PP Process for Lime Grinding Plant(LGP)

A). Nonvaluated Finished Goods: Master Data:


1. Materail Master: a). Finished Goods
Industry Sector: Chemical Industry Material Type: ZFIN

b). Raw Material: Industry Sector: Chemical Industry Material Type: ZROH

2. Bill of material-BOM (T-code CS01):

2 of 48

3. Cost Center (T-code KS01):

3 of 48

4. Resource (T-code CRC1):

EnterPI03 in control key

Enter ZLIM in Standard value key Select UOM for standard values Select 2in Rule

4 of 48

Enter001 as Capacity Category

Press enter

5 of 48

Enter suitable formula as given here

6 of 48

5. Master Recipe (T-code C201):

7 of 48

Complete the recipe creation


8 of 48

Proces Steps:
1.

Create Process Order: (Tcode: COR1)

EnterZAM3 for process order type

9 of 48

Press On Enter

10 of 48

Press On Enter

11 of 48

Enter On Back Button

12 of 48

Press On Release button

13 of 48

Save process order

14 of 48

Process order LIME300512 created successfully.

15 of 48

2.

Create Confirmation: (Tcode: COR6N)


Enter Process Order Number Enter Yield qty. Enter Process loss, Handling Loss, Machine Hours, Labor, Nitrogen, and Power.

Select Go to Goods movement Tab.

16 of 48

Enter raw material qty.

Save the confirmation.

17 of 48

Confirmation done successfully.

18 of 48

Display Material documents (Tcode - COR2)

Goto Lists Documented Goods Movement

19 of 48

20 of 48

B). Valuated Finished Goods: Master Data:


1. Materail Master: a). Finished Goods
Industry Sector: Chemical Industry Material Type: FERT

21 of 48

b). Raw Material:

2. Bill of material-BOM (T-code CS01):

22 of 48

3. Cost Center (T-code KS01):

4. Resource (T-code CRC1):


23 of 48

EnterPI03 in control key

Enter ZLIM in Standard value key Select UOM for standard values Select 2in Rule

24 of 48

Enter001 as Capacity Category

Press enter

25 of 48

Enter suitable formula as given here

26 of 48

5. Master Recipe (T-code C201):

27 of 48

Complete the recipe creation

28 of 48

Proces Steps:

Create Process Order: (Tcode: COR1)


Enter Material, Plant, Process Order Type, Process Order Number.

EnterZAM1 for process order type

29 of 48

Enter Total qty, Process start date. And press on enter.

30 of 48

Press on ENTER.

31 of 48

Release Process Order.

32 of 48

Process Order Released

33 of 48

34 of 48

3. Confirmation of Process Order : (Tcode COR6N)


Enter Process Order Number Enter Yield qty. Enter Process loss, Handling Loss, Machine Hours, Labor, Nitrogen, and Power.

Press on Enter

35 of 48

Enter Yield qty.

36 of 48

Enter Process loss, Handling Loss, Machine Hours, Labor, Nitrogen, and Power.

37 of 48

Enter Raw material qty.

38 of 48

Save Process Order Confirmation.

39 of 48

40 of 48

Display Material Document number.

41 of 48

42 of 48

3. Change Status (TECO) of Process order (COR2)

43 of 48

44 of 48

45 of 48

46 of 48

4. Carry out settlement CO88

Enter plant as required Enter period and year as required

47 of 48

48 of 48