Вы находитесь на странице: 1из 53

PRESUPUESTO RESUMEN

CENTRO COMERCIAL POWER CENTER SULLANA - PIURA

2/18/2013

Area Techada (m2), PROMART


Area Techada (m2), PLAZA VEA
Area Techada (m2), LOCATARIOS
Area Techada (m2), SERVICIOS
AREA TECHADA TOTAL
AREA LIBRE TRATADA
Metros lineales de cerco

7,104.23
6,386.02
1,132.68
2,318.68
16,941.61
11,975.87

m2
m2
m2
m2
m2
m2

539.58

ml

PRESUPUESTO RESUMEN
CENTRO COMERCIAL POWER CENTER SULLANA - PIURA
Area Techada (m2), PROMART
Area Techada (m2), PLAZA VEA
Area Techada (m2), LOCATARIOS
Area Techada (m2), SERVICIOS
AREA TECHADA TOTAL
AREA LIBRE TRATADA
Metros lineales de cerco

2/18/2013
7,104.23
6,386.02
1,132.68
2,318.68
16,941.61
11,975.87

m2
m2
m2
m2
m2
m2

539.58

ml

OBRA:
UBICACIN:
SECTOR:
FECHA:

Item
OPP1002
OPP1003
OPP1004
OPP1005
OPP1006
OPP1007
OPP1008
OPP1009
OPP1010
OPP1011
OPP1011.1
OPP1012
OPP1013
OPP1014
OPP1015
OPP1016
OPP1017
OPP1018
OPP1019
OPP1020
OPP1021
OPP1022
OPP1022.1
OPP1023
OPP1024

CENTRO COMERCIAL POWER CENTER


SULLANA, PIURA
PROMART, PLAZA VEA, LOCATARIOS, AREAS DE SERVICIO, CERCO EXTERIOR
2/14/2013

Descripcin de Partidas
OBRAS PROVISIONALES
OBRAS PROVISIONALES
Oficina Tcnica del Contratista
Oficina para la Gerencia del Proyecto
Oficina para el Propietario
Almacn Provisional
Vestuarios y Comedor para Personal Obrero
Cartel de Obra
Consumos de Agua
Instalacin de agua y desage provisional
GRUPO ELECTROGENO
Empalme elctrico
SSHH para personal tcnico
SSHH para personal obrero
Cercos Provisionales - triplay de 8mm (h=2.40m) + malla raschel (h=2.20m)
Cercos Provisionales - triplay de 8mm (h=2.40m)
Caseta de Vigilancia de obra
MOVILIZACION Y DESMOVILIZACION
Movilizacin y desmovilizacin de equipos y herramientas, Fletes
SERVICIOS
Limpieza permanente de obra
Limpieza final para entrega de obra
Transporte horizontal en obra
Comunicaciones
Equipos, Vehculos, Andamios, Herramientas

OPP1025
OPP1026
OPP1027
OPP1028
OPP1029

Mantenimiento y Seguridad de Obra, Artculos de Oficina, Artculos de


Seguridad Individual y Colectiva, Ensayos y Laboratorios
PARTIDAS COMPLEMENTARIAS
Seguridad de Obra (Policia,Vigilancia, otros)
Sistema de control de agua de lluvias
Control de plagas
TOTAL

RCO EXTERIOR

Und.

mes
mes
mes
gbl
gbl
und
mes
gbl
mes
gbl
mes
mes
ml
ml
un
gbl
mes
mes
mes
mes
mes

PU (S/.)
3,894.67
2,174.61
1,314.58
25,000.00
25,000.00
2,000.00
2,500.00
11,000.00
18,250.00
50,000.00
1,285.20
4,498.20
360.00
300.00
2,100.08
210,000.00
16,896.00
33,792.00
16,896.00
1,880.00
97,337.89

RESUMEN
Metrado
Parcial (S/.)
5.50
21,420.69
5.50
11,960.36
5.50
7,230.19
1.00
25,000.00
1.00
25,000.00
2.00
4,000.00
5.50
13,750.00
1.00
11,000.00
5.50
100,375.00
5.50
7,068.60
5.50
24,740.10
2.00
4,200.15
1.00

210,000.00

5.50
1.00
5.50
5.50
5.50

92,928.00
33,792.00
92,928.00
10,340.00
535,358.40

PU RPP PIURA

4,300.00
1,720.00
860.00
25,000.00
30,000.00
2,000.00
11,500.00
11,000.00
50,000.00
1,285.20
4,498.20
300.00
300.00
1,500.00

275,000.00
16,860.00
33,720.00
16,896.00
860.00
103,745.53

mes

proforma
proforma
proforma

5.50
10,423.80
45,000.00
15,000.00
5,000.00

57,330.88
13,650.21

5.50
1.00
1.00

247,500.00
15,000.00
5,000.00
1,555,922.36

10,000.00
15,000.00
5,000.00

Parcial PU PIURA

DELTA

23,650.00
9,460.00
4,730.00
25,000.00
30,000.00
4,000.00
63,250.00
11,000.00
7,068.60
24,740.10
3,000.00
-

-2,229.31
2,500.36
2,500.19
-5,000.00
-49,500.00
100,375.00
1,200.15
-

275,000.00
92,730.00
33,720.00
92,928.00
4,730.00
570,600.41

-65,000.00
198.00
72.00
5,610.00
-35,242.01

75,076.15
55,000.00
15,000.00
5,000.00
1,425,683.25

-17,745.27
192,500.00
130,239.10

OBRA:
UBICACIN:
SECTOR:
FECHA:

CENTRO COMERCIAL POWER CENTER


SULLANA, PIURA
PROMART, PLAZA VEA, LOCATARIOS, AREAS DE SERVICIO, CERCO EXTERIOR
2/14/2013
PROMART - RPPIURA

Nivel

Area techada (m2)


=>

AREA 1ER PISO

7,256.13

AREA MEZANINE
AREA SOTANO

168.94
-

TOTAL
Losas de C (m2)
techo metalico (m2)

Item

EST0001
EST0002
EST0003
EST0004
EST0005
EST0006
EST0007
EST0008
EST0009
EST0010
EST0011
EST0012
EST0013
EST0014
EST0015
EST0016
EST0017
EST0018
EST0019
EST0020
EST0021
EST0022
EST0023
EST0024
EST0025
EST0026
EST0027
EST0028
EST0029
EST0030
EST0031
EST0032
EST0033
EST0034
EST0035
EST0036
EST0037
EST0038
EST0039
EST0040
EST0041
EST0042
EST0043
EST0044
EST0045
EST0046
EST0047
EST0048
EST0049
EST0050
EST0051
EST0052
EST0053
EST0054
EST0055
EST0056
EST0057
EST0058
EST0059
EST0060
EST0061
EST0062
EST0063
EST0064
EST0065
EST0066
EST0067
EST0068
EST0069
EST0070
EST0071
EST0072
EST0073
EST0074
EST0075
EST0076
EST0077
EST0078
EST0079
EST0080
EST0081
EST0082
EST0083
EST0084
EST0085
EST0086
EST0087
EST0088
EST0089
EST0090
EST0091
EST0092
EST0093
EST0094
EST0095
EST0096
EST0097
EST0098
EST0099
EST0100
EST0101
EST0102
EST0103
EST0104
EST0105

7,425.07
3,409.35
4,015.72

Descripcin de Partidas
ESTRUCTURAS
TRAZO Y REPLANTEO
Trazo y replanteo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavaciones para cimentacin de muros (manual)
Excavaciones para cimentacin cisterna (c/equipo)
Perfilado de zapatas
RELLENOS
Relleno c/material propio
Relleno c/material de prstamo (arena)
Relleno c/material de prstamo (afirmado)
OBRAS DE CONCRETO SIMPLE
CALZADURAS
Excavacin Manual
Concreto 80kg/cm2 +30% de piedra grande, 0.30m como mximo
Encofrado
OBRAS DE CONCRETO ARMADO
VIGAS DE CIMENTACION
Solado de concreto f'c=100 Kg/cm2, e=2" p/zapatas
Concreto 280 (rel a/c=0,45)
Acero de refuerzo
Encofrado y desencofrado
Curado
CIMIENTOS CORRIDOS
Solado de concreto f'c=100 Kg/cm2, e=2" p/zapatas
Concreto 210
Acero de refuerzo
Encofrado y desencofrado
Curado
ZAPATAS
Solado de concreto f'c=100 Kg/cm2, e=2" p/zapatas
Concreto 280 (rel a/c=0,45)
Acero de refuerzo
Encofrado y desencofrado
Curado
CISTERNA
LOSA (INCLUYE CIMENTACIN)
Solado de concreto f'c=100 Kg/cm2, e=2" p/zapatas
Concreto fc 280 kg/cm2 (rel a/c=0,45)
Acero de refuerzo
Encofrado y desencofrado
Curado
MUROS
Concreto fc 280 kg/cm2 (rel a/c=0,45)
Acero de refuerzo
Encofrado y desencofrado
Curado
TECHO
Concreto fc 280 kg/cm2 (rel a/c=0,45) incluye enduredecedor de piso
Acero de refuerzo
Encofrado y desencofrado
Curado
SOBRECIMIENTOS ARMADOS
Concreto 210
Acero de refuerzo
Encofrado y desencofrado
Curado
COLUMNA
Concreto fc 210 kg/cm2
Encofrado y desencofrado de columnas a doble altura
Acero de refuerzo
Curado
PLACAS
Concreto fc 210 kg/cm2
Encofrado y desencofrado de placas a doble altura
Acero de refuerzo
Curado
LOSA MACIZA
Concreto f'c 210 kg/cm2 (e=0.20)
Encofrado
Acero de refuerzo
Curado
VIGAS
Concreto f'c 210 kg/cm2
Encofrado doble altura de vigas
Acero de refuerzo
Curado
ESCALERAS DE CONCRETO
Concreto fc 210 kg/cm2
Encofrado y desencofrado de escaleras
Acero de refuerzo
Curado
MUROS DE CONTENCION
Concreto fc 280 kg/cm2 (rel a/c=0,45)
Encofrado y desencofrado
Acero de refuerzo
Curado
PAVIMENTO DE CONCRETO
Losa de concreto e=0.18 m f'c 210 kg/cm2 acab.frotachado a -0.05
Losa de concreto e=0.20 m f'c 245 kg/cm2 c/fibra
Encofrado de losas contra terreno
Suministro y colocacin de pasadores de acero liso 1 1/2"@0.30 PVC SAP 1 1/2"
Corte de Juntas de Contraccin y Construccin
Curado de losas
Sellado de Juntas con material semirigido
ESTRUCTURA METALICA Y COBERTURA
Estructura Metalica reticulada para techo
Soportes para Letreros
Estructura Metalica para soporte de cerramiento lateral
Insertos metlicos
PARTIDAS COMPLEMENTARIAS
Pases en Vigas, losas y placas 2" a 8"
Sello de Pases 2" a 8" no cortafuego
Impermeabilizacin de cisternas (Sika Top 77)
Water Stop para cisternas 10"
TOTAL

Und.

m2

m3
m3
m3
m3
m3
m3

m3
m3
m2

m2
m3
kg
m2
m2
m2
m3
kg
m2
m2
m2
m3
kg
m2
m2

m2
m3
kg
m2
m2
m3
kg
m2
m2
m3
kg
m2
m2
m3
kg
m2
m2
m3
m2
kg
m2
m3
m2
kg
m2
m3
m2
kg
m2
m3
m2
kg
m2
m3
m2
kg
m2
m3
m2
kg
m2
m3
m3
m2
Kg
ml
m2
ml
Kg
Kg
Kg
Kg
Und.
Und.
m2
ml

PU (S/.)

1.89
39.74
45.74
39.74
24.46
49.46
84.46
48.17
354.61
87.66
16.19
556.03
3.32
48.88
1.88
16.19
407.15
3.32
48.88
1.88
16.19
556.03
3.32
48.88
1.88
16.19
611.32
3.32
48.88
1.88
722.38
3.32
67.83
1.88
630.53
3.32
61.99
1.88
407.15
3.32
48.88
1.88
452.78
69.07
3.32
1.88
444.99
58.07
3.32
1.88
455.49
61.99
3.32
1.88
455.49
91.96
3.32
1.88
455.49
136.01
3.32
1.88
722.38
67.83
3.32
1.88
435.39
553.83
48.88
22.42
5.44
1.88
8.46
10.00
10.00
10.00
10.00
20.00
15.35
40.00
50.00

RESUMEN
Metrado

Parcial (S/.)

28,917.48
2,454.85
3,217.16
4,425.73
891.54

62.40
62.40
104.00

55.90
5.59
456.18
55.90
55.90
758.40
834.24
2,598.00
2,168.40
1,190.73
833.51
27,286.01
1,617.81
1,190.73

846.62
308.71
14,299.60
150.27
846.62
203.11
9,408.03
1,354.06
677.03
266.69
12,352.86
846.62
846.62
77.44
3,676.45
774.40
774.40
580.77
3,598.68
97,046.57
3,598.68
546.00
3,771.30
25,723.79
3,771.30
1,360.54
7,649.31
134,754.49
7,649.31
500.82
3,975.26
89,365.95
3,975.26
46.85
619.10
6,904.77
619.10
135.14
1,242.92
11,903.13
1,242.92
1,383.22
434.06
501.74
2,874.02
2,508.71
9,854.86
2,508.71
165,631.64
4,387.20
36,560.00
56.00
16.00
16.00
1,198.61
185.35

NOTAS:
* Presupuesto elaborado en base a los planos de Estructuras del 04/02/13 y 11/02/13
* No incluye la proforma de movimiento de tierras
* Las celdas marcadas en color plomo del metrado real de Promart del Real Plaza no han sido calculados oficialmente; algunos de los mismos has sido estimados.
* No incluye el
* Se ha estimado el
* Para el metrado de
* Para el metrado de

54,555.72
97,555.87
147,152.72
175,878.64
21,808.78
3,005.81
22,127.55
9,116.54
904.98
3,108.09
1,516.06
2,732.24
105.12
12,278.42
339,658.73
8,634.19
105,989.22
19,277.76
463,456.72
90,682.32
79,076.87
2,239.28
13,706.69
188,721.19
47,523.29
7,345.05
1,592.15
146,722.78
31,266.64
91,844.72
1,273.23
168,154.36
41,053.51
52,483.16
1,592.15
31,529.50
12,218.32
37,851.90
1,456.34
262,961.89
248,545.78
322,524.56
6,767.67
242,965.62
219,010.93
85,490.43
7,092.31
619,712.27
474,191.44
447,843.07
14,385.29
228,116.92
365,555.52
296,998.78
7,475.87
21,339.73
84,201.31
22,947.33
1,164.28
97,622.84
84,306.02
39,558.87
2,337.44
602,241.84
240,398.58
24,524.67
64,448.70
13,647.40
18,533.05
21,215.93
1,656,316.38
43,872.00
365,600.00
560.00
320.01
245.59
47,944.40
9,267.50
9,849,448.84

PU PIURA (S/.)

0.73

39.74

14.99
523.27
3.34
43.26
1.49
14.99
374.31
3.34
43.26
1.49
14.99
506.27
3.34
43.26
1.49

14.99
611.32
3.34
43.26
1.49
560.35
3.34
69.97
1.49
630.53
3.34
61.13
1.49
374.31
3.34
43.26
1.49
417.04
66.21
3.34
1.49
409.21
56.34
3.34
1.49
419.75
61.13
3.34
1.49
419.75
76.30
3.34
1.49
419.75
80.10
3.34
1.49
560.35
69.97
3.34
1.49
429.75
550.03
43.26
22.67
5.44
1.49
8.46
9.50
9.50
9.50

20.00
16.00
40.00
50.00

Parcial PU PIURA

20,968.06
97,555.87
147,152.72
175,878.64
21,808.78
3,005.81
22,127.55
9,116.54
837.91
2,924.98
1,525.77
2,418.32
83.11
11,368.42
312,264.37
8,689.53
93,811.49
17,849.01
421,985.46
91,263.51
69,991.26
1,770.37
12,690.83
188,721.19
47,827.87
6,501.13
1,258.75
113,811.81
31,467.03
94,742.41
1,006.61
168,154.36
41,316.62
51,756.76
1,258.75
28,986.53
12,296.63
33,502.87
1,151.38
242,203.04
238,253.57
324,591.65
5,350.51
223,427.20
212,456.40
86,038.35
5,607.17
571,090.45
467,628.33
450,713.34
11,372.99
210,219.17
303,302.99
298,902.28
5,910.41
19,665.45
49,588.67
23,094.40
920.48
75,725.33
86,965.87
39,812.40
1,847.97
594,435.38
238,749.65
21,706.89
65,152.26
13,647.40
14,652.21
21,215.93
1,573,500.56
41,678.40
347,320.00
560.00
320.00
256.00
47,944.40
9,267.50
9,315,944.04
5.73%

DELTA

33,587.65
67.07
183.11
-9.72
313.92
22.01
910.00
27,394.36
-55.34
12,177.73
1,428.75
41,471.25
-581.19
9,085.61
468.91
1,015.86
-304.58
843.92
333.40
32,910.98
-200.39
-2,897.69
266.61
-263.12
726.40
333.40
2,542.97
-78.31
4,349.03
304.96
20,758.85
10,292.21
-2,067.09
1,417.16
19,538.42
6,554.53
-547.92
1,485.14
48,621.82
6,563.11
-2,870.27
3,012.30
17,897.76
62,252.53
-1,903.49
1,565.46
1,674.29
34,612.64
-147.07
243.80
21,897.50
-2,659.85
-253.54
489.46
7,806.46
1,648.92
2,817.79
-703.56
3,880.84
82,815.82
2,193.60
18,280.00
0.01
-10.41
533,504.80

OBRA:
UBICACIN:
SECTOR:
FECHA:

CENTRO COMERCIAL POWER CENTER


SULLANA, PIURA
PROMART, PLAZA VEA, LOCATARIOS, AREAS DE SERVICIO, CERCO EXTERIOR
2/14/2013
PROMART - RPPIURA

Nivel

Area techada (m2)


=>

AREA 1ER PISO

7,256.13

AREA MEZANINE
TOTAL
Losas de C (m2)
techo metalico (m2)

168.94
7,425.07
3,409.35
4,015.72

Item

ARQ0001
ARQ0002
ARQ0003
ARQ0004
ARQ0005
ARQ0006
ARQ0007
ARQ0008
ARQ0009
ARQ0010
ARQ0011
ARQ0012
ARQ0013
ARQ0014

ARQ0015
ARQ0016
ARQ0017
ARQ0018
ARQ0019
ARQ0020
ARQ0021
ARQ0022
ARQ0023
ARQ0024
ARQ0025
ARQ0026
ARQ0027
ARQ0028
ARQ0029
ARQ0030
ARQ0031
ARQ0032
ARQ0033
ARQ0034
ARQ0035
ARQ0036
ARQ0037
ARQ0038
ARQ0039
ARQ0040
ARQ0041
ARQ0042
ARQ0043
ARQ0044
ARQ0045
ARQ0046
ARQ0047
ARQ0048
ARQ0049
ARQ0050
ARQ0051
ARQ0052
ARQ0053
ARQ0054
ARQ0055
ARQ0056
ARQ0057
ARQ0058
ARQ0059
ARQ0060
ARQ0061
ARQ0062
ARQ0063
ARQ0064
ARQ0065
ARQ0066
ARQ0067
ARQ0068
ARQ0069
ARQ0070
ARQ0071
ARQ0072
ARQ0073

ARQ0074

ARQ0075

ARQ0076
ARQ0077

ARQ0078

Descripcin de Partidas
ARQUITECTURA
MUROS Y TABIQUES
MUROS
Muro de bloque de concreto - e=0.19 hasta h= 6.00 m
Muro de bloque de concreto - e=0.19 sobre h= 6.00 m
Muro de bloque de concreto - e=0.14 hasta h= 6.00 m.
Muro de bloque de concreto - e=0.14 sobre h= 6.00 m.
Muro de bloque de concreto - e=0.14 hasta h= 1.00 m.
Sellado de Juntas con Sikaflex
Vigas collarin en muros de bloquetas
Concreto fc=210kg/cm2
Encofrado y desencofrado
Armadura de acero. Fy=4200kg/cm2
Curado
TABIQUES
Tabique INTERIOR con estructura metlica de 90mm@0.406m,
e=90mm con 2 planchas CORTAFUEGO RF de 12.5mm por ambas
caras.+ Lana de Vidrio de 89mm d=12kg/m3
PANELES DE FACHADA
Cenefa de superboard de 1/2" una cara
Tabique de superboard de 1/2" por una cara
TARRAJEOS, REVOQUES Y ENLUCIDOS
Tarrajeo interior de muros de albaileria h < 3 m
Tarrajeo de muros de albaileria exterior h < 3 m
SOLAQUEOS
Estructura de concreto horizontal expuesta limpia
Estructura de concreto vertical expuesta limpia
PISOS
CONTRAPISO
Contrapiso e=5cm
PAVIMENTOS
PORCELANATO UNICOLOR GAUDI PULIDO GRIS 40X40 - PISOS SSHH
PORCELANATO UNICOLOR GAUDI PULIDO NEGRO 40X40 - PISOS
PISO ACABADO CEMENTO PULIDO
PISO TRAVERTINO 0.40x0.40 MARCA ROSELLO, LINEAS
TUSCANY/CRATER/GOLDEN
ACABADO BRUADO PARA LOSA DE CONCRETO (trastienda
camiones)
REVESTIMIENTOS DE GRADAS Y ESCALERAS
CEMENTO
Pasos y contrapaso de cemento pulido
contrazocalo de cemento pulido h=15cm
Descanso de cemento pulido
REVESTIMIENTOS
Pasos y contrapasos de TRAVERTINO TUSCANY
Contrazcalo de TRAVERTINO TUSCANY
Descanso de TRAVERTINO TUSCANY
COBERTURAS
COBERTURAS
Impermeabilizacin de losa de concreto con membrana gravillada de
MR Aguilar
Cubierta sistema Deck bicapa de MR Aguilar
Panel de Aluminio Compuesto Alpolic color Silver Metalic rf 4mm
CANALETAS y FLASHING
Canaleta descarga de lluvia
Cumbreras
Membrana Bicapa
Flashing
ZOCALOS
CERAMICOS Y PORCELANATOS
PORCELANATO CASSINELLI ESMALTADO MATE POTENZA GRIS
MAYOLICA OLIMPO BLANCO - CASSINELLI 30X60 (Muro SSHH)
PEPELMASTONE ART MIX ROJO BARRA
PEPELMASTONE ART MIX VERDES
PERFIL DE ALUMINIO RODO METAL 9.5MM X 2MT
TAPA CANTO DE ACERO INOXIDABLE
VARIOS
ZOCALO MARMOL TRAVERTINO TUSCANY 12"X12"X3/8" CREMA MIX
MATE I MG H=1.50 o H=2.50 (SEGN ELEVACIN)
CONTRAZOCALOS
CONTRAZOCALO CEMENTO PULIDO H=0.10 M
CONTRAZOCALO TRAVERTINO H=0.10 M
CIELO RASO Y FALSO CIELO
FALSO CIELO RASO
FCR Interior con estructura metalica de 64 mm @0.40espesor
0.45mm y plancha regular ST de 12.5 mm.
CENEFA DE DRYWALL ESTANDAR EN BAOS MEZANINE
BALDOSAS EN BAOS
CARPINTERIA METALICA
PUERTAS
PB-01 (17.10 x 4.50): Reja batiente

Und.

m2
m2
m2
m2
m2
mt
m3
m2
kg
m2

119.33
124.75
110.97
116.02
100.88
24.70
455.49
91.96
3.32
1.88
-

m2

ml
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2

ml
ml
m2
ml
ml
m2

PROFORMA
PROFORMA
PROFORMA
PROFORMA
PROFORMA
PROFORMA
PROFORMA

m2
m2
m2
m2
ml
ml
m2
ml
ml

ml
ml
m2

m2

PT-I-110 (1.0 x 2.10): Puerta de fierro, plancha de fierro de e=1mm,


con marco cajn, pintada con pintura a base de poliuretano - 1 hoja

m2

PMC-II (4.90 x 2.70): Puerta de fierro, plancha de fierro de e=1mm,


con marco cajn, pintada con pintura a base de poliuretano - 2 hojas.

m2

PMC-II (2.90 x 2.70): Puerta de fierro, plancha de fierro de e=1mm,


con marco cajn, pintada con pintura a base de poliuretano - 2 hojas.

m2

140.00
120.00
120.00
23.81
23.81
6.28
6.28
29.13
78.64
78.64
90.63
163.59
16.00
18.00
12.28
12.00
232.34
118.49
187.34
55.00
140.00
424.00
160.00
135.48
83.99
77.99
292.64
276.59
18.47
32.47
154.09
12.28
29.24
85.00
85.00
93.67
660.00

Metrado

RESUMEN
Parcial (S/.)

491.02
986.84
1,775.68
1,180.52
1,674.37
12.97
164.13
1,558.78
164.13
-

58,592.28
123,109.91
197,049.63
119,094.40
41,357.27
5,908.03
15,092.87
5,180.44
308.66
-

27.59

3,862.32

24.45
229.42
434.23
193.57
12,471.19
8,724.04
1,009.71
99.70
102.02
807.99

2,933.40
27,530.40
10,339.24
4,609.03
78,306.59
54,778.26
29,413.51
7,839.59
8,022.41
73,229.59

1,859.83

304,241.59

222.45

3,559.20

66.70
70.40
19.08
37.80
35.50
3.92
-

1,200.60
864.39
228.96
8,782.29
4,206.33
734.36
-

m2

419.75
53.41
3.34
1.49

119.25
85.09
21.36
21.36
4.22
4.22

19.87
67.06
64.82
89.62
165.00

18.00
12.24
12.00
130.40
130.40
150.00

288,933.15

59.39

1,300,922.00

140.00

441.16

187,051.71

318.00

205.22
292.73
132.98
132.98
9.06
21.64
27.00
4.80
-

27,803.21
11,168.59
10,370.69
2,652.01
5,984.62
498.69
155.86
-

193.57

29,826.68

356.95
-

4,382.74
1,667.01
-

213.16

18,118.94

80.36
76.95

7,526.95
50,787.00

2.10

1,386.00

13.23

8,731.80

7.83

5,167.80

10.42

1,282.60

99.69
104.43
94.94
104.43
94.94

9,292.30

660.00

660.00
-

PU PIURA (S/.)

5,253.33

660.00

PUERTAS CORTAFUEGO
P1 (1.20 x 2.15): Puerta de fierro, plancha de fierro de e=1mm, con
marco cajn, pintada con pintura a base de poliuretano - 2 hojas

PU (S/.)

127.75
135.48

68.73
68.28
267.13
287.70
18.47
32.47
165.00
12.24
130.40

Parcial PU PIURA

9,644.39
20,051.20
28,468.61
7,017.25
463.54
6,327.04
-33.20
64.63
-

3,862.32
2,915.06
19,521.35
9,275.20
4,134.70
52,566.05
36,771.84
20,066.88
6,685.23
6,612.78
72,412.06

18.34
8,009.05
1,064.04
474.33
25,740.53
18,006.42
9,346.64
1,154.36
1,409.64
817.52

306,871.95

-2,630.36

1,200.60
862.01
228.96
4,928.95
4,629.04
588.00
-

3,559.20
2.39
3,853.34
-422.71
146.36
-

312,020.93
1,300,922.00

-23,087.78
-

140,288.88
27,803.21
9,139.34
9,079.40
2,420.90
6,225.15
498.67
155.86
-

46,762.83
2,029.24
1,291.29
231.11
-240.53
0.02
-

31,939.38
4,370.64

-2,112.70
12.10
1,667.01
-

61.56
85.15

DELTA

48,947.89
103,058.71
168,581.02
112,077.15
41,357.27
5,444.50
8,765.84
5,213.64
244.03
-

13,122.27
6,842.31
50,787.00

4,996.67
684.63
-

1,386.00

8,731.80

5,167.80
-

13,359.56

13,359.56

ARQ0079

ARQ0080

ARQ0081

ARQ0082
ARQ0083
ARQ0084
ARQ0085
ARQ0086
ARQ0087
ARQ0088
ARQ0089
ARQ0090
ARQ0091
ARQ0092
ARQ0093
ARQ0094
ARQ0095
ARQ0096
ARQ0097
ARQ0098
ARQ0099
ARQ0100
ARQ0101

ARQ0102
ARQ0103
ARQ0104
ARQ0105
ARQ0106
ARQ0107
ARQ0108
ARQ0109
ARQ0110
ARQ0111
ARQ0112
ARQ0113
ARQ0114
ARQ0115
ARQ0116
ARQ0117
ARQ0118
ARQ0119
ARQ0120
ARQ0121
ARQ0122
ARQ0123
ARQ0124
ARQ0125
ARQ0126
ARQ0127
ARQ0128
ARQ0130
ARQ0131
ARQ0132
ARQ0133
ARQ0134
ARQ0135
ARQ0136
ARQ0137
ARQ0138
ARQ0139
ARQ0140
ARQ0141
ARQ0142
ARQ0143
ARQ0144
ARQ0145
ARQ0146
ARQ0147
ARQ0148

P2 (1.80 x 2.15): Puerta de fierro, plancha de fierro de e=1mm, con


marco cajn, pintada con pintura a base de poliuretano - 2 hojas

m2

P3 (2.65 x 2.15): Puerta de fierro, plancha de fierro de e=1mm, con


marco cajn, pintada con pintura a base de poliuretano - 2 hojas

m2

PME-II-160 (1.60 x 2.19): Puerta de fierro, plancha de fierro de


e=1mm, con marco cajn, pintada con pintura a base de poliuretano 2 hojas. Incluye accesorios y cerrajera listados UL

m2

PME-II-235 (2.35 x 2.19): Puerta de fierro, plancha de fierro de


e=1mm, con marco cajn, pintada con pintura a base de poliuretano 2 hojas. Incluye accesorios y cerrajera listados UL

m2

PUERTAS ENRROLLABLE
CE-1 (9.45 x 4.50): Puerta enrollablede fierro con sistema electrico de
cierre y apertura
CE-2 (6.70 x 3.00): Puerta enrollablede fierro con sistema electrico de
cierre y apertura
CE-3 (7.15 x 3.00): Puerta enrollablede fierro con sistema electrico de
cierre y apertura
CR-1 (7.60 x 3.00): Puerta enrrollable de fierro con sistema elctrico
de cierre y apertura
CR-2 (8.05 x 3.00): Puerta enrrollable de fierro con sistema elctrico
de cierre y apertura
CR-3 (5.40 x 3.40): Puerta enrrollable de fierro con sistema elctrico
de cierre y apertura
CR-4 (7.65 x 3.40): Puerta enrrollable de fierro con sistema elctrico
de cierre y apertura
CR-5 (6.00 x 4.55): Puerta enrrollable de fierro con sistema elctrico
de cierre y apertura
CR-6 (14.30 x 4.55): Puerta enrrollable de fierro con sistema elctrico
de cierre y apertura
CR-7 (11.15 x 3.70): Puerta enrrollable de fierro con sistema elctrico
de cierre y apertura
ESTRUCTURA DE INGRESO A LOCALES
MARCOS METALICOS (15 KG/M2)
BARANDAS
BARANDA METALICA
PASAMANO METALICO
REJILLAS
Rejillas galvanizado marco 40X40X3mm y platinas de 40x10mm @
0.05 e=30cm
Escalera de gato para acceso a cisternas a=45cm, parantes de tubo fe
2"x3mm y travesaos de tubo fe 1 1/2"x3mm
Esclusa de acceso a cisternas 0.80x0.60 con marco de fe 1 1/2"x1
1/2"x3mm con puerta de pl metlica 3mm y portacandado
CERRAMIENTO VERTICAL
Panel tipo Isowall E=50mm prepintado 0,5/05mm Ext. RAL 2004 Int.
RAL 9003, de MR Aguilar
Panel tipo Isowall E=50mm prepintado 0,5/05mm Ext. RAL 1018 Int.
RAL 9003, de MR Aguilar

34,745.63

11.40

14,615.23

1,282.60
14.02

17,976.92

10.29

13,201.80

1,282.60

1,282.60
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
ml
ml
ml
ml

641.30
641.30
641.30
641.30
641.30
641.30
641.30
641.30
641.30
641.30
150.00
225.77
75.00
450.00
200.00

und
500.00
PROFORMA
PROFORMA

Trascara de zinc-aluminio e=0.5mm en azotea incluye flashing

PROFORMA

Corona de plancha galvanizada en fachada


VIDRIOS
Mampara 10 mm
Ventana 10 mm
Muro Cortina 10 mm
ESPEJOS
Espejos empotrado biselado bisel 1"
APARATOS SANITARIOS, GRIFERIAS Y ACCESORIOS
APARATOS SANITARIOS

PROFORMA
m2
m2
m2
m2

INODORO REDONDO MARCA TOTO MODELO CT705EN (INC TAPA)

und

URINARIO SECO HELVEX MGS-E (proporcionado por Real Plaza)

und

Instalacin de aparatos sanitarios


Mesa de concreto para ovalines a=0.60m (sin revestimiento)
GRIFERIAS
VALVULAS DE FLUJO FLUSHMASTER MARCA COBRA MODELO
KF1.214
VALVULA DE CIERRE TEMPORIZADO PARA LAVAMANOS MARCA
COBRA MODELO KM2.100
Instalacin de griferias
ACCESORIOS
Dispensador de jabn lquido modelo SD-101 RX Leeyes
Dispensador de papel higienico modelo SB-194 Leeyes
Dispensador de papel toalla modelo SB - 068 Leeyes
Secador de manos World Dryer DXA- 054
Gancho de ropa modelo CB-034 LEEYES

pza
ml
und
und
und
und
und
und
und
und

Panel divisorio metlic TJ Castro, Suspendido modelo Libertador

ml

Colocacin de accesorios sanitarios


VARIOS
LAVADERO DE CONCRETO CORRIDO REVESTIDO EN GRANITO NEGRO
ABSOLUTO
PINTURA
Pintura latex 2 manos en muros interiores
Pintura esmalte en muros interiores

und

Pintura ltex en cielos (imprimante + una mano de pintura)-----c

m2

Pintura texturada
Pintura en falso cielo raso de drywall
PARTIDAS COMPLEMENTARIAS
Flashing de fierro galvanizado dos aguas en techo
Tapajuntas de acero inoxidable
Sardinel de concreto armado acabado cemento pulido de
0.10x0.15m (base de tab. De drywall)
Tapas de registro en falso cieloraso Nauf Buildex 60
Rejilla de Acero Inox de .10x1 (platina 1"x1/4" @ 1.5cm con marco de
1 1/4"x1")
Sello cortafuego de 2" a 8"

m2
m2

Cenefa tipo Dens glass en fachada (solo en perimetro) de Home

27.09
1,282.60

ml
m2
m2

PROFORMA
ml
ml
und
ml
ml
PROFORMA

280.00
280.00
600.00
400.00
1,050.00
200.00
525.00
50.39
121.83
385.00
335.50
38.88
79.02
89.32
901.60
850.00
49.50
600.00
31.97
850.00
9.50
9.50
9.50
36.50
9.50
7.50
156.00
38.31
500.00
733.00
151.00
125,000.00

42.53

27,271.28

20.10

12,890.13

21.45

13,755.89

22.80

14,621.64

24.15

15,487.40

18.36

11,774.27

26.01

16,680.21

27.30

17,507.49

65.07

41,726.18

41.26

26,456.83

313.02
63.04
51.59
-

46,952.63
14,232.54
3,869.25
-

30.00

13,500.00

13.20

2,640.00

4.00

2,000.00

142.50
225.77
65.00
450.00

536.38

150,186.40

150.00

1,438.63

402,816.40

150.00

292.73

69.31
4.50
136.12
30.60
-

41,586.00
1,800.00
142,926.00
6,120.00
-

33.00

17,325.00

20.00

378.95
218.62
1,056.86
198.75

511.23

53.00
43.00
-

2,670.70
5,238.55
-

50.39
117.74

33.00

12,705.00

385.00

37.00

12,413.50

335.50

70.00
19.00
33.00
4.00
4.00
33.00

2,721.68
1,501.38
2,947.56
3,606.40
3,400.00
1,633.50

38.88

770.00
49.50

74.25

44,550.00

557.07

93.00
-

2,973.22
-

31.97

43.00

36,550.00

220.00

434.23
2,313.25

4,125.20
21,975.88

8.00
8.00

807.99

7,675.91

8.00

213.16
95.75
19.60

2,025.06
718.13
3,057.60

31.80
8.00

7.26

278.15

35.71

5.00

2,500.00

500.00

109.75
1.00

7.50
159.00

733.00

16,572.25

151.00

125,000.00

129,180.00

4,608,375.33

34,745.63

14,615.23

17,976.92

13,201.80
-

27,271.28

12,890.13

13,755.89

14,621.64

15,487.40

11,774.27

16,680.21

17,507.49

41,726.18

26,456.83
44,604.99
14,232.54
3,353.35
13,500.00

2,640.00

2,000.00
-

80,457.00

69,729.40

215,794.50

187,021.90

26,265.01
983.81
143,860.01
6,081.75
-

15,320.99
816.19
-934.01
38.25
-

16,870.59

454.41

2,670.66
5,063.03
-

0.04
175.52
-

12,705.00

12,413.50
2,721.68
1,501.38
2,947.56
3,606.40
3,080.00
1,633.50

320.00
-

41,362.34
2,973.35
-

3,187.66
-0.13
-

9,460.00
3,473.86
18,506.00

27,090.00
651.35
3,469.88

6,463.92
1,705.31
718.13
3,116.40

1,211.99
319.75
-58.80

259.26
2,500.00

18.89
-

16,572.25

129,180.00

-4,180.00

4,126,072.11

482,303.23

11.69%
NOTAS:
* Presupuesto elaborado en base a los planos de Arquitectura del 31/01/12
* Se ha asumido los mismos acabados que en Real Plaza Piura
* Los metrados de las partidas resaltadas en gris han sido ESTIMADAS
* En los SSHH se ha considerado: PISOS 50% de cada color. FCR 60% drywall, 40% baldosas. ZOCALOS DE PORCELANATTO 50% de cada color
* Para los paneles de la fachada Tambogrande (letreros) se ha asumido tabique de SB con pintura texturada
* Se ha asumido que toda la vereda alrededor de Promart, locales y Plaza Vea es de mrmol, y que tiene zcalo de mrmol

2,347.63
515.90
-

OBRA:
UBICACIN:
SECTOR:
FECHA:

CENTRO COMERCIAL POWER CENTER


SULLANA, PIURA
PROMART, PLAZA VEA, LOCATARIOS, AREAS DE SERVICIO, CERCO EXTERIOR
2/14/2013
PROMART - RPPIURA

Nivel

PROMART - PCSULLANA

Area techada (m2)

Nivel

PROMART - PCSULLANA

Area techada (m2)

Nivel

LOCATARIOS

Area techada (m2)

Nivel

AREAS COMUNES Y SERVICIO

Area techada (m2)

Nivel

OBRAS EXTERIORES

Area techada (m2)

Nivel

Area techada (m2)

=>
AREA 1ER PISO

7,256.13

AREA 1ER PISO

AREA MEZANINE
AREA SOTANO
TOTAL
Losas de C (m2)
techo metalico (m2)

168.94
7,425.07
3,409.35
4,015.72

AREA MEZANINE
AREA SOTANO
AZOTEA
TOTAL
Losas de C (m2)
Permetro (ml)

6,861.09 AREA 1ER PISO

Techo metlico (m2)


Item

EXT1001
EXT1002
EXT1003
EXT1004
EXT1005
EXT1006
EXT1007
EXT1008
EXT1009
EXT1010
EXT1011
EXT1020
EXT1020.1
EXT1021
EXT1021.1
EXT1021.2
EXT1022
EXT1023
EXT1024
EXT1025
EXT1026
EXT1027
EXT1028
EXT1029
EXT1030
EXT1029.1
EXT1031
EXT1032
EXT1033
EXT1034
EXT1035
EXT1036
EXT1036.1
EXT1036.2
EXT1036.3
EXT1036.4
EXT1036.5
EXT1036.6
EXT1036.7
EXT1036.8
EXT1036.9
EXT1036.10
EXT1037
EXT1038
EXT1039
ARQ1151
ARQ1152
ARQ1153
ARQ1155
ARQ1156
ARQ1157
EXT1041
EXT1042
EXT1043
EXT1044
EXT1054
EXT1046
EXT1047
EXT1048
EXT1049
EXT1049.1
EXT1049.2
EXT1049.3
EXT1050
EXT1052
EXT1052.1
EXT1052.2
EXT1059
EXT1060
EXT1061
EXT1062
EXT1063
EXT1064
EXT1065
EXT1066
EXT1067
EXT1067.1
EXT1068
EXT1069

Descripcin de Partidas
ESTACIONAMIENTOS Y CERCO
CERCO
DEMOLICIONES
Demolicion de cerco de albaileria c/maquinaria
Demolicion de cimientos y columnas de cerco c/maquinaria
Eliminacion de demoliciones
Movimiento de Tierras
Excavacin localizada simple
Relleno con material propio
Eliminacion de material excedente
Nivelacin interior y apisonado
Pruebas de densidad de campo
Cimiento de cerco perimetrico
Solado de concreto f'c=100 Kg/cm2, e=2" p/zapatas
Concreto 210
Acero de refuerzo
Encofrado y desencofrado
Curado
Sobrecimiento de cerco perimetrico
Concreto fc=210kg/cm2
Encofrado y desencofrado
Armadura de acero. Fy=4200kg/cm2
Curado
Cimiento de columnetas
Concreto fc=210kg/cm2
Armadura de acero. Fy=4200kg/cm2
Encofrado y desencofrado
Curado
Columnetas y vigas de amarre
Concreto fc=210kg/cm2
Encofrado y desencofrado
Armadura de acero. Fy=4200kg/cm2
Curado
Sardinel de concreto acabado pulido (altura h=0.10 m) - Jardineras
Concreto fc=210kg/cm2
Encofrado y desencofrado
Armadura de acero. Fy=4200kg/cm2
Curado
Muros de albaileria armada Eje 17
Muros de albaileria de concreto h=3.25
Acero de refuerzo
Grouting de concreto en alveolos
Sellado de juntas
REVESTIMIENTOS
Solaqueo de sobrecimientos
Solaqueo de columnas
REJAS METALICAS
Cerco metlico
REJA PLEGADIZA DE 35.40 mt
REJA PLEGADIZA DE 15.00 mt
REJA BATIENTE DE 6.50 mt (04 HOJAS)
REJA BATIENTE DE 7.45 mt (02 HOJAS)
VEREDAS
Nivelacion, riego y compactacion de terreno
Relleno material de prestamo e=0.10 m.
Vereda de concreto e=0.15 f'c=210 kg/cm2
Encofrado de veredas
Acero para veredas y losas
Sellado de juntas con mortero asfaltico
Curado de veredas y losas
Acabado de cemento pulido
Enchape de veredas con marmol travertino 0.40x0.40 marca Rosell, lneas
Tuscany, Crter, Golden
JARDINES
Jardinera grass americano
ESTACIONAMIENTOS
Imprimacion asfaltica
Carpeta asfltica 2"
Base afirmado e=20
PINTURA DE TRAFICO
Pintura trfico en estacionamientos Discapacitados
Pintura en demarcacin de estacionamientos E=0.10 m
Demarcacin de flechas Recta - Viraje FDH-01 ( Pintura trfico)
Demarcacin de flechas Recta y Viraje - Viraje Doble FDH-02( Pintura
trfico)
Demarcacin Paso de Peatones FDH-06 ( Pintura Trfico )
Pintura en sardineles, topes y bordes de veredas
ALUMBRADO DE ESTACIONAMIENTOS
Bases de Postes de Alumbrado
Postes de Alumbrado de 4x4x3/16 h=9,00m
Postes de Alumbrado de 4x4x3/16 h=6,00m
Postes de Alumbrado C.A.C. h=18m

Und.

m2
m3
m3
m3
m3
m3
m2
Glb.
m2
m3
kg
m2
m2
m3
m2
kg
m2
m3
kg
m2
m2
m3
m2
kg
m2
m3
m2
kg
m2
m2
kg
m3
ml
m2
m2
kg
und
und
und
und
m2
m2
m2
m2
Kg
ml
m2
m2

PU (S/.)

15.20
85.00
22.88
16.86
24.46
22.88
5.00
16.19
407.15
3.32
48.88
1.88
407.15
48.88
3.32
1.88
407.15
3.32
48.88
1.88
543.34
67.57
3.32
1.88
488.58
58.65
3.32
1.88
119.33
24.70
14.86
14.86
10.00
75,000.00
30,000.00
10,000.00
10,200.00
5.00
9.13
89.62
48.88
3.32
8.46
1.88
12.00

m2

RESUMEN
Metrado

15.20
85.00
22.88
16.86
24.46
22.88
5.00

14.99
374.31
3.34
43.26
1.49
374.31
43.26
3.34
1.49
374.31
3.34
43.26
1.49
417.04
53.45
3.34
1.49
4.54
43.20
750.71
43.20
636.80
4,584.96
83.58
77.63

1,716.10
1,716.10
1,716.10
196.80
2,164.80
1,255.68
271.53
-

8,580.50
15,659.76
153,796.88
9,619.39
7,194.50
10,619.18
510.65
-

1,716.10

280,729.42

7,300.10
7,300.10

m2
mt
m2

26.00
3.50
26.00

114.00
1,260.00
37.12

m2
mt
und
und
und
und

26.00
26.00
3.50
Incluir en IIEE
Incluir en IIEE
Incluir en IIEE
Incluir en IIEE

5.00
9.13
89.62
43.26
3.34
8.46
1.49
12.00
165.00

789.35

78.00
563.96
13.00
3.00
8.00
2.00

19,733.75
43,435.60
306,604.20
2,964.00
4,410.00
965.12
2,028.00
1,973.86
-

954,055.93
NOTAS:
* Presupuesto elaborado en base a los planos de Arquitectura del 31/01/12
* Se ha asumido los mismos acabados que en Real Plaza Piura
* Los metrados de las partidas resaltadas en gris han sido ESTIMADAS

94.94

7.52
7.52

m2
m2

m2

2,216.19
2,533.89
2,494.90
81.24
75,987.56
1,917.35
-

9.50
75,000.00
30,000.00
10,000.00
10,200.00

163.59
25.00
5.95
42.00

m2

PU PIURA
(S/.)

Parcial (S/.)

22.80
5.95
42.00

26.50
3.50
26.50
26.50
26.50

Parcial PU PIURA

Metrado

60,457.03
8,580.50
15,659.76
153,796.88
8,514.16
7,240.61
10,619.18
403.72
-

2,216.19
2,533.89
2,494.90
81.24
15,530.53
1,917.35
1,105.23
-46.11
106.93
-

283,156.50
17,997.18
43,435.60
306,604.20
3,021.00
4,410.00
983.68
2,067.00
926,946.99

AREA 1ER PISO


AREA MEZANINE
259.97 (Estimado)
AREA SOTANO
AZOTEA
6,386.02 TOTAL
2,134.78 Losas de C (m2)
Perimetro (ml)

217.72
25.42
7,104.23
2,063.17

AREA MEZANINE
AREA SOTANO
AZOTEA
TOTAL
Losas de C (m2)
Perimetro (ml)

5,041.06

Techo metlico (m2)

PROMART

DELTA

6,126.05

4,251.24

Techo metlico (m2)

PLAZA VEA
Parcial (S/.)

Metrado

LOCATARIOS
Metrado

Parcial (S/.)

LOSA PATIO DE
815.27 MANIOBRA

743.22 AREA 1ER PISO


AREA MEZANINE
389.46 (Estimado)
AREA SOTANO
AZOTEA
1,132.68 TOTAL
1,132.68 Losas de C (m2)
Perimetro (ml)

656.79
846.62
2,318.68
2,318.68

Techo metlico (m2)

AREAS SERVICIO

Parcial (S/.)

Metrado

2,170.32

ASFALTO
VEREDA
JARDINES
TOTAL
Losas de C (m2)
Perimetro (ml)

7,300.10
1,716.10
789.35
11,975.87
2,170.32

Techo metlico (m2)

OBRAS EXTERIORES

Parcial (S/.)

Metrado

Parcial (S/.)

551.06
606.16
6,221.57
1,480.75
551.06

78.25
521.66
3,716.80
521.66

32.34
3,900.20
92.40
92.40

22.09
325.88
3,544.82
325.88

4.54
43.20
750.71
43.20

636.80
4,584.96
83.58
77.63

-2,427.08
1,736.57
-57.00
-18.56

1,716.10

7,300.10
7,300.10

-39.00
1,973.86
27,108.94
2.92%

606.16
12.48
848.63
11,975.87
1.00

521.66
92.40
39,420.00
1.00
1.00
1.00
2.00
1,716.10
1,716.10
1,716.10
196.80
2,164.80
1,255.68
271.53
-

789.35

114.00
1,260.00
37.12
78.00
563.96

10,219.88
305.29
19,416.57
59,879.35
8,921.54
246,797.18
20,676.77
72,377.77
1,036.32
31,858.64
25,498.02
12,352.41
981.03
13,167.15
12,961.94
4,516.42
173.77
12,000.15
22,020.33
11,780.84
612.85
2,216.19
2,533.89
2,494.90
81.24
75,987.56
1,917.35
7,749.46
1,372.65
394,200.00
75,000.00
30,000.00
10,000.00
20,400.00
8,580.50
15,659.76
153,796.88
9,619.39
7,194.50
10,619.18
510.65
280,729.42
19,733.75
43,435.60
306,604.20
2,964.00
4,410.00
965.12
2,028.00
1,973.86
-

13.00
3.00
8.00
2.00
-

2,080,332.26

PRIMER PISO
MEZANINE
SOTANO
AZOTEA

AREAS LIBRES
LOSA PATIO DE MANIOBRA
ASFALTO
VEREDA
JARDINES

PROMART
C
Fe
1,820.03
5,041.06
217.72
0.00
0.00
0.00
25.42
0.00
2,063.17
5,041.06
7,104.23

2,170.32
7,300.10
1,716.10
789.35
11,975.87

PLAZA VEA
C
Fe
1,874.81
4,251.24
259.97
0.00
0.00
0.00
0.00
0.00
2,134.78
4,251.24
6,386.02

LC MENORES
C
743.22
389.46
0.00
0.00
1,132.68
1,132.68

LC MENORES
Fe
0.00
0.00
0.00
0.00
0.00
1,132.68

AC Y SERVICIO
C
Fe
815.27
656.79
846.62
0.00
2,318.68
2,318.68

0.00
0.00
0.00
0.00
0.00

TOTAL
C
Fe
5,253.33
9,292.30
1,523.94
0.00
846.62
0.00
25.42
0.00
7,649.31
9,292.30
16,941.61

14,545.63
1,523.94
846.62
25.42
16,941.61

METRADO DE PISOS
TIPO
CEMENTO PULIDO

AMBIENTE
CUARTO BOMBAS
CORREDOR SERVICIO
CUARTOS ELECTRICOS

NIVEL
SOTANO
PRIMER PISO
MEZANINE

SSHH HOMBRES
SSHH MUJERES

MEZANINE
MEZANINE

51.01
48.69

99.70

CASALGRANDE 40X40
UNICOLORE GIGRIO CENERE SSHH HOMBRES
SSHH MUJERES

MEZANINE
MEZANINE

51.01
51.01

102.02

PISO TRAVERTINO 0.40x0.40


MARCA ROSELLO, LINEAS
HALL INGRESO
TUSCANY/CRATER/GOLDEN COMPARTIDO
VEREDA
HALL SSHH

PRIMER PISO
PRIMER PISO
MEZANINE

176.70
1,603.83
79.30

1,859.83

PROMART

PLAZA VEA
1
0
0
0
1
1
1
0
0
0
0
0
0
0
0
4
0
0
0
8

CASALGRANDE UNICOLORE
40X40 NERO

AREA

TOTAL
145.72
807.99
389.86
272.41

METRADO DE VANOS
PB-01 17.10 x H
PMC-II 4.90 x 2.70
PMC-II 2.90 x 2.70
PT-I-110 1.00 x 2.10
CE-01 9.45 x H
CE-02 6.70 x H
CE-03 7.15 x H
CR-1 7.60 x 3.00
CR-2 8.05 x 3.00
CR-3 5.40 x 3.40
CR-4 7.65 x 3.40
CR-5 6.00 x 4.55
CR-6 14.30 x 4.55
CR-7 11.15 x 3.70
PCF-01 1.20 x 2.15
PCF-02 1.80 x 2.15
PCF-03 2.65 x 2.15
PME-II-160 1.60 x 2.19
PME-II-235 2.35 x 2.19

TIPO
METALICA BATIENTE
METALICA
METALICA
METALICA
ENRROLLABLE
ENRROLLABLE
ENRROLLABLE
ENRROLLABLE
ENRROLLABLE
ENRROLLABLE
ENRROLLABLE
ENRROLLABLE
ENRROLLABLE
ENRROLLABLE
CORTAFUEGO
CORTAFUEGO
CORTAFUEGO
CORTAFUEGO
CORTAFUEGO

0
1
1
1
0
0
0
1
1
1
1
1
1
1
0
0
0
4
2
16

AC Y SERV
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
3
2
0
0
9

METRADO DE TABIQUES DE DRYWALL


UBICACIN
LC-101 / LC-102
LC-102 / LC-103

TIPO
RF
RF

LARGO

ALTURA
1.21
1.21

TOTAL
3.80
3.80

4.60
4.60

LC-103 / R-01
R-02 / LC-104
LC-104 / LC-105
LC-105 / LC-106

RF
RF
RF
RF

1.21
1.21
1.21
1.21
7.26

3.80
3.80
3.80
3.80

4.60
4.60
4.60
4.60
27.59

METRADO DE DINTELES SUPERBOARD


UBICACIN
LC-101
LC-102
LC-103
LC-104
LC-105
LC-106

LARGO

ALTURA
7.46
8.87
8.63
7.77
8.52
7.64
48.89

TOTAL
0.50
0.50
0.50
0.50
0.50
0.50

3.73
4.44
4.32
3.89
4.26
3.82
24.45

METRADO DE PANELES DE FACHADAS


PROMART - COLOR NARANJA
UBICACIN
LARGO/AREA
FACHADA TAMBOGRANDE
BORDE MARQUESINA PROMART
FACHADA PANAMERICANA
FACHADA CALLE A
EJE 9A

ALTURA
115.08
17.40
403.9
375.44
12

VECES
1.00
1.00
1.00
1.00
7.00

TOTAL
1.00
1.00
1.00
1.00
7.00

115.08
17.40
403.90
375.44
588.00
536.38

PROMART - COLOR AMARILLO


UBICACIN
FACHADA PANAMERICANA
LADO EJE C
LADO EJE Ka / 1-2

LARGO/AREA

ALTURA
468.3
2.29
12.58

VECES
1.00
7.00
7.00

TOTAL
1.00
1.00
1.00

468.30
16.03
88.06
468.30

PLAZA VEA - COLOR AMARILLO


UBICACIN
LARGO/AREA
FACHADA TAMBOGRANDE
BORDE MARQUESINA PROMART
CALLE A / 9B-11
LADO EJE 11
CALLE A / 11-17

ALTURA
67.69
17.40
99.19
7.00
330.91

VECES
7.00
1.00
1.00
7.00
1.00

TOTAL
1.00
1.00
1.00
1.00
1.00

473.83
17.40
99.19
49.00
330.91
970.33

METRADO DE TABIQUES DE ALBAILERIA E=14CM


LOCALES COMERCIALES
UBICACIN
LOCAL LC-101

LARGO

ALTURA
1.95

VECES
2.50

TOTAL
1

4.88

LOCAL LC-101 - PROMART EJE 3


LOCAL LC-101 - PROMART EJE 3
LOCAL LC-101 - LC-102
LOCAL LC-101 - PROMART EJE B
LOCAL LC-102 - LC-103
LOCAL LC-103 - PROMART
LOCAL LC-103 - R01
LOCAL R01 - PROMART
LOCAL R01
LOCAL R02
LOCAL R02 - INGRESO
LOCAL R02 - PLAZA VEA
LOCAL R02 - LC-104
LOCAL R02 - LOCATARIO 1
LOCAL LC-104 - LC-105
LOCAL LC-104 - LOCATARIO 1
LOCAL LC-105 - LC-106
LOCAL LC-105 - LOCATARIO 2
LOCAL LC-106 - PLAZA VEA
LOCAL LC-106
LOCAL LC-101 (MEZANINE)
R-01 (MEZANINE)
R-01 (MEZANINE) - SSHH
R-02 (MEZANINE)
R-02 (MEZANINE)
R-02 (MEZANINE) - SE
R-02 (MEZANINE) - FACHADA

7.40
1.10
8.50
3.70
8.50
8.60
4.25
16.25
4.20
4.20
5.60
8.20
4.80
3.63
4.80
7.75
8.50
8.50
8.50
1.95
13.50
16.25
5.65
15.68
7.60
9.65
8.73

2.50
3.80
3.80
3.80
3.80
4.30
3.80
4.30
2.50
2.50
4.30
3.80
3.80
3.80
3.80
4.30
3.80
4.30
3.80
2.50
4.40
4.43
4.36
3.27
4.43
4.43
4.30

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
HASTA 6M
MAS DE 6M

18.50
4.18
32.30
14.06
32.30
36.98
16.15
69.88
10.50
10.50
24.08
31.16
18.24
13.79
18.24
33.33
32.30
36.55
32.30
4.88
59.40
71.99
24.63
51.27
33.67
42.75
495.08
0.00

PLAZA VEA
UBICACIN
ESQUINA A-16
EJE 16 / A-M
VANO PCF-02
COSTADOS DINTEL

LARGO

ALTURA
3.70
77.40
1.80
1.70

VECES
2.50
5.00
2.15
2.15

TOTAL
1
1
-3
6

HASTA 6M
MAS DE 6M

9.25
387.00
-11.61
21.93
406.57
0.00

AREAS COMUNES
UBICACIN
LARGO
SSHH PERIMETRO
VANOS
SSHH INTERNO
PASILLO SSHH
CUARTOS ELECTRICOS - FACHADA
CUARTOS ELECTRICOS - INTERIOR
VANO PCF-01
VANO PCF-02
CUARTOS ELECTRICOS - EJE B

ALTURA
50.19
1.20
39.95
8.15
34.18
33.98
1.20
1.80
16.48

VECES
4.30
2.15
2.55
2.75
4.30
4.43
2.15
2.15
3.27

TOTAL
1
-2
1
1
1
1
-1
-3
1

215.82
-5.16
101.87
22.41
146.97
150.53
-2.58
-11.61
53.89

ESCALERA A SEE - 1 PISO


ESCALERA A SEE - MEZANINE
ESCALERA A SEE - MEZANINE
CORREDOR DE SERVICIO
ESCALERA A SOTANO - SOTANO
VANO PCF-01
ESCALERA A SOTANO - 1 PISO
VANO PCF-01
ESCALERA A SOTANO - MEZANINE
VANO PCF-01

13.70
30.00
24.20
96.30
9.60
1.20
19.70
1.20
19.70
1.20

3.80
3.30
2.10
3.85
3.30
2.15
3.80
2.15
3.80
2.15

1
1
1
1
1
-1
1
-1
1
-1
HASTA 6M
MAS DE 6M

52.06
99.00
50.82
370.76
31.68
-2.58
74.86
-2.58
74.86
-2.58
874.03
0.00

METRADO DE TABIQUES DE ALBAILERIA E=19CM


PROMART
UBICACIN
ESQUINA A-2
EJE 2 / B-C
EJE 1 / C-Ka
VANO PME-II
COSTADOS DINTEL
EJE Ka / 1-2
EJE 2 / Kb-O'
EJE O' / 2-9A
EJE 9A
EJE 7' - PATIO MANIOBRAS
VANO INTERNO
EJE L - PATIO MANIOBRAS
VANO PME-II-160
EJE 9A / L-M
EJE 9A / Kb-L
EJE 9A / C-Kb
EJE Ka / 2-9A
VANO INTERNO
VANO INTERNO
VANO PME-II-160

LARGO

ALTURA
3.00
9.06
67.64
2.35
1.20
12.63
33.80
37.35
12.25
20.85
4.00
13.20
1.60
9.40
9.85
46.45
37.95
4.00
3.00
1.60

VECES
2.50
2.50
1.50
1.50
2.19
1.50
2.50
2.50
2.50
8.22
3.70
8.30
2.19
6.25
8.19
7.34
7.20
3.70
3.70
2.19

TOTAL
1
1
1
-2
4
1
1
1
1
1
-1
1
-1
1
1
1
1
-1
-1
-1

HASTA 6M
MAS DE 6M

7.50
22.65
101.46
-7.05
10.51
18.95
84.50
93.38
30.63
171.39
-14.80
109.56
-3.50
58.75
80.67
340.94
273.24
-14.80
-11.10
-3.50
362.52
986.84

PLAZA VEA
UBICACIN
EJE O / 9B-11
VANO PCF-02
EJE O / 11-15 (INC. EJE 11)

LARGO

ALTURA
6.25
1.80
46.70

VECES
2.50
2.15
2.50

TOTAL
1
-1
1

HASTA 6M
MAS DE 6M

15.63
-3.87
116.75
128.51
0.00

METRADO DE BARANDAS METALICAS


UBICACIN
NIVEL
CORREDOR
MEZANINE
LLEGADA ESCALERA A SSHH MEZANINE
ESCALERA A SSHH
ESCALERA A SSHH - INTERIOR
ESCALERA A SSHH - EXTERIOR
ESCALERA A SEE
ESCALERA A SOTANO
ESCALERA A SOTANO

TIPO
LARGO
BARANDA
18.85
BARANDA
9.36
PASAMANO
5.37
BARANDA
8.22
BARANDA
8.17
PASAMANO
20.74
PASAMANO
25.48
BARANDA
18.44
BARANDAS
63.04
PASAMANOS
51.59

1
1
1
1
1
1
1
1
1
1
1
1
1
1
4
7
2
4
2

SELLO

VECES
2.50

TOTAL
2

2.50
3.80
3.80
3.80
3.80
4.30
3.80
4.30
2.50
2.50
4.30
3.80
3.80
3.80
3.80
4.30
3.80
4.30
3.80
2.50
4.40
4.43
4.36
3.27
4.43
4.43
4.30

SELLO

2
2
4
4
4
0
2
2
2
2
0
4
2
2
2
2
4
2
4
2
2
2
4
6
2
4
2

VECES
2.50
5.00
2.15
2.15

SELLO

TOTAL
2
42
0
0

VECES
4.30
2.15
2.55
2.75
4.30
4.43
2.15
2.15
3.27

5
7.6
15.2
15.2
15.2
0
7.6
8.6
5
5
0
15.2
7.6
7.6
7.6
8.6
15.2
8.6
15.2
5
8.8
8.86
17.44
19.62
8.86
17.72
8.6
269.9

5
210
0
0
215

TOTAL
2
42
6
4
4
6
0
0
4

8.6
90.3
15.3
11
17.2
26.58
0
0
13.08

3.80
3.30
2.10
3.85
3.30
2.15
3.80
2.15
3.80
2.15

SELLO

2
4
14
26
2
0
2
0
2
0

VECES
2.50
2.50
1.50
1.50
2.19
1.50
2.50
2.50
2.50
8.22
3.70
8.30
2.19
6.25
8.19
7.34
7.20
3.70
3.70
2.19

SELLO

TOTAL
2
2
32
0
0
4
10
13
4
8
0
10
0
6
3
12
10
0
0
0

VECES
2.50
2.15
2.50

7.6
13.2
29.4
100.1
6.6
0
7.6
0
7.6
0
354.16

5
5
48
0
0
6
25
32.5
10
107.46
0
109.4
0
56.3
44.27
180.98
147.9
0
0
0
777.81

TOTAL
4
0
19

10
0
47.5
57.5

1. COLUMNAS
1.1 CONCRETO
COLUMNAS
C-1
C-2
C-3
C-4
C-5
C-6
C-7
C-8
C-9
C-11
C-12
C-14
C-15
C-16
C-17
MT-1
C s/n 1
C s/n 2

CANTIDAD
28
1
1

LARGO
0.60
0.60
0.60

ANCHO
0.60
0.60
0.60

ALTO
PARCIAL
8.50
85.68
8.50
3.06
8.50
3.06
8.50
0.00
9.00
16.20
8.50
6.12
8.50
3.06
9.00
19.44
8.50
9.18
8.50
3.06
8.50
3.06
8.50
15.30
8.50
3.32
8.50
3.32
8.50
11.31
8.50
1.02
8.50
17.00
8.50
61.20 estimado x falta de definir en planos
TOTAL(m3) 272.31

5
2
1
6
3
1
1
5
1
1
2
1
8
20

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.40
0.50
0.60

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.65
0.65
0.95
0.30
0.50
0.60

CANTIDAD
28
28
28
1
1
1
1
1

VECES
6.00
2.00
58.00
8.00
58.00
8.00
4.00
58.00

LONGITUD
10.02
10.02
4.08
10.02
4.08
10.02
10.02
4.08

1"
3/4"
3/8"
1"
3/8"
1"
3/4"
3/8"

Kg/m
3.98
2.24
0.56
3.98
0.56
3.98
2.24
0.56

5
5
5
2
2
2
1
1
1
1
1

8.00
4.00
52.00
4.00
8.00
58.00
6.00
2.00
26.00
16.00
26.00

10.02
10.02
4.08
10.02
10.02
4.08
5.01
5.01
4.08
5.01
4.08

1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/8"

3.98
2.24
0.56
3.98
2.24
0.56
3.98
2.24
0.56
3.98
0.56

1.2 ACERO
COLUMNAS
C-1

C-2
C-3

C-4
C-5

C-6

C-7

PARCIAL
6,695.84
1,255.47
3,706.27
318.85
132.37
318.85
89.68
132.37
0.00
1,594.25
448.38
593.37
318.85
358.71
264.73
119.57
22.42
59.34
318.85
59.34

C-8

C-9

C-11

C-12

C-14

C-15

C-16

C-17
MT-1
C s/n 1 y 2

6
6
6
3
3
3
1
1
1
1
1
1
1
1
1
1
1
5
5
5
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
28
28
28

6.00
2.00
52.00
6.00
2.00
52.00
6.00
2.00
26.00
12.00
4.00
26.00
6.00
2.00
26.00
12.00
26.00
6.00
2.00
58.00
6.00
2.00
26.00
12.00
26.00
6.00
2.00
26.00
6.00
6.00
26.00
16.00
52.00
10.00
52.00
8.00
4.00
58.00

5.01
5.01
4.08
5.01
5.01
4.08
5.01
5.01
4.08
5.01
5.01
4.08
5.01
5.01
4.08
5.01
4.08
10.02
10.02
4.08
5.01
5.01
4.08
5.01
4.08
5.01
5.01
4.08
5.01
5.01
4.08
10.02
6.00
10.02
4.08
10.02
10.02
4.08

1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/8"
1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/8"
1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/8"
1"
3/8"
1"
3/4"
3/8"
TOTAL(Kg)

ALTO
8.50
8.50
8.50

PARCIAL
571.20
20.40
20.40

1.3 ENCOFRADO
1.4 CURADO
COLUMNAS
C-1
C-2
C-3

CANTIDAD PERIMETRO
28
2.40
1
2.40
1
2.40

3.98
2.24
0.56
3.98
2.24
0.56
3.98
2.24
0.56
3.98
2.24
0.56
3.98
2.24
0.56
3.98
0.56
3.98
2.24
0.56
3.98
2.24
0.56
3.98
0.56
3.98
2.24
0.56
3.98
2.24
0.56
3.98
0.56
3.98
0.56
3.98
2.24
0.56

717.41
134.51
712.04
358.71
67.26
356.02
119.57
22.42
59.34
239.14
44.84
59.34
119.57
22.42
59.34
239.14
59.34
1,195.69
224.19
661.83
119.57
22.42
59.34
239.14
59.34
119.57
22.42
59.34
119.57
67.26
59.34
1,275.40
349.04
398.56
118.67
8,927.79
2,510.94
3,706.27
42,539.20

C-4
C-5
C-6
C-7
C-8
C-9
C-11
C-12
C-14
C-15
C-16
C-17
MT-1
C s/n 1
C s/n 2

5
2
1
6
3
1
1
5
1
1
2
1
8
20

0.00
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.50
2.50
3.30
1.40
1.00
1.20

8.50
9.00
8.50
8.50
9.00
8.50
8.50
8.50
8.50
8.50
8.50
8.50
8.50
8.50
8.50
TOTAL(m2)

0.00
108.00
40.80
20.40
129.60
61.20
20.40
20.40
102.00
21.25
21.25
56.10
11.90
68.00
204.00
1,542.22

CANTIDAD
2
10
1
11
10
5
3
3

LARGO
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80

ANCHO
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80

ALTO
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

3.20

3.20

0.70

35.00

2.00

0.70

35.00

2.80

0.70

1
1
1

15
39.70
13.60

2.50
2.50
2.70

0.70
0.70
0.70

5
1
1

1.40
1.60
1.80

1.40
1.60
1.80

0.70
0.70
0.70

2. ZAPATAS
2.1 CONCRETO
ZAPATAS
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
Z-11
ZM-1
ZM-2
ZM-3
ZM-4
ZM-5
ZM-6
ZM-7
ZM-8
ZM-9
ZM-10
ZE-1
Z-1A
Z-2A
Z-3A

PARCIAL
2.74
17.92
2.27
30.80
33.88
20.16
14.20
16.46
0.00
7.17
0.00
49.00
0.00
0.00
68.60
0.00
0.00
0.00
26.25
69.48
25.70
0.00
6.86
1.79
2.27

Z-8A

2.80

2.80

CANTIDAD
2
10
1
11
10
5
3
3
1
1
1
1
1
1
1
1
1
1
1
5
1
1
1

VECES
20
22
25
28
30
33
36
38
44
234
14
234
19
100
17
265
17
91
18
20
22
25
38

LONGITUD
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.20
2.00
35.00
2.80
35.00
2.50
15.00
2.50
39.70
2.70
13.60
1.40
1.60
1.80
2.80

0.70
TOTAL(m3)

5.49
413.07

2.2 ACERO
ZAPATAS
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-10
ZM-1
ZM-4
ZM-8
ZM-9
ZM-10
Z-1A
Z-2A
Z-3A
Z-8A

Kg/m
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
TOTAL(Kg)

1.3 ENCOFRADO
ZAPATAS
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
Z-11
ZM-1
ZM-2

CANTIDAD PERIMETRO
2
3.92
10
5.12
1
6.48
11
8.00
10
9.68
5
11.52
3
13.52
3
15.68
0.00
1
20.48
0.00
1
140.00
0.00

ALTO
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.00
0.70
0.00
0.70
0.00

PARCIAL
5.49
35.84
4.54
61.60
67.76
40.32
28.39
32.93
0.00
14.34
0.00
98.00
0.00

PARCIAL
87.01
553.56
69.73
943.45
1,034.61
614.05
431.45
499.45
216.78
726.55
750.47
1,017.16
1,040.51
390.26
399.32
1,029.89
1,056.87
382.32
390.23
213.18
55.36
69.73
166.48
12,745.34

ZM-3
ZM-4
ZM-5
ZM-6
ZM-7
ZM-8
ZM-9
ZM-10
ZE-1
Z-1A
Z-2A
Z-3A
Z-8A

5
1
1
1

0.00
196.00
0.00
0.00
0.00
75.00
198.50
73.44
0.00
3.92
5.12
6.48
15.68

0.00
0.70
0.00
0.00
0.00
0.70
0.70
0.70
0.00
0.70
0.70
0.70
0.70
TOTAL(m2)

0.00
137.20
0.00
0.00
0.00
52.50
138.95
51.41
0.00
13.72
3.58
4.54
10.98
826.14

CANTIDAD
2
10
1
11
10
5
3
3

LARGO
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80

ANCHO
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80

3.20

3.20

35.00

2.00

35.00

2.80

1
1
1

15
39.70
13.60

2.50
2.50
2.70

5
1
1
1

1.40
1.60
1.80
2.80

1.40
1.60
1.80
2.80
TOTAL(m2)

PARCIAL
3.92
25.60
3.24
44.00
48.40
28.80
20.28
23.52
0.00
10.24
0.00
70.00
0.00
0.00
98.00
0.00
0.00
0.00
37.50
99.25
36.72
0.00
9.80
2.56
3.24
7.84
590.10

1
1
1

1.4 CURADO
ZAPATAS
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
Z-11
ZM-1
ZM-2
ZM-3
ZM-4
ZM-5
ZM-6
ZM-7
ZM-8
ZM-9
ZM-10
ZE-1
Z-1A
Z-2A
Z-3A
Z-8A

3. PLACAS

3.1 CONCRETO
PLACAS
M-1

CANTIDAD
5
2
2
1
1
1
1
4

LARGO
7.50
7.40
8.15
15.40
9.40
11.40
9.40
7.40

ANCHO
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

CANTIDAD
5
5
2
2
2
2
1
1
1
1
1
1
1
4
4

VECES
88
99
87
99
95
99
178
99
109
99
132
99
109
99
87

LONGITUD
9.60
8.10
9.60
8.00
9.60
8.75
9.60
10.00
9.60
12.00
9.60
10.00
9.60
8.00
9.60

ALTO
PARCIAL
8.50
95.63
8.50
37.74
8.50
41.57
8.50
39.27
8.50
23.97
8.50
29.07
8.50
23.97
8.50
75.48
TOTAL(m3) 377.69

3.2 ACERO
PLACAS

Kg/m
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
TOTAL(Kg)

3.3 ENCOFRADO
3.4 CURADO
PLACAS
M-1

CANTIDAD PERIMETRO
5
15.60
2
15.40
2
16.90
1
31.40
1
19.40
1
23.40
1
19.40
4
15.40

ALTO
8.50
8.50
8.50
8.50
8.50
8.50
8.50
8.50

PARCIAL
663.00
261.80
287.30
266.90
164.90
198.90
164.90
523.60

PARCIAL
2,355.06
2,245.99
929.75
887.30
1,021.80
970.49
955.83
554.56
587.61
665.48
710.35
554.56
587.61
1,774.61
1,859.50
17,493.55

TOTAL(m2)

2,607.24

4. VIGAS
4.1 CONCRETO
VIGAS
VM-1

V-108
V-107
V-108A
V-106A
V-106
V-102

V-102A
V-101
V-109A
V-109
V-105
V-104
V-103
V-111B
V-110A
V-111A

V-110

CANTIDAD
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
8
10
1
1
1
1
1
1
11
8
1
1
1
1
1
1
1
1
1
1
1
1
1

LARGO
32.8
30.7
25.75
23.75
28.18
33.54
16.2
2.98
7.3
12.8
10.65
52.2
26.05
31.3
72.65
8.3
8.3
10.98
8.3
28.54
69.68
24.35
28.58
10.05
10.05
29.11
9.35
10.58
33.8
33.8
16.2
34.25
56
4.11
10.05
45.95
11.63
44.48

ANCHO
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.50
0.30
0.30
0.30
0.25
0.25
0.40
0.30
0.40
0.30
0.25
0.30
0.30
0.25
0.50
0.30
0.40
0.40
0.25
0.25
0.30
0.30
0.30
0.30
0.50
0.30
0.25
0.25

ALTO
PARCIAL
0.70
6.89
0.70
6.45
0.70
5.41
0.70
4.99
0.70
5.92
0.70
7.04
0.70
3.40
0.70
0.63
0.70
1.53
0.70
2.69
0.80
4.26
0.70
10.96
0.70
5.47
0.70
6.57
0.60
10.90
0.60
9.96
0.70
23.24
1.20
3.95
0.70
2.32
0.60
5.14
0.60
10.45
0.70
5.11
0.70
6.00
0.60
16.58
0.80
32.16
0.70
6.11
0.70
2.62
0.70
2.96
0.60
5.07
0.60
5.07
0.70
3.40
0.70
7.19
0.70
11.76
0.70
0.86
0.80
4.02
0.70
9.65
0.70
2.04
0.70
7.78
TOTAL(m3) 274.56

4.2 ACERO
VIGAS
V-101

CANTIDAD
1
1
1

VECES
5
5
1

LONGITUD
5.06
6.10
4.36
31.20

Kg/m
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
1"
3.98
TOTAL(Kg)

4.3 ENCOFRADO
4.4 CURADO
VIGAS
VM-1

V-108
V-107
V-108A
V-106A
V-106
V-102

V-102A
V-101

CANTIDAD PERIMETRO
1
1.70
1
1.70
1
1.70
1
1.70
1
1.70
1
1.70
1
1.70
1
1.70
1
1.70
1
1.70
1
2.10
1
1.70
1
1.70
1
1.70
1
1.45
8
1.45
10
1.80
1
2.70
1
1.80
1
1.50
1
1.45
1
1.70
1
1.70

ALTO
32.8
30.7
25.75
23.75
28.18
33.54
16.2
2.98
7.3
12.8
10.65
52.2
26.05
31.3
72.65
8.3
8.3
10.98
8.3
28.54
69.68
24.35
28.58

PARCIAL
55.76
52.19
43.78
40.38
47.91
57.02
27.54
5.07
12.41
21.76
22.37
88.74
44.29
53.21
105.34
96.28
149.40
29.65
14.94
42.81
101.04
41.40
48.59

PARCIAL
100.63
121.32
17.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
251.26

V-109A
V-109
V-105
V-104
V-103
V-111B
V-110A
V-111A

V-110

11
8
1
1
1
1
1
1
1
1
1
1
1
1
1

1.45
2.10
1.70
1.80
1.80
1.45
1.45
1.70
1.70
1.70
1.70
2.10
1.70
1.65
1.65

10.05
10.05
29.11
9.35
10.58
33.8
33.8
16.2
34.25
56
4.11
10.05
45.95
11.63
44.48
TOTAL(m2)

160.30
168.84
49.49
16.83
19.04
49.01
49.01
27.54
58.23
95.20
6.99
21.11
78.12
19.19
73.39
2,156.93

ta de definir en planos

1. COLUMNAS
1.1 CONCRETO
COLUMNAS
C s/n 1
C s/n 3

CANTIDAD
66
13

LARGO
0.60
0.60

ANCHO
0.60
0.60

CANTIDAD
66
66
66
13
13
13

VECES
8.00
4.00
58.00
8.00
4.00
58.00

LONGITUD
9.02
9.02
4.08
12.82
12.82
4.08

ALTO
PARCIAL
7.50
178.20 estimado x falta de definir en planos
11.30
52.88
TOTAL(m3) 238.02

1.2 ACERO
COLUMNAS
C s/n 1

C s/n 3

Kg/m
1"
3.98
3/4"
2.24
3/8"
0.56
1"
3.98
3/4"
2.24
3/8"
0.56
TOTAL(Kg)

PARCIAL
18,943.86
5,327.96
8,736.20
5,303.34
1,491.56
1,720.77
43,599.87

estimado x falta de definir en

1.3 ENCOFRADO
1.4 CURADO
COLUMNAS
C s/n 1
C s/n 3

CANTIDAD PERIMETRO
66
2.40
13
2.40

ALTO
7.50
11.30
TOTAL(m2)

PARCIAL
1,188.00
352.56 estimado x falta de definir en planos
1,586.78

2. ZAPATAS
2.1 CONCRETO
ZAPATAS
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
Z-11
ZM-1
ZM-2
ZM-3
ZM-4

CANTIDAD
14
4
9
4
7
2
3
2
1

LARGO
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
35.00

ANCHO
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
2.00

ALTO
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

35.00

2.80

0.70

PARCIAL
19.21
7.17
20.41
0.00
13.55
28.22
9.46
16.46
12.60
0.00
8.09
0.00
0.00
0.00
68.60

ZM-5
ZM-6
ZM-7
ZM-8
ZM-9
ZM-10
ZE-1
Z-1A
Z-2A
Z-3A
Z-8A

1
1

12.70
37.00

2.70
2.80

0.70
0.70

15
39.70
13.60
2.50
1.40
1.60
1.80
2.80

2.50
2.50
2.70
1.00
1.40
1.60
1.80
2.80

0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
TOTAL(m3)

VECES
20
22
25
30
33
36
38
41
46
234
14
234
19
85
18
247
19
17
7

LONGITUD
1.40
1.60
1.80
2.20
2.40
2.60
2.80
3.00
3.40
2.00
35.00
2.80
35.00
2.70
12.70
2.80
37.00
1.00
2.50

24.00
72.52
0.00
0.00
0.00
0.00
14.00
0.00
0.00
0.00
0.00
323.74

2.2 ACERO
ZAPATAS
Z-1
Z-2
Z-3
Z-5
Z-6
Z-7
Z-8
Z-9
Z-11
ZM-1
ZM-4
ZM-5
ZM-6
ZE-1

CANTIDAD
14
4
9
4
7
2
3
2
1
1
1
1
1
1
1
1
1
8
8

Kg/m
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
TOTAL(Kg)

1.3 ENCOFRADO
ZAPATAS
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7

CANTIDAD PERIMETRO
14
3.92
4
5.12
9
6.48
8.00
4
9.68
7
11.52
2
13.52

ALTO
0.70
0.70
0.70
0.70
0.70
0.70
0.70

PARCIAL
38.42
14.34
40.82
0.00
27.10
56.45
18.93

PARCIAL
609.08
221.42
627.60
413.84
859.67
287.63
499.45
381.61
244.42
726.55
750.47
1,017.16
1,040.51
357.15
364.40
1,075.17
1,099.97
212.97
221.67
11,561.29

Z-8
Z-9
Z-10
Z-11
ZM-1
ZM-2
ZM-3
ZM-4
ZM-5
ZM-6
ZM-7
ZM-8
ZM-9
ZM-10
ZE-1
Z-1A
Z-2A
Z-3A
Z-8A

3
2
1

1
1
1

15.68
18.00
20.48
23.12
140.00
0.00
0.00
196.00
68.58
207.20
0.00
75.00
198.50
73.44
5.00
3.92
5.12
6.48
15.68

0.70
0.70
0.70
0.70
0.70
0.00
0.00
0.70
0.70
0.70
0.00
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
TOTAL(m2)

32.93
25.20
0.00
16.18
0.00
0.00
0.00
137.20
48.01
145.04
0.00
0.00
0.00
0.00
28.00
0.00
0.00
0.00
0.00
647.47

LARGO
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
35.00

ANCHO
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
2.00

35.00
12.70
37.00

2.80
2.70
2.80

15
39.70
13.60
2.50
1.40

2.50
2.50
2.70
1.00
1.40

PARCIAL
27.44
10.24
29.16
0.00
19.36
40.32
13.52
23.52
18.00
0.00
11.56
0.00
0.00
0.00
98.00
34.29
103.60
0.00
0.00
0.00
0.00
20.00
0.00

1.4 CURADO
ZAPATAS
Z-1
Z-2
Z-3
Z-4
Z-5
Z-6
Z-7
Z-8
Z-9
Z-10
Z-11
ZM-1
ZM-2
ZM-3
ZM-4
ZM-5
ZM-6
ZM-7
ZM-8
ZM-9
ZM-10
ZE-1
Z-1A

CANTIDAD
14
4
9
4
7
2
3
2
1

1
1
1

Z-2A
Z-3A
Z-8A

1.60
1.80
2.80

1.60
1.80
2.80
TOTAL(m2)

CANTIDAD
4
4
2
1
1

LARGO
7.40
7.40
9.40
8.15
7.53

ANCHO
0.30
0.30
0.30
0.30
0.30

CANTIDAD
4
4
4
4
2
2
1
1
1
1

VECES
87
99
87
99
109
99
95
99
88
99

LONGITUD
9.60
8.00
9.60
8.00
9.60
10.00
9.60
8.75
9.60
8.13

0.00
0.00
0.00
462.48

3. PLACAS
3.1 CONCRETO
PLACAS
M-1

ALTO
PARCIAL
8.50
75.48
8.50
75.48
8.50
47.94
8.50
20.78
8.50
19.20
TOTAL(m3) 246.05

3.2 ACERO
PLACAS

Kg/m
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
3/8"
0.56
TOTAL(Kg)

3.3 ENCOFRADO
3.4 CURADO
PLACAS
M-1

CANTIDAD PERIMETRO
4
15.40
4
15.40
2
19.40
1
16.90
1
15.66

4. VIGAS DE CIMENTACION
4.1 CONCRETO

ALTO
8.50
8.50
8.50
8.50
8.50
TOTAL(m2)

PARCIAL
523.60
523.60
329.80
143.65
133.11
1,703.37

PARCIAL
1,859.50
1,774.61
1,859.50
1,774.61
1,175.23
1,109.13
510.90
485.24
472.85
450.86
12,046.05

V.C
VC-1

CANTIDAD
9

LARGO
3.35

ANCHO
0.30

CANTIDAD
9
9
9

VECES
3
3
12

LONGITUD
1.42
3.95
1.80

ALTO
PARCIAL
0.60
5.43
TOTAL(m3)
5.59

4.2 ACERO
V.C
VC-1

Kg/m
3/4"
2.24
3/4"
2.24
3/8"
0.56
TOTAL(Kg)

PARCIAL
85.58
238.62
110.25
456.18

4.3 ENCOFRADO
4.4 CURADO
V.C
VC-1

CANTIDAD PERIMETRO
9
1.80

LARGO
3.35
TOTAL(m2)

PARCIAL
54.27
55.90

ALTO
0.60
0.70
0.70
0.60
0.70
0.70
0.60
0.70
0.60

4. VIGAS
4.1 CONCRETO
VIGAS

CANTIDAD
1
2
7
1
2
14
12
1
2

LARGO
85.6
31.58
10
30.23
104.7
3.65
3.65
10.05
2.15

ANCHO
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.25

CANTIDAD

VECES

LONGITUD

PARCIAL
15.41
13.26
14.70
5.44
43.97
10.73
7.88
2.11
0.65
0.00
TOTAL(m3) 117.58

4.2 ACERO
VIGAS

3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"

Kg/m
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56

PARCIAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
TOTAL(Kg)
4.3 ENCOFRADO
4.4 CURADO
VIGAS

CANTIDAD PERIMETRO
1
1.5
2
1.7
7
1.7
1
1.5
2
1.7
14
1.7
12
1.5
1
1.7
2
1.45

ALTO
85.6
31.58
10
30.23
104.7
3.65
3.65
10.05
2.15
TOTAL(m2)

PARCIAL
128.40
107.37
119.00
45.35
355.98
86.87
65.70
17.09
6.24
959.95

0.56
0.56
0.56
0.56
0.56
0.56
0.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ta de definir en planos

estimado x falta de definir en planos

1. COLUMNAS
1.1 CONCRETO
COLUMNAS
C-9
C-10
C-11
C-12
C-13
C-18
C s/n 1

CANTIDAD
1
2
2
1
1
2
11

LARGO
0.60
0.60
0.60
0.60
0.60
0.60
0.60

ANCHO
0.60
0.60
0.60
0.60
0.60
0.60
0.60

CANTIDAD
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
11

VECES
6.00
2.00
52.00
6.00
2.00
26.00
6.00
6.00
26.00
6.00
2.00
26.00
12.00
4.00
26.00
6.00
2.00
26.00
12.00
26.00
6.00
2.00
26.00
12.00
26.00
6.00
2.00
26.00
12.00
26.00
8.00

LONGITUD
5.01
5.01
4.08
5.01
5.01
4.08
5.01
5.01
4.08
5.01
5.01
4.08
5.01
5.01
4.08
5.01
5.01
4.08
5.01
4.08
5.01
5.01
4.08
5.01
4.08
5.01
5.01
4.08
5.01
4.08
10.02

ALTO
PARCIAL
9.50
3.42
9.50
6.84
9.50
6.84
9.50
3.42
9.50
3.42
9.50
6.84
9.50
37.62 estimado x falta de definir en planos
TOTAL(m3)
70.45

1.2 ACERO
COLUMNAS
C-9

C-10

C-11

C-12

C-13

C-18

C s/n 1

1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/4"
3/8"
1"
3/8"
1"
3/4"
3/8"
1"
3/8"
1"
3/4"
3/8"
1"
3/8"
1"

Kg/m
3.98
2.24
0.56
3.98
2.24
0.56
3.98
2.24
0.56
3.98
2.24
0.56
3.98
2.24
0.56
3.98
2.24
0.56
3.98
0.56
3.98
2.24
0.56
3.98
0.56
3.98
2.24
0.56
3.98
0.56
3.98

PARCIAL
119.57
22.42
118.67
239.14
44.84
118.67
239.14
134.51
118.67
239.14
44.84
118.67
478.27
89.68
118.67
119.57
22.42
59.34
239.14
59.34
119.57
22.42
59.34
239.14
59.34
239.14
44.84
118.67
478.27
118.67
3,507.34

11
11

4.00
58.00

10.02
4.08

3/4"
3/8"
TOTAL(Kg)

ALTO
9.50
9.50
9.50
9.50
9.50
9.50
9.50
TOTAL(m2)

PARCIAL
22.80
45.60
45.60
22.80
22.80
45.60
250.80
469.68

2.24
0.56

986.44
1,456.03
10,907.49

1.3 ENCOFRADO
1.4 CURADO
COLUMNAS
C-9
C-10
C-11
C-12
C-13
C-18
C s/n 1

CANTIDAD PERIMETRO
1
2.40
2
2.40
2
2.40
1
2.40
1
2.40
2
2.40
11
2.40

2. ZAPATAS
2.1 CONCRETO
ZAPATAS
Z-4
Z-5
Z-9
Z-10
Z-11
ZM-5

2.2 ACERO
ZAPATAS
Z-4
Z-5
Z-9
Z-10
Z-11
ZM-5

CANTIDAD
1
1
2
6
1
1

LARGO
2.00
2.20
3.00
3.20
3.40
12.70

ANCHO
2.00
2.20
3.00
3.20
3.40
2.70

CANTIDAD
1
1
2
6
1
1
1

VECES
28
30
41
44
46
85
18

LONGITUD
2.00
2.20
3.00
3.20
3.40
2.70
12.70

ALTO
PARCIAL
0.70
2.80
0.70
3.39
0.70
12.60
0.70
43.01
0.70
8.09
0.70
24.00
TOTAL(m3)
96.71

Kg/m
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
5/8"
1.55
TOTAL(Kg)

2.3 ENCOFRADO
ZAPATAS
Z-4
Z-5
Z-9

CANTIDAD PERIMETRO
1
8.00
1
8.80
2
12.00

ALTO
0.70
0.70
0.70

PARCIAL
5.60
6.16
16.80

PARCIAL
85.77
103.46
381.61
1,300.70
244.42
357.15
364.40
2,979.38

Z-10
Z-11
ZM-5

6
1
1

12.80
13.60
30.80

0.70
0.70
1.70
TOTAL(m2)

53.76
9.52
52.36
144.20

CANTIDAD
1
1
2
6
1
1

LARGO
2.00
2.20
3.00
3.20
3.40
12.70

ANCHO
2.00
2.20
3.00
3.20
3.40
2.70
TOTAL(m2)

PARCIAL
4.00
4.84
18.00
61.44
11.56
34.29
138.15

CANTIDAD
6
1
1
2
8
5
7
1

LARGO
8.5
67.25
24.4
51.95
9.7
9.7
9.7
55.25

ANCHO
0.40
0.30
0.30
0.30
0.30
0.30
0.30
0.30

CANTIDAD

VECES

LONGITUD

2.4 CURADO
ZAPATAS
Z-4
Z-5
Z-9
Z-10
Z-11
ZM-5
4. VIGAS
4.1 CONCRETO
VIGAS
VM-04
VM-02
VM-05

V-204
V-202

ALTO
PARCIAL
0.70
14.28
0.70
14.12
0.60
4.39
0.70
21.82
0.70
16.30
0.60
8.73
0.70
14.26
0.70
11.60
TOTAL(m3) 108.67

4.2 ACERO
VIGAS

3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"
3/8"

Kg/m
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56
0.56

PARCIAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3/8"
TOTAL(Kg)
4.3 ENCOFRADO
4.4 CURADO
VIGAS
VM-04
VM-02
VM-05

V-204
V-202

CANTIDAD PERIMETRO
6
1.8
1
1.7
1
1.5
2
1.7
8
1.7
5
1.5
7
1.7
1
1.7

ALTO
8.5
67.25
24.4
51.95
9.7
9.7
9.7
55.25
TOTAL(m2)

PARCIAL
91.80
114.33
36.60
176.63
131.92
72.75
115.43
93.93
858.38

0.56

0.00
0.00

falta de definir en planos

REUNION PROYECTISTAS SULLANA


Fecha de cierre
22-Feb
26-Feb ARQ y EST
Deteccion
Angel Reyes (ESSAC)
pasa correo a juan bazan de rp y define si hay reunion
Fachadas
Reunion con Promart jueves 14/02 y viernes 15/02 con Plaza Vea (en FMZ)
Plantas
Claudia Pastor envia plantas a IA, fachadas a PV y Promart
Plaza Vea
Definir ingresos en eje B, incluyendo esquinas
Iluminacion
1 dia desde plantas
Cimentacion
Revisar diseo de placas de locales y anclas, cisterna, refuerzo en losa
Estructuras metalicas
Pasa a Claudia Pastor planos para actualizar cortes
Precor
Ala de 25 cm desde el muro de cierre
Plaza Vea
Eliminar muros de albaileria en junta estructural
Cerco
Pasa Rolando detalle, Claudia confirma con FMZ si hay. Desarrollar desniveles
Detalles de Arquitectura
Escaleras, cuadro de acabados, baos, puertas (inc. Promart y PV), mamparas, cerco, marquesina
OJO
Pasar a proyectistas lo de Plaza Vea
Mamparas
Vanos abiertos en todos los niveles, solo dinteles

amparas, cerco, marquesina, detalles de fachada (aleros, marquesinas).

ENC1000
ENC3000.1
ENC3001
ENC4000
ENC4000.1
ENC5000
ENC6000
ENC7001

CMO1001
CMO1005
CMO1006
CMO1009
CMO1010
CMO1011
CMO1012.1
CMO1012.2
CMO2001
CMO2002
CMO2004

504023

M2
M2
M2
M2
M2
M2
M2
M2

HH
HH
HH

HH
HH
HH

ENCOFRADO DE CIMENTACION
ENCOFRADO DE PLACAS ALTAS
ENCOFRADO DE MUROS CONTRA TERRENO
ENCOFRADO DE COLUMNAS
ENCOFRADO DE COLUMNAS ALTAS
ENCOFRADO LOSAS H > 5,50M
ENCOFRADO DE VIGAS ALTAS
ENCOFRADO ESCALERA

CUADRILLA JORNALES
CUADRILLA TERMINACIONES
CUADRILLA ESTRUCTURAS
CUADRILLA TOPOGRAFIA
CUADRILLA ANDAMIOS
CUADRILLA - VOLANTES
Cuadrilla Obras Provisionales
Cuadrilla Indirectos
CUADRILLA CONCRETO
CUADRILLA ENCOFRADO
CUADRILLA ALBAIL

8,096.66
3,771.30
2,596.98
391.06
3,598.68
8,531.41
4,139.39
619.1

5
10
12
10
15
12
40
10.5

40,483.29
37,713.00
31,163.76
3,910.56
53,980.20
102,376.86
165,575.60
6,500.55
441,703.82

0
0
0
0
0
0
0
0

15,789.98
6,717.51
332.92
8,910.00
12,556.36
9,600.00
9,042.00
11,100.00
21,096.71
85,021.93
7,521.85
187,689.26
563067.78

14.05
20.93
20.61
18.67
16.54
14.08
16.23
14.12
19.46
19.39
19.99

221,849.18
140,597.47
6,861.45
166,349.70
207,682.25
135,168.00
146,751.66
156,732.00
410,541.93
1,648,575.21
150,361.81
3,391,470.67
2,828,402.89

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

HOR100
HOR1010
HOR175
HOR210
HOR280

CUA1000
CUA1001
CUA1002
CUA1004
CUA1005
CUA1006
CUA1009
CUA1010
CUA1011

502002
502002
S
S

rS
rS
rS
rS
rS
r
r
r
rS

M3
M3
M3
M3
M3

HH
HH
HH
HH
HH
HH

HH

CONCRETO F'C = 100 KG/CM2


CONCRETO F'C = 80 KG/CM2 MS
CONCRETO FC = 175 KG/CM2
CONCRETO FC = 210 KG/CM2
CONCRETO FC = 280 KG/CM2

182.04
56.78
53.01
7,586.20
2,825.06

256.01
46,605.34
256.01
14,537.27
269.25
14,272.88
328.69 2,493,507.55
413.71 1,168,756.28
3,737,679.31

CONCRETO F'C = 100 KG/CM2


CONCRETO F'C = 80 KG/CM2 MS
CONCRETO FC = 175 KG/CM2
CONCRETO FC = 210 KG/CM2
CONCRETO FC = 280 KG/CM2

182.04
56.78
53.01
7,586.20
2,825.06

243.82
44,384.99
243.82
13,844.10
277.8
14,726.18
311.1 2,360,066.82
413.71 1,168,755.57
3,601,777.66

CUADRILLA - JORNALES
15,789.98
CUADRILLA - CONCRETO
21,230.05
CUADRILLA - CARPINTEROS
83,394.60
CUADRILLA - ALBAILES
7,521.85
CUADRILLA - TERMINACION/ARQUITECTURA
6,717.51
CUADRILLA - ESTRUCTURAS
331.01
CUADRILLA TOPOGRAFIA
1,782.00
CUADRILLA ANDAMIOS
11,510.00
CUADRILLA - VOLANTES
9,000.00

14.05 221,849.18
19.46 413,136.83
19.39 1,617,021.25
19.99 150,361.77
20.93 140,597.47
20.61
6,822.03
20.41
36,370.62
16.54 190,375.40
14.08 126,720.00

0
0
0
0
0

0
0
0
0
0
0
0
0
0

269.65

2.14

0
0
0
0
0

0
0
0
0
0
0
0
0
0

Вам также может понравиться