Вы находитесь на странице: 1из 15

Issue: Basic

Total 15 pages

Huawei Test Cases Description

eRAN3.0 Feature(Basic)

Huawei Technologies Co., Ltd. All Rights Reserved.

Website:
http://support.huawei.com

E-MAIL:
support@huawei.com

Address:
Bantian, Longgang District, Shenzhen, P. R.

Postal Code:
518129

China

Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. Please feel free to contact our local office or company headquarters.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base Bantian, Longgang Shenzhen 518129 People's Republic of China Website: Email: http://www.huawei.com support@huawei.com

Copyright Huawei Technologies Co., Ltd. 2004. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders.

Notice
The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute the warranty of any kind, express or implied.

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

Table of Contents

Issue: Basic

Huawei Proprietary and Confidential

Page i of i

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

eRAN3.0 Feature(Basic) Test Case Description

T01

Operation and Maintenance

T01-01 Real-time Monitoring of System Running Information


T01-0101 [LBFD-004009] Cell Users Monitoring Global ID T01-0201 Priority Middle Objective This feature provides the function of monitoring the running information of the equipment, RF system, cells, subscribers and transport links. This test case aims to verify that the eNodeB supports the function of real-time monitoring of its cell users in terms of chart and list. Network Diagram For the network diagram and required data configuration, see Test Network Preparation Guide . This test case involves the following elements: EPC, eNodeB1, CELL1, and UE1. Prerequisites
1. 2. 3. 4.

The status of the eNodeB is normal. The status can be checked by choosing Workbench > Main Topology on the M2000. The cell is activated, and its status is normal. UE1 is ready and is located in the center of its serving cell. Uu interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > Uu Interface Trace ) and S1 interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > S1 Interface Trace ) tasks have been created on the M2000. Expected Result The S1AP_INITIAL_CONTEXT_SETUP_RSP and S1AP_UL_NAS_TRANS messages appear in the S1 tracing result, indicating that the attach procedure is successful. The returned results show the detailed information about CELL1. The parameter
Page 1 of 12

Procedure
1.

Power on the UE to initiate an attach procedure. Ensure that there is no data traffic between the UE and the eNodeB.

2.

Query the detailed information about a

Issue: Basic

Huawei Proprietary and Confidential

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

cell by running the DSP CELL command on the M2000. Suppose the queried Local Cell ID is 0 . Query the details of the selected cell by running the following command: DSP CELL:LOCALCELLID= 0;

Local cell identity indicates that the value of Local Cell ID. ---------------------------start-----------------------%%/*43588*/DSP CELL:;%% RETCODE = 0 Operation succeeded. Local cell ID = 0 ---------------------------end----------------------------

3.

Click Monitor on the top of the page on the M2000. Choose Monitor > Signaling Trace > Signaling Trace Management and double-click Cell Performance Monitoring on the Monitor Navigation Tree, which is located on the left of the page. Select Users Statistic Monitoring on the Monitor Item. Click New on the right of window. Then a new window Trace Creation is displayed. In this new window, enter a trace name in the Trace Name field, and in the Filter by Name field, select the eNodeB by name. Click the End Time button and click Next . The Users Statistic Monitoring window is displayed. In the window, enter a value in the Cell ID field, and click Finish . Find the tracing task by name. Right-click the tracing task and choose Query Result to observe the graphical users statistic curve.

The Monitor page is displayed successfully.

4.

The Cell Performance Monitoring dialog box is displayed successfully.

5.

The tracing task is successfully created.

6.

Three types of data: General Users Number, NO-Activated Users Number and Keep UL Synch Users Number are displayed. General Users Number and Keep UL Synch User Number are both 1 . NO-Activated Users Number is 0 . The S1AP_UE_CONTEXT_REL_CMP message is displayed in the S1 interface trace window. General Users Number and Keep UL Synch Users Number are decreased to 0 . The Users Statistic window is closed and the task is deleted.

7.

Power off the UE to initiate a detach procedure.

8.

Observe the graphical users statistic curve. Stop the Users Statistic monitoring task by closing the Users Statistic window and delete the tracing task.

9.

Issue: Basic

Huawei Proprietary and Confidential

Page 2 of 12

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

Remarks Time required: 1 hour

Issue: Basic

Huawei Proprietary and Confidential

Page 3 of 12

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

T01-0102 [LBFD-004009] Throughput Monitoring Global ID T01-0202 Priority Middle Objective This feature provides the function of monitoring the running information of the equipment, RF system, cells, subscribers and transport links. This test case aims to verify that the eNodeB supports the function of real-time monitoring of its throughput in terms of chart and list. Network Diagram For the network diagram and required data configuration, see Test Network Preparation Guide . This test case involves the following elements: EPC, eNodeB1, CELL1, and UE1. Prerequisites
1. 2. 3. 4.

The status of the eNodeB is normal. The status can be checked by choosing Workbench > Main Topology on the M2000. The cell is activated, and its status is normal. UE1 is ready and is located in the center of its serving cell. Uu interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > Uu Interface Trace ) and S1 interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > S1 Interface Trace ) tasks have been created on the M2000. The FTP server for UE1 is normal. Expected Result The S1AP_INITIAL_CONTEXT_SETUP_RSP and S1AP_UL_NAS_TRANS messages appear in the S1 tracing result, indicating that the attach procedure is successful. The Monitor page is displayed successfully. The User Performance Monitoring dialog box is displayed successfully.

5.

Procedure
1.

Power on the UE to initiate an attach procedure. Ensure that there is no data traffic between the UE and the eNodeB.

2. 3.

Click Monitor on the top of the page. Choose Monitor > Signaling Trace > Signaling Trace Management and double-click Cell Performance Monitoring on the Monitor Navigation Tree, which is located on the left of the page. Select General Throughput

4.

The tracing task is successfully created.


Huawei Proprietary and Confidential Page 4 of 12

Issue: Basic

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

Monitoring on the Monitor Item. Click New on the right of the window. Then a new window Trace Creation is displayed. In this new window, enter a trace name in the Trace Name field, and in the Filter by Name field, select the eNodeB by name. Click the End Time button and click Next . The General Throughput Monitoring window is displayed. In the window, enter a value in the Cell ID field, and click Finish .
5.

Observe the graphical throughput curve.

Six types of data are displayed: Cell Downlink RLC Throughput, Cell Uplink RLC Throughput, Cell GBR Traffic Downlink RLC Throughput, Cell GBR Traffic Uplink RLC Throughput, Cell NO-GBR Traffic Downlink RLC Throughput, and Cell NO-GBR Traffic Uplink RLC Throughput. The data of the throughput increases as the uplink FTP transfer is being executed. The data of the throughput is listed and the value is consistent with the curve in the chart page. The function of throughput monitoring can be supported by eNodeB. The S1AP_UE_CONTEXT_REL_CMP message is displayed in the S1 interface trace window. The Throughput window is closed and the task is deleted.

6.

Start uplink FTP data transfer.

7.

Observe the graphical throughput curve.

8.

Power off the UE to initiate a detach procedure.

9.

Stop the user statistic monitoring task by closing the Throughput window and delete the tracing task.

Remarks Time required: 1 hour

Issue: Basic

Huawei Proprietary and Confidential

Page 5 of 12

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

T02

Service Bearing

T02-01 Service Test


T02-0101 Attach Global ID T04-0101 Priority Middle Objective This test case aims to verify that the eNodeB supports the attach procedure. Network Diagram For the network diagram and required data configuration, see Test Network Preparation Guide . This test case involves the following elements: EPC, eNodeB1, CELL1, and UE1. Prerequisites
1. 2. 3.

The status of the eNodeB is normal. The status can be checked by choosing Workbench > Main Topology on the M2000. The cell is activated, and its status is normal. Uu interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > Uu Interface Trace ) and S1 interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > S1 Interface Trace ) tasks have been created on the M2000. Expected Result The S1AP_INITIAL_CONTEXT_SETUP_RSP and S1AP_UL_NAS_TRANS messages appear in the S1 tracing result, indicating that the attach procedure is successful.

Procedure
1.

Enable UE1 to initiate an attach procedure.

Remarks Message flow:

Issue: Basic

Huawei Proprietary and Confidential

Page 6 of 12

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

(1) (2) (3)

The UE sends an RRC Connection Request message (random value or S-TMSI) to the eNodeB. The eNodeB sends an RRC Connection Setup message (RadioResourceConfigDedicated) to the UE. The UE sends the eNodeB an RRC Connection Complete message, indicating that the UE is in RRC_CONNECTED mode. The message also includes an Attach Request message. The eNodeB sends the MME an Initial UE Message (including the Attach Request message) to set up an S1 link with the MME. The MME sends an Initial Context Setup Request (including the IEs MME UE S1AP ID, eNB UE S1AP ID, UE Aggregate Maximum Bit Rate, E-RAB to Be Setup List, UE Security Capabilities, and Security Key) to request a UE context setup. The eNodeB sends a Security Mode Command message to the UE and the UE responds with a Security Mode Complete message, activating access stratum (AS) security. The eNodeB sends an UE Capability Enquiry message only after receiving an Initial
Huawei Proprietary and Confidential Page 7 of 12

(4) (5)

(6) (7)

Issue: Basic

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

Context Setup Request message without the IE UE Radio Capability. (8) (9) After receiving an UE Capability Information message over the Uu interface, the eNodeB sends the MME an UE Capability Info Indication message. The eNodeB sends the UE an RRC Connection Reconfiguration message containing the NAS message Attach Accept to set up SRB2 and a DRB.

(10) After receiving an RRC Connection Reconfiguration Complete message from the UE, the eNodeB sends the MME an Initial Context Setup Response message, indicating that the UE context setup is complete. (11) The last two direct transfer messages (UL Information Transfer on the Uu interface and UL NAS Transport on the S1 interface) are used to transport the Attach Complete message to the MME. Time required: 1 hour

Issue: Basic

Huawei Proprietary and Confidential

Page 8 of 12

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

T02-0102 Detach Global ID T04-0102 Priority Middle Objective This test case aims to verify that the eNodeB supports the detach procedure. Network Diagram For the network diagram and required data configuration, see Test Network Preparation Guide . This test case involves the following elements: EPC, eNodeB1, CELL1, and UE1. Prerequisites
1. 2. 3.

The status of the eNodeB is normal. The status can be checked by choosing Workbench > Main Topology on the M2000. The cell is activated, and its status is normal. Uu interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > Uu Interface Trace ) and S1 interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > S1 Interface Trace ) tasks have been created on the M2000. UE1 has been attached to the cell. Expected Result The S1AP_UE_CONTEXT_REL_CMD and S1AP_UE_CONTEXT_REL_CMP messages appear in the S1 tracing result and the RRC_CONN_REL message appears in the UU tracing result, indicating that the detach procedure is successful.

4.

Procedure
1.

Power off UE1 to initiate a detach procedure.

Remarks Message flow:

(1) (2) (3)

The UE sends a UL Information Transfer message to the eNodeB containing a Detach Request message with the IE detach type of switch off. The eNodeB sends a UL NAS Transfer message to the MME containing a Detach Request message. The MME sends the eNodeB a UE Context Release Command message to release the UE context.

Issue: Basic

Huawei Proprietary and Confidential

Page 9 of 12

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

(4) (5)

The eNodeB sends an RRC Connection Release message to the UE to release the RRC connection and then sends a UE Context Release Complete message to the MME. There is no Detach Accept message from the MME because the detach type is switch off. Time required: 1 hour

Issue: Basic

Huawei Proprietary and Confidential

Page 10 of 12

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

T02-0103 FTP Global ID T04-0105 Priority Middle Objective This test case aims to verify that the eNodeB supports File Transfer Protocol (FTP) services. Network Diagram For the network diagram and required data configuration, see Test Network Preparation Guide . This test case involves the following elements: EPC, eNodeB1, CELL1, and UE1. Prerequisites
1. 2. 3.

The status of the eNodeB is normal. The status can be checked by choosing Workbench > Main Topology on the M2000. The cell is activated, and its status is normal. Uu interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > Uu Interface Trace ) and S1 interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > S1 Interface Trace ) tasks have been created on the M2000. An FTP server is available. Expected Result The S1AP_INITIAL_CONTEXT_SETUP_RSP and S1AP_UL_NAS_TRANS messages appear in the S1 tracing result, indicating that the attach procedure is successful. Downlink data transfer works normally.

4.

Procedure
1.

Power on UE1 to initiate an attach procedure.

2.

Start downlink FTP data transfer.

Remarks Operation guide The downlink throughput can be observed in the following way: Log in to the M2000. Create a general throughput monitoring task. (Choose Monitor > Signaling Trace > Signaling Trace Management > General Throughput Monitoring . Set Trace Name , NE , Start Time , and End Time , and select Monitor Period . Then, click Finish .) Double-click the created task to view monitoring results. You can also see the M2000 help for detailed operations. Time required: 1 hour

Issue: Basic

Huawei Proprietary and Confidential

Page 11 of 12

Huawei Test Cases Description eRAN3.0 Feature(Basic)

Internal use

T02-0104 Web Browsing Global ID T04-0106 Priority Middle Objective This test case aims to verify that the eNodeB supports web browsing. Network Diagram For the network diagram and required data configuration, see Test Network Preparation Guide . This test case involves the following elements: EPC, eNodeB1, CELL1, and UE1. Prerequisites
1. 2.

The status of the eNodeB is normal. The status can be checked by choosing Workbench > Main Topology on the M2000. Uu interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > Uu Interface Trace ) and S1 interface tracing (by choosing Monitor > Signaling Trace > Signaling Trace Management > S1 Interface Trace ) tasks have been created on the M2000. The cell is activated, and its status is normal. The Web server is available and can be accessed. Expected Result The S1AP_INITIAL_CONTEXT_SETUP_RSP and S1AP_UL_NAS_TRANS messages appear in the S1 tracing result, indicating that the attach procedure is successful. The web page can be browsed normally.

3. 4.

Procedure
1.

Power on UE1 to initiate an attach procedure.

2.

Visit a website by using the Internet Explorer on UE1 and browse the web page. Enable UE1 to detach from the network.

3.

Data transfer between the UE and the website stops.

Remarks Time required: 1 hour

Issue: Basic

Huawei Proprietary and Confidential

Page 12 of 12

Вам также может понравиться