Вы находитесь на странице: 1из 15

AL ANMMA ORGANISATION STRUCTURE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Client Group Company Company code Controlling Area Language Currency Country City Plant Storage Location Purchase Org Purchase Group Vendor Materials Sales Org Distribution Channel Division Sales Office Sales Group Customer Cost Center Activity Types Ship to party Sold to party Bill to party Payer Partner Determination 901 ZA00 ZA02 ZA02 AR BHD IQ BASARA SL01 (ROH) ZPG SL02 (HALB) ZA02 SL03 (FERT) SL04 (HAWA) ZA02(Centralized)

ZA02 ZR , ZW ZS, ZB ZASO, ZASL ZA1, ZA2 900801

900861

ZASP ZASH ZABP ZAPY ZAPD

900831 - 900860 900801 - 900830 900861 - 900890 900891 - 900920

ZAV1(Virtual) SL05 (PIPE) SL06 (ROH)

Sl No Material Name 1 Iron Ore 2 Coal 3 Lime stone 4 Oxygen 5 Silicon 6 Molten Metal 7 Coke 8 Slag 9 Scrap 10 Coal Gas 11 Steel Bar 12 Steel Billet 13 Electricity 14 Water 15 Lubricant

Material Number 112

Material Type ROH ROH ROH HAWA HAWA HALB HALB HAWA (By Product) HALB (By Product) HAWA (By Product) FERT FERT PIPE PIPE ROH

Plant ZA02 ZA02 ZA02 ZA02 ZA02 ZA02 ZA02 ZA02 ZA02 ZA02 ZA02 ZA02 ZA02 ZA02 ZA02

Storage Location SL01 SL01 SL01 SL04 SL04 SL02 SL02 SL04 SL02 SL04 SL03 SL03 SL05 SL05 SL01

Sales Org. --------------------ZA02 ZA02 -------

Charecteristics Meltability Ductability Weldability Bendability Batch Management Include Classification view Class - 023

Distribution channel --------------------ZR ZW -------

Division --------------------ZS ZB -------

Basic Unit of Measure Kg

Basic Data1 Material Group 01 01 01

Division Gross Wt.

01

Net Wt.

Classification Class 023

Purchasing Purchasing Group ZPG

MRP 1 View Batch Management tick Purchasing Value Key 1 MRP Type PD VM VM VB VB PD PD PD PD PD PD PD ----VB

MRP 1 View MRP Controller Lot Size AL1 EX AL1 EX AL1 EX AL1 EX AL1 EX AL1 EX AL1 EX AL1 EX AL1 EX AL1 EX AL1 EX AL1 EX --------AL1 EX

Procurement Type E E E E E I I X I X X X ----E

MRP 2 View Planned Delivery Time In-House Production 6 --3 --3 --3 --3 ----1 --1 --1 --1 --2 --2 --2 --------3 ---

Scheduling Margin Key AL1 AL1 AL1 AL1 AL1 AL1 AL1 AL1 AL1 AL1 AL1 AL1 ----AL1

Period Indicator M M M M M M M M M M M M ----M

MRP 3 View Strategy Group 10 10 10 10 10 10 10 10 10 10 10 10 ----10

Availability Check Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 ----Z1

Work Scheduling Vie Production Scheduler AL1 AL1 AL1 AL1 AL1 AL1 AL1 AL1 AL1 AL1 AL1 AL1 ----AL1

Work Scheduling View Production Scheduling Profile AL0001 AL0001 AL0001 AL0001 AL0001 AL0001 AL0001 AL0001 AL0001 AL0001 AL0001 AL0001 ----AL0001

Steel Bar

fert

molten metal slag(by product) scrap(by product)

Steel Billet

fert

molten metal slag(by product) scrap(by product) coke lime stone iron ore scrap coal coal gas(by product)

Molten Metal

halb

Coke

halb

Person Responsible Parameters ZAL_01 ZAL_02 ZAL_03 ZAL_08 ZAL_09 ZAL_11

AL1

set up time machine time lobor time base quantity Operation Qty. Operation Splits (No.of Machines)

Formulas ZAL001= ZAL_01 ZAL002 = ZAL_02* ZAL_09/ ZAL_08/ ZAL_11 ZAL003 = ZAL_03* ZAL_09/ ZAL_08/ ZAL_11 Blast Furnace BOF (Basi Oxygen Furnace) EAF (Electric arc Furnace) Casting Machine Billet Mill Coke Oven

1 2 3 4 5 6

Work Center Coke Oven Blast Furnace Basic Oxygen Furnace Electric Arc Furnace Casting Cutting

Extract Coke from Coal

Plant Parameters Number Ranges Planned Orders Dep Req/ Reservation Purachase Requisition MRP List Simulative Dep Req Conversion Planned Order -> Production Order Planned Order -> Purchase Requisition Dep Req Availability BOM/ Routing Sel ID External Procurement Planning Horizon Error Handling Item Numbers

Вам также может понравиться