Академический Документы
Профессиональный Документы
Культура Документы
Switchgear Type WS
Table of Content
1. Tightness test (IEC 62271-200 / 7.4) 2. Dielectrical test on the main circuit (IEC 62271-200 / 7.1) 3. Partial discharge measurement (IEC 62271-200 / 7.101) 4. Dielectrical test on auxiliary an control circuits (IEC 60694_Edition 2.2 / 7.2.4) 5. Mechanical Operation Tests (IEC 62271-200 / 7.102) 6. Verification of correct wiring (IEC 60694_Edition 2.2 / 7.2.1) 7. Test of Auxiliary Electrical Devices (IEC 60694_Edition 2.2 / 7.2.2) 8. Operation Test of Interlocks (IEC 62271-200 / 7.104) 9. Measurement of the resistance of the main circuits (IEC 62271-200 / 7.3)
10. Operation Test of Control, Metering, Indicating and Protection Systems (IEC 60694_Edition 2.2 / 7.2.1) 11. Routine Test of Circuit Breakers (IEC 62271-100 / 7)
1. Tightness test
All gas compartment are filled with SF6 gas up to the maximum service pressure All sealing are checked for their gas tightness with an SF6 gas sniffer indicator, as shown below.
-8 3 Standard Value: The leakage detector has a sensibility value of 5x10 cm /sec. Maximum Gas leakage rate 1%/year 1x10-4 up to 1x10-5 cm3/sec. The leakage test will be passed if the leakage rate is lower than 10-7 cm3/sec.
Ck
Zm
kV
Measuring impedance pC
Test duration: minimum 2 min The test will be passed if the measured value is lower than 20pC.
Test object Capacitive divider Coupling capacitor Test transformer
Ck
Zm
kV
Measuring impedance pC
The test will be repeated for the other phases as well. Note: The applied power frequency voltage will be raised to pre-stress value at least 1.3xUr and maintained at this value for at least 10 s.
test object
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4
test device 0 - 10 kV AC
5.6 Contact position test of the disconnecting switch (shown by picture below).
Remark: The approved and corrected wiring diagrams are treated as internal test certificates and are stored in the testing archives. Wiring faults marked up in the wiring diagrams are transformed to the original wiring diagrams. All test are carried out in function if possible.
Remark: Electromechanical interlocking systems (blocking coils) relevant for the complete switchboard are tested during the HV-part commissioning on site.
Test Description
Apply 100 Amps. DC current through each feeder and direct reading of the resistance is measured from the instrument. Injection points: contact of isolator and cable connection sockets
Make: GLOOR ORLIKON; Type: 60670 R; S.No.: 146 532 or equivalent equipment
Busbar
Q1 Q5 Q2
Switching condition Q1: open Q2: open Q0: closed Q5: open
Q0
Reference values: 2500A panel (multi cable connection): L1 56.1 ; L2 56.5 ; L3 52.3 630/1250A panel (multi cable connection): L1 144.7 ; L2 137.9 ; L3 133.2 630/1250A panel (single cable connection): L1 134.0 ; L2 128.0 ; L3 122.5 2500A Bus Coupler&Riser: L1 97.6 ; L2 82 ; L3 95.4 2500A Bus Section&Riser BB1: L1 85.7 ; L2 75.0 ; L3 84.8 2500A Bus Section&Riser BB2: L1 104.0 ; L2 98.1 ; L3 95.9 Note: The reference values to be understood as maximum allowable values.
10.4 Voltage transformer test: 10.4.1 Primary injection test for each voltage transformer. No metering of class, burden and mag. curve ratings because that was already done by the supplier and confirmed by test certificates. 10.4.2 Check of correctness of the VT ratio. 10.4.3 Cross checking of VT rating plates and the ratings listed in the wiring diagram list of equipment .
11.
11.1 Dielectrical test on the main Circuit acc. to IEC 62271-100 / 7.1 Dielectrical test on auxiliary and control circuit acc. to IEC 62271-100 / 7.2 IEC 60694_Edition 2.2 / 7.2.4 : The test voltage shall be 2kV with a duration of 1s Measurement of the resistance of the main circuit acc. to IEC 62271-100 / 7.3 11.2 Design and visual checks acc. to IEC 62271-100 / 7.5 11.3 Mechanical operation tests acc. to IEC 62271-100 / 7.101 at minimum and maximum supply voltage of operating devices: at rated supply voltage of operating devices: 5 close-open operating cycles for circuit-breakers inteded for auto-reclosing: 5 open-close cycles measurement of operating times expected closing time of CB: < 70 ms expected opening time of CB: < 65 ms measurement of speed on and speed off measurement of spring charge motor current test of the control and auxiliary switch to indicate the open and closes position of the circuit breaker correctly verification of all auxiliary equipment operating correctly in the limits of supply voltage inspection of the wiring of the control and auxiliary equipment circuits recharging time of the springs for operating the circuit breaker charging motor current operating of anti-pumping device function test of under-voltage opening releases within the specified voltage limits (if applicable) test of damper function check of correct travel check of correct damping test of blocking coils check of proper function between 15 % undervoltage and 10 % overvoltage Remark: No-load travel curve will be recorded but not within a prescribed envelope of mechanical travel characteristic.
11.6 Additional internal documentation type, ident. no., fabrication no. CB, fabrication no. Switchgear serial No. of vacuum bottles spring charging motor: time, max. current, min. operation voltages operation counter test date, signature Picture of the used test equipment: