PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No.

1 - PRELIMINARIES Qnty Unit Rate Amount


% Complete Amount AED

The temporary hoarding and the site office size and location shown on dwg is tentative only It is Tenderer's responsibility to confirm the location and the limits of the above with the authorities to accommodate all the required facilities within the allowed limits. In case of the temporary hoarding and the site office are required to be located (partly or fully) beyond the plot limit (i.e on adjacent neighbouring plot etc.), then it is tenderer's responsibility to obtain the consent/ permission for temporarily usage of the plot(s) for the above purpose from the owner of the said plot(s).

Setting up the Site

Allow for providing an office compound and sites for workshops, plant etc. Use and Protection of the Site

item

Allow for protecting the site during the course of the work to the entire satisfaction of the Engr. Allow for keeping the site and building and any adjcent areas affected by the building operations clear of debris and other rubbish and at completion making good all disturbed works or ground to the entire satisfaction of the Engineer

item

item

Allow for temporary covering and barricading to open excavation and other hazards Allow for providing and maintaining warning signs, red warning lamps,etc. as necessary in all such places. Allow for temporary traffic signs as necessary

item

item

item

TO COLLECTION (AED)

Page 1/1

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 1 - PRELIMINARIES Qnty Unit Rate Amount
% Complete Amount AED

Employer's / Engineer's Facilities [Ref. to Appendix-A to the General Spec Section 01 'General Items] Allow for providing the following facilities including modifying, adapting or relocating to suit the progress of the works and removing from site

Offices for the sole use of the Client Rep. and Engineer including stationery, furniture, cleaning maintenance, and attendance Telephone and facsimile for the sole use of the Engineer including paying all charges for installation, rental, calls (within UAE) & removal Ditto - Mobile telephone for Resident Engineer Surveying equipment and assistance in checking and setting out or measuring on site Provide a photocoppier machine for the sole use of the Engineer, including all paper, toner, maintenance etc. Provide computers all accessories as specified in Appendix -A to the General specification Section 01 (General Items), complete Provide equipment like camera, etc.as specified

Item

30,534.00

50%

15,267.00

item item

C D

item item
INCLUDED

item

item

TO COLLECTION (AED)

30,534.00

15,267.00

Page 1/2

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 1 - PRELIMINARIES
Contractors Facilities Allow for providing the following facilities including modifying, adapting or relocating to suit the progress of the works and removing from site

Qnty

Unit

Rate

Amount

% Complete Amt. AED

Offices conference room, sample room, stores, messrooms, etc. Sanitary facilities Telephones Site first aid Site fire figting equipment Site drinking water Temporary hordings Temporary roads, hardstandings, etc. Contractors Site Administration Allow for the following:

item

153,122.00

50%

76,561.00

B C D E F G H

item item item item item item item Included

I J K L M

Site administration Supervision and site management Security Safety, health and welfare of workers Transport of workers Plant and Equipment Allow for providing the following:

item item item item item

202,704.00 606,768.00 36,800.00 129,917.00 128,800.00

6% 6% 6% 6% 6%

12,162.24 36,406.08 2,208.00 7,795.02 7,728.00

N O P Q

Small plant and tools Cranes and lifting equipment Site transport Any other plant and equipment

item item item item

522,670.00 684,998.00 118,000.00

2% 2% 6%

10,453.40 13,699.96 7,080.00

TO COLLECTION (AED)

2,583,779.00

174,093.70

Page 1/3

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 1 - PRELIMINARIES Qnty Unit Rate Amount
% Complete Amount AED

Scaffolding Allow for providing, erecting and maintaining, dismantling and clearing away at completion proper and adequate scaffolding including that required for Sub-contractors and Specialists & Sub-contractors nominated by the Client Setting out and surveying Allow for setting out the work and preparing a levels survey Existing services Allow for ascertaing the location of all underground services Allow for protecting all underground services during the progress of the work The Contractor shall be responsible for any damage caused to the underground services, for any costs of repair and for any delays arising from such damage Temporary Services for the Works Allow for providing the following services for the works including those required by the Sub-contractors, paying all charges and for providing all necessary temporary installations and removing on completion Water for the works The contractor shall install a separate meter for water on site and all charges for the temporary connection and consumption shall be paid by the Contractor OR Any costs of importing water by tanker and storing on site shall be allowed for by the Contractor as required. Electric lighting and power for the works. The contractor shall install a separate meter for electricity on site and all charges for the temporary connection and consumption shall paid by the Contractor OR Any costs for temporary electricity generating equipment shall be allowed for by the contractor

item

144,900.00

item

item

item

item

item

109,779.00

6%

6,586.74

item

338,675.00

6%

20,320.50

TO COLLECTION (AED)

593,354.00

26,907.24

Page 1/4

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 1 - PRELIMINARIES
Protection of the Works

Qnty

Unit

Rate

Amount

% Complete Amount AED

Allow for covering up and protecting the works from the weather and from dammage by the Contractors own or other workmen performing subsequent operations including providing all necessary dust sheets, barriers and guard rails and clearing away same at completion Allow for carefully protecting finished work including that of Sub-contractors Allow for providing and maintaining warning signs, red warning lamps and barrycades as necessary in all such places Enclosing site etc.

item

item

item

Allow for providing any temporary hoardings, enclosures, gates, entrances, etc. for the protection of the site, the works and materials and for alerting and adapting the same as may be required, removing at completion of the works and making good all works disturbed Local Authority Workmen

item

31,050.00

85%

26,392.50

Allow for giving access to workmen employed by the local or other authorities and providing them with attendance as required Attendance item

Allow for the general attendance of one trade upon another Temporary works

item

Allow for furnishing the Engineer with full particulars, drawings, etc. of all temporary works necessary for the execution of work

item

TO COLLECTION (AED)

31,050.00

26,392.50

Page 1/5

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 1 - PRELIMINARIES
Samples, Mockups, Tests, etc. Allow for providing and submitting to the Engineer, as he may require, samples of all materials and goods which are proposed for incorporation in the works including removal of the same on completion of the inspection Allow for testing materials as required by the Specifications Allow for providing sample panels of materials as required including removal of the same on completion of the inspection Allow for providing mock-ups as required including as part of work of the same on completion of the inspection As Built Drawings and Manuals Allow for providing the Engineer with as-built drawings and manuals as required by the project specifications Progress Photographs Allow for providing monthly sets of negatives, taken at relevant locations Allow for providing prints from negatives selected by the Engineer Allow for providing photographs of the project at the completion stage taken by prfessional photographer

Qnty

Unit

Rate

Amount

% Complete Amount AED

item

Included

item

28,750.00

6%

1,725.00

item

item

item

23,000.00

6%

1,380.00

item

1,725.00

item

item

Notice Boards Allow for providing and erecting Two Site Notice Boards as per the details mentioned in the project specification Clearing Away Rubbish Allow for clearing away rubbish at regular intervals during the progress of works and leaving the site and perimeter tidy at completion

item

51,405.00

item

99,360.00

6%

5,961.60

Cleaning at Completion Allow for cleaning the entire site including the building inside and out side and leaving ready for occupation upon completion

item

34,500.00

TO COLLECTION (AED)

238,740.00

9,066.60

Page 1/6

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 1 - PRELIMINARIES
Condition of Contract Allow for complying with the Conditions of Contract as follows:

Qnty

Unit

Rate

Amount

% Complete Amt. AED

A B C D E

Cost of Insurances Cost of Performance Bond Building Permit fee Fluctuations in cost Compliance with Statutes, Regulations (Refer to Conditions of Contract Part II, Conditions of Particular Application, page CC/2.4, Clause 26.02) Sub-contractors - Nominated/ Domestic

item item item item -

109,250.00 Excluded 28,750.00

100%

109,250.00

100%

28,750.00

item

Allow for provision, erection, maintenance and subsequent removal of free site accommodation to the nominated and domestic sub-contractors including provision of drainage and sewrage connections to the sewer system/septic tank and provision of separate line of telephone, power, water, etc. as required for the office accommodation, but excluding all fitting-outs of accommodation,such as Air-conditioners, Furniture, etc. [Also, main contractor to fully take over all responsibilities for the nominated and domestic Sub-contractors] [The payment of all charges for the telephone, water, power,etc. for the site accommodation to be mutually agreed between the Main Contractor, and the Sub-contractor]

item

Excluded

Allow for provision, erection, maintenance and subsequent removal (at completion of works) of all temporary buildings, storage areas, etc. togather with hard-standings as required for the nominated and domestic Sub-contractors Allow for lifting/lowring of all plant, equipment and materials as required by all the Sub-contractors

item

Excluded

item

Excluded

TO COLLECTION (AED)

138,000.00

138,000.00

Page 1/7

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 1 - PRELIMINARIES Qnty Unit Rate Amount
% Complete Amt. AED

Any other items

Allow for all costs, expences, etc. details of which must be set out below and extended separately by the Contractor, incurred in carrying out the requirements of the contract and not otherwise included

1. 2. 3

Hire plot for temporary site setup Site distribution gang

322,546.00 89,700.00 -

6% 6%

19,352.76 5,382.00

TO COLLECTION (AED)

412,246.00

24,734.76

COLLECTION Page no. 1/1 1/2 1/3 1/4 1/5 1/6 1/7 1/8

AMOUNT

30,534.00 2,583,779.00 593,354.00 31,050.00 238,740.00 138,000.00 412,246.00

15,267.00 174,093.70 26,907.24 26,392.50 9,066.60 138,000.00 24,734.76

BILL NO.1 PRELIMINARIES TOTAL AMOUNT CARRIED TO SUMMARY (AED)

4,027,703.00

414,461.80

Page I/S

Page 1/8

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 2 - SHORING
The work in this 'Sub- structure' section is to include all items upto the ground floor level including the ground floor slab. Shoring

Qnty

Unit

Rate

Amount

% Complete Amount AED

Allow for design, shop drawings, monitoring, etc. of the shoring system. Allow to obtain Dubai Municipality approval of the shoring design incliding paying all fees and charges as required. Allow for all co-ordinations with Municipality and execution of all works as per the 'Notes' stated on Shoring detail drawings.

Item

23,000.00

100%

23,000.00

Item

Item

Permanent shoring system as shown on dwg Shoring system with Secant Piling wall including RCC coping beam with all form work and steel reinforcement, Steel section H-piles, pre-cast concrete planks,tie-back anchoring, strutting etc as required in full compliance with statutory regulations and site conditions. Tender must provide the total quantity (in linear meter) and the unit rate (AED per lin. M) for the Shoring Works.

D E F

Secant pile 1000mm dia. Guniting for the secant piling. Stiffener column / beam including formworks, reinforcement steel, strutt, etc., complete. 200mm thick solid concrete block wall with smooth cement plaster. Waterproofing membrane and protection board are measured elsewhere in this bill section.

133

22100

2,939,300.00 387,203.00

35 773,500.00

Item Item

122

m2

112

13,664.00

Removal of the above shoring system between ground level and -2.00m level as shown on dwg including removal of the steel I-section, pre-cast concrete panels, etc.

Item

64,400.00

TO COLLECTION (AED)

3,427,567.00

796,500.00

Page 2/9

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 2 - SHORING
Earthwork Allow for trial pits to locate any existing services. Preparation of site for construction work including levelling (cutting & filling), compaction, as necessary, etc.complete. Excavate between existing ground level and bottom of blinding for raft slab/etc( The excavated material shall be stored temporarily at near-by site as directed by the Engineer being separated as suitable material for back filling and unsuitable material for disposal)

Qnty

Unit

Rate

Amount

% Complete Amount AED

A B

Item

3,857.00

100%

3,857.00

Item

8,802.00

100%

8,802.00

11669

m3

32

373,408.00

13%

48,543.04

Backfiling using the excavated suitable fill material as directed by the Engineer Disposal of excavated surplus material to tip approved by the Authorities and the Engineer Compact all surfaces in the bottom of excavations 11669 1078

m3

N/A

m3 m2

13 7

151,697.00 7,546.00

13%

19,720.61

Filling with imported material to make up levels all in accordance with drawings and specifications

188

m3

91

17,108.00

Dewatering

Allow to obtain Dubai Municipality and all other concerned authority approval for discharging the dewatering including paying all fees and charges as required Allow for liaison and co-ordination with Employer, Engineer and all authorities as required, for the dewatering system. Dewatering the wole site during excavation and through construction till sufficient counter weight against buoyancy uplift is achieved ( Refer to structural drawings)

Item

INCLUDED

Item

Item

497,703.00

TO COLLECTION (AED)

1,060,121.00

80,922.65

Page 2/10

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 2 - SHORING Qnty Unit Rate Amount % Complete Amount AED

Plain in situ concrete, grade C20 with durability requirements as in Specification Section 3

A B

Concrete blinding 75mm thick 50mm thick protection screed to membrane Reinforced in situ concrete, grade C60 with durability requirements as in Specifications Section 3

1078 936

m2 m2

37 22

39,886.00 20,592.00

C D

Columns Walls Reinforced in situ concrete, grade C50 with durability requirements as in Specification Section 3

54 255

m3 m3

688 688

37,152.00 175,440.00

E F G H J

Basement walls Raft slab Footing beam/other foundations beams Base slab of lift pit/ water tank/ etc. Walls of lift pit/ water tank/ etc

528 976

m3 m3 m3 m3

710 585

374,880.00 570,960.00 N/A

INCLUDED m3

TO COLLECTION (AED)

1,218,910.00

Page 2/11

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 2 - SHORING
Reinforced in situ concrete, grade C45 with durability requirements as in Specification Section 3

Qnty

Unit

Rate

Amount

% Complete Amount AED

A B C D E

Basement- 3 - Slab & beams Basement-2 - Slab & beams Basement-1 - Slab & beams Ground slab,beams,Ramp etc Staircases

76 137 137 431 24

m3 m3 m3 m3 m3

537 537 537 537 551

40,812.00 73,569.00 73,569.00 231,447.00 13,224.00

Formwork

F G H J K L M N P

To sides of columns/walls To sides of raft slab/other slabs To sides of footing/other foundation beams To sides and soffits of beams/lintels/sills To sides of base slabs of lift pit/water tank/etc To soffit of water tank To stringers and soffits of stairs To sides and soffits of suspended slabs/ramps To sides of grades slab,steps,ramps,etc.

3467 84

m2 m2 m2

131 56

454,177.00 4,704.00 N/A

402

m2 m2 m2

73

29,346.00 INCLUDED INCLUDED

124 3139 35

m2 m2 m2

59 73 56

7,316.00 229,147.00 1,960.00

Reinforcement

High tensile steel bar of various diameters

413400

kg

6.1

2,521,740.00

TO COLLECTION (AED)

3,681,011.00

Page 2/12

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 2 - SHORING Qnty Unit Rate Amount % Complete Amount AED

Waterproofing as per drawings/specifications

A1

Waterproofing membrane laid on blinding below raft slab,downstand beam, etc. Waterproofing membrane laid on vertical surface of water tank walls, holding tank walls,basement walls,footing beam,etc. Protection board 6mm thick 25x25mm Groove with sealant to terminate waterproofing membrane. Waterstop/ junction hose system at all concrete joints

936

m2

51

47,736.00

A2

1523

m2

51

77,673.00

A3 A4

1523 127

m2 m

29 29

44,167.00 3,683.00

A5

1202

49

58,898.00

A6 A7

Allow for junction,corner,etc,details as required Reinforced fair face blockwork to receive waterproofing membrane

item m2 N/A

5,750.00

B1

Waterproofing membrane and protection board over ground slab to receive interlocking tiled paving area

120

m2

79

9,480.00

B2

Ditto - any other areas as required

m2

INCLUDED

Water tank

C1 GRP lining to all internal surfaces of under ground


water tank (slabs,walls,soffit)

439

m2

104

45,656.00

C2 GRP ladder to underground water tanks C3 Fully sealed water/ air tight cover complete to u/gwater
tank All necessary accessories like valves,fittings etc to the underground water tank are measured in bill part " Plumbing & Drainage installation"

2 2

no no

1725 1035

3,450.00 2,070.00

Hollow Concrete Blockwork

D1 200mm thick D2 100mm thick

m2 N/A m2

TO COLLECTION (AED)

298,563.00

Page 2/13

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 2 - SHORING Qnty Unit Rate Amount % Complete Amount AED

Column Protectors

High density neoprene corner protection 100mm high anchored with mechanical fasteners, complete as per as per drawing

93

No

72

6,696.00

Road marking on parking and driveway at basements, ramps and ground floor including all parking separation lines, arrows,hatching,etc, complete as shown on drawings (External roadmarkings are measured under bill for "External Works"

item

34,745.00

Kerbing and tiling at basement and ground floor parking /driveways

D E

150mm high upstand kerb fixed to floor slab Two coats of chlorinated rubber based quick drying paint in approved colours ( black/yellow/white) to upstand kerbs 60mm thick, interlocking concrete paving blocks,shape,size and colour as approved, laid in multicolour and pattern on and including 50mm thick sand bed and sub-base Wheel stopper 150x150x1650 long Hydraulically pressed kerb towed to RC slab.

39 39

m m

73 18

2,847.00 702.00

30

m2

67

2,010.00

54

No

210

11,340.00

High duty polystyrene ( Density not less than 40kg/m3) factory cut to suit filling in substation all to DEWA requirements including form trenches,chequer plate,steel joisnts as required PVC sleeves, etc.

Item

5750

5,750.00

Epoxy painted removable chequered steel plate cover plate cover along with supporting angle at substation trenches as per DEWA apecifications

Item

17,250.00

TO COLLECTION (AED)

74,644.00

Page 2/14

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item
Sundries

BILL No. 2 - SHORING

Qnty

Unit

Rate

Amount

% Complete Amount AED

A B C

Anti termite treatment 1000 Gauge Polythene water barrier membrane, one layer Damp proof course to all block wall ( as required) 1030 54

Item m2 m2 4 8

3,054.00 4,120.00 432.00

Two coats of approved bituminous coating on concrete/ blockwork surfaces directly contracting with soil. Allow for all joints of construction,control,surface,etc.as required and complete as shown on drawings. Allow for expansion joint including cover.

m2

Item

2,300.00

Item

2,300.00

TO COLLECTION (AED)

9,152.00

Page 2/15

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL No. 2 - SHORING
Any other items

Qnty

Unit

Rate

Amount

% Complete Amount AED

Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below : Circular column guard Wall guard for ramp Compacted sand filling 12 220 14 no. m m3 367 153 44 4,404.00 33,660.00 616.00

1. 2. 3

TO COLLECTION (AED)

38,680.00

COLLECTION Page no. 2/1 2/2 2/3 2/4 2/5 2/6 2/7 2/8

AMOUNT

AMOUNT

3,427,567.00 1,060,121.00 1,218,910.00 3,681,011.00 298,563.00 74,644.00 9,152.00 38,680.00

796,500.00 80,922.65 -

BILL NO.2 SUB-STRUCTURE TOTAL CARRIED TO SUMMARY (AED) Page - 2/S

9,808,648.00

877,422.65

Page 2/16

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item Bill No. 3
Reinforced in situ concrete, grade C60 with durability requirements as in Specifications Section 3

Qnty

Unit

Rate

Amount

% Complete

A B

Columns Walls Reinforced in situ concrete, grade C45 with durability requirements as in Specification Section 3

184 504

m3 m3

688 688

126592 346752

C D E F

Beams Stairs Swimming Pool base slab Walls for swimming pool

187 73

m3 m3

537 545

100419 39785

G H I J

Lintels / sills Suspended conventional slab (As shown in Dwgs) Parapet walls, coping, counter, etc., Screed in fill to utilities, toilets & baths, etc to match adjacent raised floor area. Formwork

9 1064 128 50

m3 m3 m3 m3

993 537 565 398

8937 571368 72320 19900

K L M N O

To columns To sides and soffits of beams To walls

1237 1059 3613 337 1416

m2 m2 m2 m2 m2

127 73 100 59 59

157099 77307 361300 19883 83544

To stringers and soffits of stairs To vertical sides of parapets, coping, counter etc.,

To base slab / walls of swimming pool

m2

TO COLLECTION

1,985,206.00

Page 2/17

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 3 SUPERSTRUCTURE

A B C

To sides and soffits of lintel / sill To horrizontal soffit of suspended slabs Allow for all recesses, grooves and other labours to formwork Reinforcement

High tensile steel bar of various diameters Sands on roof for A/C units and water tank are included in builder's work for Mechanical Installation and Plumbing & Internal drainage work respectivly

High Duty Polystyrene (Density not less than 40kg/m3 factory cut to suit)

F G H

Light weight screed infill (as required) Lintels/ sills Suspended conventional slab (As shown in Dwgs.)

I J

Parapet walls, coping, counter, etc Screed in fill to utilities, toilet & baths, etc. to match adjacent raised floor area Formwork

K L M N O P

To columns To sides and soffits of beams To walls To stingers and soffits of stairs To vertical sides of parapets, coping, counter etc To base slab/ walls of swimming pool

Page 2/18

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI A B C To sides and soffit of lintel/ sill To horizontal soffit of suspended slabs Allow for all recesses, grooves and other labours to formwork Reinforcement D High tensile stell bar of various diameters Strands on roof for A/C units and water tank are included in Builder's work for Mechanical Installation and Plumbing & Internal drainage works, reqpectively E High Duty Polystrene Density not less than 40k/m3 factory cut to suit) Light weight screed infill (as required) Waterproofing G Water proofing to slabs in kitchens, toilets and bathrooms Water proofing to airwells, balconies & planters Water proofing to external walls behind cladding & glazing Insulation (ref. drawing of wall sections) K Extended polystyrene insulation to internal wall/beam/ slab soffit 50mm thick black mineral fibre insulation mechanically anchored to wall at spandrel panel Sundries M Wall ties 250mm long one end cast into concrete and other end built into joint of blockwork Allow for wall/ slab opening for all services ducts/ pipe, etc. Allow for expansion joint including cover TO COLLECTION BILL NO. 3 SUPERSTRUCTURES Any Other Items
item 5750 975 m2 56 54600 458 m2 30 13740 m2 n/a 299100 kg 6.2 1854420 136 4010 m2 m2 item 114 73 15504 292730 2875

m3

H J

28

m2 item

30

840 20636

m2

included

item

5750

item

5750 2,272,595.00

Page 2/19

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI A Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below : 1 2 3

COLLECTION Page 3/1 Page 3/2 Page 3/3 CARRIED TO SUMMARY


1,985,206.00 0 2,272,595.00 4,257,801.00

Page 2/20

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL - Post tensioning Wroks to Concrete Post Tensioning: Bonded type Supply and install tendons with all accesoriez for installation including anchoring, stressing, grouting, supervision by specialised Engineers, design of all post-tensioned slabs, beams and associated works, submission of detailed drawings and calculation

Structural design must satisfy minimum loading criteria specified on darwings and actual loading for critical areas as well as the slab thickness and other minimum conventional reinforcement specified in the structural drawings/ specification A Submittal of shop drawings with supporting design calculations Beamsand slabs upto and including the ground floor slab is considered under "Sub-structure" and above ground floor slab is considered under "Superstructure" B C Post-tensioning works for slabs (Super-structure) Post-tensioning works for beams (Super-structure)
Item Item 232,639.00 INCLUDED Item 28,750.00

Allow for producing as built drawings Any Other Items

Item

5,750.00

Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below: 1 2 3

CARRIED OUT TO SUMMARY

267,139.00

Page 2/21

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Amount AED

Page 2/22

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 4 BLOCKWORK Autoclaved Aerated Concrete (AAC) light weight block work fully complied with British codes and approved by Dubai Municipality to external walls A B 200mm thick 250mm thick Light weight blockwork (Internal partitions) (Block density not exceeding 850kg/m3) C D E 100mm wall 200mm wall 250mm wall Allow for filling hollow blockwork wall solid with concrete at vertical and horizontal abutments and around openings F G 100mm wall 200mm wall 12mm thick compressible joint filler between top of blockwork wall and concrete structure H J K 100mm thick 200mm thick 250mm wall Sundries L Allow for forming openings for doors, windows, etc in blockwork including all details at jambs, sills and heads Allow for forming expansion joints with Flexel board and mastic seal Allow for the protection of all of the works in this section
Item 2,300.00 157 772 289 m m m2 15 17 19 2,355.00 13,124.00 5,491.00 m2 m2 494 2839 m2 m2 m2 81 88 N/A 40,014.00 249,832.00 228 244 m2 m2 128 147 29,184.00 35,868.00

Item

2,300.00

Item

2,300.00

TO COLLECTION (AED)

382,768.00

Page 2/23

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 4 BLOCKWORK Any Other Items Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below : 1. 300mm thick Autoclave block 2. 400mm thick Light weight block 3. Dry wall partition 4. Fire sealant
283 11 290 1248 m2 m2 m2 m 166 225 230 14 46,978.00 2,475.00 66,700.00 17,472.00

TO COLLECTION (AED)

133,625.00

COLLECTION Page 4/1 4/2 382,768.00 133,625.00

Bill No.4 BLOCK WORK TOTAL CARRIED TO SUMMARY

516,393.00

Page 2/24

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 5 ROOFING Membrane Roofing A Light weight concrete infill (density 600kg/m3) min. thick 40mm, max thick 150mm 4mm thick torch applied waterproofing membrane to roof and rainwater channel as specified in Particular Specification 50mm (minimum) thick extruded polystyrene rigid insulation density35kg/m3 Non woven fabric mesh/ building paper/ 1000 gauge polythene separation layer as approved 600x600x50mm precast plain cement concrete tiles with expansion joints at 3000mm centres both ways laid in and including 30mm thick cement sand bedding Perimeter detail including skirting tile, flashing, mastic fill, sealant with backup rod, groove, fillet at corner, protection board, etc around parapet wall/ airwell/ services Dressing roofing system to rainwater outlets Rain water drain system installation is measured under bill section 'Plumbing & Drainage'
m2

m2

m2

m2

m2

Item

Sundries H Allow for all opening in roof slab and wall/ roof for services inlets and outlets Allow for protection of all the works in this section
Item

Item

BILL NO. 5 ROOFING Any Other Items A Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below :

Page 2/25

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI 1 2 3

Page 2/26

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 6 CARPENTARY AND JOINERY Refer to dwgs for Schedule of Doors Door & frame sets, complete including architraves, sub-frames, fix only hardware set, all finishes, etc., as required and as shown on drawings and specification Supply only hardware set is included as BOQ item below with PC supply rates. A1 A2 A3 A4 A5 A6 Wooden Door - 05 (1000 x 2200mm) Wooden Door - 06 (800 x 2200mm) Wooden Door - 07 (900 x 2200mm) Wooden Door - 07A (900 x 2200mm) Wooden Door - 08 (1100 x 2200mm) Wooden Door - 09 (900 x 2200mm) Supply only hardware set B1 Ironmongery for all doors PC supply only rate AED 350.00/door Door closer for all doors PC supply only rate AED 350.00/door Note : Engineer may delete door closer fully or partly as per his discretion and hence, the actual quantity of the door closer used on site shall be considered and the contract sum shall be adjusted accordingly
No No No NO No No

No

B2

No

BILL NO. 6 CARPENTARY AND JOINERY Supply and fix Kitchen/pantry units with marble/granite worktop including 100mm high plinth A1 A2 Base Unit Wall unit
m m

Page 2/27

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI A3 Extra over item kitchen cabinet base unit for supply and fix sink, mixer, trap, other fixing accessories, etc. including connections, complete (PC supply only sink & mixer AED 650.00/set) A4 30mm thick marble/ granite worktop PC supply only rate of stone AED 450.00/m Extra over item above for 20mm thick marble/ granite splash back (PC supply only rate of stone AED 45.00/m) 100mm high plinth for base unit Vanity Wash Basin Marble/ Granite Counter Top Wash basin natural stone counter top, down fascia, splash back including cutting hole for the wash basin, mastic sealing, hardwood frame, MS angle frame & supports, etc., complete
No m

A5

m m

A6

For the toilets and bathrooms (PC supply only of stone AED 350.00/m2) Mirrors for above vanity tops are measured under bill section 'Glazing' Lockers to change room

m2

3 Tier 300 x 400 x 300 deep High Pressure Laminated (HPL) lockers complete with doors, hardware, accessories, etc. for complete operations. (TRESPA or approved equal)

No

BILL NO. 6 CARPENTARY AND JOINERY Any Other Items Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below :

Page 2/28

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 7 METAL WORK Hollow metal (HM) doors Door & frame sets, complete inlcluding architraves, sub-frames, fixing, all finishes etc. as required and as shown on drawing and specification A1 A2 A3 A4 Door no. HM-02, size 1000 x 2200mm Door no. HM-03, size 1000 x 2200mm Door no. HM-04, size 1000 x 2000mm Door no. HM-05, size 1500 x 2200mm
No No No No

A5

Fire Rated Steel Door - 01 (1100 x 2200mm) Supply only hardware set for Steel doors

No

B1

Ironmongery for all Hollow metal doors except stairs fire escape doors PC supply only rate AED 350.00/door Ironmongery for stairs fire escape doors PC supply only rate AED 2,000.00/door Aluminium Doors and Windows (Refer drawings & specifications)

No

No

B2

No

C1 C2 C3 C4 C5 C6 C7 C8 C9

GL - 01 GL-02 GL-03 GL- 04 GL-05 GL- 06 GL- 07 GL- 08 GL- 09

No No No No No No No No No No No No

C10 GL- 10 C11 GL- 11 C12 GL- 12

Page 2/29

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 7 METAL WORK Aluminium Doors and Windows [Cont'd] (Refer drawings & Specifications) A1 A2 A3 A4 A5 A6 A7 A8 A9 GL-13 GL-14 GL-15 GL-16 GL-17 GL-18 GL-19 GL-20 GL-21
No No No No No No No No No No No No No No No No No No No

A10 GL-22 A11 GL-23 A12 GL-24 A13 GL-25 A14 GL-26 A15 GL-27 A16 GL-28 A17 GL-29 A18 GL-30 A19 GL-31

Page 2/30

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI A20 GL-32 A21 GL-33 A22 GL-34 A23 GL-35 A24 GL-36 A25 GL-37
No No No No No No

BILL NO. 7 METAL WORK Aluminium Doors and Windows [Cont'd] (Refer drawings & Specifications) A1 A2 A3 A4 A5 A6 A7 GL-38 GL-39 GL-40 GL-41 GL-42 GL-43 GL-44 Louvers (Refer drawings & specifications) B1 B2 B3 B4 B5 B6 LV-01 LV-02 LV-03 LV-04 LV-05 LV-06 Super durable polyester powder coated aluminium windows, including timber sub-frames, supply and fix all associated ironmongery, weathersealing, flyscreens and fixing in position as required Curtain Walls (Refer drawings & specifications)
No No No No No No No No No No No No No

Page 2/31

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI C1 C2 C3 C4 C5 C6 CW-01 CW-02 CW-03 CW-04 CW-05 CW-06
No No No No No No

BILL NO. 7 METAL WORK Cat Ladder (Refer detailed drwg. A-451) A A2 Cat ladder from roof to upper roof Cat ladder from ground to first floor Staircase Handrails Refer to drawing nos. A300 to A303 For staircase - 1 Fixed on the wall For staircase - 2 Fixed on the floor Fixed on the wall For staircase - 3 Fixed on the floor 50mm Powder coated stainless steel pipe handrail (refer drwg. A-450) E1 E2 F To Pump Room To Commercial Area 100 x 20mm PESDF coated continuous aluminium box section Canopy/Pergola Steel Canopy, complete including all supports of steel structure, etc. complete (To be design by the Contractor) G1 G2 To Ground Floor Area To Roof Area
Item Item m m m2 m m m

C1 C2

m m m

Page 2/32

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Extra over above item G1 & G2 6mm thick pre finished aluminium composite panel cladding over galvanized steel skeleton structure anchored and braced to main structure

H1 H2

To Ground Floor Area To Roof Area

m2 m2

BILL NO. 7 METAL WORK Any Other Items A Any other tiems not included above but considered to have a monetarey value by the Contractor are to be listed and priced below : 1 2 3

Page 2/33

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 8 FLOOR, WALL AND CEILING FINISHES Insitu Finishes A Cement sand plaster (1:4) 15mm thick to concrete and blockwork walls in two coat work (internally) Ditto to ceilings Cement sand plaster (1:4) 20mm thick to walls in two coat work (externally) Ditto to parapets, etc Allow for expanded metal lathing 300mm wide at junctions of concrete and blockwork Allow for the provision of all grooves, rain water drips and the like as necessary, in plastering
7363 m2 40 294,520.00

B C

895 1095

m2 m2

43 49

38,485.00 53,655.00

D E

437

m2 Item

49

21,413.00

INCLUDED

Item

TO COLLECTION (AED)

408,073.00

Page 2/34

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 8 FLOOR, WALL AND CEILING FINISHES Rate for Floor/ Wall/ Stair/ Step/ etc tiles shall include for jointing and pointing with an approved grout as required and bed with cement sand mortar/ cement based adhesive as approved

Contractor shall allow for plastic edge strips for all ceramic tiles external corners and horizontal edges with matching colours

Floor Finishes F-01, 300 x 300mm Heavy duty unglazed ceramic tiles with matching colour (PC rate for supply only Dhs. 35.00/m2) F-02, 200x 200 unglazed granite tiles with matching colour grout (PC rate for supply only Dhs. 35.00/m2) Raised flooring system, complete (PC rate for supply only Dhs. 150/m2) Extra over ablove item C1 Carpet tile F-03, with matching colour grout on raised floor (PC rate for supply only Dhs.90.00/m2)

12

m2

129

1,548.00

11

m2

129

1,419.00

C1

2498

m2

173

432,154.00

C2

2483

m2

104

258,232.00

F04, 75mm thick Sand cement screed with self leveling compound Nito Floor Top or similar equivalent approved to received finishes by Tenant. F05, Concret slab power floated finish with hardener and sealer coat F06, 75mm thick sand cement screed with epoxy resin based coating F07, 100% solid epoxy flexible wear coat system, seeded into epoxy with manufacturer approved aggregate (i.e. size, washed, dried & bagged), having a minium hardness of six (6) on the Moh scale, at the recommended coverage. The system should have A-1 fire

400

m2

67

26,800.00

127

m2

68

8,636.00

126

m2

55

6,930.00

1740

m2

68

118,320.00

TO COLLECTION (AED)

854,039.00

Page 2/35

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 8 FLOOR, WALL AND CEILING FINISHES Floor Fhishes (Cont'd) A F08, Multi-layered solvent free, rapid curing, 100% soldi flexible epoxy coating system. The system will consist of a primer coat, elastomeric tough seamless waterproofing membrane based on Du Pont Neoprene and abrasion resistance traffic bearing top coa The system should have A-1 fire rating ASTM E86 or equivalent approved coverage F-10, Non Slip epoxy resin coating over precast concrete steps/ landing applied to a thickness of 3mm including non slip aggregate F11, 300 x 300mm precast white cement Terrazzo tiles with Italian chips laid on sand cement mortar bed F-13, 60mm thick precast interlock plain cemnet concrete tiles for pedestrain paved areas

648

m2

107

69,336.00

869

m2

75

65,175.00

104

m2

115

11,960.00

48

m2

96

4,608.00

F-15, 400x 400 porcelain tiles with matching colour grout (PC rate for supply only Dhs. 120.00/m2) F-19, 20mm thick granite slab cut to size with mathcing colour granite border to form pattern (PC rate for supply only Dhs. 350.00/m2) F-20, 300 x 300 ceramic tiles with matching colour grout (PC rate for supply only Dhs. 35.00/m2)

119

m2

231

27,489.00

139

m2

549

76,311.00

195

m2

129

25,155.00

TO COLLECTION (AED)

280,034.00

Page 2/36

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 8 FLOOR, WALL AND CEILING FINISHES Skirting Finishes A S-01, 100mm high porcelain tile skirting to match the floor tiles. (PC rate for supply only Dhs.15.00/m) S-02, 100mm high Terrazzo tiles skirting matching to floor (PC rate for supply only Dhs. 15.00/m) S-03, 100mm high epoxy resin coating - type and colour to match floor S-04, 150mm high epoxy resin coating - type and colour to match floor F12, 600x 600 x 50mm precast plain cement concrete tiles laid in and including cement sand bedding on roof top is measured under bill sention "Roofing" F14, GRP lineron floor slab of water tank (including wall and ceiling) is measure under bill section "Sub-structure" Waterproof membrane laid over structural slab with protection board over & on sides is measured under bill section "Sub-structure" 1398 m 39
54,522.00

83

39

3,237.00

931

13

12,103.00

657

13

8,541.00

Statement Only

Statement Only

Statement Only

TO COLLECTION (AED)

78,403.00

Page 2/37

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 8 FLOOR, WALL AND CEILING FINISHES Marble Threshold 30mm thick polished granite/ marble threshold to approval full width to all wet areas with rounded edges and anchored with stainless steel dowels

Width to match 100mm wide wall (PC supply only AED 100.00/m) Width to match 200mm wide wall (PC supply only AED 200.00/m) Sill Cladding (Ref. Wall Sections)

39

151

5,889.00

20

278

5,560.00

20mm thick polished granite sill at typical floors (PC supply only granite rate AED 200.00/m2 198 56 m2 m 381 23
75,438.00 1,288.00

3mm thick stainless steel strip between different floor finishes as required Marble cladding arround lift wall

95

571

54,245.00

TO COLLECTION (AED)

142,420.00

Page 2/38

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 8 FLOOR, WALL AND CEILING FINISHES Wall Finishes All paint finishes to wall are measured under Bill section 10 A W-13, 200 x 300mm glazed ceramic wall tiles with matching colour grout (PC rate for supply only Dhs. 40.00/m2) W-17, 20mm thick Granite/ Marble stone cut to size anchored to wall in matching colour with stainless stell mechanical fasteners up to 100mm above the suspended ceiling. (PC rate for supply only Dhs.600.00/m2) Decorative Wooden Panel as per Engineer's approval (Refer drawing A-310)

1335

m2

97

129,495.00

767

m2

682

523,094.00

133

m2

748

99,484.00

TO COLLECTION (AED)

752,073.00

Page 2/39

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 8 FLOOR, WALL AND CEILING FINISHES Suspended Ceilings Suspension systems shall be galvanised steel and cilings shall include painting where required by the Engineer All paint finishes as required in the following suspended ceiling system are measured in the Bill section '10' A SC01, 600 x 600mm pre finished decorative perforated gypsum tiles with black acoustic backing and recessed edge suitable for black reveal Fine Line grid suspension system, all surrounded by 12.5mm thick gypsum board bulkhead (25mm lower than ceiling tiles SC02, 6mm thick calcium silicate board ceiling painted with paint type similar to adjacent surface 53 m2 110
5830

66

m2

92

6072

SC03, 1200 x 600mm pre finished gypsum tiles with recessed exge suitable for semi concealed (recessed) suspension system all around, surrounded by 12.5mm thick gypsum board bulkhead (25mm lower than ceiling tiles) painted with paint type-3 SC04, 600 x 600mm vinyl faced moisture resistant gypsum tiles with aluminium back foil and exposed grid suspension system. SC05, 600 x 600mm pre finished aluminium tiles with black reveal Fine Line grid suspension system SC10, 600 x 600mm pre finihsed gypsum tiles with recessed edge suitable for semi concealed (recesssed) suspension system all around, surrounded by 12mm thick gypsum board bulkhead(25mm lower than ceiling tiles) painted with paint type-3 215

m2

N/A

m2

75

16125

2555

m2

156

398580

343

m2

87

29841

TO COLLECTION (AED)

456,448.00

Page 2/40

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 8 FLOOR, WALL AND CEILING FINISHES Sundries A Allow for cutting all holes for light fittings, etc. including any extra hangers, supports, and the like (ceiling) Allow for all cutting and fitting around openings and fittings and narrow widths, etc. (flooring & wall tiling) 600 x 600mm properietary system access panel with concealed hinges/ spring latch, finish to match gypsum ceiling Allow for protection of all of the works in this section Shadow gap Bulk Head 2203 628 Item

INCLUDED

Item

Item

2,300.00

Item

INCLUDED

E F

m m

14 87

30,842.00 54,636.00

TO COLLECTION (AED)

87,778.00

Page 2/41

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 8 FLOOR, WALL AND CEILING FINISHES Any Other Items A Any other tiems not included above but considered to have a monetarey value by the Contractor are to be listed and priced below : 1 2 3
0

TO COLLECTION (AED) Page 8/9

COLLECTION Page no. 8/1


408,073.00

8/2
854,039.00

8/3
280,034.00

8/4
78,403.00

8/5
142,420.00

8/6
752,073.00

8/7
456,448.00

8/8
87,778.00

8/9

BILL NO. 8 FLOOR,WALL AND CEILING FINISHES TOTAL CARRIED TO SUMMARY


3,059,268.00

Page 2/42

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

Page 2/43

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 9 GLASS Note : Glazing to aluminium door and window units is included with the relevant units, Mirror size shall be 600 x 900mm high for pedestal type basin and full width x 1200mm high for vanity type basins Mirrors (Belgium glass) 6mm thick polished plate glass mirrors with bevelled edges and 12mm thick marine plywood (exposed edges sealed with silicon or plastic strip colour to match with adjacent wall finish) backing plugged and screwed to walls with chromium plated dome headed m A B C D Above wash basin pedestal type Above wash basin vanity type Miscellaneous glazing as required Allow for protection of all of the works in this section Any Other Items E Any other tiems not included above but considered to have a monetarey value by the Contractor are to be listed and priced below : 1 2 3 No m2 Item Item

Page 2/44

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 10 PAINTING AND DECORATING Prepare and apply paint on smooth cemnt render, internally TO WALL A W01, Acrylic base Emulsion paint (Paint Type-3) on smooth cand cement plaster W02, Oil based /Alkyd enamel paint (Paint Type4)on smooth cand cement plaster W03, Semi Epoxy paint (Paint Type-2) over fair faced concrete wall W05, Full Epoxy paint (Paint Type-1) over smooth sand cement plaster W06, Non fungus Acrylic paint (Paint Type-5) over fair faced concrete wall W15, Fairface concrete/flush pointed block wall wity tyrolene coat TO CEILING G C-04, Alkyd enamel paint over sand cement plaster C-06, Smooth finished sand cement plaster painted with paint type-02 TO FALSE CEILING Refer to false ceiling SC01, SC03, SC07 & SC10 Acrylic Emulsion paint (Paint Type-3) Refer to false ceiling SC02 m2 m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 2/45

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 10 PAINTING AND DECORATING EXTERNAL DECORATIONS Refer to elevation & section drawings A Full Epoxy Paint System (Paint Type-1) rendering on sand cement plaster, colour & textured m2

30mm thick Natural stone cladding anchored with stainless steel fasteners as required (PC rate for supply only of tiles Dhs.450.00/m2)

m2

Sundry C Allow for the protection of all the work in this section Item

BILL NO. 10 PAINTING AND DECORATING A Any Other Items Any other tiems not included above but considered to have a monetarey value by the Contractor are to be listed and priced below : 1 2 3

Page 2/46

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 10A BUILDER'S WORK Allow for all Builder's work in connection with the Provisional sum items including coordination/liasion with all concerned authorities and sub-contractors and all general and special attendance as required A For nominated Lift installation sub-contract works Also include for steel supports if necessary B For the installation of Signage internal & external Item Item

For the installation of Cleaning cradle system Buidler's work for the installations of following works, which are neither described above nor anywhere in the BOQ, which includes the following but not limited to Excavation, Trenching, Backfilling, Compaction, Concrete blocks, Thrust block, finishes, Pr

Item

D E F

For the Mechanical works For the Electrical works For the Plumbing works

Item Item Item

Page 2/47

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 10A BUILDER'S WORK A Any Other Items Any other tiems not included above but considered to have a monetarey value by the Contractor are to be listed and priced below : 1 2 3

Page 2/48

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 11 PLUMBING & INTERNAL DRAINAGE INSTALLATIONS RAINWATER INSTALLATION Dressing roofing system to sump/ outlet, etc, is within the scope of main contract A Roof rainwater outlet including grating, short pipes and bends through slab/ wall, connection to 100mm dia. Rainwater downpipes, etc. Outlet in balcony for 100mm dia pipe including grating and connection to floor drain 100mm uPVC rainwater pipe including brackets and supports Allow for cast rainwater pipe into concrete/ blockwork Allow for bends, cleanouts, outlets, etc. to rainwater pipe Powder coated aluminium cover to rainwater outlet No.

No.

Item

Item

No.

BILL NO. 11 PLUMBING & INTERNAL DRAINAGE INSTALLATIONS BASEMENT RAINWATER DRAINAGE uPVC pipes including fittings, pipe supports, brackets, rodding eyes, pipe access, access panels and the like. A B Basement floor stormwater pipe line to sump Catch basin Item No.

Page 2/49

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Heavy duty polymer concrete drainage channel, comprising 300x50mm thick heavy duty cast iron grating, including all necessary civil works, etc., complete including silt bucket as shown on drwgs. C D E At ramp At Garbage room Sump pit including heavy duty type cover, sand trap, etc., complete Sump pump comrising two pumps (1D+1SB) 4.2 LPS @ 10m head including automatic switchover facility, high and low level float switches, all interconnecting pipework, valves, fittings, controls and control panel, etc. complete m m No.

Item

Pumping main from sump pump to waste line including all bends, clean outs, fittings, etc. complete

Item

BILL NO. 11 PLUMBING & INTERNAL DRAINAGE INSTALLATIONS SANITARY INSTALLATION (Supply of sanitary wares and accessories is included as provisional sum) Fix only sanitary ware, taps and accessories including waste outlets, traps, connections to hot and cold water supplies and wastes, compelete

A B C

Pedestal type wash basin + mixer Vanity type wash baisn + mixer WC seating type including low level flushing cistern, compelte

No. No. No.

Page 2/50

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI D Urinal Fix only approved accessories including forming recesses and making good as required E Robe hook, Toilet roll holder, Soap holder, Towel rail, Towel ring, Tissue holder, forming recesses and making good as required Item No.

BILL NO. 11 PLUMBING & INTERNAL DRAINAGE INSTALLATIONS SANITARY INSTALLATION Pipes and Fittings, etc A uPVC waste, soil and vent pipes including fittings, pipe supports, brackets, rodding eyes, access panels and the like Waste pipe with bend to wash basin/ sink Floor trap Gully trap Allow for connections to underground drainage pipes Manhole F Pressure breaking MH with heavy duty type cover, complete MH 600x600mm with heavy duty type cover, complete Ditto - (F.I.C), DI cover medium duty recess type with 6mm thick GRP push fit sealing plate No. Item

B C D E

No. No. No. Item

No.

No.

Allow for connection to DM sewer system HOT AND COLD WATER INSTALLATION

Item

Page 2/51

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Equipment K Provide all connections to concrete underground water tank to incoming and outgoing service, neck, vent, access cover and frame, etc., as required -Ditto- to roof tanks Ladder & air-tight covers to u/g water tank are measured under bill 'Sub-structure' Item

Item

BILL NO. 11 PLUMBING & INTERNAL DRAINAGE INSTALLATIONS HOT AND COLD WATER INSTALLATION (Cont'd) Roof mounted water tank Roof mounted approved cold water storage tank GRP sectional insulated panel type all connections to incoming services, interconnection, overflow, drain and supply high and low level float switches, etc A Size 2 compartments 3.0 x 10.60 x 2.5m h. with 70m3 water capacity Transfer pump set comprising two nos. (1W+1SB), Each 250 USGPM @ 9 bar including automatic switchover facility, float switches, all interconnection pipework, valves and fittings, controls and control panel, etc, Water supply booster pump set two nos. (1W+1SB) 7L/S @ 2 Bar. Each with controls and pane, 100 GPM pr. Vessel, by-pass line and aluminium enclosure including all interconnecting pipework, valves and fittings Supply of water meter is not in the scope and part of DEWA connection. However all liasions, coordinations and all buider's works in connection with the DEWA connection are in the scope No.

Item

Item

Page 2/52

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI D Valve pit, valves, etc., at site entry including collect and fix water meter Main supply from meter to underground tank and to roof tank Collect and fix all water meter complete and valves, etc., for individual areas/ flats Item

Item

Item

BILL NO. 11 PLUMBING & INTERNAL DRAINAGE INSTALLATIONS HOT AND COLD WATER INSTALLATION (Cont'd) Pipes, Fittings, etc. A CWS supply pipe to individual apartments and other areas as required Cold/ Hot water distribution pipework with cross linked polethylene pipe & conduit sytem, all fixing accessories, etc. complete to all fittings such as sanitary wares, water heater, etc Item

Item

Insulated copper hot water supply pipework including fittings, supports, brackets, etc, from water hearters to supply points Allow for all other valves as required Bib taps Water heater, 30 litre capacity Water heater, 50 litre capacity Sundries

Item

D E F G

Item No. No. No.

H J

Allow for suitable protection to CWS pipes UV protection and heat insulation for weather exposed piping

Item Item

Page 2/53

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI K Allow for cleaning, sterilizing and disinfecting the plumbing and internal drainage installation as specified Allow for testing and commissioning the plumbing and internal drainage installation Allow for producing as built drawings and manuals as specified Item

Item

Item

BILL NO. 11 PLUMBING & INTERNAL DRAINAGE INSTALLATIONS Any Other Items A Any other items not included above buty considered to have a monetary value by the Contracted are to be listed and priced below : 1 2 3

Page 2/54

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 12 ELECTRICAL INSTALLATION Include for the supply & complete installation as detailed in the Specifications and on the Drawings and to the complete satisfaction and approval of the Engineer and all concerned Statutory Authorities and under the following sections. A Allow for all liasions, coordinations and all builder's works in connection with the DEWA connection including collect and install KWH meter, etc. LV panels including breakers, terminations, isolators, all necessary cabling including cable ladder,/ conduits, cleats all fittings trace and trunking supports emergency push buttons, current transformers, power factor correctors, accessories as per DEWA B1 B2 B3 L.V Panel - 1 L.V Panel - 2 Capacitor bank 350 K.V.A.R LIGHTING AND POWER Sub main distribution boards including MCCB's breakers, Terminations, isolators supports, accessories, etc., complete C1 C2 C3 C4 C5 C6 C10 C11 C12 C13 C14 C15 C16 SMDB - ESS SMDB - B SMDB - COM SMDB - CHILLERS SMDB - CH SMDB - LL SMDB - T1 SMDB - T2 SMDB - T3 SMDB - T4 SMDB - T5 SMDB - T6 SMDB - T7 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. Item

Page 2/55

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 12 ELECTRICAL INSTALLATION (Cont'd) Distribution boards including breakers, terminations, isolators, supports, accessories, capacitor banks, built in meters, etc., complete A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23 B DB-LL2-ESS DB-LL1-ESS DB-R-ESS DB-B-ESS DB-S/S DB-G DB-LL1 DB-MAIN TELE DB-ROOF TELE DB-LL2 DB-COM-1 DB-COM-2 DB-B1 DB-B2 DB-B3 DB-GYM DB-PM DB-T1-OF1 DB-T1-OF2 DB-T1-OF3 DB-T2-OF1 DB-T2-OF2 DB-T2-OF3 Isolators including accessories Isolators No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.

Item

BILL NO. 12 ELECTRICAL INSTALLATION (Cont'd) A Cable to all mechanical/ electrical equipments Supply & install B Lighting protection system and structural bounding complete Item Item

Page 2/56

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Cables for Sub main distribution boards and distribution boards C D From LV panels to SMDB's From SMDBs to DB's Light Fittings The supply of light fittings is included as a Provisional Sum Fix only light fittings as specified and as shown on drawings including supports, fixings, terminations, connections, brackets, etc Lighting/ General power installation including supply and fix switches/ sockets, wiring, ladders, ducts/conduits, cleats, trays, trunking, cable trays, fittings, accessories, connections, etc., all as necessary, compelete F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 Lighting point, internal Lighting point, external One gang one way light switch One gang two way light switch Two gang one way light switch Three gang one way light switch Four gang one way light switch Grid switch unit Time delay switch 13 amp single switched socket outlet - Ditto - weather proof 13 amp double switched socket outlet 15 amp single switched socket outlet 15 amp flex outlet 20 amp double pole switch with neon indicator Call bell indicator Bell push button Floor box No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. Item Item

Item

BILL NO. 12 ELECTRICAL INSTALLATION STRUCTURED CABLING SYSTEM

Page 2/57

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Supply and installation of Structured Cabling is including as Provisional sum A1 Voice/ Data outlet points, junction boxes, underground trunking & conduits to approval Voice/ Data conduiting from the master line jack unit to all other outlets by a tele-communication authority approved contractor as per Specification Item

A2

Item

A3 A4 A5

Allow for all cable tray for Voice/ Data cables Allow for Voice/ Data cable trunking Allow for all ducts for incoming telephone cable to Etisalat's spec. & detail Allow for all other necessary underground ducts and conduits with draw wires Lead-in-conduits as required Allow for Telephone manholes and earthing complete as required G.S.M

Item Item Item

A6

Item

A7 A8

Item Item

B1

All conduits, supports, containments and Electrical works as per Tele-Communication Authority (Etisalat, etc.) requirements Cable trays Allow for Earthing system, complete Allow for connections to air conditioning, drain equipment etc.

Item

B2 B3 B4

Item Item Item

BILL NO. 12 ELECTRICAL INSTALLATION CATV System

Page 2/58

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI A Containment only (including all builder's work) Supply and install conduits/ cable trays as per drawings with draw wires, and all related civil works to CATV system Supply and installation of MATV/SMATV system is included as Provisional sum Containment only (including all builder's work) Supply and install conduits with draw wires and all builder's work to MATV/SMATV system Supply and installation including testing & commissioning of Generator is included as Provisional sum Builder's work only Allow for all builder's work as required for the complete gernerator installation including its unloading, temporary stroring, placement & positioning, supply & fix of all cabling, piping, ductwork, acoutstic treatment, pedestals, etc. Fuel Storage Tank and Fuel Filling System Allow for supply and install Fuel Storage Tank and Fuel Filling System for the above mentioned Generator Supply and installation of intercom system is included as Provisional sum Containment only (including all builder's work) Supply and install conduits with draw wires and all builder's work to the intercom sytem Gate barriers (supply & fix is measured in Bill section 'External Works') Containment only (including all builder's work) Supply and install conduits with draw wires and builder's work to Gate barriers

Item

Item

Item

Item

Item

Item

BILL NO. 12 ELECTRICAL INSTALLATION Sundries

Page 2/59

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI A B C Allow for Earthing system, complete Clean Earth Allow for connections to air conditioning equipment, fans, water, heaters, etc Allow for producing as built drawing and manuals as specified Allow for third party testing and commissioning the electrical installation Allow for the proctection of all the work in this section Item Item Item

Item

Item

Item

BILL NO. 12 ELECTRICAL INSTALLATION Any Other Items A Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below : 1 2 3

Page 2/60

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 13 MECHANICAL INSTALLATION AIR-CONDITIONING & VENTILATION All external A/C units to be isolated from roof structure by approved vibration isolation material

Air-Conditioning - as specified and as shwon on drawings Chillers A Water chiller units CH! & CH2 cooling capacity 94 TR Pumps - including all valves, pressure guage, flexible connection, etc., compelte B Primary chilled water pumps 3 nos.(2W + 1SB) capacity 226 GPM@ 100ft head (exact head to be determined by the Contractor and to Engineer's approval) Secondary chilled water pumps 2 nos. (1W+1SB) capapcity 451GPM @ 100ft head (exact head to be determined by the Contractor and to Engineer's approval) Chilled Water Pressurisation Unit - 1Set D Automatic package unit comprising of 2 nos. feed pump ses (duty + standby), feed tank and 2 nos. expansion vessel (unit capacity to be calculated by Contractor and approved by Engineer) Item Item No

Item

Chemical Dosing Unit E Chemical dosing unit including sensors, and controllers Fresh Air Supply F Fresh Air Handling Unit including run around coil heat exchanger, heat pipe, filters, all control & fire dampers, ductwork, VCD, grillers, etc., to all floors, complete (FAHU 1) Item Item

Page 2/61

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 13 MECHANICAL INSTALLATION AIR-CONDITIONING & VENTILATION Chilled water system air-conditioning including air handiling units, fan coil units, chilled water piping, all valves, all ducting, grilles, diffusers, etc., complete to the following area A1 A2 A3 A4 A5 A6 A7 A8 A9 Basement floor -3 Basement floor -2 Basemnet floor - 1 Ground floor Floor - 1 Floor - 2 Floor - 3 Floor - 4 Floor - 5 Item Item Item Item Item Item Item Item Item Item Item Item

A10 Floor - 6 A11 Floor - 7 A12 Roof Floor

BILL NO. 13 MECHANICAL INSTALLATION

Page 2/62

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI AIR-CONDITIONING & VENTILATION Exhaust air systems to the following including exhaust fans, all ducting, grilles, diffusers, etc., as required complete A Car Park (Basement - 3) Unit : EF - 1&2 Car Park (Basement - 2) Unit : EF - 1&2 Laundry (Basement - 1) Unit : EF - 1&2 Guard Room (Ground floor) Unit : EF - 1 Garbage Room (Ground floor) Unit : EF - 2 Toilet (Ground floor) Unit : EF-3 Roof floor Unit : EF-1 Unit : SMK-1 Staircase Pressurisation Fans SPF - 1 & 2 Item

Item

Item

Item

Item

Item

Item

Item

BILL NO. 13 MECHANICAL INSTALLATION Builder's Work A Allow for all builders work in connection with the mechanical installation including but not limited to the following : a) Concrete stand/ foundation for A/C units including anti-vibration pads, springs b) Forming opening in slab for SA/RA duct/ refrigernat pipes, etc. c) Painting of all equipment, duct work and accessories d) Walkovers over pipting, ducting as required e) Inertia bases for pumps f) Floating floor for chillers Sundries

Item

Page 2/63

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI B Allow for all control panels, thermostats, controls, etc Allow for necessary connections, terminations control wiring, etc. complete Allow for condensate drain pipework, fittings, insulation, 'U' traps and connections to discharge into the nearest floor trap from all A/C equipments Allow for testing and commissioning the air conditioning & ventilation installation Allow for protection of all of the works in this section Allow for any acoustic treatment to chillers, surroundings, other equipment, ducts, etc. Item

Item

Item

Item

Item

Item

BILL NO. 13 MECHANICAL INSTALLATION Any Other Items A Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below : 1 2 3

Page 2/64

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 14 FIRE ALARM Fire alarm installation including all wiring, conduits, connections and the like A B C D E F G H J K L Repeater panel Fire alarm control panel interfacing unit Smoke detector Heat detector Fire voice evacuation speaker Fire alarm electric sounder Fireman Telephone -Ditto- weatherproof Break glass call bell unit Allow for all interconnecting wiring, conduits, etc. for the system Supply and Fix Emergency Lighting M N P Q R Emergency light fittings Emergency light fitting with EXIT sign Emergency light fitting with EXIT + arrow sign Central emergency battery cabinet Any Other Items Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below : 1 2 3 No. No. No. No. No. No. No. No. No. No. No. No. No. No. Item

Page 2/65

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI

BILL NO. 15 FIRE PROTECTION Extinguishers A 4.5kg dry powder wall mounted hand operated extinguisher 5.0kg CO2 wall mounted hand operated extinguisher 5.0kg automatic dry powder fire extinguisher Landing valve/ FHR/ Fire extinguisher cabinet D Stainless steel mirror finish recessed type cabinet for FHR, Fire extinguishers and LV - Ditto - surface mounted type No. No.

No.

No.

No.

BILL NO. 15 FIRE PROTECTION Wet Riser/ Sprinkler A B C Fire Hose reel Landing valve with hose, etc. Wet riser pipework system complete including all valves, flow switches, etc., as required, completed Sprinkler pipework system complet including all valves, flow switches, etc., as required, complete No. No. Item

Item

Page 2/66

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI E Fire Protection pump set 3 Nos. (1 electric + 1 deisel + 1 jockey) main pump 750 GPM @ 9.6 Bar, Jockey 40 GPM @@ 9.6 Bar including fuel storage tank, pipework, valves, connections, automatic control panel, controls, cabling, pressure and flow switches, fl Sprinkler, pendent/ upright type Breeching inlets (Dry Riser) G Twin Inlet breaching point complte with recessed decorative mirror finish stainless steel cabinet, complete Breeching inlet pipework system including all valves as required, complete Sundries J Allow for all builders work in connection with the Fire Proetection Installation Allow for testing and commissioning the fire protection installation Allow for producing as built drawings and manuals Item Item Item

Item

Item

Item

Item

BILL NO. 15 FIRE PROTECTION Any Other Items A Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below : 1 2 3

Page 2/67

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI Item BILL NO. 16 GARBAGE DISPOSAL Garbage Chute/ container trolley (Refer drwg.A-345) A Garbage chute complete as per drawing comprising chute vent, axial blowing exhauster, access door, draft control flap, flughing spray head, loose linen intake door at each floor, Chute tube, supporting frames, automatic brushing device, etc., complete Supply and install Garbage bin trolley, capacity 2.50m3 each No.

Page 2/68

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 17 EXTERNAL WORKS PAVING A B C D Excavate oversite to reduce levels Backfill with selected excavated material Remove surplus excavated material from site Imported fill in making up levels compacted in layers Kerbs Precast hydraulically pressed concrete kerb with foundation and haunching, mortar including all necessary excavation, disposal and backfilling m m m3 m3 m3

E F G

150 x 305mm. Upstand kerb 150 x 225mm, Flush kerb Two coats of chlorinated rubber based quick drying paint in approved colours (black/yellow/white) to upstand kerbs

BILL NO. 17 EXTERNAL WORKS Footpaths A 150mm thick aggregate road base, compacted to minimum CBR 80%, MDD 95% m2

Page 2/69

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI B 60mm thick, interlocking concrete paving blocks, shape, size and colour as approved, laid in multicolour and pattern on an includin 50mm thick sand bed. 50 mm thick crushed sand bed, compacted 150mm thick sub base type II, compacted to minimum CBR 30%, MDD 95% 150mm thick aggregate road base, compacted to minium CBR 80%, MDD 100% Interlocking pavers, 80mm thick laid on land including 50mm thick sand bed in multi-colour and pattern to approval Allow to all necessary works at existing road edge including saw cutting etc., to Municipality approval, as required General H Allow to match new paving upto existing and form a neat, level joint Road marking to external parking and driveway including all parking separation lines, arrows, hatching, etc., complete as shown on drawings and specifications Electricity Operated Gate Barrier Electricity operated remote controlled/ card operated barrier full width across driveway, complete as shown on dwg. (Manufacturer's details and shop drawings to approval) K1 Gate barrier system at the ground floor entrance to and from the basement floor parking complete Item Item m2

C D

m2

Item

Item

K2

Supply of remote control handsets OR electronic cards to Engineer's approval - (Total no. of parking + extra 10nos.)

Page 2/70

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI BILL NO. 17 EXTERNAL WORKS Any Other Items A Any other items not included above but considered to have a monetary value by the Contractor are to be listed and priced below : 1 2 3

Amount (AED)

Contractor's Total Mark-up (AED) Amount (AED)

50,000.00 200,000.00 600,000.00 Provisional Sums Item 1 Supply only Sanitary ware, Mixers, Accessories 350,000.00 20,000.00

2 3 4 5

Supply only Light Fittings Passenger Lifts (2nos) Supply & install cleaning Cradle system Supply & install MATV/ SMATV system with cabling Supply & install Structured Cabling System Supply, install, testing & commissioning of Generator Supply & install Building Directory Supply & install Internal and External Signage

400,000.00 250,000.00 15,000.00 20,000.00

6 7

2,000,000.00

8 9

Page 2/71

BOQ(1/8)

PROJECT NO. -1348 PROPOSED OFFICE BUILDING ON PLOT NO. 373-1136 AT AL BARSHA FIRST, DUBAI 10 Contingency

Page 2/72

BOQ(1/8)