ENGINEERED SYSTEMS

Get the benefits of Pfaudler's Thin Film Evaporator (TFE) for your application: SHORT-PATH DISTILLATION PURIFICATION OF HEAT-SENSITIVE COMPOUNDS HIGH VACUUM OPERATION ( < 1 MICRON) CONCENTRATION OF VISCOUS MATERIALS

Application Questionnaire
BOTH WIPED AND FIXED CLEARANCE DESIGNS AVAILABLE LOW HORSEPOWER MOTOR EASY ROTOR REMOVAL

Thin Film Evaporator

Pfaudler has a complete TFE Pilot Plant Test Facility available to demonstrate your application. Pfaudler will type, size and quote a TFE for your application if you will complete and return this questionnaire. Customer: Address: Customer Contact: Phone # Fax # Date:

Pfaudler has proprietary software that it uses to simulate Thin Film Evaporator applications in order to optimize equipment or system design.Please fill in as much information as possible concerning your application to aid us in our evaluation. This Word form can be filled out on the computer or printed out and completed by hand. Please mail, fax or email the completed form to Pfaudler.

APPLICATION/OBJECTIVES/SPECIAL PURITY REQUIREMENTS:

Compound 1) 2) 3) 4)

MATERIAL BALANCE (@ Production Molecular % By Weight Weight Totals PHYSICAL PROPERTIES


Compound 1 Compound 2 Compound 3

Rate) Feed (lbs/hr)

Distillate (lbs/hr) Feed Distillate

Bottoms (lbs/hr) Bottoms

Decomposition Temperature (F) Viscosity (cP) Melting Point (F) Specific Gravity Specific Heat (BTU/lb-F) Latent Heat (BTU/lb) Conductivity (BTU/hr-sqft-F) Vaporization Temperature (F) * Vaporization Temperature (F) * * Vapor pressure curves or at least two (2) vapor pressure points are required for simulation program. Desired Operating Conditions: Feed Temperature (F): TFE Pressure (Torr): Jacket Temperature (F):

Compound 4

ENGINEERED SYSTEMS
A Unit of Robbins & Myers, Inc.

Thin Film Evaporator


Page 1 of 2

Application Questionnaire
THIN FILM EVAPORATOR SYSTEM EQUIPMENT INFORMATION To have Pfaudler provide the TFE as a pre-assembled, skid-mounted system please specify which of the following equipment items should be included Required Item Type or Manufacturer Preference Material of Construction (Y/N) Wiped Film Evaporator Pfaudler Fixed Clearance Evaporator Pfaudler TFE Condenser Pfaudler Distillation Column Pfaudler Feed Pump Feed Preheater Feed Degasser Bottoms Level Tank & Pump Distillate Level Tank & Pump Bottoms Cooler Vacuum System Hot Oil Heating System Process Piping INSTRUMENTATION / CONTROLS Flow Trans. Pref. Mfr. Level Trans. Pref. Mfr. Press.Trans. Pref. Mfr. Temp. Trans. Pref. Mfr. Cntrl Valve Pref. Mfr. *List other pref. instr. vendors below. Local Controls Pref. Mfr. PLC Controls Pref. Mfr. Operator Interface (HMI) Data Logging Historical Trending Batch Reporting PC Based HMI Pref. Mfr. Touchscreen Pref. Mfr. Control Panel Location NEMA Rating/MOC MISCELLANEOUS Please specify any other miscellaneous equipment, instrumentation, piping, specialty items, or design criteria that are required. (Please add another sheet if required.)

UTILITIES AVAILABLE Steam Pressure (psig) Hot Oil (specify type) Pressure (psig) Temperature (F) Coolant (specify type) Pressure (psig) Temperature (F) Refrigerant (specify type) Pressure (psig) Temperature (F) Instrument Air Press. (psig) Electricity Volts/Phase/Hertz
Mail, Fax, or E-mail to:

Pfaudler, Inc. Engineered Systems P.O. Box 23600 1000 West Avenue Rochester, NY 14692-3600

NFPA ELECTRICAL CLASSIFICATION PLANT LOCATION New or Existing Building Space Available (ft) Length Width Height PROJECT STATUS Budget Price or Firm Price Required Funding Approved (Y/N) Projected Purchase Date Projected Start-Up Date Class Division Group(s)
Phone: (585) 235-1000 Fax : (585) 235-3048 Email: mpowers@pfaudler.com Rev: 5: 7/21/06