Q1. Quality and reliability are related concepts but are fundamentally different in a number of ways. Discuss them. Answer. The quality movement started in the 1940s with a major contribution on quality aspects from W. Edwards Deming. One of the major benefits of quality has been the saving in the overall cost of production. A system of continuous improvement helps in achieving good quality. Kaizen refers to a system of continuous process improvement. The purpose of kaizen is to develop a process that is visible, Repeatable, and measurable. After Kaizen it is atarimae hinshitsu, which refers to examination of intangibles that affect the process and works to optimize their impact. Both kaizen and atarimae hinshitsu focuses on processes. The next stage is kansei which leads to improvement in the product itself and, potentially, to the process that created it. The final stage is miryokuteki hinshitsu which broadens the management concern beyond the immediate product. Quality Concepts: It is a well-known fact that all engineered and manufactured parts exhibit some or the other variation. The variations may not be clearly visible always. The variations are sometimes microscopic which can be identified by means of some equipment necessary to measure the geometrical attributes, electrical characteristics etc. Quality: Designers specify the characteristics of the quality of a product. The grade of materials used in the product development and product characteristics, permissible tolerances, and performance specifications contribute to the quality of design. For higher-grade of materials the tolerances are very small. When the tolerance is set to a very low level the expected design characteristics would be of high quality. When greater levels of performance are specified, there is an increase in the design quality of a product and the manufacturing processes and the product specification are set according to the specified quality norms. Quality of conformance is expressed as the degree to which the design specifications are followed during the process of manufacturing. If the degree of conformance is high then the level of quality of conformance is also deemed as high. Quality of conformance is mainly focused on the implementation of the software. Quality Control: Quality is the buzz word of every organization today. But how does one work towards achieving quality in the organization and within the organization at various process levels. There are a number of ways of achieving quality. One can consider the fundamental step of quality where the variations are measured with respect to the expected values in any process or characteristics of the product. The first step towards quality is to see that the variations are minimized. Controlling quality can be done by means of measuring various characteristics of
Page 2 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

the product and understanding the behavior of the product towards changes in the product characteristics. It involves a series of inspections, reviews, and tests on the software processes. A feedback mechanism in the process list will help in constantly reviewing the performance and enhancement in the performance. A combination of the measurement and the feedback allows the software developer to refine the software process and tend to approach perfection. It is possible to automate these steps in the quality control process of the software system. One of the concepts of quality control is that every process can be measured. The measurement will tell as to whether there has been any improvement in the process or not. Quality Assurance: Quality assurance is a process of auditing various areas and identifying the non conformances in such areas. A non conformance is reported if a deviation is observed in the actual performance when compared with the planned performance against certain expectation. The expectations are listed out based on the requirement of certain standards norms. The nonconformances are reported area wise or process wise. The report based on the audit provides the management with the information that is necessary for them to take suitable actions. Cost of Quality: There are many activities involved in a software project leading to the completion of the intended service or the product. Every such activity is associated with some cost. And associated with every process is the quality which again comes with certain cost. The total cost of quality means the sum total of all the costs involved in setting up a quality process or a quality activity and additional resources procured towards maintaining and running the quality process. The main categories under which the quality costs may be listed are the ones dealing with processes towards prevention, processes towards appraisal, and processes towards maintenance. The main components contributing towards the cost are the cost component of quality planning, cost component of formal technical reviews and the cost component pertaining to the test equipment. Software Reliability: The need for quality is there in the minds of everybody associated with the software project. One of the key issues pertaining to the quality aspect is the reliability of the software product. There are number of methods to ensure reliability of the product which depends upon the characteristics of the product and its features and the expectations from the product and its services. One of the task before the software engineer or the software manager is to establish the relevant reliability measures well in advance before the implementation so that the quality is assured. A series of audits may be conducted to keep a tab on the deviations if they tend to occur. Statistically the software reliability may be defined as the probability of an operation of a computer program which is free from error or has not failed during the operation time, tested under a specified environment and for specified time. Failure refers to nonconformance to the
Page 3 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

requirements of the software stated. One of the simple measures of reliability is the express it as the meantime between failure (MBF) which is the sum of mean time of occurrence of failure (MTF) and mean time towards repair (MTR). It is necessary to identify and assess the hazards in software projects that affect the software performance. If it is possible to identify the hazards in the early stages of the software project then a module to counteract such hazards could be developed or built in to the software which will then be able to rectify errors leading to hazards. Suitable models could be used to achieve this safety. Background Issues: The quality assurance processes are very vital in establishing quality features in the product. Various standard mechanisms are developed in the companies to focus on the quality of the product. These mechanisms have to undergo improvements time to time in order to maintain the competition in the market. The product has to be viewed from the user point of view. A satisfaction note on the various features of the product is necessary to be reviewed to bring a change in the product to enhance it and to make it a quality product. Q2. Discuss the Objective & Principles Behind Software Testing. Answer: Testing Objectives Glen Myers states a number of rules that can serve well as testing objectives: 1. Testing is a process of executing a program with the intent of finding an error. 2. A good test case is one that has a high probability of finding an as return discovered error. 3. A successful test is one that uncovers an as-yet-undiscovered error.

Testing Principles Davis suggests a set of testing principles that have been adapted: All tests should be traceable to customer requirements: As we have seen, the objective of software testing is to uncover errors. It follows that the most severe defects (from the customers point of view) are those that cause the program to fail to meet its requirements. Tests should be planned long before testing begins: Test planning can begin as soon as the requirements model is complete. Detailed definition of test cases can begin as soon as the design model has been solidified. Therefore, all tests can be planned and designed before any code has been generated. The Pareto principle applies to software testing: Stated simply, the Pareto principle implies that 80 percent of all errors uncovered during testing will most likely be traceable to 20 percent of all program components. The problem, of course, is to isolate these suspect components and to thoroughly test them.
Page 4 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

Testing should begin in the small and progress toward testing in the large: The first tests planned and executed generally focus on individual components. As testing progresses, focus shifts in an attempt to find errors in integrated clusters of components and ultimately in the entire system. Exhaustive testing is not possible: The number of path permutations for even a moderately sized program is exceptionally large. For this reason, it is impossible to execute every combination of paths during testing. It is possible, however, to adequately cover program logic and to ensure that all conditions in the component-level design have been exercised. To be most effective, testing should be conducted by an independent third party- By most effective, we mean testing that has the highest probability of finding errors (the primary objective of testing). For reasons that have been introduced earlier in this unit, the software engineer who created the system is not the best person to conduct all tests for the software. Q3. Discuss the CMM 5 Levels for Software Process. Answer: The Capability Maturity Model (CMM) is a theoretical process capability maturity model. The CMM was originally developed as a tool for objectively assessing the ability of government contractors' processes to perform a contracted software project. For this reason, it has been used extensively for avionics software and government projects around the world. The 5Level structure of the CMM can be illustrated by the diagram below.

Although the CMM comes from the area of software development, it can be (and has been and still is being) applied as a generally applicable model to assist in understanding the process capability maturity of organisations in areas as diverse as, for example: software engineering, system engineering, project management, software maintenance, risk management, system acquisition, information technology (IT), and personnel management.
Page 5 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

The CMM was first described in the book managing the Software Process (1989) by Watts Humphrey, and hence was also known as "Humphrey's CMM". Humphrey had started development the model at the SEI (US Dept. of Defence Software Engineering Institute) in 1986, basing it on the earlier work of Phil Crosby - the latter had earlier published the Quality Management Maturity Grid in his book Quality is Free (1979). The SEI was at Carnegie Mellon University in Pittsburgh. The CMM has been superseded by a variant - the Capability Maturity Model Integration (CMMA) - the old CMM being renamed to Software Engineering CMM (SE-CMM). Accreditations based on the SE-CMM expired on 31 December 2007. Variants of maturity models derived from the CMM emerged over the years, including, for example, Systems Security Engineering CMM (SSE-CMM) and the People Capability Maturity Model. (Note that maturity models generally started to become part of international standards as part of ISO 15504.) The CMM involves the following aspects: Maturity Levels: A 5-Level process maturity continuum - where the uppermost (5th) level is a notional ideal state where processes would be systematically managed by a combination of process optimization and continuous process improvement. Key Process Areas: Within each of these maturity levels are Key Process Areas (KPAs) which characterise that level, and for each KPA there are five definitions identified: Goals Commitment Ability Measurement Verification

o o o o o

The KPAs are not necessarily unique to CMM, representing - as they do - the stages that organizations processes will need to pass through as they progress up the CMM continuum. Goals: The goals of a key process area summarize the states that must exist for that key process area to have been implemented in an effective and lasting way. The extent to which the goals have been accomplished is an indicator of how much capability the organization has established at that maturity level. The goals signify the scope, boundaries, and intent of each key process area. Common Features: Common features include practices that implement and institutionalize a key process area. There are five types of common features: Commitment to Perform, Ability to Perform, Activities Performed, Measurement and Analysis, and Verifying Implementation. Key Practices: The key practices describe the elements of infrastructure and practice that contribute most effectively to the implementation and institutionalization of the KPAs.
Page 6 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

Levels of the CMM: There are five levels defined along the continuum of the CMM, and, according to the SEI: "Predictability, effectiveness, and control of an organizations software processes are believed to improve as the organization moves up these five levels. While not rigorous, the empirical evidence to date supports this belief." Level 1 - Initial Processes are usually ad hoc and the organization usually does not provide a stable environment. Success in these organizations depends on the competence and heroics of the people in the organization and not on the use of proven processes. In spite of this ad hoc, chaotic environment, maturity level 1 organizations often produce products and services that work; however, they frequently exceed the budget and schedule of their projects. Organizations are characterized by a tendency to over commit, abandon processes in the time of crisis, and not be able to repeat their past successes again. Software project success depends on having quality people. Level 2 - Repeatable Software development successes are repeatable. The processes may not repeat for all the projects in the organization. The organization may use some basic project management to track cost and schedule. Process discipline helps ensure that existing practices are retained during times of stress. When these practices are in place, projects are performed and managed according to their documented plans. Project status and the delivery of services are visible to management at defined points (for example, at major milestones and at the completion of major tasks). Basic project management processes are established to track cost, schedule, and functionality. The minimum process discipline is in place to repeat earlier successes on projects with similar applications and scope. There is still a significant risk of exceeding cost and time estimate. Level 3 - Defined The organizations set of standard processes, which is the basis for level 3, is established and improved over time. These standard processes are used to establish consistency across the organization. Projects establish their defined processes by the organizations set of standard processes according to tailoring guidelines. The organizations management establishes process objectives based on the organizations set of standard processes and ensures that these objectives are appropriately addressed. A critical distinction between level 2 and level 3 is the scope of standards, process descriptions, and procedures. At level 2, the standards, process descriptions, and
Page 7 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

procedures may be quite different in each specific instance of the process (for example, on a particular project). At level 3, the standards, process descriptions, and procedures for a project are tailored from the organizations set of standard processes to suit a particular project or organizational unit. Level 4 - Managed Using precise measurements, management can effectively control the software development effort. In particular, management can identify ways to adjust and adapt the process to particular projects without measurable losses of quality or deviations from specifications. At this level organization set a quantitative quality goal for both software process and software maintenance. Sub processes are selected that significantly contribute to overall process performance. These selected sub processes are controlled using statistical and other quantitative techniques. A critical distinction between maturity level 3 and maturity level 4 is the predictability of process performance. At maturity level 4, the performance of processes is controlled using statistical and other quantitative techniques, and is quantitatively predictable. At maturity level 3, processes are only qualitatively predictable. Level 5 - Optimizing Focusing on continually improving process performance through both incremental and innovative technological improvements. Quantitative process-improvement objectives for the organization are established, continually revised to reflect changing business objectives, and used as criteria in managing process improvement. The effects of deployed process improvements are measured and evaluated against the quantitative process-improvement objectives. Both the defined processes and the organizations set of standard processes are targets of measurable improvement activities. Process improvements to address common causes of process variation and measurably improve the organizations processes are identified, evaluated, and deployed. Optimizing processes that are nimble, adaptable and innovative depends on the participation of an empowered workforce aligned with the business values and objectives of the organization. The organizations ability to rapidly respond to changes and opportunities is enhanced by finding ways to accelerate and share learning. A critical distinction between maturity level 4 and maturity level 5 is the type of process variation addressed. At maturity level 4, processes are concerned with addressing special causes of process variation and providing statistical predictability of the results. Though processes may produce predictable results, the results may be insufficient to achieve the established objectives. At maturity level 5, processes are concerned with addressing common causes of process variation and changing the process (that is, shifting the mean of the process performance) to improve process performance (while maintaining statistical probability) to achieve the established quantitative process-improvement objectives. 3. Discuss the Water Fall model for Software Development.
Page 8 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

Answer: Water fall model: The simplest software development life cycle model is the waterfall model, which states that the phases are organized in a linear order. A project begins with feasibility analysis. On the successful demonstration of the feasibility analysis, the requirements analysis and project planning begins. The design starts after the requirements analysis is done. And coding begins after the design is done. Once the programming is completed, the code is integrated and testing is done. On successful completion of testing, the system is installed. After this the regular operation and maintenance of the system takes place. The following figure demonstrates the steps involved in waterfall life cycle model.

The Waterfall Software Life Cycle Model With the waterfall model, the activities performed in a software development project are requirements analysis, project planning, system design, detailed design, coding and unit testing, system integration and testing. Linear ordering of activities has some important consequences. First, to clearly identify the end of a phase and beginning of the others. Some certification mechanism has to be employed at the end of each phase. This is usually done by some verification and validation. Validation means confirming the output of a phase is consistent with its input (which is the output of the previous phase) and that the output of the phase is consistent with overall requirements of the system. The consequence of the need of certification is that each phase must have some defined output that can be evaluated and certified. Therefore, when the activities of a phase are completed, there should be an output product of that phase and the goal of a phase is to produce this product. The outputs of the earlier phases are often called intermediate products or design document. For the coding phase, the output is the code. From this point of view, the output of a software project is to justify the final program along with the use of documentation with the requirements document, design document, project plan, test plan and test results. Another implication of the linear ordering of phases is that after each phase is completed and its outputs are certified, these outputs become the inputs to the next phase and should not be changed or modified. However, changing requirements cannot be avoided and must be faced. Since changes performed in the output of one phase affect the later phases that might
Page 9 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

have been performed. These changes have to make in a controlled manner after evaluating the effect of each change on the project. This brings us to the need for configuration control or configuration management. The certified output of a phase that is released for the best phase is called baseline. The configuration management ensures that any changes to a baseline are made after careful review, keeping in mind the interests of all parties that are affected by it. There are two basic assumptions for justifying the linear ordering of phase in the manner proposed by the waterfall model. For a successful project resulting in a successful product, all phases listed in the waterfall model must be performed anyway. Any different ordering of the phases will result in a less successful software product. Q5. Explain the Advantages of Prototype Model, & Spiral Model in Contrast to Water Fall model. Answer: Prototype Model Advantages Creating software using the prototype model also has its benefits. One of the key advantages prototype modeled software has is the time frame of development. Instead of concentrating on documentation, more effort is placed in creating the actual software. This way, the actual software could be released in advance. The work on prototype models could also be spread to others since there are practically no stages of work in this model. Everyone has to work on the same thing and at the same time, reducing man hours in creating software. The work will even be faster and efficient if developers will collaborate more regarding the status of a specific function and develop the necessary adjustments in time for the integration. Another advantage of having prototype modeled software is that the software is created using lots of user feedbacks. In every prototype created, users could give their honest opinion about the software. If something is unfavorable, it can be changed. Slowly the program is created with the customer in mind. The waterfall model is a sequential design process, often used in software development processes, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of Conception, Initiation, Analysis, Design, Construction, Testing, Production/Implementation and Maintenance.

Page 10 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

The unmodified "waterfall model". Progress flows from the top to the bottom, like a waterfall. The waterfall development model originates in the manufacturing and construction industries: highly structured physical environments in which after-the-fact changes are prohibitively costly, if not impossible. Since no formal software development methodologies existed at the time, this hardware-oriented model was simply adapted for software development. The first known presentation describing use of similar phases in software engineering was held by Herbert D. Benington at Symposium on advanced programming methods for digital computers on 29 June 1956.[1] This presentation was about the development of software for SAGE. In 1983 the paper was republished prototype. The first formal description of the waterfall model is often cited as a 1970 article by Winston W. Royce,
[3] [2]

with a foreword by Benington

pointing out that the process was not in fact performed in strict top-down, but depended on a

though Royce did not use the term "waterfall" in this article. Royce

presented this model as an example of a flawed, non-working model (Royce 1970). This, in fact, is how the term is generally used in writing about software developmentto describe a critical view of a commonly used software practice.[4] Q.6. Explain the COCOMO Model & Software Estimation Technique. Answer:

Page 11 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

The COCOMO cost estimation model is used by thousands of software project managers, and is based on a study of hundreds of software projects. Unlike other cost estimation models, COCOMO is an open model, so all of the details are published, including:

The underlying cost estimation equations Every assumption made in the model (e.g. "the project will enjoy good management") Every definition (e.g. the precise definition of the Product Design phase of a project) The costs included in an estimate are explicitly stated (e.g. project managers are included, secretaries aren't) Because COCOMO is well defined, and because it doesn't rely upon proprietary

estimation algorithms, Costar offers these advantages to its users:


COCOMO estimates are more objective and repeatable than estimates made by methods relying on proprietary models COCOMO can be calibrated to reflect your software development environment, and to produce more accurate estimates

Costar is a faithful implementation of the COCOMO model that is easy to use on small projects, and yet powerful enough to plan and control large projects. Typically, you'll start with only a rough description of the software system that you'll be developing, and you'll use Costar to give you early estimates about the proper schedule and staffing levels. As you refine your knowledge of the problem, and as you design more of the system, you can use Costar to produce more and more refined estimates. Costar allows you to define a software structure to meet your needs. Your initial estimate might be made on the basis of a system containing 3,000 lines of code. Your second estimate might be more refined so that you now understand that your system will consist of two subsystems (and you'll have a more accurate idea about how many lines of code will be in each of the subsystems). Your next estimate will continue the process -- you can use Costar to define the components of each subsystem. Costar permits you to continue this process until you arrive at the level of detail that suits your needs. One word of warning: It is so easy to use Costar to make software cost estimates, that it's possible to misuse it -- every Costar user should spend the time to learn the underlying

Page 12 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

COCOMO assumptions and definitions from Software Engineering Economics and Software Cost Estimation with COCOMO II. Introduction to the COCOMO Model The most fundamental calculation in the COCOMO model is the use of the Effort Equation to estimate the number of Person-Months required developing a project. Most of the other COCOMO results, including the estimates for Requirements and Maintenance, are derived from this quantity. Source Lines of Code The COCOMO calculations are based on your estimates of a project's size in Source Lines of Code (SLOC). SLOC is defined such that:

Only Source lines that are DELIVERED as part of the product are included -- test drivers and other support software is excluded SOURCE lines are created by the project staff -- code created by applications generators is excluded One SLOC is one logical line of code Declarations are counted as SLOC Comments are not counted as SLOC The original COCOMO 81 model was defined in terms of Delivered Source

Instructions, which are very similar to SLOC. The major difference between DSI and SLOC is that a single Source Line of Code may be several physical lines. For example, an "if-thenelse" statement would be counted as one SLOC, but might be counted as several DSI. The Scale Drivers In the COCOMO II model, some of the most important factors contributing to a project's duration and cost are the Scale Drivers. You set each Scale Driver to describe your project; these Scale Drivers determine the exponent used in the Effort Equation. The 5 Scale Drivers are:

Precedentedness Development Flexibility


Page 13 of 16

Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

Architecture / Risk Resolution Team Cohesion Process Maturity Note that the Scale Drivers have replaced the Development Mode of COCOMO 81.

The first two Scale Drivers, Precedentedness and Development Flexibility actually describe much the same influences that the original Development Mode did. Cost Drivers COCOMO II has 17 cost drivers you assess your project, development environment, and team to set each cost driver. The cost drivers are multiplicative factors that determine the effort required to complete your software project. For example, if your project will develop software that controls an airplane's flight, you would set the Required Software Reliability (RELY) cost driver to Very High. That rating corresponds to an effort multiplier of 1.26, meaning that your project will require 26% more effort than a typical software project. COCOMO II defines each of the cost drivers, and the Effort Multiplier associated with each rating. Check the Costar help for details about the definitions and how to set the cost drivers. COCOMO II Effort Equation The COCOMO II model makes its estimates of required effort (measured in Person-Months PM) based primarily on your estimate of the software project's size (as measured in thousands of SLOC, KSLOC)): Effort = 2.94 * EAF * (KSLOC)E Where EAF Is the Effort Adjustment Factor derived from the Cost Drivers. E Is an exponent derived from the five Scale Drivers. As an example, a project with all Nominal Cost Drivers and Scale Drivers would have an EAF of 1.00 and exponent, E, of 1.0997. Assuming that the project is projected to consist of 8,000 source lines of code, COCOMO II estimates that 28.9 Person-Months of effort is required to complete it:
Page 14 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

Effort = 2.94 * (1.0) * (8)1.0997 = 28.9 Person-Months Effort Adjustment Factor The Effort Adjustment Factor in the effort equation is simply the product of the effort multipliers corresponding to each of the cost drivers for your project. For example, if your project is rated Very High for Complexity (effort multiplier of 1.34), and Low for Language & Tools Experience (effort multiplier of 1.09), and all of the other cost drivers are rated to be Nominal (effort multiplier of 1.00), the EAF is the product of 1.34 and 1.09. Effort Adjustment Factor = EAF = 1.34 * 1.09 = 1.46 Effort = 2.94 * (1.46) * (8)1.0997 = 42.3 Person-Months COCOMO II Schedule Equation The COCOMO II schedule equation predicts the number of months required to complete your software project. The duration of a project is based on the effort predicted by the effort equation: Duration = 3.67 * (Effort)SE Where Effort is the effort from the COCOMO II effort equation SE Is the schedule equation exponent derived from the five Scale Drivers Continuing the example, and substituting the exponent of 0.3179 that is calculated from the scale drivers, yields an estimate of just over a year, and an average staffing of between 3 and 4 people: Duration = 3.67 * (42.3)0.3179 = 12.1 months Average staffing = (42.3 Person-Months) / (12.1 Months) = 3.5 people

Page 15 of 16 Vijay Kumar Sharma

Master of Business Administration Semester-III


MI0033 Software Engineering
Assignment Set- I

The SCED Cost Driver The COCOMO cost driver for Required Development Schedule (SCED) is unique, and requires a special explanation. The SCED cost driver is used to account for the observation that a project developed on an accelerated schedule will require more effort than a project developed on its optimum schedule. A SCED rating of Very Low corresponds to an Effort Multiplier of 1.43 (in the COCOMO II.2000 model) and means that you intend to finish your project in 75% of the optimum schedule (as determined by a previous COCOMO estimate). Continuing the example used earlier, but assuming that SCED has a rating of Very Low, COCOMO produces these estimates: Duration = 75% * 12.1 Months = 9.1 Months Effort Adjustment Factor = EAF = 1.34 * 1.09 * 1.43 = 2.09 Effort = 2.94 * (2.09) * (8)1.0997 = 60.4 Person-Months Average staffing = (60.4 Person-Months) / (9.1 Months) = 6.7 people Notice that the calculation of duration isn't based directly on the effort (number of Person-Months) instead it's based on the schedule that would have been required for the project assuming it had been developed on the nominal schedule. Remember that the SCED cost driver means "accelerated from the nominal schedule".