Construction Equipment
Concrete & Asphalt Works
Edited by: Translated by: Jzsef Kroly Ph.D. student and Dr. Zoltn A.Vattai Dr. Zoltn A.Vattai
Budapest, 2009-2010
Concrete and asphalt works D Aggregate production (at pit or quarry): D Batching (mixing) at plant: Receiving and storing rough material: extraction (excavation) processing crushing sizing washing
aggregates: by fractions, in open-air deposits or in chambered silos fines (cement, (cement limestone dust): in silos (handled by compressed air) bitumen: in tanks, as heated liquid
mixing: pug-pressure mixing (kneading) (asphalt, continuous: dryer-mixer drum) transporting: dumper truck (asphalt), mixer truck (concrete) D Processing mixtures on site: spreading, compacting: by asphaltasphalt or concrete finisher heat-curing, aging (concrete) curing (concrete)
2 1
0/120
0/120
0/32
32/120
water
4/32
10 88
wood, etc.
13 2
7 7
0/4
11 99
wa aste water
12
0/1
0/4
4/8
8/16
16/32
6. screen 7. washer
8. crusher 9. screen
Crushers
impact crusher
4 5
1. case 2. rotor 3. crushing piece 4. impact piece 5. impact piece cylinder li d 6. feeder 7. tiltable upper case 8. wear parts 9. tiltable upper case cylinder
Cone crusher
1. Feed hopper 2. Bowl hopper 3. Adjustment cap seal 4. Feed cone 5. Cover plate 6. Torch ring 7 Main shaft 7. sleeve 8. Bowl 9. U-shaped bolt and washer 10. Adjustment ring d t collar dust ll 11. Bowl liner 12. Mantle 13. Head 14. Socket seal ring 15. Gear 16. Arm guard 17. Pinion thrust washer 18. Pinion 19. Inner eccentric bushing 20. Eccentric 21. Outer eccentric bushing 22. Main frame 23. Step bearing plate
24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 43 44. 45. 46. 47.
Main frame cap Feed plate Main shaft nut Adjustment cap Main frame pin Adjustment ring Upper spring segment Spring Spring bolt Socket liner Main frame liner Lower spring segment t Socket Countershaft box guard Oil flinger Crusher sheave Sheave taper sleeve Countershaft Outer countershaft bushing Oil flinger housing Countershaft box Inner countershaft bushing Countershaft box seal Main shaft
Cone crusher
Jaw crusher
Impact crusher
hydraulic
flat screen
drum screen
100 80 60 40 20 0
Q sz Qr
d
grid size ( log d ), mm
Q = Q r + Q sz
Mechanical screening
dmax
Qr
Q sz z
Hydarulic sizing settling velocity of grains heavier than water is function of their sizes particles lighter than water are floating on the surface and let out to waste tanks (washing) bigger grains (d > 4 mm) are separated to fractions by water on flat screens slurry (water + d < 4 mm grains + pollutants) is further screened by hydraulic screens
1. 2. 3.
Delivery roller
1. bunker (silo) 2. pneumatic (hydraulic) cylinder 3. sector gate 4. control track 5-6. position sensors
Vibratory feeder
Conveyor scale
bunker slide gate
1. bunker (silo) 2. conveyor belt 3. senzor roller 4. manometer 5. driving unit 6. display
Belt feeder
Cement feeders
Screw feeder Cellular wheel (drum) feeder
1. cement bunker (silo) 2. compressed air 3. pneumatic lock and cylinder 4. baffle (spreader) 5. compressed air (P = 0.05 Bar) 6. pneumatic lock and cylinder
2 4 3 5 6 to scale
5 12 10 2 13
Agitator mixer
14 11
4 5
6 17
15
12 16
Pan mixer
7. geared transmission 7 8. discharge door 9. discharge door drive 10. feeder 11 water inlet 11. 12. driver 13. dead-axle (sun) gear 14. revolver gear 15 planetary mixing 15. blades 16. cylinder 17. wear lining
8 2 1 4
Continuous mixer
6 2 1
B. Double engined
3 5
1 2
6
3 7 4 3
7 5
8 10 9 2
4 5
7 3
6 8
10 9 9
G-H section
E-F section
- fractions of aggregate are separated - water content measured and controlled - heating facilities for hot concrete (winter-time concreting) - grain-size distribution composed and fit to concrete when batching
Shoe-Container
On smaller hopper containers the sector gate is operated by simple levers (a) but on bigger ones segment gears and handwheels are provided (b)
Concrete pumps
Piston
Pump - mixer truck (pumix) Mixer truck and pumix co-operating at the site
vibrating cylinder rubber cover pipe sword head formwork vibrator head A-A section
Structural maintenance
1. dry mix hopper 2. rotary feeder wheel 3. feeder pocket 4. dry mix conveying by y compressed p air
Free-form architecture
Dome construction
Shotcrete (Gunite) applications Retaining R t i i wall ll construction t ti (permanent or temporary), paving, landscaping
Immersible vibrator
12 11
10
7 8
1. bogie track 1 2. mould 3. distributor screw 4. Immersible vibrator 5. surface vibrator 6. floating trowel 7. motor
8. exciter mass 9. power cable 10. hydraulic cylinder 11. tip shaft 12. plate spring
Course spreading
10
11
12
3. bogie track 4. elevation control 5. main frame 6. distributor screw 7. immersible vibrators 8 screed (mould) 8. 9. joint-bar inserter 10. joint-bar vibrator 11. transversal screed 12 longitudinal 12. l it di l screed d 13. level detectors 14. guide wire
Precipitation:
14 14
9 5
6 6
18
11
15
1 2 3
4 4
10 10 17
7 10 19 11
Horizontal system 1. feeder bunkers 2. conveyor belt scale 3. conveyor belt 4. rotary dryer 5. hot elevator 6. separator 7. scales 8. limestone dust silo 9. fines elevator 10. mixer 11. ready-mix container 12. bitumen tank 13. bitumen heater 14. dust collector 15. exhaust ventilator 16. control room 17. elevator bucket 18. wire rope 19. transporter truck
8 9 20
13 13
11
10
14 15 4 12 17 16 1 2 3 7 19 18
5 5
4
1. feeder bunkers 2. collector conveyor 3. conveyor belt scale 4. batching g conveyor y 5. rotary dryer 6. pre-store basin 7. elevator bucket
8. limestone dust silo 9. feeder screw scale 10. bitumen tank 11. bitumen heater 12. bitumen batcher pump 13. dust collector 14. chambered asphalt bunkers
15. belt scale (for recycled asphalt) 16. elevator line 17. lifting g rope p ( (of hoist) ) 18. ready-mix bunker 19. waste material bunker 20. control room
Pavers (Finishers)
A h lt Asphalt
Course thickness 30 - 300 mm, more layers, spread in layers preliminary by the finisher final by rollers
C Concrete t
180 - 600 mm, single layer both preliminary and final by finisher (higher output vibrators) roughening and curing equipments can be attached behind the finisher
Compacting
Auxiliary units
10
1. delivery dumper truck 6. main frame 2. feeder bunker 7. distributor screw 3. conveyor belt 8. tamper beam 4. screed 9. vibro plate 5. level mould 10. push idler
feeder bunker
tractor (crawler)
conveyor belt
Feeder (bunker)
Bogie types: Track (caterpillar) Rubber wheel Rubber belt (track) Track (crawler) bogie Rubber wheel bogie
30
20 10 0 1
tenvironment = 10 oC
160 140
150 C 135 C
2 3 4 5 6 7 8 Layer thicknes [cm]
o
Maximum M i holding h ldi time ti of f concrete t in i function f ti of f means of transport and of temperature of the environment
Temperature [oC]
30 - 20 19 - 10 9-5 30 - 20 19 - 10 9-5
Transport [h]
1,0 1,5 1,5 0,50 0 50 0,75 0,75
Casting [h]
0,5 0,5 0,5 0,5 0 5 0,5 0,5
Dumper truck
Bond course
> 0 oC
Wearing course
> ( 3 6 ) oC according to thickness
Snow S and di ice must tb be removed df from th the surface f b before f spreading di any aphalt h lt course on it it. Roller compactors must work immediately after (behind) the finisher. Hot summer: Delivery temperature must be optimized regarding the temperature of the environment. Rubber-wheel rollers should not be favoured (due to segregation). Handover to traffic is allowed when asphalt temperature got less than 40 oC. Rainy weather: Top (wearing) course must not be spread on wet base or in rainy weather . Rain-water collected on the surface must be removed after rainfall before going on.
P Proper
C l d Cooled
B Burnt
black, weakly sparkling greyish ih easily castable adheres properly not steaming i lumpy crust on the surface
Sources of B&W pictures and drawings: - Bacher Kroly, Dr. Lnczos Pl, Dr. Sos Lszl, ptsgpests I., Tanknyvkiad, Budapest, 1985 - Dr. Nagy Pl, ptstechnolgia I, Alaptechnolgik, Tanknyvkiad, Budapest, 1990 - Sos Lszl, pt oipari gpek I., Tervezsi segdlet, Tanknyvkiad, Budapest, 1987 - Sos Lszl, ptipari gpek II, Tervezsi segdlet, Tanknyvkiad, Budapest, 1987