Вы находитесь на странице: 1из 6

ALERT

SUBJECT:

POWER TURBINE

OUTER COUPLING

NUT INSPECTION

The Model 250 Series Engines have accumulated approximately 23 million flight hours since 1966. During this time there have been instances wherein corrosion has attacked the power turbine coupling nut (P/N 6846278 or 6871338). This condition usually occurs in extremely humid areas which have abnormal amounts of sulphur in the atmosphere. Failure of this nut would result in disengagement of the power turbine curvic coupling, resulting in possible N2 overspeed and turbine disk failure. To alleviate this condition of corrosion, an aluminum corrosion resistant paint has been released to the nut, (Ref. P/N 6846278, Change G) as shown in Figure 1. Production and overhauled engines now incorporate the painted nut; however, corrosion has attacked the coated nut. Therefore, is required a) a mandatory as follows: inspection of coated and uncoated nuts

For engines with turbine sections having more than 400 hours or one calendar year time in service since installation in an aircraft, initial compliance must be accomplished within the next 100 hours or 60 days time in service, whichever occurs first. For engines with turbine sections having less than 400 hours and less than one calendar year time in service since installation in an aircraft, initial compliance must be accomplished within 500 hours or one year time in service since installation in an aircraft, whichever occurs first. For each turbine section incorporating an acceptable uncoated or coated coupling nut, repatitive compliance is required at intervals not to exceed 500 hours or one calendar year time since last inspection, ,whichever occurs first.

b)

c)

October 27, 1976 Revision No. 5 July 22, 1994

250-Cl8 250-C2O/C2DB 250-B15G 250-81718176


Rolls-Royce Proprietary Data Uncontrolled Printed Copy

CSL-88 CSL-1060 TP CSL-25 TP CSL-1030 Page 1 of 6

ALLISON Commercial NOTE:

ENGINE COMPANY Service Letter

The following turbine assemblies 6890531 or later power turbine are exempt from this inspection: MODEL Cl8 c20 C2OB B15G 817 8178

incorporate coupling nuts TURBINE CAT CAT CAT CAT CAT CAT SERIAL

P/N and NO.

23649BC 38617P 33892 50100 60063P 80204

Compliance with the following Commercial Engine Bulletins which install PIN 6890531 or P/N 23001801 Power Turbine Coupling Nuts removes the inspection requirement: 250-Cl8 250-C2O/C2OB 250-815G 250-81718178 CEB-193/207 CEB-112011158 CEB-53/76 CEB-108811134

;;

The nut is located approximately one and one half inches,forward of the fourth-stage turbine wheel inside the center section of the exhaust collector support. (See Figure 2.1 By using a borescope, some type of fiberoptic equipment, or a small mirror inserted between the forward face of the fourth-stage turbine wheel and the inner section of the exhaust collector support, it is possible to examine the condition of the nut. NOTE: The following vendors however, any acceptable the operator. can supply alternate acceptable borescopes; device can be selected

by

American Cystoscope Makers, 300 Stillwater Avenue Stamford, Connecticut 06902

Inc.

October 27, 1976 Revision No. 5 July 22, 1994

250-Cl8 250-C2O/C2OB 250-B15G 250-B17/817B

CSL-88 CSL-1060 TP CSL-25 TP CSL-1030 Page 2 of 6

Rolls-Royce Proprietary Data Uncontrolled Printed Copy

ALLISON Commercial

ENGINE COMPANY Service Letter

Dolan-Jenner 68 Ingalls Melbrose, Dyonics. 69 Pine Wolburn.

Industries, Massachusetts

Inc. 02176

Inc. Street Massachusetts

01801

An alternative way to inspect the condition of the nut consists of using a high intensity light source and a small non-magnifying mirror. It is possible to examine the condition of the nut by inserting the mirror approximately halfway inside the exhaust collector, holding the light source in a position such that the light falls upon the nut, and positioning the mirror until the nut is in view. With the equipment inserted, slowly rotate the fourth-stage turbine wheel by hand so that the full 3600 area of the nut can be viewed. Uncoated or coated nuts will show a grainy textured riurface created by the corrosion attack. (See Figure 3.) 1) 2) If the rotation, corrosion is continuous around the nut must be replaced. the (See full 3600 of Figure 3.)

If there is only local, intermittent spots of corrosion around the full 360 rotation, the nut should be continued in service. (See Figure 4.) Reinspect acceptable coated and uncoated nuts per step (Cl.

If you experience difficulty suggested you contact the Aooroval:

in complying Distributor for

with your

the inspection, it area for assistance.

is

The accomplishment Technical aspects are FAA approved. of Revision 3. Revision 4, or Revision 5 to this bulletin approved by the Manager, Chicago Aircraft Certification compliance with AD 77-15-12 as indicated. Compliance pages of with this the engine inspection log book. should be entered in the

instructions are Office for

applicable

CUSTOMER SUPPORT ALLISON ENGINE COMPANY

October 27, 1976 Revision No. 5 July 22, 1994

25D-ClB --_~250-C2O/C2OB 250-B15G 250-B17/B17B

CSL-BB CSL-1060 TP CSL-25 TP CSL-1030 Page 3 of 6

Rolls-Royce Proprietary Data Uncontrolled Printed Copy

ALLISON Commercial

ENGINE COMPANY Service Letter

I-f

FOURTH NO.

STAGE

TURBINE

WHEEL

PART

6846278 CHANGE

G NUT

POWER TURBINE

ROTOR ASSY. SHOWING P/N 6846278 CHANGE "G" NUT FIGURE 1 CSL-88 CSL-1060 TP CSL-25 TP CSL-1030 Page 4 of 6

October 27, 1976 Revision No. 5 July 22, 1994

250-08 250-C20/C20B 250-8156 ~250-B17/817B

Rolls-Royce Proprietary Data Uncontrolled Printed Copy

ALLISON Commercial

ENGINE COMPANY Service Letter

INSERT BORESCOPE, FIBEROPTICS, OR MIRROR THIS LOCATION.

TURBINE

TO

COMPRESSOR

COUPLING

250-C20

TURBINE FIGURE 2

SECTION

October 27, 1976 Revision No. 5 July 22, 1994

250-Cl8 250-C2O/C2OB 250-B15G 250-B17/817B

CSL-88 CSL-1060 TP CSL-25 TP CSL-1030 Page 5 of 6

Rolls-Royce Proprietary Data Uncontrolled Printed Copy

ALLISON Commercial

ENGINE COMPANY Service Letter

gjj?&~.

NOTE IRREGULAR, GRAINY TEXTURE WHICH 1s CONTINUOUS AROUND FULL 360.

TYPICAL

UNACCEPTABLE CORRODED NUT FIGURE 3

TYPICAL

ACCEPTABLE CORRODED NUTS FIGURE 4 250-Cl8 250-C20/C20B 250-B15G 250-B17/817B CSL-88 CSL-1060 TP CSL-25 TP CSL-1030 Page 6 of 6

October 27, 1976 Revision No. 5 July 22. 1994

Rolls-Royce Proprietary Data Uncontrolled Printed Copy

Вам также может понравиться