The purpose of this handbook is to help the field inspectors find the information they need by listing the different resource documents for a particular subject. The Article in the specifications and the Section in the Construction Manual are listed directly along with a reference to Appendix A of the handbook, which has a listing of other possible reference documents for each item in the check list. The first draft of this handbook is being made available for use and review from the field. We encourage any questions, comments or suggestions you have regarding the handbook to be directed to Kyle Frame of the Central Construction Office (Phone 515-239-1619; Office Vision kframe or e-mail at kframe@max.state.ia.us). Any questions concerning the purpose, intent or clarification of the resource documents or methods of construction, will be addressed and added to Appendix B of the handbook as they come in.
Produced by Wayne Sunday, Structures Field Engineer Kyle Frame, Foundations Field Engineer Central Construction Office
4/27/2000
Excavation and Erosion Control Foundations - Drilled Shaft Foundations Driven Pile Foundations Spread Footings Forming Falsework Concrete Beams Steel Beams Reinforcing Steel Deck Grades
Concrete Placement Substructure Concrete Placement Bridge Deck Concrete Placement Barrier Rail Expansion Joints Appendices Appendix A Appendix B Appendix C
q q q q q q q q q q q q
Pertinent Documents Staking Layout and Dimensions Staking Control Benchmarks and Cross Ties Minimum Staking Requirements Independent Survey Check Performed Surveying Documentation Construction Survey Offset Stakes Slope Stakes Meeting to Review Staking Verify Staking Fits Field Conditions Preservation of Stakes Periodic Check of Stakes
A1, A2, A3, A5, A7, A8 A1, A3, A7, A8 A1, A3, A5 A2 A2, A3, A7 A2, A3, A7 A5 A5 A3, A7 A5 A2, A3, A7 A3 Section 2526 Article 2526.01 Chapter 11 Section 11.21 Chapter 11 Section 11.21 Chapter 11 Section 11.21 Section 2526 Article 2526.01 Section 2526 Article 2526.01 Section 2526 Article 2526.01 Chapter 11 Section 11.21 Chapter 11 Section 11.21 Chapter 11 Section 11.21 Chapter 11 Section 11.21
q q q q q q q q q
Pertinent Documents Erosion Control Classification of Excavation Excavation Quantity Limits Cross Section Prior to Excavation Shoring Cofferdam Drainage Control Foundation Preparation Foundation Treatment
A1, A2, A3, A7, A9 A2, A3, A9 A2 A2 A2, A7 A1, A2 A2 A2 Section 2525 Article 2525.04 Section 2402 Article 2402.11 Section 2402 Article 2402.12 Section 2402 Article 2402.12 Section 2402 Article 2402.01 Section 2405 Articles 2405.02 & 2405.03 Section 2402 Article 2402.04 Chapter 7 Section 7.40
q q q q q q q q q q q
Pertinent Documents Drilled Shaft Installation Plan Preproduction Meeting Check Layout Shaft Construction Slurry Test Excavation Inspection and Construction Tolerances Reinforcing Steel Placement Cage Centering and Support Concrete Mix Concrete Placement and Slurry Capture
q q q q q q q q q q q q
Pertinent Documents Check Layout Wave Equation Analysis Prebore Holes and Bentonite Slurry Pile Materials Type of Pile Driving Equipment Verify Pile Driving Equipment Pile Position, Alignment and Batter Production Pile Driving Logging of Pile Retapping Static or Dynamic Pile Testing Extensions and Splices
A1, A2, A3, A7 A1 A2, A3, A11 A2, A3, A7, A11 A2, A3, A4, A7, A11 IMs 204, 462 A2, A3, A11 A2, A3, A7, A11 A1, A2, A11 A3, A11 A2, A3, A11 A2, A3, A11 A2, A3, A4, A11 IMs 558, 560 Section 2501 Article 2501.13E Section 2501 Article 2501.13 C, D Section 2501 Article 2501.18 Section 2501 Article 2501.09J Section 2501 Article 2501.19 Section 2501 Article 2501.02 Section 2501 Article 2501.09 Section 2501 Article 2501.09 Section 2501 Article 2501.12 Chapter 11 Section 11.25 Chapter 11 Section 11.22 Chapter 11 Section 11.22 Chapter 11 Section 11.23 Chapter 11 Section 11.25 Chapter 11 Section 11.26 Chapter 11 Section 11.24 Chapter 11 Section 11.22 Chapter 11 Section 11.22
q q q q
Pertinent Documents Check Layout and Elevation Keyed into Rock Rock Soundness
A1, A2 A1 A1, A2 A2, A3 Section 2405 Article 2405.04 Section 2405 Article 2405.04 Chapter 11 Sec. 11.31B
q q q q q q q q q
Pertinent Documents Check Layout and Dimensions Form Type and Material Form Quality Form Support and Bracing Chamfers, Fillets and Keyways Release Agent Forms and Falsework Design Insulated Forms
A1, A2, A3, A7 A1 A2, A7 A2, A7 A2, A7 A1, A2, A7 A2 A2, A7 A2, A3 Section 2403 Article 2403.07E Section 2403 Article 2403.17 Section 2403 Article 2403.11 Chapter 11 Section 11.54 Section 2403 Article 2403.07E Section 2403 Article 2403.07E Section 2403 Article 2403.07E
q q q q q q q
Pertinent Documents Materials Designed by Engineer Falsework Plans Construction of Falsework Deflections Removal
A2, A3 A2, A3 A2, A3 A2, A3 A2, A3 A2, A3 A2, A3 Section 2403 Article 2403.17 Section 2403 Article 2403.17 Section 2403 Article 2403.17F Section 2403 Article 2403.17B Section 2403 Article 2403.17E Section 2403 Article 2403.18 Chapter 11 Section 11.31 Chapter 11 Section 11.31 Chapter 11 Section 11.31 Chapter 11 Section 11.31 Chapter 11 Section 11.31 Chapter 11 Section 11.31
q q q q q q q q q q q q q q
Pertinent Documents Tolerances Handling and Storage Layout for Bearing Position Placement of Bearing Units Check Sweep Setting Beams Alignment of Beams Intermediate Diaphragms - Steel Intermediate Diaphragms Concrete Diaphragm Coil Ties Layout and Shooting of Beam Grades Evaluation of Beam Grades for Decking Preformed Pier Cap Expansion
A1, A2, A3, A7 A2, A7 A2, A7 A1 A1 Section 2407 Article 2407.12 Section 2407 Article 2407.13
A3
A3 A3 A1 A1 A1 A1 9
q q q q q q q q q q q q
Pertinent Documents Painted and Unpainted Steel Layout for Bearing Units Bearing Unit Anchor Bolts Erection of Steel Girders Installation of Cross Frames Prebolting Meeting, Rotational Capacity of Fasteners Bolting Procedures Alignment Temperature Setting of Rockers Layout and Shooting of Beam Grades Evaluation of Beam Grades
A3
A1, A2 A1 A1
10
q q q q q q q q q q q q
Pertinent Documents Reinforcing Bar List, Bent Bar Diagram and Layout Handling and Storage Bending or Straightening of Reinforcing Steel Repair of Damaged Coating Placement and Fastening Placement and Clearance Reinforcing Supports Materials Splicing Cleaning Cutting of Reinforcing Steel
A1, A2, A3, A4, A6, A7 A1 A3, A7 A2 A2, A3 A2, A3, A7 A3, A6, A7 A2, A3 A4 IM 451.01 A2, A3 A2 A7 Section 2404 Article 2404.08 Section 2404 Article 2404.03 Chapter 11 Section 11.44 Section 2404 Article 2404.07 Section 2404 Articles 2404.04, 2404.05 Section 4151 Article 4151.03B Section 2404 Article 2404.06 Chapter 11 Section 11.42 Chapter 11 Section 11.42 Chapter 11 Section 11.41 Chapter 11 Section 11.42 Chapter 11 Section 11.42
11
q q q q q q
Pertinent Documents Survey Crew to Shoot Beam Elevations Calculate Grades Camber Haunch or Embedment Limits Reinforcing Steel Clearance Deck Thickness
A1, A2
12
q q q q q q q q q q q q
Pertinent Documents Concrete Mix Admixtures Concrete Mixing and Delivery Time Concrete Testing and Modification Placing Vibration Finishing and Keyways Protection and Curing Strength Requirements and Determination Form Removal Surface Finish and Patching Checking Temperature of Concrete
A1, A2, A3, A7 A1, A2 IM 529 A2, A3, A7 A2, A3, A7 A2, A3, A7, IMs 204,317, 318, 327, 328 A2, A3, A7 A2, A7 A2 A2, A7 A2, A7 IM 316 A2, A7 A3, A7 Articles 2301.13, 2415.03 & 2403.01 2403.03 Section 2403 Article 2403.03 Articles 2403.06, 2301.13D Section 2403 Article 2403.03 Articles 2403.07, 2403.08 & 2415.04 Section 2403 Article 2403.09 Articles 2403.07, 2415.04 Section 2403 Articles 2403.10 & 2403.11 Section 2403 Article 2403.19 Section 2403 Article 2403.18 & 2403.21 Chapter 11 Section 11.54 Chapter 11 Section 11.53 Chapter 11 Section 11.52 Chapter 11 Section 11.52 Chapter 11 Section 11.56
13
q q q q q q q q q q q
Pertinent Documents Concrete Mix Admixtures Concrete Mixing and Delivery Time Concrete Testing and Modification Concrete Placement Methods Placing Sequence Location of Permissible Headers Placing and Evaporation Rate Vibration Surface Finish Curing
A1, A2, A3 A1, A2 A2, A3 A2 A2 A3 A3 A2, A3 A2 A2 A2 Articles 2403.08, 2412.05 Section 2403 Article 2403.09 Section 2412 Article 2412.06 Section 2412 Article 2412.07 Articles 2403.01-2403.03, 2412.02 Articles 2403.03, 2412.02 Section 2403 Articles 2403.06, 2301.13D Section 2403 Article 2403.03 Chapter 11 Section 11.56 Chapter 11 Section 11.55 Chapter 11 Section 11.55 Chapter 11 Section 11.53
14
q q q q q q q q q q q q
Pertinent Documents Types of Barrier Rail Slip Form Barrier Rail Cast in Place Barrier Rail Bridge Deck Strength Concrete Mix Admixtures Concrete Mixing and Delivery Time Concrete Testing and Modification Curing Removal of Forms Finish
A1, A2, A3 A2 A3 A3 A3 A1, A2 A2, A3 A2 A2 A2 A2 A2 Section 2513 Article 2513.03 Section 2513 Article 2513.02C Articles 2403.06, 2407.09 2301.13D Section 2513 Article 2513.03 Section 2513 Article 2513.06 Section 2513 Article 2513.07 Section 2513 Article 2513.08 Chapter 11 Section 11.53 Section 2513 Article 2513.01 Chapter 11 Section 11.72 Chapter 11 Section 11.73 Chapter 11 Section 11.71
15
q q q q q
Pertinent Documents Joint Opening Distance Setting Surface Preparation of Concrete or Steel Lubricant Adhesive per Manufactures Recommendations Position of Expansion Material
16
INFORMATION SOURCES
q q q q q q q q q q q
A1 Project Plans A2 Standard Specifications A3 Construction Manual A4 Instructional Memorandum (IM) Volume II A5 Surveyors Handbook A6 Reinforcing Steel Placement Handbook A7 Bridge and Culvert Structures Inspection Training Manual A8 Bridge Standards A9 Standard Road Plans A10 Special Provisions for Concrete Drilled Shaft A11 Field Manual for Pile Driving Using the Wave Equation
17
18