MODULE 3
Materials Management Materials Requirements Planning (Mrp)
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
A Typical Mrp
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Dimension
MRP
Traditional
Demand
Dependent
Independent
Order Philosophy
Requirements
Replenishment
Forecast
Control Concept
ABC
Objectives
Lot Sizing
Discrete
EOQ
Demand Pattern
Types of Inventory
Management Science II
Dr.T.T.Narendran
Pre-Requisites Of Mrp
A time-phased master production schedule in which every item is described by bill of materials (BOM) A unique no. identifying each component and the parent in every BOM Properly structured, accurate BOM and tight control of engineering changes Accurate current inventory balances Accurate quantities and reliable delivery dates
Management Science II
Dr.T.T.Narendran
Further requirements for practical application Computer software and hardware to handle huge volume of data Timely reporting of issues, receipts, inventory adjustments and order releases Discipline in handling and order releases Capable people (for handling and deciding)
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Vendors
Adversaries
Scrap
Eliminate
Tolerate
Maintenance
Lead times
Minimize
Workers
Involve them
Impersonal-drive them
Inventory
Lot size
Set-ups
Queues (WIP)
Eliminate PRO-ACTIVE
Necessary RE-ACTIVE
Suitability
Management Science II
Dr.T.T.Narendran
Mrp
Based on Master schedule, B.O.M. and predicted demand. Complete inventory control. Convenient lot-size.
Jit
Emphasis on waste reduction. Aim for Zero defect. Aim for Zero Inventory. Quick change-overs. Small lots.
Management Science II
Dr.T.T.Narendran
Multi-Skilled Worker
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Kanban
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
transportation, etc.,
Locked-up capital
storage space
handling,
taxes (?)
insurance
obsolescence,
deterioration,
maintaining records
Shortage costs
special transportation
Management Science II
Dr.T.T.Narendran
Probabilistic
Stock Level
Time
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Management Science II
Dr.T.T.Narendran
Filename: CHAPTER 4 Directory: C:\Documents and Settings\User 1\Desktop\5 Template: C:\Documents and Settings\User 1\Application Data\Microsoft\Templates\Normal.dot Title: Subject: Author: User 1 Keywords: Comments: Creation Date: 6/29/2006 10:32:00 AM Change Number: 24 Last Saved On: 7/21/2006 12:44:00 PM Last Saved By: User 1 Total Editing Time: 544 Minutes Last Printed On: 9/21/2006 11:55:00 AM As of Last Complete Printing Number of Pages: 25 Number of Words: 742 (approx.) Number of Characters: 4,231 (approx.)