YU Bin Quan ,Senior Engineer gxtunnel@gmail.com , David Cheng tunnelcon@gmail.com ,Technical Advisor Yangzhou Guangxin Heavy Machinery , www.gxtunnel.com,
Index ref 1 2 Topic Introduction Table -China - box jacking using shield machines 3 4 Examples of box jacking in China Some pictures 7 11 pg 2 4
1. Introduction Presently, the common way of construction of large rectangular pipeline generally involve the following options: 1. Open cut excavation and construction 2. construction using box culvert jacking method manual 3. construction using box culvert machine jacking method- using rectangular shield machine 4. Pipe roof construction and pipe jacking construction. Of these four methods, options 1 (open cut excavation) and 3 (using rectangular shield shield machines) can be used to construct longer distances. The former ,option 1 requires situation where interruption of traffic and services are allowed and are generally only suitable
for construction in the outskirts of cities and not under railway lines etc.; Option 2 ( Manual box jacking) has been widely used especially in India railways lines and been successfully jacked in
and in SE Asia for constructing underpass across roads .Even in USA ( Boston) large boxes have
that manner , where soil and other conditions make it suitable due to ability and acceptance of reasonable controllable l settlement .
option 3 (rectangular shield machine ) enabler construction of large boxes safer and economical .The machines have been evolved through
i
various applications and Chinas Yangzhou Guangxin (GX Tunnel) developed machines that are huge success in a number of projects .
have
prestigious
suitable for
length up to
150 m due to its limitation of jacking a series of steel pipe of small diameter( 700 -800 mm OD in common) forming a soil bounded by the pipe roof , and excavate the
boxed are
much shorter if box culvert jacking machine is used and to less temporary material( steel pipes used, as
the culvert cast are jacked directly , section by section in the option 3. and pipe jacking construction for not more than 150m a shorter distance, rectangular pipeline construction
2. China - box jacking using shield machines In China, research and application of the rectangular box jacking have gained grounds since the early 1990s. The first major rectangular pipe jacking construction was done in April 1999. When The Shanghai Institute of tunnel construction technology developed a 3.8 m 3.8 m rectangular box jacking machine for box construction. The Construction of Shanghai Metro Line 2 Lujiazui Station on the 5th entrance used earth pressure balance pipe jacking machine, and completed in two months the two tunnels. These works were achieved with good quality, and safety, with the normal use and road traffic during the construction of underground pipelines. Other examples will be illustrated and the following table indicate the
South Chen Road Station on the 2nd entrance a 7 Pujang bus supporting projects in Pujiang
Town (2, Exit 3) 8 Shanghai --- Rail delivery on the 10th line of the new Bay Exit 5, 7, 8 9 Shanghai , rail cross the line on the 10th Yin High Road Station on the 3rd entrance 10 Nanjing West ancestral hall Lane Rectangular Pipe Jacking 11 Nanjing Military General Hospital Rectangular Pipe Jacking
6
Sno Project name
12
1x 43.3 m
13
Nanjing Water Simon Street Memorial of underground Guojietongdao Rectangular Pipe Jacking
1 x 60 m
section of the rectangular top tube tunnel extended Jinke Road Station in East, Shanghai Rail Transit Line 2 East a4.2m 6.9m multi-cutter earth pressure balanced rectangular pipe jacking machine (with Yangzhou wide the Xin rectangular pipe jacking machine) Tunneling. Through Jinke Road Zu Chong Zhi Road intersection project located in the Pudong New Area, for a total length of 49.1m, the overburden depth of 5.1 ~ 4.6m.The +0.7% The Road and along the tunnel during construction through the Zu including two 220KV power cable, 1000mm rainwater pipes, 500mm other series of important pipelines, and the engineering challenge tremendous . For this a for this project was jacking slope
project risks .The top command are specialist leading senior engineers in the
starting .
In September 29, 2010 after just 24 days of work MCC Heavenly Shanghai thirteen Metallurgical Construction Co., Ltd. at the Shanghai Zhongshan Hospital, the rectangular shield machine made by Yangzhou GuangXin smoothly executed the 78.8 m long, 3.3 m high x 5.0 m wide box through the connecting hospital (Shanghai Zhongshan Hospital, Fudan) .The completion of the underground passage further improve the process of hospital care in the future. The First rectangular pipe jacking in Guangzhou was done in 2012 Guangzhou MetroTunnel Guangzhous Metro-using GX Tunnels rectangular shield .The cheaper "open-top excavation method for this project ,near the Pearl River was considered too risky due the heavy trafficked road and the nature of the
sandy layers. This Subway , measuring 64.5 m long, on the 6th line East Lake Station on the 2nd entrance involve the investment of over 1000 million
RMB( USD 170 Million) a total of 4 rows of 6.4 x 4 m , separated by 1 m in betwwen. The cover is only 4 m maximum The project project team reported not encountering much difficulties in the similar to other
the problems
In Guangzhou, Foshan Guicheng underground commercial street rectangle pipe jacking The Guicheng Underground Commercial Street located in Nanhai Avenue South, with the complexity of the location (at the lower part of the planned subway lines and close proximity of the upper large drainage boxes, cross-section 4.2m x 2.5m.) with the conditions imposed by the municipality that the traffic cannot be interrupted, the proposed pipe jacking construction was done using rectangular shield from GX Tunnel. The jacking strata are mainly sandy, any manual or open excavation will cause gushing sand, resulting in excessive deformation .The cover is only 5.5 m, with the electrical crossings at the depth of 2.2 to 3.1 m, and only 6.5m adjacent to an existing tunnel With the various boundary underground conditions, busy street the proposed construction of the pipe jacking method using the parallel arrangement of the four sections. The details are summarized below: i. . depth or cover 5.5m, ii. Cross section of box : 6.9m 4.9m rectangular, wall thickness of 0.45m,
iii. Each box section length 2m, with tongue and groove joints.
10
domestic 1st
v. Each of the top section with prestressing strand segment bolted together to enhance the overall stiffness. vi. The shield machine is made into 2 halves- the two halves were assembled and the box after another . top and down .The
10
11
4) Some pictures The following are some photos of the construction site.