 4 to 5 8 Supply and fit studwalls to enclose bathroom at room 7, form bathroom between rooms 13 and 14 9 Supply and fit double glazed, spring balanced matching wooden sash windows 10 Supply and fit MDF 18mm cupboards in styles tbc in rooms 9, 11, 13 and 14 11 Create hatch hole for loft void in 15 and then insulate and board loft area, supply pull down ladder 12 Allow for the refitting of supplied chimney mantle pieces 13 Supply and fit wooden fencing panels and posts throughout complete garden 14 Fit only customer supplied wooden flooring to rooms 1,2 and 3 15 Allow for fitting of customer supplied shelving units in basement and new washing machine room 16 Fit only supplied kitchen estimated at 5m 17 Add metal support grille to back of stained glass, supply yale 7 lever door lock Total F. Plastering and dry lining 1 Plasterboard all new studwalls, all damaged ceilings including bedrooms and any new work within kitchen extension 2 Plaster walls and ceilings within new extension, around steel openings in rooms 3 and 4, between rooms 9 and 10 and in rooms 13,14 and 16. Dryline and plaster basement, plaster all wiring chase marks used in the process of rewiring Total G. Tiling and waterproofing 1 Supply and fit marine plywood floors, Ditra matting, Kurdi band and trap, tanking solution to fully waterproof bathrooms 2 Fit only supplied floor tiles, BTL supply adhesive, Customer supplies grout and tiles

CPU

Qty

Total

CPU 3 Fit only supplied wall tiles, BTL supply adhesive, Customer supplies grout and tiles Total H. Painting and decorating 1 Paint complete house including all internal walls and ceilings, all woodwork and all external window sills and fascias in 3 coats of Dulux paint supplied by BTL Property Total I. Roofing 1 Supply lead valley gutters to ends of extension hipped roof 2 Supply and fit 3 layer torch on felt to roof above room 8, allow for repair and replacement of drips around roofing perimeter 3 Supply and fit roofing materials to clad new loft dormer 4 Allow for remedial roofing works to leaking areas around rooms 13 and 14 Total J. Various 1 Construct 500 high new brick wall to front of house (to accommodate railings, supplied by others) pave front path to doorway with pavings supplied by customer, supply and fit pea shingle and motorcycle ground anchor to front garden 2 Point chimney stack and front top level hipped area (above window in room 14), replace damaged small roof section under window 14 and replace with lead lining 3 Supply small casement style window to room 15 4 Fit only supplied paving to back garden

Qty

Total

Build Total VAT Project Total

K. Other requested costs 1 Strip off all paint work from reception cornicing and hallway. I would need to use a separate company for this and the quotes I have got so far are roughly 280 per linear meter 2 Plaster complete house if plaster work beneath wall paper is found to be poor