ARROW JUICE FACTORY PROPOSED ARROW JUICE FACTORY JEDDAH U.

G SEPTIC TANK 1 Item Description

BILLS OF QUANTITIES HEK ENGINEERING CONSULTANTS BILL No. 11 (Rev. 0) DIVISION - 2 - Site Works Quantity Unit Unit Price SR Amount SR

DIVISION 02 - SITEWORK Earthworks: Excavation in any class of ground including rock, commencing at existing ground level including surface treatment and earthwork support etc. complete A B Excavation for tank Backfill around tank Disposal C Disposal of material arising from excavation 1 Item 300 300 504 77 m3 m3 25 35 12,600 2,695

To General Summary

15,595

1/30/2013

126925498.xls.ms_officeDiv-02

Page 1of5

BILLS OF QUANTITIES
ARROW JUICE FACTORY PROPOSED ARROW JUICE FACTORY JEDDAH U.G SEPTIC TANK 1 Ref. DESCRIPTION DIVISION 03 - CONCRETE WORK SUBSTRUCTURE Supply and poured concrete specification and related drawings in accordance with HEK ENGINEERING CONSULTANTS BILL No. 11 (Rev. 0) Division 03 - Concrete Works Unit Price SR Amount SR

Quantity Unit

Plain concrete with sulfate resisting (type V) cement and minimum compressive strength of 20N/mm2 (Cylindrical)28 days, tamped finish including formwork A B Lean blinding concrete below tank Protection Screed 35 mm thick Reinforced concrete with sulfate resisting type-V cement and minimum compressive strength of 35 N/mm2 (Cylindrical) after 28 days including reinforcement of 420 N/mm2 high yield deformed steel bars or as specified and formwork, exposed faces fair face C Walls tank Reinforced concrete with sulfate resisting type-V cement and minimum compressive strength of 30 N/mm2 (Cylindrical) after 28 days including reinforcement of 420 N/mm2 high yield deformed steel bars or as specified and formwork, exposed faces fair face D E F Base for tank, top slope towards sump(limitized 80 kg) Drop beams Top slab 45 2 18 m3 m3 m3 950 1,600 1,520 42,750 3,200 27,360 53 m3 1,600 84,800 11 4 m3 m3 380 400 4,180 1,600

To General Summary

163,890

1/30/2013

126925498.xls.ms_officeDiv-03

Page 2 of 5

BILLS OF QUANTITIES
ARROW JUICE FACTORY PROPOSED ARROW JUICE FACTORY JEDDAH U.G SEPTIC TANK 1 Ref. DESCRIPTION DIVISION 05 - METAL WORKS A Supply and fix 600 x 600 mm heavy duty cast iron manhole cover and frame welded fish plate 200 x40x6 mm embeded in concrete. 1 no. 1,250 1,250 HEK ENGINEERING CONSULTANTS BILL No. 11 (Rev. 0) Division 05 - METAL WORKS Unit Price SR Amount SR

Quantity Unit

To General Summary

1,250

1/30/2013

126925498.xls.ms_officeDiv-05

Page 3of5

BILLS OF QUANTITIES
ARROW JUICE FACTORY PROPOSED ARROW JUICE FACTORY JEDDAH U.G SEPTIC TANK 1 Ref. DESCRIPTION DIVISION 07 - THERMAL AND MOISTURE PROTECTION Sub-Structure: A Supply and lay 1000 gauge (or 250 microns) polyethylene sheet vapour barrier. Supply and fix one layer of 4 mm thick waterproof membrane torch applied B C Horizontal and vertical surfaces Supply and fix protection board 50 mm polystyrene or styrofoam Supply and fix uPVC 230 mm wide water stop bar 300 m2 65 19,500 8,358 105 m2 5 525 HEK ENGINEERING CONSULTANTS BILL No. 11 (Rev. 0) Division 07 - Thermal & Moisture Protection Unit Price SR Amount SR

Quantity Unit

199 41

m2 m

42 65

2,665

To General Summary

31,048

1/30/2013

126925498.xls.ms_officeDiv-07

Page 4of5

BILLS OF QUANTITIES
ARROW JUICE FACTORY PROPOSED ARROW JUICE FACTORY JEDDAH U.G SEPTIC TANK 1 Ref. DESCRIPTION GENERAL SUMMARY Division 02 - Sitework Division 03 - Concrete Work Division 05 - Metal Works Division 07 - Thermal & Moisture Protection 15,595 163,890 1,250 31,048 HEK ENGINEERING CONSULTANTS BILL No. 11 (Rev. 0) General Summary Unit Price SR Amount SR

Quantity

Unit

To Main Summary

211,783

1/30/2013

126925498.xls.ms_officeSum