Вы находитесь на странице: 1из 2

34916 Federal Register / Vol. 67, No.

95 / Thursday, May 16, 2002 / Notices

comments on alternatives and issues DEPARTMENT OF DEFENSE Street, NW., Room 10235, New
from Federal, State, and local agencies, Executive Office Building, Washington,
affected Indian tribes, and other Department of the Army; Corps of DC 20503 or should be electronically
interested private organizations and Engineers mailed to the internet address Lauren
individuals. The next public workshop Wittenberg@omb.eop.gov.
is scheduled for May 22, 2002, at the Intent To Prepare a Draft
SUPPLEMENTARY INFORMATION: Section
Miami-Dade Extension Office, located at Environmental Impact Statement for
the Shrewsbury River Basin, 3506 of the Paperwork Reduction Act of
18710 SW 288th Street, Homestead, 1995 (44 U.S.C. chapter 35) requires that
Florida. The meeting will begin at 6:30 Monmouth County, NJ, Flood Control
and Ecosystem Restoration Study: the Office of Management and Budget
p.m. and continue to 10 p.m. (OMB) provide interested Federal
g. DEIS Preparation: The integrated Feasibility Phase;Correction
agencies and the public an early
draft PIR, including a DEIS, is currently AGENCY: Department of the Army, U.S. opportunity to comment on information
scheduled for publication in June 2004. Army Corps of Engineers, DoD. collection requests. OMB may amend or
Luz D. Ortiz, ACTION: Notice; date correction. waive the requirement for public
consultation to the extent that public
Army Federal Register Liaison Officer. SUMMARY: The public scoping meetings participation in the approval process
[FR Doc. 02–12187 Filed 5–15–02; 8:45 am] scheduled for June 13, 2002 from 2 pm would defeat the purpose of the
BILLING CODE 3710–AJ–M to 5 pm and from 7 pm to 9 pm information collection, violate State or
published in the Federal Register on Federal law, or substantially interfere
Friday, May 3, 2002 (67 FR 22414) have with any agency’s ability to perform its
DEPARTMENT OF DEFENSE been rescheduled. The public scoping statutory obligations. The Leader,
meetings will now be held on June 14, Regulatory Information Management
Department of the Army; Corps of
2002 from 2 pm to 5 pm and from 7 pm Group, Office of the Chief Information
Engineers
to 9 pm. The meetings will be held in Officer, publishes that notice containing
Cancellation of the Notice of Intent To Monmouth County at the Sea Bright proposed information collection
Prepare a Draft Environmental Impact Borough Hall gymnasium. requests prior to submission of these
Statement for the Dade County Beach FOR FURTHER INFORMATION CONTACT: Ms. requests to OMB. Each proposed
Erosion Control and Hurricane Melissa Alvarez, Project Biologist, information collection, grouped by
Protection Project, for a Test Beach Fill Planning Division, U.S. Army Corps of office, contains the following: (1) Type
Using a Domestic Upland Sand Source Engineers, New York District, 26 of review requested, e.g. new, revision,
Based on a Generic Sand Specification Federal Plaza, Room 2142, New York, extension, existing or reinstatement; (2)
New York, 10278–0090, at (212) 264– Title; (3) Summary of the collection; (4)
AGENCY: Department of the Army, U.S. 2008 or at Description of the need for, and
Army Corps of Engineers, DoD. melissa.d.alvarez@usace.army.mil. proposed use of, the information; (5)
ACTION: Notice; cancellation. SUPPLEMENTARY INFORMATION: The Respondents and frequency of
information for the point of contact for collection; and (6) Reporting and/or
SUMMARY: The Jacksonville District, U.S. the original notice has also changed, the Recordkeeping burden. OMB invites
Army Corps of Engineers hereby cancels physical street address has been public comment.
its notice of intent to prepare a Draft modified and the email address has Dated: May 13, 2002.
Environmental Impact Statement (DEIS) been added (see above). John D. Tressler,
for the Dade County Beach Erosion
Luz D. Oritz, Leader, Regulatory Information Management,
Control and Hurricane Protection
Office of the Chief Information Officer.
Project, as published in 64 FR 24373, Army Federal Register Liaison Officer.
May 6, 1999. [FR Doc. 02–12186 Filed 5–15–02; 8:45 am] Office of Postsecondary Education
The notice is cancelled because, after BILLING CODE 3710–06–M Type of Review: Reinstatement.
scoping for the proposed DEIS was Title: Application for Grants under
completed, no new new issues were the Ronald E. McNair Postbacalaureate
raised; no request was received for DEPARTMENT OF EDUCATION Achievement Program (84.217).
public meetings, and comments were Frequency: Once every four years.
received only from environmental and Submission for OMB Review; Affected Public: Not-for-profit
resource agencies. Comment Request institutions; Businesses or other
An Environmental Assessment will be for-profit; State, Local, or Tribal Gov’t,
prepared and coordinated for the AGENCY: Department of Education. SEAs or LEAs.
proposed action. This document is SUMMARY: The Leader, Regulatory Reporting and Recordkeeping Hour
expected to be available in May 2002. Information Management Group, Office Burden:
of the Chief Information Officer invites Responses: 300
FOR FURTHER INFORMATION CONTACT:
comments on the submission for OMB Burden Hours: 1,500
Questions can be forwarded to Mr. Mike
review as required by the Paperwork Abstract: The application form is
Dupes, Environmental Branch, Planning
Reduction Act of 1995. needed to conduct a national
Division, Jacksonville District, Corps of
DATES: Interested persons are invited to competition for the Ronald E. McNair
Engineers, Post Office Box 4970,
Jacksonville, Florida 32232–0019, submit comments on or before June 17, Postbaccalaureate Achievement Program
Phone: 904–232–1689. 2002. for program year 2002–03. The program
ADDRESSES: Written comments should provides Federal financial assistance in
Dated: May 1, 2002.
be addressed to the Office of the form of grants to institutions of
James C. Duck, Information and Regulatory Affairs, higher education and combinations of
Chief, Planning Division. Attention: Lauren Wittenberg, Desk institutions of higher education. The
[FR Doc. 02–12179 Filed 5–15–02; 8:45 am] Officer, Department of Education, Office program provides Federal financial
BILLING CODE 3710–AJ–M of Management and Budget, 725 17th assistance in the form of discretionary

VerDate 11<MAY>2000 16:28 May 15, 2002 Jkt 197001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\16MYN1.SGM pfrm01 PsN: 16MYN1
Federal Register / Vol. 67, No. 95 / Thursday, May 16, 2002 / Notices 34917

grants to institutions of higher and wetlands assessment will be Washington, is necessary to maintain
education for the purpose of providing performed and a floodplain statement of reliable electrical service during severe
academic and other support services to findings will be included in the winter conditions in the growing
prepare low-income, first-generation Supplemental Draft EIS, in accordance northwest Washington area. The
college students, and students from with the National Environmental Policy intended effect on the public is to
groups underrepresented in graduate Act (NEPA). maintain a reliable high-voltage
education for doctoral study. DATES: Written comments on the NEPA transmission system for Seattle area
Requests for copies of the submission scoping process are due to the address utilities and avoid an increasing risk of
for OMB review; comment request may below no later than June 19, 2002. partial blackouts in the Puget Sound
be accessed from http:// Comments may also be made at public area during winter weather events that
edicsweb.ed.gov, by selecting the meetings to be held on June 5, 6, 8, and create a high demand for energy. The
‘‘Browse Pending Collections’’ link and 13, 2002, at the times and addresses action would also enhance BPA’s ability
by clicking on link number 1991. When below. to provide firm energy to Canada to
you access the information collection, ADDRESSES: Send letters with comments meet the requirements of the Columbia
click on ‘‘Download Attachments’’ to and suggestions on the proposed scope River Treaty of 1961. BPA proposes to
view. Written requests for information of the Supplemental Draft EIS to construct the 500-kV transmission line
should be addressed to Vivian Reese, Communications, Bonneville Power in 2003–04 to meet these purposes.
Department of Education, 400 Maryland Administration—KC–7, P.O. Box 12999, This action may involve floodplain
Avenue, SW, Room 4050, Regional Portland, Oregon, 97212. You may also and wetlands. In accordance with DOE
Office Building 3, Washington, DC give your comments by calling (360) regulations for compliance with
20202–4651 or to the e-mail address 418–8445, or toll-free 1–800–282–3713. floodplain and wetlands environmental
vivivan.reese@ed.gov. Requests may Comments may also be sent to the BPA review requirements, BPA will prepare
also be electronically mailed to the Internet address: comment@bpa.gov. To a floodplain and wetlands assessment
internet address OCIO_RIMG@ed.gov or be placed on the project mail list, call and will perform this proposed action in
faxed to 202–708–9346. Please specify 1–800–622–4520. In all a manner so as to avoid or minimize
the complete title of the information communications, please specify the potential harm to or within the affected
collection when making your request. Kangley-Echo Lake Project. floodplain and wetlands. The
Comments regarding burden and/or Comments may also be made at public assessment and a floodplain statement
the collection activity requirements meetings to be held on Wednesday, June of findings will be included in the
should be directed to Joseph Schubart at 5, 2002, 4–8 p.m., at Seattle Center, 305 Supplemental Draft EIS and Final EIS
(202) 708–9266 or via his internet Harrison Street, Seattle, Washington; being prepared for the proposed project
address at Joe.Schubart@ed.gov. Thursday, June 6, 2002, 4–8 p.m., at Mt. in accordance with NEPA.
Individuals who use a Si Senior Center, 411 Main Avenue
telecommunication device for the deaf South, North Bend, Washington; Alternatives Proposed for
(TDD) may call the Federal Information Saturday, June 8, 2002, 11 a.m.–3 p.m., Consideration
Relay Service (FIRS) at 1–800–877– at Black Diamond Community Center, In response to comments received on
8339. 31605 3rd Avenue (State Route 169), the Draft EIS, BPA identified four
[FR Doc. 02–12243 Filed 5–15–02; 8:45 am] Black Diamond, Washington; and additional alternatives for location and
BILLING CODE 4000–01–M Thursday, June 13, 2002, 4–8 p.m., at configuration of a transmission line
Maple Valley Community Center, 22010 outside the Cedar River Municipal
SE 248th Street, Maple Valley, Watershed that would meet the
DEPARTMENT OF ENERGY Washington. The weekday meetings will intended purpose of the transmission
have an open house format from 4–6 line. Two of the alternatives to be
Bonneville Power Administration p.m. with opportunities to provide more considered cross land managed by the
formal comments from 6–8 p.m. The U. S. Forest Service north and east of
Kangley-Echo Lake Transmission Line Saturday meeting will have the same the Cedar River Municipal Watershed, a
Project format, with an open house from 11 large natural area in the Cascade
a.m.–1 p.m. and a more formal comment Mountains used by the City of Seattle to
AGENCY: Bonneville Power
period from 1–3 p.m. collect drinking water for about 1.3
Administration (BPA), Department of
Energy (DOE). FOR FURTHER INFORMATION, CONTACT: Lou million people in King and Snohomish
Driessen, Project Manager, Bonneville Counties. The added alternatives are
ACTION: Notice of intent to prepare a
Power Administration—TNP/TPP–3, described below.
Supplemental Draft Environmental
P.O. Box 3621, Portland, Oregon,
Impact Statement (EIS) and notice of Alternative A
97208–3621; direct telephone (360)
floodplain and wetlands involvement.
619–6327; toll-free telephone 1–800– Rebuild BPA’s existing Covington to
SUMMARY: This notice announces BPA’s 282–3713; or e-mail lcdriessen@bpa.gov. Maple Valley 230-kV transmission line
intention to prepare a Supplemental You may also contact Gene Lynard, to a double-circuit 500-kV line. New
Draft EIS on the construction, operation, Environmental Project Manager, transmission towers would be about 175
and maintenance of a 500-kilovolt (kV) Bonneville Power Administration— feet tall. The new 500-kV line would be
transmission line in King and Kittitas KEC–4, P.O. Box 3621, Portland, constructed on existing right-of-way.
Counties, State of Washington. Oregon, 97208–3621; direct telephone Each end of the new line would be
Cooperating agencies are Mt. Baker- (503) 230–3790; toll-free telephone connected to existing unused 500-kV
Snoqualmie and Wenatchee National 1–800–282–3713; fax number (503) 230– circuits such that the new line would be
Forests, U.S. Department of Agriculture. 5699; or e-mail: gplynard@bpa.gov. connected to BPA’s Raver and Echo
The Supplemental Draft EIS will SUPPLEMENTARY INFORMATION: The Lake substations. The northern vacant
include analysis of additional construction, operation, and circuit would need to be connected to
alternatives recommended in comments maintenance of a 500-kV transmission Echo Lake Substation with a short line
received on the Draft EIS. A floodplain line in King and Kittitas Counties, on BPA property.

VerDate 11<MAY>2000 16:28 May 15, 2002 Jkt 197001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\16MYN1.SGM pfrm01 PsN: 16MYN1

Вам также может понравиться