ATRIP Project Cost By Selection Round

Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 1 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Autauga County
ATRIP No.
01-03-03

Div.
County
06 AUTAUGA

Sponsor

Project Description
Resurface CR-165 from SR-14 to US-82

Local Amt
$148,000.00

ATRIP Amt
$592,000.00

Total Cost
$740,000.00

01-03-04

06

AUTAUGA

Resurface CR-40 from CR-19 to CR-1

$170,000.00

$680,000.00

$850,000.00

01-03-05

06

AUTAUGA

Resurface CR-37 from US-82 to Billingsley School

$110,000.00

$440,000.00

$550,000.00

01-03-06

06

AUTAUGA

Resurface CR-57 from Prattville City Limits to Posey Crossroads

$210,000.00

$840,000.00

$1,050,000.00

01-03-07

06

AUTAUGA

Resurface CR-4 from SR-14 to US-31

$160,000.00

$640,000.00

$800,000.00

Prattville

Totals for Autauga County 5 Projects

0 Bins

$798,000.00

Local Total

ATRIP Total

$3,192,000.00 Total Cost

$3,990,000.00

Projects Identified for Baldwin County


ATRIP No.
02-03-23

Div.
County
09 BALDWIN

Sponsor

Project Description
Additional turn lanes & signals at US-98 and CR-65

Local Amt
$524,600.00

ATRIP Amt
$498,400.00

Total Cost
$1,023,000.00

02-03-24

09

BALDWIN

Intersection improvements at CR-64 and CR-13

$885,000.00

$540,000.00

$1,425,000.00

02-03-28

09

BALDWIN

Resurface CR-20 from SR-59 to S. Hickory St

$266,000.00

$1,065,000.00

$1,331,000.00

02-03-29

09

BALDWIN

Robertsdale

Ext. of Wilters from CR-83 to SR-59

$228,380.40

$913,521.60

$1,141,902.00

02-03-31

09

BALDWIN

Foley

Ext Pride Dr from SR-59 to CR-20 etc

$4,463,570.43

$12,129,553.69

$16,593,124.12

Totals for Baldwin County 5 Projects

0 Bins

Local Total

$6,367,550.83

ATRIP Total

$15,146,475.29 Total Cost

$21,514,026.12

Projects Identified for Blount County


ATRIP No.
05-03-03

Div.
County
01 BLOUNT

Sponsor

Project Description
Resurface CR-8 from Jefferson county line to SR-160

Local Amt
$219,612.68

ATRIP Amt
$878,450.72

Total Cost
$1,098,063.40

05-03-04

01

BLOUNT

Resurface CR-29 from CR-27 to US-231

$109,175.11

$436,700.45

$545,875.56

05-03-05

01

BLOUNT

Resurface CR-26 from Blount/Cullman line to US-231 & SR-75

$728,229.34

$2,912,917.37

$3,641,146.71

Totals for Blount County 3 Projects

0 Bins

Local Total

$1,057,017.13

ATRIP Total

$4,228,068.54 Total Cost

Projects Identified for Butler County


ATRIP No.
07-03-01

Div.
County
06 BUTLER

07-03-04

06

BUTLER

07-03-06

06

BUTLER

Sponsor
Greenville

Project Description
Resurface CR-50 from SR-10 to Crenshaw county line

Local Amt
$244,555.44

ATRIP Amt
$978,221.78

Total Cost
$1,222,777.22

Resurface Conecuh St from SR-10 to US-31 in Greenville

$239,200.00

$696,800.00

$936,000.00

Resurface CR-45 and CR-59 from US-31 to Pigeon Creek

$424,863.00

$1,699,453.00

$2,124,316.00

$5,285,085.67

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 2 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Butler County
ATRIP No.
07-03-07

Div.
County
06 BUTLER

Sponsor

Project Description
Resurface CR-45 from SR-106 to CR-59

Totals for Butler County 4 Projects

0 Bins

Local Total

Local Amt
$531,808.00

$1,440,426.44

ATRIP Total

ATRIP Amt
$2,127,232.00

Total Cost
$2,659,040.00

$5,501,706.78 Total Cost

$6,942,133.22

Projects Identified for Calhoun County


ATRIP No.
08-03-03

Div.
County
04 CALHOUN

Sponsor

Project Description
Resurface CR 55 (Choccolocco Road) from Scarbourgh Lane to
SR-9

Local Amt
$315,122.51

ATRIP Amt
$1,260,490.03

Total Cost
$1,575,612.54

$96,287.33

$385,149.33

$481,436.66

$380,000.00

$1,520,000.00

$1,900,000.00

$1,254,861.00

$4,013,665.00

$5,268,526.00

08-03-05

04

CALHOUN

Weaver

Resurface Main St Astor Ave Alexandria Rd Cedar Spgs Rd

08-03-06

04

CALHOUN

Jacksonville

Road improvements at 10 intersections along SR-21

08-03-07

04

CALHOUN

Anniston

Iron Mtn Rd Extension from Pappy Dunn Blvd to SR-21

08-03-15

04

CALHOUN

Resurface Boiling Springs Road from the Talladega C/L to SR-77

$243,830.40

$975,321.60

$1,219,152.00

08-03-16

04

CALHOUN

BR on Choctaw Street

$151,872.00

$607,488.00

$759,360.00

08-03-17

04

CALHOUN

BR on Grayton Road

$277,048.00

$1,108,192.00

$1,385,240.00

08-03-18

04

CALHOUN

BR on Verbon George Road

$191,888.00

$767,552.00

$959,440.00

08-03-19

04

CALHOUN

BR on Wellington Road

$75,704.00

$302,816.00

$378,520.00

08-03-20

04

CALHOUN

BR on Gilbert's Ferry Road

$169,880.00

$679,520.00

$849,400.00

08-03-21

04

CALHOUN

BR on Brown Ridge Road

$259,601.60

$1,038,406.40

$1,298,008.00

08-03-22

04

CALHOUN

BR on Steinburg Road

$335,504.00

$1,342,016.00

$1,677,520.00

Totals for Calhoun County 12 Projects

7 Bins

Local Total

$3,751,598.84

ATRIP Total

$14,000,616.36 Total Cost

Projects Identified for Chambers County


ATRIP No.
09-03-03

Div.
County
04 CHAMBERS

09-03-04

04

CHAMBERS

09-03-05

04

CHAMBERS

09-03-06

04

CHAMBERS

09-03-07

04

CHAMBERS

Sponsor
Valley

Project Description
Resurface Fob James Dr from Fairfax Bypass to US-29

Valley

Resurface 30th Street and 12th Avenue & Resurface 12th Ave
from 30th to End of Road
Resurface CR-84 from Hwy-50 to Bridge 40

Lanett

Resurface Magnolia Rd from 21st Ave to Near US-29


Resurface CR-299 from CR-83 to CR-208

Local Amt
$179,120.37

ATRIP Amt
$716,481.49

Total Cost
$895,601.86

$82,364.23

$329,456.90

$411,821.13

$301,967.76

$1,207,871.04

$1,509,838.80

$93,926.61

$375,706.46

$469,633.07

$330,659.29

$1,322,637.18

$1,653,296.47

$17,752,215.20

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 3 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Chambers County
ATRIP No.
09-03-08

Div.
County
04 CHAMBERS

Sponsor

Project Description
Road Improvements to CR-289 and 222 from CR-216 to US-431

Local Amt
$401,330.44

ATRIP Amt
$1,605,321.76

Total Cost
$2,006,652.20

09-03-11

04

CHAMBERS

Road Improve to CR-210 from CR-84 to CR-202

$158,006.79

$632,027.13

$790,033.92

09-03-12

04

CHAMBERS

Full Depth Reclamation of CR-222 from CR-289 to End of Road

$200,192.98

$800,771.94

$1,000,964.92

09-03-13

04

CHAMBERS

Full Depth Reclamation of CR-258 from CR-232 to Randolph c/l

$158,515.23

$634,060.94

$792,576.17

Totals for Chambers County 9 Projects

0 Bins

Local Total

$1,906,083.70

ATRIP Total

$7,624,334.84 Total Cost

$9,530,418.54

Projects Identified for Cherokee County


ATRIP No.
10-03-02

Div.
County
01 CHEROKEE

Sponsor

Project Description
Resurface CR-15 from CR-259 to the Alabama / Georgia state
line

10-03-03

01

CHEROKEE

Resurface CR-29 from CR-12 north to US-411

10-03-04

01

CHEROKEE

Resurface CR-147 from CR-44 to SR-273

Totals for Cherokee County 3 Projects

0 Bins

$426,335.39

Local Total

Local Amt
$113,215.78

ATRIP Amt
$452,863.11

Total Cost
$566,078.89

$264,280.33

$1,057,121.34

$1,321,401.67

$48,839.28

$195,357.10

$244,196.38

ATRIP Total

$1,705,341.55 Total Cost

$2,131,676.94

Projects Identified for Choctaw County


ATRIP No.
12-03-03

Div.
County
08 CHOCTAW

Sponsor

Project Description
BR on CR-45 over Tuckabum Creek

Local Amt
$60,000.00

ATRIP Amt
$240,000.00

Total Cost
$300,000.00

12-03-04

08

CHOCTAW

Resurface CR-23 from McCarty's Ferry Road to CR-43

$216,540.00

$866,160.00

$1,082,700.00

12-03-05

08

CHOCTAW

Resurface CR-9 from SR-10 to CR-32

$247,392.00

$989,568.00

$1,236,960.00

12-03-06

08

CHOCTAW

Resurface CR-23 from CR-25 to McCarty's Ferry Road

$290,844.00

$1,163,376.00

$1,454,220.00

12-03-07

08

CHOCTAW

Resurface CR-25 from CR-9 to the End of Project

$267,768.00

$1,071,072.00

$1,338,840.00

Totals for Choctaw County 5 Projects

1 Bins

Local Total

$1,082,544.00

ATRIP Total

$4,330,176.00 Total Cost

Projects Identified for Clarke County


ATRIP No.
13-03-03
13-03-04

Div.
County
08 CLARKE
08

CLARKE

Sponsor

Project Description
Resurface CR-35 from US-84 to Simmons Creek Road
Resurface CR-3 from McVay Road to US-84

Local Amt
$138,531.50

ATRIP Amt
$554,126.00

Total Cost
$692,657.50

$419,296.00

$1,677,184.00

$2,096,480.00

$5,412,720.00

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 4 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Clarke County
ATRIP No.
13-03-05

Div.
County
08 CLARKE

Sponsor

Project Description
Resurface CR-30 from CR-27 to CR-35

Totals for Clarke County 3 Projects

0 Bins

Local Total

Local Amt
$183,824.25

$741,651.75

ATRIP Total

ATRIP Amt
$735,297.00

Total Cost
$919,121.25

$2,966,607.00 Total Cost

$3,708,258.75

Projects Identified for Coffee County


ATRIP No.
16-03-01

Div.
County
07 COFFEE

Sponsor

Project Description
Resurface CR-107 from CR-110 to SR-125

Local Amt
$68,455.41

ATRIP Amt
$273,821.62

Total Cost
$342,277.03

Resurface CR-410 from SR 134 to CR-401

$165,095.07

$660,380.28

$825,475.35

Resurface CR-355 and CR-364 (Taylor Mill Road) from SR-141 to


SR-203

$265,100.96

$1,060,403.82

$1,325,504.78

16-03-02

07

COFFEE

16-03-04

07

COFFEE

16-03-07

07

COFFEE

Resurface CR-306 from CR-330 to Pike / Coffee county line

$207,011.81

$828,047.22

$1,035,059.03

16-03-08

07

COFFEE

Resurface CR-105 from CR-110 to Pike / Coffee county line

$83,522.88

$334,091.52

$417,614.40

16-03-09

07

COFFEE

Resurface CR-114 from CR-138 to CR-105

$87,838.07

$351,352.26

$439,190.33

16-03-10

07

COFFEE

Resurface CR-143 from Dale / Coffee county line to SR-51

$62,517.42

$250,069.68

$312,587.10

16-03-11

07

COFFEE

Resurface CR-107 from CR-105 to SR-51

$85,063.55

$340,254.18

$425,317.73

16-03-14

07

COFFEE

Resurface CR-330 from SR-189 to CR-306

$99,828.96

$399,315.84

$499,144.80

16-03-18

07

COFFEE

Resurface CR-376 from SR-141 to Covington / Coffee county line

$72,555.01

$290,620.05

$363,175.06

16-03-20

07

COFFEE

Resurface CR 249 / Herman Driggers Drive 1.65

$74,358.59

$297,434.34

$371,792.93

16-03-21

07

COFFEE

Resurface CR-625 from CR-636 to SR-141

$162,655.50

$650,622.00

$813,277.50

16-03-24

07

COFFEE

Phase II Improvements of Dauphin Street

$363,593.37

$773,121.49

$1,136,714.86

16-03-25

07

COFFEE

Resurface CR-651 from Geneva county line to SR-27

$184,607.00

$738,427.00

$923,034.00

16-03-26

07

COFFEE

Resurface CR-547 from SR-134 to CR-514

$72,960.00

$291,840.00

$364,800.00

16-03-27

07

COFFEE

Resurface CR-460 from Geneva county line to CR-474

$100,967.00

$403,867.00

$504,834.00

16-03-28

07

COFFEE

BR on CR-637 over Whisky Branch

$53,272.00

$213,019.00

$266,291.00

Elba

Elba

Enterprise

Totals for Coffee County 17 Projects

1 Bins

Local Total

$2,209,402.60

ATRIP Total

$8,156,687.30 Total Cost

Projects Identified for Colbert County


ATRIP No.
17-03-03

Div.
County
02 COLBERT

Sponsor

Project Description
BR on Frankfort Rd over Little Bear Creek

Local Amt
$280,000.00

ATRIP Amt
$1,120,000.00

Total Cost
$1,400,000.00

$10,366,089.90

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 5 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Colbert County
ATRIP No.
17-03-04
17-03-05

Div.
County
02 COLBERT
02

COLBERT

Sponsor
Muscle Shoals

Project Description
Widening of Avalon Ave between SR-133 (Wilson Dam Rd) and
Webster Street

Sheffield

Add'l lanes to Avalon between Cox Blvd. & Mtgy Ave & Resurface
Mtgy Ave

Local Amt
$795,239.15

ATRIP Amt
$3,180,956.58

Total Cost
$3,976,195.73

$970,419.43

$3,881,677.72

$4,852,097.15

Tuscumbia

Totals for Colbert County 3 Projects

1 Bins

Local Total

$2,045,658.58

ATRIP Total

$8,182,634.30 Total Cost

$10,228,292.88

Projects Identified for Conecuh County


ATRIP No.
18-03-01

Div.
County
09 CONECUH

Sponsor

Project Description
CR-20 Resurface from CR-15 to Ivey Cemetary Rd

Local Amt
$120,361.02

ATRIP Amt
$481,444.12

Total Cost
$601,805.14

18-03-02

09

CONECUH

CR-29 Resurface from SR-83 to Sepulga River

$197,352.97

$789,411.92

$986,764.89

18-03-06

09

CONECUH

CR-5 Resurface from US-84 to CR-30 and from Murder Ck to


Pipkin Bypass

$266,074.01

$1,064,296.03

$1,330,370.04

18-03-13

09

CONECUH

Resurface Wild Ave from SR-83 to US-31

$107,007.00

$428,026.00

$535,033.00

Evergreen

Totals for Conecuh County 4 Projects

0 Bins

Local Total

$690,795.00

ATRIP Total

$2,763,178.07 Total Cost

Projects Identified for Covington County


ATRIP No.
20-03-01

Div.
County
07 COVINGTON

Sponsor

Project Description
CR-45 Resurface from Andalusia CL

Local Amt
$32,897.53

ATRIP Amt
$123,671.64

Total Cost
$156,569.17

CR-42 Resurface Andalusia to Brooklyn

$479,377.76

$1,803,373.49

$2,282,751.25

$151,547.00

$606,188.00

$757,735.00

$2,146,361.69

$8,585,470.75

$10,731,832.44

$125,064.95

$500,259.80

$625,324.75

20-03-04

07

COVINGTON

20-03-06

07

COVINGTON

Opp

Resurface West Cummings Ave from Main St to US-84

20-03-08

07

COVINGTON

Andalusia

Improvements of S Three Notch St

20-03-09

07

COVINGTON

Resurface CR-4 from SR-54 to Geneva c/l

20-03-10

07

COVINGTON

BR on CR-25 over Eden Creek

$71,421.80

$285,687.20

$357,109.00

20-03-11

07

COVINGTON

Resurface CR-73

$86,005.69

$344,022.76

$430,028.45

20-03-12

07

COVINGTON

Resurface CR-42 from US-84 to CR-77

$143,723.22

$574,892.88

$718,616.10

20-03-13

07

COVINGTON

Resurface CR-42 from CR-77 to Opp c/l

$104,721.60

$418,886.38

$523,607.98

$3,453,973.07

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 6 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Covington County
ATRIP No.
20-03-14

Div.
County
07 COVINGTON

Sponsor

Project Description
Resurface CR-70 from CR-77 to US-331

Totals for Covington County 10 Projects

1 Bins

Local Total

Local Amt
$100,869.55

$3,441,990.79

ATRIP Total

ATRIP Amt
$403,478.20

Total Cost
$504,347.75

$13,645,931.10 Total Cost

$17,087,921.89

Projects Identified for Cullman County


ATRIP No.
22-03-03

Div.
County
01 CULLMAN

Sponsor
Good Hope

Project Description
CR-565 Resurface and Guardrails from CR-490 to Hanceville CL

Local Amt
$184,407.29

ATRIP Amt
$737,629.16

Total Cost
$922,036.45

BR on Beech Grove Road over Bavar Creek

$227,529.14

$909,587.42

$1,137,116.56

22-03-09

01

CULLMAN

22-03-10

01

CULLMAN

Resurface CR-747 from Blount/Cullman County Line to CR-1545

$638,693.92

$2,554,775.66

$3,193,469.58

22-03-11

01

CULLMAN

Resurface CR-1101 from Lawrence/Cullman County Line to


SR-157

$249,097.00

$996,388.01

$1,245,485.01

22-03-12

01

CULLMAN

Resurface CR-1435 from Morgan/Cullman County Line to SR-157

$236,122.95

$944,491.28

$1,180,614.23

22-03-13

01

CULLMAN

Resurface CR-1223 from US-31 to CR-1242

$207,393.72

$829,574.87

$1,036,968.59

22-03-15

01

CULLMAN

Construction of Interchange @ CR-222 and I-65

$1,277,633.06

$9,192,595.25

$10,470,228.31

22-03-16

01

CULLMAN

Holly Pond

Resurface CR-698/55 from SR-91 to Holly Pond town limits

$29,000.00

$116,000.00

$145,000.00

22-03-17

01

CULLMAN

Fairview

Resurface CR-1669 from Fairview City Limits to SR-69

$47,231.70

$188,926.80

$236,158.50

Totals for Cullman County 9 Projects

1 Bins

Local Total

$3,097,108.78

ATRIP Total

$16,469,968.45 Total Cost

$19,567,077.23

Projects Identified for Dallas County


ATRIP No.
24-03-01

Div.
County
06 DALLAS

Sponsor

Project Description
Resurface on CR-115 from CR-988 to CR-33

Local Amt
$77,136.00

ATRIP Amt
$308,545.00

Total Cost
$385,681.00

24-03-05

06

DALLAS

Resurface a segment of CR-45

$167,413.00

$669,952.00

$837,365.00

24-03-06

06

DALLAS

Resurface a segment of CR-7 from CR-12 northward for a


distance of 0.75 miles

$107,737.00

$430,949.00

$538,686.00

24-03-08

06

DALLAS

Resurface Water Ave from Race St to CR-41, Phase I

$243,212.00

$978,850.00

$1,222,062.00

Selma

Totals for Dallas County 4 Projects

0 Bins

Local Total

$595,498.00

ATRIP Total

$2,388,296.00 Total Cost

Projects Identified for Dekalb County


ATRIP No.
25-03-03

Div.
County
01 DEKALB

Sponsor

Project Description
Resurface CR-27 from Airport Rd to CR-121

Local Amt
$75,000.00

ATRIP Amt
$300,000.00

Total Cost
$375,000.00

$2,983,794.00

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 7 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Dekalb County
ATRIP No.
25-03-04

Div.
County
01 DEKALB

Sponsor

Project Description
Resurface CR-27 from CR-121 to SR-75

Local Amt
$150,000.00

ATRIP Amt
$600,000.00

Total Cost
$750,000.00

$120,000.00

$480,000.00

$600,000.00

25-03-05

01

DEKALB

Resurface CR-27 from SR-75 to Jackson C/L

25-03-06

01

DEKALB

Resurface CR-85 from US-11 to CR-121

$75,600.00

$302,400.00

$378,000.00

25-03-07

01

DEKALB

Resurface CR-85 from CR-121 to SR-40

$145,000.00

$580,000.00

$725,000.00

25-03-08

01

DEKALB

Resurface CR-127 from CR-271 to CR-89

$108,600.00

$434,400.00

$543,000.00

25-03-09

01

DEKALB

Resurface CR-479 from the Etowah C/L to CR-26

$70,000.00

$280,000.00

$350,000.00

25-03-10

01

DEKALB

Resurface CR-479 from CR-26 to SR-168

$142,000.00

$568,000.00

$710,000.00

25-03-11

01

DEKALB

Resurface CR-44 from CR-50 to CR-835

$140,000.00

$560,000.00

$700,000.00

25-03-12

01

DEKALB

Resurface CR-50 from CR-56 to SR-75

$44,000.00

$176,000.00

$220,000.00

25-03-13

01

DEKALB

Resurface CR-50 from SR-75 to CR-44

$91,000.00

$364,000.00

$455,000.00

25-03-14

01

DEKALB

BR on Chavies Road over Town Creek

$308,890.00

$1,235,560.00

$1,544,450.00

Rainsville

Totals for Dekalb County 12 Projects

1 Bins

Local Total

$1,470,090.00

ATRIP Total

$5,880,360.00 Total Cost

Projects Identified for Elmore County


ATRIP No.
26-03-03

Div.
County
06 ELMORE

Sponsor

Project Description
Resurface CR-80 from US-231 to SR-63

Local Amt
$769,500.00

ATRIP Amt
$3,078,000.00

Total Cost
$3,847,500.00

26-03-04

06

ELMORE

Resurface CR-23 from SR-143 to the Chilton County Line

$652,500.00

$2,610,000.00

$3,262,500.00

26-03-05

06

ELMORE

Resurface Dozier Rd from Rifle Range Rd to Redland Rd

$171,500.00

$686,000.00

$857,500.00

26-03-06

06

ELMORE

Resurface Rifle Range Rd from Chubbehatchee Ck to Rock


Springs

$247,500.00

$990,000.00

$1,237,500.00

26-03-10

06

ELMORE

Resurface Myrick Rd from Deatsville Hwy to Ingram Rd

$67,500.00

$270,000.00

$337,500.00

26-03-11

06

ELMORE

Resurface Rosehill Rd from Grandview Rd to Coosada Rd

$85,500.00

$342,000.00

$427,500.00

26-03-12

06

ELMORE

Resurface Central Rd from SR-9 to SR-63

$36,602.00

$146,406.00

$183,008.00

26-03-13

06

ELMORE

Resurface Jasmine Hill Rd from US-231 to Old Montgomery Hwy

$41,033.00

$164,133.00

$205,166.00

26-03-14

06

ELMORE

Resurface Willow Springs Rd from Jasmine Hill Rd to Redland Rd

$20,795.00

$83,180.00

$103,975.00

26-03-15

06

ELMORE

Road improve. on Cobbs Ford Rd from I-65 to SR-143

$42,635.00

$170,542.00

$213,177.00

26-03-16

06

ELMORE

Road improve. on Tram Rd from Autauga c/l to Lightwood Rd

$20,825.00

$83,302.00

$104,127.00

$7,350,450.00

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 8 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Elmore County
ATRIP No.
26-03-17

Div.
County
06 ELMORE

Sponsor

Project Description
Road improve. on Channa Ck Rd from Eclectic t/l to SR-229

Local Amt
$41,003.00

ATRIP Amt
$164,014.00

Total Cost
$205,017.00

26-03-18

06

ELMORE

Road improve on Rifle Range Rd from Sprgs Dr to Tallassee c/l

$77,472.00

$309,889.00

$387,361.00

26-03-19

06

ELMORE

Rd improve on Rifle Range Rd from Redland Rd to


Chubbehatchee Ck

$72,289.00

$289,155.00

$361,444.00

26-03-20

06

ELMORE

Rd improve on Williams Rd from US-231 to SR-170

$39,140.00

$156,561.00

$195,701.00

26-03-21

06

ELMORE

Rd improve on P'ville Rd from Autauga County line to SR-14

$18,815.00

$75,258.00

$94,073.00

Totals for Elmore County 16 Projects

0 Bins

Local Total

$2,404,609.00

ATRIP Total

$9,618,440.00 Total Cost

$12,023,049.00

Projects Identified for Escambia County


ATRIP No.
27-03-01

Div.
County
09 ESCAMBIA

Sponsor

Project Description
Resurface CR-5 from US-31 to CR-27

Local Amt
$115,037.06

ATRIP Amt
$460,148.23

Total Cost
$575,185.29

27-03-02

09

ESCAMBIA

Widen and resurface CR-12 from CR-1 to CR-27

$159,459.87

$637,839.45

$797,299.32

27-03-05

09

ESCAMBIA

Resurface Pea ridge Rd from Brewton CL to SR-41

$121,679.77

$486,719.07

$608,398.84

27-03-08

09

ESCAMBIA

Resurface CR-6 from SR-113 to Old Hwy 31

$198,493.36

$793,973.45

$992,466.81

27-03-20

09

ESCAMBIA

Resurface CR-22 from the East Brewton c/l to US-29

$188,398.72

$753,594.90

$941,993.62

27-03-21

09

ESCAMBIA

Resurface Medical Park Dr/MLK Dr from State Line Road to


Carver Ave

$147,461.00

$589,845.00

$737,306.00

27-03-22

09

ESCAMBIA

Resurface CR-55 from FL s/l to SR-41

$188,401.10

$753,604.40

$942,005.50

27-03-23

09

ESCAMBIA

East Brewton

Resurface Dailey Street from E RR Street to Shoffner Street

$69,196.20

$192,904.80

$262,101.00

27-03-24

09

ESCAMBIA

East Brewton

Resurface Shoffner Street from SR-29 to City Limit

$60,163.30

$167,733.20

$227,896.50

27-03-25

09

ESCAMBIA

East Brewton

Resurface Dailey St from SR-29 to East Railroad Street

$24,627.50

$68,670.00

$93,297.50

Atmore

Totals for Escambia County 10 Projects

0 Bins

Local Total

$1,272,917.88

ATRIP Total

$4,905,032.50 Total Cost

Projects Identified for Etowah County


ATRIP No.
28-03-14
28-03-15

Div.
County
01 ETOWAH
01

ETOWAH

Sponsor
Gadsden

Project Description
BR on Jackson Trail Road over Locust Fork

Local Amt
$360,000.00

ATRIP Amt
$1,440,000.00

Total Cost
$1,800,000.00

BR over Black Creek on Tuscaloosa Avenue

$150,000.00

$600,000.00

$750,000.00

$6,177,950.38

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 9 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Etowah County
ATRIP No.
28-03-16

Div.
County
01 ETOWAH

Sponsor
Hokes Bluff

Project Description
BR on Caddell Circle Bridge over Big Cove Creek

Totals for Etowah County 3 Projects

3 Bins

Local Total

Local Amt
$229,276.00

$739,276.00

ATRIP Total

ATRIP Amt
$445,405.00

Total Cost
$674,681.00

$2,485,405.00 Total Cost

$3,224,681.00

Projects Identified for Franklin County


ATRIP No.
30-03-04

Div.
County
02 FRANKLIN

Sponsor

Project Description
CR-22 BR over Mack Branch and FDR Resurface From SR-187 to
McCafee Rd

Local Amt
$120,897.83

ATRIP Amt
$483,591.31

Total Cost
$604,489.14

$146,312.00

$625,248.00

$771,560.00

30-03-05

02

FRANKLIN

Red Bay

Resurface Golden Rd between SR-24 and the State Line and


bridge culvert replacement

30-03-06

02

FRANKLIN

Hodges

Turn Lanes & Decel Lanes at the Entrance to the Hodges


Equestrian Trail

$40,674.00

$162,696.00

$203,370.00

30-03-07

02

FRANKLIN

Russellville

Resurface Madison Street and Intersection Improvements at


US-43 & Lagrange Street

$45,000.00

$180,000.00

$225,000.00

Totals for Franklin County 4 Projects

2 Bins

Local Total

$352,883.83

ATRIP Total

$1,451,535.31 Total Cost

$1,804,419.14

Projects Identified for Greene County


ATRIP No.
32-03-02

Div.
County
05 GREENE

Sponsor

Project Description
Resurface CR-208 from I-20/59 interchange to CR-60

32-03-03

05

GREENE

Resurface CR-181 from SR-14 to the Pickens County Line

32-03-04

05

GREENE

BR on CR-120 over Bangdoodle Creek

Totals for Greene County 3 Projects

1 Bins

Local Total

$901,143.00

Local Amt
$366,058.00

ATRIP Amt
$1,464,234.00

Total Cost
$1,830,292.00

$455,085.00

$1,820,340.00

$2,275,425.00

$80,000.00

$320,000.00

$400,000.00

ATRIP Total

$3,604,574.00 Total Cost

Projects Identified for Houston County


ATRIP No.
35-03-03

Div.
County
07 HOUSTON

Sponsor

Project Description
Resurface Fortner St from Brannon Stand Rd to Bear Ck

Local Amt
$356,388.55

ATRIP Amt
$1,425,554.20

Total Cost
$1,781,942.75

35-03-13

07

HOUSTON

Dothan

Westage Pkwy Resurface from Harrison Rd to US-431"

$110,897.47

$443,589.86

$554,487.33

35-03-14

07

HOUSTON

Dothan

Fortner St and Lafayette St Resurface from Woodland Dr to 6th


Ave

$192,696.61

$770,786.46

$963,483.07

35-03-16

07

HOUSTON

Dothan

Montana St Resurface from US-84 to US-231"

$93,186.30

$372,745.20

$465,931.50

35-03-25

07

HOUSTON

$480,355.50

$1,921,421.98

$2,401,777.48

Resurface CR-22 from Henry C/L to Gordon Williams Road

$4,505,717.00

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 10 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Houston County
ATRIP No.
35-03-27

Div.
County
07 HOUSTON

Sponsor

Project Description
Resurface CR-33 from CR-55 to SR-95

Local Amt
$466,740.93

ATRIP Amt
$1,866,963.72

Total Cost
$2,333,704.65

35-03-28

07

HOUSTON

Resurface Saunders Rd Forrester Rd & Glen Lawrence Rd from


Campbellton Hwy to Jordan Ave

$293,098.76

$1,172,395.02

$1,465,493.78

35-03-29

07

HOUSTON

Resurface Stateline Rd (CR-55) from US-231 to Seally Wells Rd

$482,151.15

$1,928,604.61

$2,410,755.76

35-03-32

07

HOUSTON

Resurface Judge Logue Rd (CR-32) from US-84 to SR-123

$199,867.94

$799,471.77

$999,339.71

Totals for Houston County 9 Projects

0 Bins

Local Total

$2,675,383.21

ATRIP Total

$10,701,532.82 Total Cost

$13,376,916.03

Projects Identified for Jackson County


ATRIP No.
36-03-01

Div.
County
01 JACKSON

Sponsor

Project Description
Resurface CR-470 from CR-21 to CR-31

Local Amt
$42,375.45

ATRIP Amt
$169,134.96

Total Cost
$211,510.41

Resurface CR-67 from Lakeshore Dr to Chisenhall Springs

$135,404.92

$541,619.68

$677,024.60

36-03-04

01

JACKSON

36-03-13

01

JACKSON

Scottsboro

Resurface Porter Road and Woods Cove Rd with culvert


extension

$590,000.00

$2,360,000.00

$2,950,000.00

36-03-14

01

JACKSON

Scottsboro

Culvert Replacement and RSF Ridgedale Rd

$300,616.31

$1,002,456.26

$1,303,072.57

Totals for Jackson County 4 Projects

1 Bins

Local Total

$1,068,396.68

ATRIP Total

$4,073,210.90 Total Cost

Projects Identified for Jefferson County


ATRIP No.
37-03-02

Div.
County
03 JEFFERSON

Sponsor
Trussville

Project Description
Resurface Queenstown Rd from CR-10 (Roper Rd) to 2nd St

Local Amt
$111,090.00

ATRIP Amt
$444,360.00

Total Cost
$555,450.00

37-03-04

03

JEFFERSON

Gardendale

Mt. Olive Rd Resurface from CR-118 to CR-112

$97,980.00

$391,920.00

$489,900.00

37-03-05

03

JEFFERSON

Gardendale

Shady Grove Rd Resurface from Fieldstown Rd to Carrington Dr

$36,800.00

$147,200.00

$184,000.00

37-03-07

03

JEFFERSON

Gardendale

CR-118 Install Traffic Signals

$79,465.00

$317,860.00

$397,325.00

37-03-09

03

JEFFERSON

Hoover

SR-150 Resurfacing and Realignement at Gallaria Blvd

$162,400.00

$531,083.00

$693,483.00

37-03-13

03

JEFFERSON

Trussville

Resurface Camp Coleman Rd from US-11 to Windsong Dr

$84,939.00

$339,756.00

$424,695.00

37-03-14

03

JEFFERSON

Trussville

Traffic signalization on Chalkville Mountain Rd from Norrell Dr to


Tyler Loop Rd

$59,271.00

$237,084.00

$296,355.00

37-03-15

03

JEFFERSON

Trussville

Interchange lighting on I-59 @ Deerfoot Pkwy

$141,300.00

$565,000.00

$706,300.00

37-03-19

03

JEFFERSON

Hoover

Intersection improve. on S. Shades Crest Rd & Eden Ridge


Dr/Shades Run Circle

$174,600.00

$698,400.00

$873,000.00

$5,141,607.58

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 11 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Jefferson County
ATRIP No.
37-03-21

Div.
County
03 JEFFERSON

Sponsor
Gardendale

Project Description
Add'l lanes on Fieldstown Rd & new signal install at Shady Grove
Rd

Local Amt
$95,220.00

ATRIP Amt
$380,880.00

Total Cost
$476,100.00

37-03-22

03

JEFFERSON

BR on Springdale Rd (CR-126) over Five Mile Creek

$411,078.06

$1,644,312.22

$2,055,390.28

37-03-23

03

JEFFERSON

Resurface Floyd Bradford from US-78 to Dollar Rd

$146,200.00

$584,800.00

$731,000.00

37-03-24

03

JEFFERSON

BR on Mt. Olive Rd (CR-77) over the Locust Fork of Warrior River

$899,789.00

$3,599,155.98

$4,498,944.98

37-03-25

03

JEFFERSON

Midfield

Resurface B.Y. Williams Sr Dr from Woodward Rd to the city


limits

$89,066.57

$356,266.29

$445,332.86

37-03-27

03

JEFFERSON

Midfield

Resurface Rutledge Dr from Allison Bonnett Memorial Dr to


Woodward & Wilkes Rd from Woodward to US-11

$168,587.73

$674,350.94

$842,938.67

37-03-29

03

JEFFERSON

Midfield

Resurface Woodard Ave

$159,829.60

$639,318.40

$799,148.00

37-03-33

03

JEFFERSON

Vestavia Hills

Resurface Columbiana Tyler and Overton Roads

$211,500.75

$846,002.99

$1,057,503.74

37-03-34

03

JEFFERSON

Vestavia Hills

Resurface Rocky Ridge Road from Lorna Rd to US 280

$535,461.74

$2,141,846.95

$2,677,308.69

37-03-37

03

JEFFERSON

Center Point

Resurface of 23rd, 24th and 26th Ave

$282,863.00

$1,131,452.00

$1,414,315.00

Totals for Jefferson County 19 Projects

2 Bins

Local Total

$3,947,441.45

ATRIP Total

$15,671,048.77 Total Cost

$19,618,490.22

Projects Identified for Lamar County


ATRIP No.
38-03-01

Div.
County
05 LAMAR

Sponsor

Project Description
Resurface CR-35 from SR-17 to Marion / Lamar county line

Local Amt
$314,166.00

ATRIP Amt
$1,256,665.00

Total Cost
$1,570,831.00

38-03-02

05

LAMAR

Resurface CR-49 from CR-36 to CR-16

$329,136.00

$1,316,543.00

$1,645,679.00

38-03-08

05

LAMAR

Resurface CR-49 from CR-20 to SR-18

$186,170.00

$744,681.00

$930,851.00

Totals for Lamar County 3 Projects

0 Bins

Local Total

$829,472.00

ATRIP Total

$3,317,889.00 Total Cost

Projects Identified for Lauderdale County


ATRIP No.
39-03-03

Div.
County
02 LAUDERDALE

Sponsor

Project Description
Resurface CR-8, 16, 47 and 26

Local Amt
$204,467.00

ATRIP Amt
$817,867.00

Total Cost
$1,022,334.00

39-03-04

02

LAUDERDALE

Bridge Culvert Replacement on CR-87 over Bluff Creek

$86,000.00

$344,000.00

$430,000.00

39-03-05

02

LAUDERDALE

Bridge Culvert Replacement on CR-25 over West Fork Creek

$86,000.00

$344,000.00

$430,000.00

39-03-06

02

LAUDERDALE

Bridge Culvert Replacement on CR-187 over Bumpass Creek

$82,000.00

$328,000.00

$410,000.00

39-03-07

02

LAUDERDALE

Bridge Culvert Replacement on CR-94 over Cowpen Creek

$82,000.00

$328,000.00

$410,000.00

$4,147,361.00

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 12 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Lauderdale County
ATRIP No.
39-03-08

Div.
County
02 LAUDERDALE

Sponsor
Florence

Project Description
Improve to Wood Ave between E Tuscaloosa St & Peck Hardware

Totals for Lauderdale County 6 Projects

4 Bins

Local Total

$1,405,760.07

Local Amt
$865,293.07

ATRIP Total

ATRIP Amt
$3,061,172.27

Total Cost
$3,926,465.34

$5,223,039.27 Total Cost

$6,628,799.34

Projects Identified for Lee County


ATRIP No.
41-03-06

Div.
County
04 LEE

Sponsor
Auburn

Project Description
Intersection improvements at SR-147 (College Street) and
Longleaf Drive

Auburn

Local Amt
$192,649.00

ATRIP Amt
$770,594.00

Total Cost
$963,243.00

Widening Opelika Rd & E Univ. Dr

$244,173.00

$976,692.00

$1,220,865.00

41-03-09

04

LEE

41-03-10

04

LEE

Widen & Resurface CR-158 from CR-183 to Junct of CR-379

$438,000.00

$1,752,000.00

$2,190,000.00

41-03-11

04

LEE

Resurface CR-146 from Auburn c/l to SR-169

$287,000.00

$1,146,000.00

$1,433,000.00

Totals for Lee County 4 Projects

0 Bins

Local Total

$1,161,822.00

ATRIP Total

$4,645,286.00 Total Cost

$5,807,108.00

Projects Identified for Limestone County


ATRIP No.
42-03-03

Div.
County
02 LIMESTONE

Sponsor
Athens

Project Description
Lindsey Lane Resurfacing from Brownsferry Rd to SR-251

Elkmont

Local Amt
$103,800.79

ATRIP Amt
$415,203.18

Total Cost
$519,003.97

Resurface Upper Fort Hampton Road from AL-127 to Sandlin


Road

$81,400.00

$325,600.00

$407,000.00

42-03-04

02

LIMESTONE

42-03-05

02

LIMESTONE

BR on 2 bridges on Ragsdale Creek Rd over Ragsdale Creek

$152,400.00

$609,600.00

$762,000.00

42-03-06

02

LIMESTONE

Resurface Nick Davis Road from Mooresville Rd to Sanderson Rd

$173,800.00

$695,200.00

$869,000.00

42-03-07

02

LIMESTONE

BR on Lucas Ferry Rd over Mud Creek

$104,400.00

$417,600.00

$522,000.00

42-03-08

02

LIMESTONE

Intersection improve. @ Huntsville-Brownsferry Rd & US-31

$41,200.00

$164,800.00

$206,000.00

42-03-09

02

LIMESTONE

Resurface Elk River Mills Rd from Baker Hill Rd to SR-99

$115,000.00

$460,000.00

$575,000.00

42-03-10

02

LIMESTONE

BR on Cambridge lane over French Mill Creek

$118,000.00

$472,000.00

$590,000.00

Athens

Totals for Limestone County 8 Projects

4 Bins

Local Total

$890,000.79

ATRIP Total

$3,560,003.18 Total Cost

Projects Identified for Macon County


ATRIP No.
44-03-02
44-03-06

Div.
County
06 MACON
06

MACON

Sponsor

Project Description
CR-56 Resurfacing from Tallapoosa CL to SR-199

Tuskegee University Old Mgm Hwy Resurface from Franklin Rd to Payton Dr

Local Amt
$220,726.17

ATRIP Amt
$882,904.68

Total Cost
$1,103,630.85

$122,680.00

$490,720.00

$613,400.00

$4,450,003.97

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 13 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Macon County
ATRIP No.
44-03-06

Div.
County
06 MACON

Sponsor
Utilities Board of
the City of
Tuskegee

Project Description
Old Mgm Hwy Resurface from Franklin Rd to Payton Dr

Local Amt
$122,680.00

ATRIP Amt
$490,720.00

Total Cost
$613,400.00

Tuskegee
44-03-07

06

MACON

Resurface CR-54 from SR-199 to Notasulga town limits

$136,640.01

$546,560.04

$683,200.05

44-03-08

06

MACON

Resurface CR-22 from CR-26 to CR-24

$185,690.27

$742,761.08

$928,451.35

44-03-09

06

MACON

Resurface CR-2 from US-29 to Rosa Rd

$248,754.89

$995,019.56

$1,243,774.45

44-03-10

06

MACON

BR on CR-7 and Cubahatchee Creek

$355,488.00

$1,421,952.00

$1,777,440.00

44-03-11

06

MACON

BR on CR-9 and Calabee Creek

$73,416.00

$293,664.00

$367,080.00

44-03-12

06

MACON

Resurface CR-9 from CR-4 to US-80 and CR-4 from Mont. Co. to
9

$343,351.82

$1,373,407.28

$1,716,759.10

44-03-13

06

MACON

$79,181.13

$316,724.54

$395,905.67

Notasulga

Resurface East Main St from Railroad Ave to Whitman Hill Rd

Totals for Macon County 9 Projects

2 Bins

Local Total

$1,765,928.29

ATRIP Total

$7,063,713.18 Total Cost

$8,829,641.47

Projects Identified for Madison County


ATRIP No.
45-03-13
45-03-14

Div.
County
01 MADISON
01

Sponsor

Project Description
Interchange @ Blake Bottom Rd at SR-255 (Research Park Blvd)
Add'l Lanes on Winchester Rd from the Flint River past Bell
Factory Rd

MADISON

Totals for Madison County 2 Projects

0 Bins

Local Total

$2,301,708.00

Local Amt
$1,400,000.00

ATRIP Amt
$5,600,000.00

Total Cost
$7,000,000.00

$901,708.00

$2,705,122.00

$3,606,830.00

ATRIP Total

$8,305,122.00 Total Cost

Projects Identified for Marshall County


ATRIP No.
48-03-02

Div.
County
01 MARSHALL

Sponsor

Project Description
CR-14 (Warrenton Rd) Resurface from Marshall C/L to CR-44

Local Amt
$165,287.80

ATRIP Amt
$661,151.18

Total Cost
$826,438.98

$130,944.00

$415,786.00

$546,730.00

$54,151.90

$216,607.60

$270,759.50

BR on Martling Road over Scarham Creek

$940,000.00

$3,760,000.00

$4,700,000.00

Intersection improvements to SR-79 and Additional lanes from


US-431 to Willow Beach Rd

$296,634.58

$1,186,538.34

$1,483,172.92

48-03-05

01

MARSHALL

Arab

RSF Sundown Dr from US-231 to Hulaco Rd & RSF Fry Gap Rd


from City Park to City Limits

48-03-06

01

MARSHALL

Arab

Resurface 10th Street NW from SR-69 to 12th St

48-03-14

01

MARSHALL

48-03-15

01

MARSHALL

Guntersville

$10,606,830.00

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 14 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Marshall County
ATRIP No.
48-03-17

Div.
County
01 MARSHALL

Sponsor
Albertville

Project Description
Resurface Industrial Blvd & Jackson St

Totals for Marshall County 6 Projects

1 Bins

Local Total

Local Amt
$207,812.47

$1,794,830.75

ATRIP Total

ATRIP Amt
$831,249.89

Total Cost
$1,039,062.36

$7,071,333.01 Total Cost

$8,866,163.76

Projects Identified for Mobile County


ATRIP No.
49-03-01

Div.
County
09 MOBILE

Sponsor

Project Description
Resurface CR-96 (Coy Smith Hwy) Resurface from School St to
US-43

Totals for Mobile County 1 Projects

0 Bins

Local Total

$1,268,113.43

Local Amt
$1,268,113.43

ATRIP Total

ATRIP Amt
$3,984,453.72

Total Cost
$5,252,567.15

$3,984,453.72 Total Cost

$5,252,567.15

Projects Identified for Monroe County


ATRIP No.
50-03-01

Div.
County
08 MONROE

Sponsor

Project Description
Resurface CR-8 from SR-59 to CR-1

Local Amt
$300,269.54

ATRIP Amt
$1,201,078.17

Total Cost
$1,501,347.71

Resurface CR-42 (The Ridge Road) from SR-41 east to CR-30

$259,007.37

$1,036,029.48

$1,295,036.85

$102,379.00

$285,542.00

$387,921.00

50-03-03

08

MONROE

50-03-04

08

MONROE

Frisco City

Resurface Purdue from SR-21 to Town Limit

50-03-05

08

MONROE

Excel

Resurfacing Excel/Frisco Rd to Town Limit

$42,811.30

$119,365.20

$162,176.50

50-03-06

08

MONROE

Excel

Resurfacing Main Street

$13,003.30

$36,253.20

$49,256.50

50-03-07

08

MONROE

Monroeville

Resurface Drewry Rd from City Limit to SR-41

$144,357.76

$402,451.04

$546,808.80

50-03-08

08

MONROE

Monroeville

Drewry & SR-41 intersection realignment

$119,299.00

$332,592.00

$451,891.00

50-03-09

08

MONROE

Monroeville

Resurface East Claiborne St from SR-41 to SR-21

$46,131.18

$128,608.72

$174,739.90

50-03-10

08

MONROE

Monroeville

RSF South Mount Pleasant St from Manford Ave to City Limit

$22,177.06

$61,828.24

$84,005.30

50-03-11

08

MONROE

Monroeville

Resurface Golf Drive from Bergman to Meadowbrook

$19,837.20

$55,304.80

$75,142.00

50-03-12

08

MONROE

Monroeville

Resurface Clausell Road from Whitting Drive to City Limit

$27,125.80

$75,623.20

$102,749.00

Totals for Monroe County 11 Projects

0 Bins

Local Total

$1,096,398.51

ATRIP Total

$3,734,676.05 Total Cost

Projects Identified for Montgomery County


ATRIP No.
51-03-02
51-03-04

Div.
County
06 MONTGOMERY
06

Sponsor

MONTGOMERY Montgomery

Project Description
Resurface CR-85 (Pike Road and Old Carter Road) from US-82 to
CR-83

Local Amt
$211,334.00

ATRIP Amt
$1,056,674.00

Total Cost
$1,268,008.00

Resurface CR-232 (Carter Hill Rd) from Pineleaf Dr to Decatur St

$473,320.00

$1,893,280.00

$2,366,600.00

$4,831,074.56

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 15 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Montgomery County
ATRIP No.
51-03-07

Div.
County
06 MONTGOMERY

Sponsor

Project Description
Resurface Vaughn Rd from SR-271 (Taylor Rd) to SR-110
(Chantilly)

Totals for Montgomery County 3 Projects

0 Bins

Local Total

$1,445,454.00

Local Amt
$760,800.00

ATRIP Total

ATRIP Amt
$3,043,200.00

Total Cost
$3,804,000.00

$5,993,154.00 Total Cost

$7,438,608.00

Projects Identified for Morgan County


ATRIP No.
52-03-08

Div.
County
02 MORGAN

Sponsor
Decatur

Project Description
Resurface Moulton Street / Old Moulton Road / 12th Avenue SW

Local Amt
$129,000.00

ATRIP Amt
$516,000.00

Total Cost
$645,000.00

52-03-10

02

MORGAN

BR on Vaughn Bridge Rd at Flint Creek

$800,000.00

$3,200,000.00

$4,000,000.00

52-03-11

02

MORGAN

BR on Kirby Bridge Road at the West Fork of Flint Creek

$800,000.00

$3,200,000.00

$4,000,000.00

52-03-14

02

MORGAN

Trinity

Resurface Old Hwy-24 from Woodall Road to West Town Limits

$112,000.00

$448,000.00

$560,000.00

52-03-15

02

MORGAN

Priceville

BR at Cave Springs Rd over Ginhouse Branch

$80,000.00

$320,000.00

$400,000.00

52-03-16

02

MORGAN

BR on Rescue Road at Kid Creek

$75,000.00

$300,000.00

$375,000.00

Totals for Morgan County 6 Projects

4 Bins

Local Total

$1,996,000.00

ATRIP Total

$7,984,000.00 Total Cost

$9,980,000.00

Projects Identified for Pike County


ATRIP No.
55-03-03

Div.
County
07 PIKE

Sponsor

Project Description
CR-2238 Resurface from CR-2243 to CR-2290

Local Amt
$197,923.52

ATRIP Amt
$791,694.07

Total Cost
$989,617.59

55-03-05

07

PIKE

CR-4404 Resurface from SR-93 to SR-130

$201,468.06

$805,872.26

$1,007,340.32

55-03-06

07

PIKE

CR-3316 Resurface from SR-87 to CR-3310

$447,648.64

$1,790,594.56

$2,238,243.20

55-03-07

07

PIKE

CR-7708 Resurface from CR-7711 to CR-7707

$112,887.84

$417,551.35

$530,439.19

55-03-08

07

PIKE

CR-6600 Resurface from SR-223 to CR-6602

$141,705.26

$566,821.03

$708,526.29

55-03-09

07

PIKE

CR-5513 Resurface from CR-5516 to CR-5511

$62,273.16

$249,092.41

$311,365.57

55-03-10

07

PIKE

CR-7702 Resurface from Mgm County line to CR-7707

$93,958.56

$375,534.22

$469,492.78

55-03-17

07

PIKE

BR on CR-6618 at Buckhorn Creek

$78,205.16

$312,820.64

$391,025.80

55-03-19

07

PIKE

$638,743.58

$2,554,974.32

$3,193,717.90

Troy

Enzor Rd, Henderson Hwy, Elm St, Elm St Bridge Replacement

Totals for Pike County 9 Projects

2 Bins

Local Total

$1,974,813.78

ATRIP Total

$7,864,954.86 Total Cost

$9,839,768.64

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 16 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Russell County
ATRIP No.
57-03-05

Div.
County
04 RUSSELL

Sponsor

Project Description
CR-4 Resurface from Old Seale Hwy to SR-165

Local Amt
$164,144.15

ATRIP Amt
$656,576.62

Total Cost
$820,720.77

CR-4 Resurface from CR-49 to US-431

$263,844.12

$1,055,376.49

$1,319,220.61

Stadium Dr and Aiport Rd Resurfacing from 25th St to Riverchase


Dr

$150,219.00

$600,878.00

$751,097.00

57-03-06

04

RUSSELL

57-03-10

04

RUSSELL

57-03-12

04

RUSSELL

BR over Little Uchee Ck Relief on Uchee Hill HWY

$118,000.00

$472,000.00

$590,000.00

57-03-13

04

RUSSELL

BR over Weolustee Ck on CR-137 (Pittsview HWY)

$155,000.00

$620,000.00

$775,000.00

57-03-16

04

RUSSELL

Resurface Greenburt Rd (CR-39) from Cottonton Rd (CR-4) to


Owichee Rd

$200,000.00

$800,000.00

$1,000,000.00

57-03-21

04

RUSSELL

Phenix City

Resurface Crawford Road/13th Street from US-280/US-431 to 3rd


Ave

$403,983.00

$1,615,931.00

$2,019,914.00

57-03-22

04

RUSSELL

Phenix City

BR on Opelika Rd & Cutrate Road Improvements

$287,016.80

$1,148,067.20

$1,435,084.00

Phenix City

Totals for Russell County 8 Projects

2 Bins

Local Total

$1,742,207.07

ATRIP Total

$6,968,829.31 Total Cost

$8,711,036.38

Projects Identified for St. Clair County


ATRIP No.
58-03-03

Div.
County
01 ST. CLAIR

Sponsor

Project Description
CR-41 (Hardwick Rd) Resurfacing from SR-34 to US-78

Local Amt
$146,356.31

ATRIP Amt
$585,425.23

Total Cost
$731,781.54

58-03-05

01

ST. CLAIR

Resurface CR-33 from US-231 to CR-24

$519,169.04

$2,076,676.14

$2,595,845.18

58-03-06

01

ST. CLAIR

RSF CR-27 from County Line to Cook Springs Cutoff Rd

$256,741.93

$1,026,967.70

$1,283,709.63

58-03-07

01

ST. CLAIR

Resurface CR-54 from Logan Martin Dam Road to US-231

$205,263.22

$821,052.88

$1,026,316.10

58-03-08

01

ST. CLAIR

Resurface CR-36 from US-11 to SR-23

$251,152.47

$1,004,609.87

$1,255,762.34

58-03-09

01

ST. CLAIR

Bridge over Logan Martin Lake on Rivercrest Drive

$82,942.13

$331,768.50

$414,710.63

Totals for St. Clair County 6 Projects

1 Bins

Local Total

$1,461,625.10

ATRIP Total

$5,846,500.32 Total Cost

Projects Identified for Shelby County


ATRIP No.
59-03-02

Div.
County
03 SHELBY

59-03-05

03

SHELBY

59-03-06

03

SHELBY

Sponsor

Hoover

Project Description
Resurface CR-47 from CR-49 to SR-25

Local Amt
$325,007.00

ATRIP Amt
$1,300,029.00

Total Cost
$1,625,036.00

Resurface CR-29 & CR-14 Resurfacing

$189,998.00

$759,993.00

$949,991.00

Hugh Daniel Dr Resurface from US-280 to CR-41

$167,929.00

$671,717.00

$839,646.00

$7,308,125.42

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 17 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Shelby County
ATRIP No.
59-03-08

Div.
County
03 SHELBY

Sponsor
Shelby Co

Project Description
BR, Turn Lanes & RSF CR-264 from 1300' west of Warrior Dr to
SR-119

Local Amt
$500,000.00

ATRIP Amt
$2,000,000.00

Total Cost
$2,500,000.00

Alabaster
59-03-09

03

SHELBY

BR on CR-55 over Muddy Prong Creek

$113,640.00

$454,558.00

$568,198.00

59-03-11

03

SHELBY

Bridge widening on CR-52 over Buck Creek

$310,561.00

$1,242,243.00

$1,552,804.00

59-03-12

03

SHELBY

Bridge widening on CR-52 over Cahaba river

$645,680.80

$2,582,723.20

$3,228,404.00

59-03-16

03

SHELBY

Resurface CR-10 from the Bibb county line to CR-22

$214,843.00

$859,371.00

$1,074,214.00

59-03-17

03

SHELBY

Intersection improvements at CR-52 & CR-13

$81,117.00

$377,803.00

$458,920.00

59-03-18

03

SHELBY

Intersection improvements at CR-52 & CR-93

$99,275.00

$397,100.00

$496,375.00

59-03-19

03

SHELBY

Resurface CR-12 from CR-22 to Shelby Street

$211,945.00

$847,778.00

$1,059,723.00

59-03-20

03

SHELBY

Resurface CR-26 from US-31 to SR-70

$352,589.00

$1,410,354.00

$1,762,943.00

59-03-23

03

SHELBY

Resurface CR-17 from CR-22 to CR-26

$106,692.00

$426,768.00

$533,460.00

59-03-24

03

SHELBY

Resurface CR-17 (Valleydale Rd) from CR-29 to US-280

$243,254.00

$973,016.00

$1,216,270.00

59-03-25

03

SHELBY

Resurface CR-91 from CR-52/CR-17/SR-261 intersection to


pavement end

$145,700.00

$582,800.00

$728,500.00

Totals for Shelby County 15 Projects

4 Bins

Local Total

$3,708,230.80

ATRIP Total

$14,886,253.20 Total Cost

Projects Identified for Talladega County


ATRIP No.
61-03-02

Div.
County
04 TALLADEGA

Sponsor

Project Description
Resurface CR-399 (Speedway Boulevard) from SR-77 east to
Eastaboga at I-20

Local Amt
$433,999.68

ATRIP Amt
$1,735,998.74

Total Cost
$2,169,998.42

$94,493.00

$378,074.00

$472,567.00

$1,236,091.00

$4,944,363.00

$6,180,454.00

61-03-03

04

TALLADEGA

Resurface CR-002 from the entrance of Omya Al quarry to


US-280

61-03-04

04

TALLADEGA

Construction of a road and bridge that will connect I-20 with


SR-21

61-03-05

04

TALLADEGA

Talladega

BR at Isbell Circle over Town Creek

$85,583.00

$342,332.00

$427,915.00

61-03-06

04

TALLADEGA

Talladega

BR at Coosa Street over Isbell Branch

$62,560.00

$250,240.00

$312,800.00

61-03-07

04

TALLADEGA

Talladega

BR at West Street over Isbell Branch

$62,560.00

$250,240.00

$312,800.00

$18,594,484.00

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 18 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Talladega County
ATRIP No.
61-03-08

Div.
County
04 TALLADEGA

Sponsor
Lincoln

Project Description
Widen and RSF CR-7 (Magnolia St) from SR-77 to US-78
(includes Intersection Imp at SR-77)

Totals for Talladega County 7 Projects

3 Bins

Local Total

$2,650,860.58

Local Amt
$675,573.90

ATRIP Total

ATRIP Amt
$2,702,295.60

Total Cost
$3,377,869.50

$10,603,543.34 Total Cost

$13,254,403.92

Projects Identified for Tallapoosa County


ATRIP No.
62-03-04
62-03-06

Div.
County
04 TALLAPOOSA
04

TALLAPOOSA

Sponsor
Tallassee

Project Description
BR on Hampton Road at County Line Creek

Local Amt
$91,807.92

ATRIP Amt
$367,231.69

Total Cost
$459,039.61

$91,600.00

$366,400.00

$458,000.00

BR on Oak Heights Road

Totals for Tallapoosa County 2 Projects

2 Bins

Local Total

$183,407.92

ATRIP Total

$733,631.69 Total Cost

$917,039.61

Projects Identified for Tuscaloosa County


ATRIP No.
63-03-05

Div.
County
05 TUSCALOOSA

Sponsor

Project Description
Keenes Mill Rd Resurface

Local Amt
$179,000.00

ATRIP Amt
$895,000.00

Total Cost
$1,074,000.00

$126,340.00

$505,360.00

$631,700.00

63-03-12

05

TUSCALOOSA

BR on Malone Creek Rd over Malone Mill Creek

63-03-13

05

TUSCALOOSA

BR on Traweek Road over Binion Creek

$96,040.00

$384,160.00

$480,200.00

63-03-14

05

TUSCALOOSA

BR on Old Fayette Road over Barbee Creek

$95,800.00

$383,200.00

$479,000.00

63-03-15

05

TUSCALOOSA

BR on Old Fayette Road over an unnamed tributary to Binion


Creek

$60,300.00

$241,200.00

$301,500.00

63-03-17

05

TUSCALOOSA

Resurface CR-140 from Dockery Road to Tuscaloosa/Pickens Co


Line

$71,800.00

$287,200.00

$359,000.00

63-03-18

05

TUSCALOOSA

Resurface a segment of Lock 17 Road (CR-59)

$86,000.00

$344,000.00

$430,000.00

63-03-19

05

TUSCALOOSA

BR on Holman Church Road over Kansas City Railroad

$112,059.40

$448,237.60

$560,297.00

63-03-23

05

TUSCALOOSA

Tuscaloosa

Hargrove & Hackberry Improvements

$700,000.00

$2,800,000.00

$3,500,000.00

63-03-24

05

TUSCALOOSA

Tuscaloosa

10 Avenue Corridor Improvements

$1,360,000.00

$5,440,000.00

$6,800,000.00

63-03-25

05

TUSCALOOSA

University of
Alabama

5th Ave Extension from current end to Hackberry Lane with a


connector to Jack Warner Pkwy

$3,749,000.00

$14,996,000.00

$18,745,000.00

Totals for Tuscaloosa County 11 Projects

5 Bins

Local Total

$6,636,339.40

ATRIP Total

$26,724,357.60 Total Cost

$33,360,697.00

ATRIP Project Cost By Selection Round


Media Detail Report for All Counties

January 29, 2013


Bridge Replacement Project

Page 19 of 19

Bridge Rehabilitation Project


Non-Qualifying Bridge or No Bridge

Selection Round : 3
Projects Identified for Walker County
ATRIP No.
64-03-02

Div.
County
03 WALKER

Sponsor
Jasper

Project Description
Resurface 9th Avenue from SR-5 to 18th Street

Local Amt
$65,552.40

ATRIP Amt
$262,209.60

Total Cost
$327,762.00

64-03-05

03

WALKER

Jasper

Resurface Airport Rd

$445,895.83

$4,013,062.42

$4,458,958.25

64-03-06

03

WALKER

Jasper

Resurface of Old Birmingham Hwy

$145,931.20

$583,724.80

$729,656.00

Totals for Walker County 3 Projects

0 Bins

$657,379.43

Local Total

ATRIP Total

$4,858,996.82 Total Cost

$5,516,376.25

Projects Identified for Washington County


ATRIP No.
65-03-02

Div.
County
08 WASHINGTON

Sponsor

Project Description
Resurface CR-34 from SR-17 in Millry to US-43 in Leroy

Local Amt
$962,238.28

ATRIP Amt
$3,848,953.12

Total Cost
$4,811,191.40

65-03-04

08

WASHINGTON

BR over Armstrong Cr on CR-6

$137,867.97

$551,471.86

$689,339.83

65-03-05

08

WASHINGTON

BR (Main & Relief) over Escatawpa River on CR-20

$393,938.41

$1,575,753.64

$1,969,692.05

65-03-06

08

WASHINGTON

BR over Escatawpa River on CR-2

$139,925.30

$559,701.19

$699,626.49

65-03-07

08

WASHINGTON

BR over Bassetts Creek on CR-12

$225,595.46

$902,381.84

$1,127,977.30

65-03-08

08

WASHINGTON

BR over Bassetts Creek on CR-19

$194,841.35

$779,365.39

$974,206.74

Totals for Washington County 6 Projects

6 Bins

Local Total

$2,054,406.77

Totals for Selection Round : 3 302 Projects 62 BINS

Local Total

$81,508,561.57 ATRIP Total

$316,280,524.47 Total Cost $397,789,086.04

Totals for this ATRIP Report 302 Projects 62 BINS

Local Total

$81,508,561.57 ATRIP Total

$316,280,524.47 Total Cost $397,789,086.04