Академический Документы
Профессиональный Документы
Культура Документы
Obra
Propiet.
Contrat.
Plz. Ejec.
Formula
: "INSTALACON DE LA LOSA MULTIDEPORIVA EN EL CASERIO DE CUNCA , DISTRITO DE BUENAVISTA ALTA, PROVINCIA CASMA - ANCASH"
: MUNICIPALIDAD DISTRITAL DE BUENAVISTA ALTA
Ubicacin : CASERIO CUNCA
: JVG CONTRATISTAS GENERALES S.A.C
Distrito
: BUENAVISTA ALTA
: 60 DIAS CALENDARIOS
Provincia : CASMA
: LOSA MULTIDEPORTIVA
Region
: ANCASH
1/
PARTIDA
Und Metrado
Costo
Unitario
VALORIZACIONES
PRESUPUESTO DE OBRA
ITEM
Supervisor de Obra
Residente de Obra
Monto de Contrato
Fecha Valorizacion
Costo
Parcial
SALDO
ACTUAL ACUMULADO
% de
% de
% de
Metrado Monto S/.
Metrado Monto S/.
Metrado Monto S/.
Avance
Avance
Avance
01.00.00
OBRAS PROVISIONALES
01.01.00
1.00
650.00
650.00
0.00
0.00
0.00
1.00
650.00
100.00
1.00
650.00
100.00
0.00
0.00
0.00
01.02.00
GLB
1.00
900.00
900.00
0.00
0.00
0.00
1.00
900.00
100.00
1.00
900.00
100.00
0.00
0.00
0.00
01.03.00
GLB
1.00
1,500.00
1,500.00
0.00
0.00
0.00
1.00
1,500.00
100.00
1.00
1,500.00
100.00
0.00
0.00
0.00
02.00.00
OBRAS PRELIMINARES
02.01.00
M2
607.56
1.70
1,032.85
0.00
0.00
0.00
607.56
1,032.85
100.00
607.56
1,032.85
100.00
0.00
0.00
0.00
02.02.00
M2
607.56
1.12
680.47
0.00
0.00
0.00
607.56
680.47
100.00
607.56
680.47
100.00
0.00
0.00
0.00
03.00.00
MOVIMIENTO DE TIERRAS
03.01.00
388.69
5.68
2,207.76
0.00
0.00
0.00
388.69
2,207.76
100.00
388.69
2,207.76
100.00
0.00
0.00
0.00
03.02.00
M3
418.56
4.05
1,695.17
0.00
0.00
0.00
418.56
1,695.17
100.00
418.56
1,695.17
100.00
0.00
0.00
0.00
03.03.00
03.04.00
M3
M2
64.76
607.56
28.13
4.13
1,821.70
2,509.22
0.00
0.00
0.00
0.00
64.76
1,821.70
100.00
64.76
1,821.70
100.00
0.00
0.00
0.00
0.00
0.00
607.56
2,509.22
100.00
607.56
2,509.22
100.00
0.00
0.00
0.00
03.05.00
M3
60.76
48.93
2,972.99
0.00
0.00
0.00
60.76
2,972.99
100.00
60.76
2,972.99
100.00
0.00
0.00
0.00
03.06.00
M3
41.86
23.00
962.78
0.00
0.00
0.00
41.86
962.78
100.00
41.86
962.78
100.00
0.00
0.00
0.00
04.00.00
CONCRETO SIMPLE
04.01.00
M3
64.76
340.91
22,077.33
0.00
0.00
0.00
64.76
22,077.33
100.00
64.76
22,077.33
100.00
0.00
0.00
0.00
04.02.00
M2
56.04
35.85
2,009.03
0.00
0.00
0.00
56.04
2,009.03
100.00
56.04
2,009.03
100.00
0.00
0.00
0.00
05.00.00
JUNTAS
05.00.01
JUNTA DE DILATACION
240.00
4.04
969.60
0.00
0.00
120.00
484.80
50.00
120.00
484.80
50.00
120.00
484.80
50.00
06.00.00
PINTURA
06.01.00
319.98
7.49
2,396.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
319.98
07.00.00
EQUIPAMIENTO
07.01.00
M3
1.52
334.87
509.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.52
509.00 100.00
07.02.00
UND
2.00
1,600.00
3,200.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
3,200.00 100.00
07.03.00
UND
2.00
900.00
1,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1,800.00 100.00
07.04.00
UND
1.00
300.00
300.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
300.00 100.00
0.00
2,396.65 100.00
: "INSTALACON DE LA LOSA MULTIDEPORIVA EN EL CASERIO DE CUNCA , DISTRITO DE BUENAVISTA ALTA, PROVINCIA CASMA - ANCASH"
: MUNICIPALIDAD DISTRITAL DE BUENAVISTA ALTA
Ubicacin : CASERIO CUNCA
: JVG CONTRATISTAS GENERALES S.A.C
Distrito
: BUENAVISTA ALTA
: 60 DIAS CALENDARIOS
Provincia : CASMA
: LOSA MULTIDEPORTIVA
Region
: ANCASH
1/
PRESUPUESTO DE OBRA
ITEM
PARTIDA
Und Metrado
COSTO DIRECTO (CD)
Costo
Unitario
Costo
Parcial
Supervisor de Obra
Residente de Obra
Monto de Contrato
Fecha Valorizacion
VALORIZACIONES
MES ANTERIOR ACUMULADO
ACTUAL ACUMULADO
SALDO
% de
% de
% de
Metrado Monto S/.
Metrado Monto S/.
Metrado Monto S/.
Avance
Avance
Avance
50,194.55
0.00
41,504.10
41,504.10
8,690.45
GASTOS GENERALES 10 %
5,019.46
0.00
4,150.41
4,150.41
869.05
UTILIDAD 10 %
5,019.46
0.00
4,150.41
4,150.41
869.05
SUB TOTAL
60,233.46
0.00
49,804.92
49,804.92
10,428.54
60,233.46
0.00
49,804.92
49,804.92
10,428.54
IMPUESTO IGV 18 %
10,842.02
0.00
8,964.89
8,964.89
TOTAL PRESUPUESTO
71,075.49
0.00
0.00
58,769.81
82.69
58,769.81
1,877.14
82.69
12,305.68 17.31
: "INSTALACON DE LA LOSA MULTIDEPORIVA EN EL CASERIO DE CUNCA , DISTRITO DE BUENAVISTA ALTA, PROVINCIA CASMA - ANCASH"
: MUNICIPALIDAD DISTRITAL DE BUENAVISTA ALTA
Ubicacin : CASERIO CUNCA
: JVG CONTRATISTAS GENERALES S.A.C
Distrito
: BUENAVISTA ALTA
: 60 DIAS CALENDARIOS
Provincia : CASMA
: GRADERIAS
Region
: ANCASH
1/
PARTIDA
Und Metrado
Costo
Unitario
VALORIZACIONES
PRESUPUESTO DE OBRA
ITEM
Supervisor de Obra
Residente de Obra
Monto de Contrato
Fecha Valorizacion
Costo
Parcial
SALDO
ACTUAL ACUMULADO
% de
% de
% de
Metrado Monto S/.
Metrado Monto S/.
Metrado Monto S/.
Avance
Avance
Avance
01.00.00
OBRAS PRELIMINARES
01.01.00
TRAZO Y REPLANTEO
M2
45.36
1.99
90.27
0.00
0.00
0.00
45.36
90.27 100.00
45.36
90.27
100.00
0.00
0.00
0.00
01.02.00
GLB
1.00
1,500.00
1,500.00
0.00
0.00
0.00
1.00
1,500.00 100.00
1.00
1,500.00
100.00
0.00
0.00
0.00
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
13.04
32.15
419.24
0.00
0.00
0.00
13.04
419.24 100.00
13.04
419.24
100.00
0.00
0.00
0.00
02.02.00
M3
24.53
34.23
839.66
0.00
0.00
0.00
24.53
839.66 100.00
24.53
839.66
100.00
0.00
0.00
0.00
02.03.00
M3
2.70
119.64
323.03
0.00
0.00
0.00
2.70
323.03 100.00
2.70
323.03
100.00
0.00
0.00
0.00
02.04.00
M3
15.65
21.08
329.90
0.00
0.00
0.00
15.65
329.90 100.00
15.65
329.90
100.00
0.00
0.00
0.00
03.00.00
03.01.00
CONCRETO SIMPLE
SOLADO DE CONCRETO C:H MEZCLA 1:12
M2
20.52
18.46
378.80
0.00
0.00
0.00
20.52
378.80 100.00
20.52
378.80
100.00
0.00
0.00
0.00
03.02.00
5.04
166.76
840.47
0.00
0.00
0.00
5.04
840.47 100.00
5.04
840.47
100.00
0.00
0.00
0.00
04.00.00
CONCRETO ARMADO
04.01.00
VIGAS DE CIMENTACION
04.01.01
M3
1.89
329.29
622.36
0.00
0.00
0.00
1.89
622.36 100.00
1.89
622.36
100.00
0.00
0.00
0.00
04.01.02
M2
15.12
51.34
776.26
0.00
0.00
0.00
15.12
776.26 100.00
15.12
776.26
100.00
0.00
0.00
0.00
04.01.03
KG
98.34
4.36
428.76
0.00
0.00
0.00
98.34
428.76 100.00
98.34
428.76
100.00
0.00
0.00
0.00
04.02.00
COLUMNAS
04.02.01
M3
0.81
302.34
244.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.81
244.90 100.00
04.02.02
M2
13.00
55.36
719.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.00
719.68 100.00
04.02.03
KG
113.84
4.36
496.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
113.84
496.34 100.00
04.03.00
VIGAS DE AMARRE
04.03.01
M3
0.86
303.34
260.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.86
260.87 100.00
04.03.02
M2
6.84
60.36
412.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.84
412.86 100.00
04.03.03
KG
87.39
4.36
381.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
87.39
381.02 100.00
04.04.00
GRADERIAS
04.04.01
M3
6.92
302.69
2,094.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.92
2,094.61 100.00
04.04.02
M2
107.84
50.40
5,435.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
107.84
5,435.14 100.00
04.04.03
KG
292.35
4.36
1,274.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
292.35
1,274.65 100.00
: "INSTALACON DE LA LOSA MULTIDEPORIVA EN EL CASERIO DE CUNCA , DISTRITO DE BUENAVISTA ALTA, PROVINCIA CASMA - ANCASH"
: MUNICIPALIDAD DISTRITAL DE BUENAVISTA ALTA
Ubicacin : CASERIO CUNCA
: JVG CONTRATISTAS GENERALES S.A.C
Distrito
: BUENAVISTA ALTA
: 60 DIAS CALENDARIOS
Provincia : CASMA
: GRADERIAS
Region
: ANCASH
1/
PRESUPUESTO DE OBRA
ITEM
PARTIDA
Und Metrado
05.00.00
ALBAILERIA
05.01.00
06.00.00
06.01.00
07.00.00
PINTURA
07.01.00
Costo
Unitario
Costo
Parcial
Supervisor de Obra
Residente de Obra
Monto de Contrato
Fecha Valorizacion
VALORIZACIONES
MES ANTERIOR ACUMULADO
SALDO
ACTUAL ACUMULADO
% de
% de
% de
Metrado Monto S/.
Metrado Monto S/.
Metrado Monto S/.
Avance
Avance
Avance
19.38
133.43
2,585.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.38
2,585.87 100.00
M2
120.48
19.46
2,344.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.48
2,344.54 100.00
M2
120.48
12.42
1,496.36
24,295.59
0.00
0.00
0.00
0.00
0.00
0.00
6,548.75
0.00
0.00
0.00
6,548.75
0.00
120.48
1,496.36 100.00
17,746.85
2,429.56
0.00
654.87
654.87
1,774.68
UTILIDAD 10 %
SUB TOTAL
2,429.56
29,154.71
0.00
0.00
654.87
7,858.49
654.87
7,858.49
1,774.68
21,296.21
29,154.71
0.00
7,858.49
7,858.49
21,296.21
5,247.85
0.00
1,414.53
1,414.53
34,402.56
0.00
IMPUESTO IGV 18 %
TOTAL PRESUPUESTO
0.00
9,273.02
26.95
9,273.02
3,833.33
26.95
25,129.53
73.05
: "INSTALACON DE LA LOSA MULTIDEPORIVA EN EL CASERIO DE CUNCA , DISTRITO DE BUENAVISTA ALTA, PROVINCIA CASMA - ANCASH"
: MUNICIPALIDAD DISTRITAL DE BUENAVISTA ALTA
Ubicacin : CASERIO CUNCA
: JVG CONTRATISTAS GENERALES S.A.C
Distrito
: BUENAVISTA ALTA
: 60 DIAS CALENDARIOS
Provincia : CASMA
: MURO DE CONTENCION
Region
: ANCASH
1/
PARTIDA
Und Metrado
Costo
Unitario
VALORIZACIONES
PRESUPUESTO DE OBRA
ITEM
Supervisor de Obra
Residente de Obra
Monto de Contrato
Fecha Valorizacion
Costo
Parcial
SALDO
ACTUAL ACUMULADO
% de
% de
% de
Metrado Monto S/.
Metrado Monto S/.
Metrado Monto S/.
Avance
Avance
Avance
01.00.00
OBRAS PRELIMINARES
01.01.00
GLB
1.00
650.00
650.00
0.00
0.00
0.00
1.00
650.00 100.00
1.00
650.00
100.00
0.00
0.00
0.00
01.02.00
TRAZO Y REPLANTEO
M2
36.00
1.75
63.00
0.00
0.00
0.00
36.00
63.00 100.00
36.00
63.00
100.00
0.00
0.00
0.00
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
10.80
32.15
347.22
0.00
0.00
0.00
10.80
347.22 100.00
10.80
347.22
100.00
0.00
0.00
0.00
02.02.00
M2
36.00
2.85
102.60
0.00
0.00
0.00
36.00
102.60 100.00
36.00
102.60
100.00
0.00
0.00
0.00
02.03.00
12.96
56.48
731.98
0.00
0.00
0.00
12.96
731.98 100.00
12.96
731.98
100.00
0.00
0.00
0.00
03.00.00
CONCRETO SIMPLE
03.01.00
04.00.00
M2
36.00
23.79
856.44
0.00
0.00
0.00
36.00
856.44 100.00
36.00
856.44
100.00
0.00
0.00
0.00
04.01.00
ZAPATAS
04.01.01
M3
10.80
310.43
3,352.64
0.00
0.00
0.00
10.80
3,352.64 100.00
10.80
3,352.64
100.00
0.00
0.00
0.00
04.01.02
M2
18.72
74.64
1,397.26
0.00
0.00
0.00
18.72
1,397.26 100.00
18.72
1,397.26
100.00
0.00
0.00
0.00
04.01.03
KG
367.20
4.41
1,619.35
0.00
0.00
0.00
367.20
1,619.35 100.00
367.20
1,619.35
100.00
0.00
0.00
0.00
04.02.00
PANTALLA
04.02.01
M3
12.00
399.79
4,797.48
0.00
0.00
0.00
12.00
4,797.48 100.00
12.00
4,797.48
100.00
0.00
0.00
0.00
04.02.02
M2
120.00
47.16
5,659.20
0.00
0.00
0.00
120.00
5,659.20 100.00
120.00
5,659.20
100.00
0.00
0.00
0.00
04.02.03
KG
734.40
4.58
3,363.55
0.00
0.00
0.00
734.40
3,363.55 100.00
734.40
3,363.55
100.00
0.00
0.00
0.00
22,940.73
0.00
22,940.73
22,940.73
0.00
2,294.07
0.00
2,294.07
2,294.07
0.00
UTILIDAD 10 %
SUB TOTAL
2,294.07
27,528.87
0.00
0.00
2,294.07
27,528.87
2,294.07
27,528.87
0.00
0.00
27,528.87
0.00
27,528.87
27,528.87
0.00
4,955.20
0.00
4,955.20
4,955.20
32,484.07
0.00
IMPUESTO IGV 18 %
TOTAL PRESUPUESTO
0.00
32,484.07
100.00
32,484.07
0.00
100.00
0.00
0.00
RESUMEN DE VALORIZACION
DE EJECUCION DE AVANCE DE OBRA N 01
Obra
Propietario
Contratista
Supervisor de Obra
Residente de Obra
Costo Total de la Obra
Monto de Contrato
Plazo de Ejecucion
Fecha de Valorizacion
Ubicacin
Distrito
Provincia
Region
DESCRIPCION
TOTAL
41,504.10
6,548.75
22,940.73
70,993.58
7,099.36
7,099.36
85,192.29
85,192.29
0.00
0.00
0.00
0.00
85,192.29
0.00
0.00
0.00
85,192.29
85,192.29
15,334.60
100,526.89
100,526.89
S/.
100,526.89
PORCENTAJE DE VALORIZACION
DE EJECUCION DE AVANCE DE OBRA N 01
Obra
Propietario
Contratista
Supervisor de Obra
Residente de Obra
Costo Total de la Obra
Monto de Contrato
Plazo de Ejecucion
Fecha de Valorizacion
Ubicacin
Distrito
Provincia
Region
DESCRIPCION
PRESUPUESTO
COSTOS DIRECTOS
Formula : LOSA MULTIDEPORTIVA
Formula : GRADERIAS
Formula : MURO CONTENCION
COSTO DIRECTO TOTAL
GASTOS GENERALES 10%
UTILIDAD 10%
SUB TOTAL
Impuesto I.G.V. 18 %
MONTO DE OBRA VALORIZADO
50,194.55
24,295.59
22,940.73
97,430.87
9,743.09
9,743.09
116,917.05
21,045.07
137,962.12
100,526.89
137,962.12
VALORIZADO
41,504.10
6,548.75
22,940.73
70,993.58
7,099.36
7,099.36
85,192.29
15,334.60
100,526.89
AVANCE ACTUAL
TOTAL
41,504.10
6,548.75
22,940.73
70,993.58
7,099.36
7,099.36
85,192.29
15,334.60
100,526.89
82.69%
26.95%
100.00%
100%
100 =
72.87
CUADRO DE METRADOS
CONTRATADOS vs. EJECUTADOS
Obra
Propietario
Contratista
Supervisor de Obra
Residente de Obra
Costo Total de la Obra
Monto de Contrato
Plazo de Ejecucion
Fecha de Valorizacion
Ubicacin
Distrito
Provincia
Region
Formula
ITEM
UND
METRADO
CONTRATADO
METRADO
EJECUTADO
01.00.00
OBRAS PROVISIONALES
01.01.00
UND
1.00
1.00
01.02.00
GLB
1.00
1.00
01.03.00
GLB
1.00
1.00
02.00.00
OBRAS PRELIMINARES
02.01.00
M2
607.56
607.56
02.02.00
M2
607.56
607.56
03.00.00
MOVIMIENTO DE TIERRAS
03.01.00
M3
388.69
388.69
03.02.00
M3
418.56
418.56
03.03.00
M3
64.76
64.76
03.04.00
M2
607.56
607.56
03.05.00
M3
60.76
60.76
03.06.00
M3
41.86
41.86
04.00.00
CONCRETO SIMPLE
04.01.00
M3
64.76
64.76
04.02.00
M2
56.04
56.04
05.00.00
JUNTAS
05.00.01
JUNTA DE DILATACION
240.00
120.00
06.00.00
PINTURA
06.01.00
319.98
0.00
07.00.00
EQUIPAMIENTO
07.01.00
M3
1.52
0.00
07.02.00
UND
2.00
0.00
07.03.00
UND
2.00
0.00
07.04.00
UND
1.00
0.00
CUADRO DE METRADOS
CONTRATADOS vs. EJECUTADOS
Obra
Propietario
Contratista
Supervisor de Obra
Residente de Obra
Costo Total de la Obra
Monto de Contrato
Plazo de Ejecucion
Fecha de Valorizacion
Ubicacin
Distrito
Provincia
Region
Formula
ITEM
UND
METRADO
CONTRATADO
METRADO
EJECUTADO
01.00.00
OBRAS PRELIMINARES
01.01.00
TRAZO Y REPLANTEO
M2
45.36
45.36
01.02.00
GLB
1.00
1.00
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
13.04
13.04
02.02.00
M3
24.53
24.53
02.03.00
M3
2.70
2.70
02.04.00
M3
15.65
15.65
03.00.00
CONCRETO SIMPLE
03.01.00
M2
20.52
20.52
03.02.00
M3
5.04
5.04
04.00.00
CONCRETO ARMADO
04.01.00
VIGAS DE CIMENTACION
04.01.01
M3
1.89
1.89
04.01.02
M2
15.12
15.12
04.01.03
KG
98.34
98.34
04.02.00
COLUMNAS
04.02.01
M3
0.81
0.00
04.02.02
M2
13.00
0.00
04.02.03
KG
113.84
0.00
04.03.00
VIGAS DE AMARRE
04.03.01
M3
0.86
0.00
04.03.02
M2
6.84
0.00
04.03.03
KG
87.39
0.00
04.04.00
GRADERIAS
04.04.01
M3
6.92
04.04.02
M2
107.84
0.00
0.00
04.04.03
KG
292.35
0.00
05.00.00
ALBAILERIA
05.01.00
M2
19.38
0.00
06.00.00
06.01.00
M2
120.48
0.00
07.00.00
PINTURA
07.01.00
M2
120.48
0.00
CUADRO DE METRADOS
CONTRATADOS vs. EJECUTADOS
Obra
Propietario
Contratista
Supervisor de Obra
Residente de Obra
Costo Total de la Obra
Monto de Contrato
Plazo de Ejecucion
Fecha de Valorizacion
Ubicacin
Distrito
Provincia
Region
Formula
ITEM
UND
METRADO
CONTRATADO
METRADO
EJECUTADO
01.00.00
OBRAS PRELIMINARES
01.01.00
GLB
1.00
1.00
01.02.00
TRAZO Y REPLANTEO
M2
36.00
36.00
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
10.80
10.80
02.02.00
M2
36.00
36.00
02.03.00
M3
12.96
12.96
03.00.00
CONCRETO SIMPLE
03.01.00
M2
36.00
36.00
04.00.00
CONCRETO ARMADO
04.01.00
ZAPATAS
04.01.01
M3
10.80
10.80
04.01.02
M2
18.72
18.72
04.01.03
KG
367.20
367.20
04.02.00
PANTALLA
04.02.01
M3
12.00
04.02.02
M2
120.00
12.00
120.00
04.02.03
KG
734.40
734.40