PILING WORK FOR High Rise Residential Towers( A,B,C & D) ARAYA in Sector-62, Gurgaon

SUMMARY SHEET (ANNEXURE F1 & F2)


S. No. 1 MAIN PILING WORK (ANNEXURE F1) Rs. AMOUNT 128,022,400.00

TEST PILING WORK (ANNEXURE F2)

Rs.

2,868,500.00

GRAND TOTAL

Rs.

130,890,900.00

Total #####

95

After rebate 120775849.1

2706132.075

123481981.1 6100009.868 Add ST @4.94 129581991

(ANNEXURE F1)

BOQ FOR THE PILING WORK FOR High Rise Residential Towers ( A,B,C &D) ARAYA
S.No. F1.1 Description Unit QTY Rate Amount

Mobilization & demobilization of all necessary Set equipments / plants, Rotary drilling Rigs, bentonite mixing set up and other allied eqipment etc. , personnel with adequate no. of cranes required for 1000mm dia. RCC cast-in-situ bored piles, complete at site. The rate shall include the cost of erecting & de-erecting of all the equipments after completion of the pile work and cleaning and re instating the site to the original condition as complete. Installation & construction of RCC cast-in-situ bored piles with ready mix concrete (RMC) M-25 grade by Rotary Rig in accordance with the execution drawing and specification including setting out coordinal points/layout of piles, boring through all strata up to the founding level of piles as per drawings using Bentonite slurry. The quoted rate shall include the boring using Hydarulic Rotary Rig, lowering of reinforcement cage, providing & placing the concrete by tremie pipe method, disposal of bored material as directed by Engineer-in-Charge. (The length of pile from shoe bottom level to cut off level shall be measured for payment).( Reinforcement steel shall be paid seperately) 1000 mm dia 26 M long, RCC M-25 Grade cast- Nos. in-situ bored piles. Note :- The RMC shall be Design Mix Of M 25 Grade with min. 400 Kg of cement per cum of concrete( Maximum fly ash allowed is 18%).

500000

1,000,000

.
F1.2

431

205000

88,355,000

F1.3.1

Add extra for piles constructed more than as stated above in item No 2 a) 1000mm dia 26 m long Rmt Deduct extra for piles constructed less than as stated above in Item No 2 a) 1000mm dia 26 m long Rmt Empty boring from Existing Ground level up to Pile cast level a) 1000mm dia Rmt

65

7500

487,500

F1.3.2

65

-5000

(325,000)

F1.4

251

2800

702,800

96

F1.5

Providing and Laying reinforcement steel in piles including decoiling, straightening, cutting, bending, welding, binding with 18 gauge annealed steel wire and placing in position in piles with approved concrete/ PVC cover blocks (of same grade of concrete as in piles). The rate shall include the cost of binding wire, welding, protecting the reinforcing bars in their virgins form or in the fabricated form or when placed and tied up in position or as dowels left for future continuation of work or at construction joint against corrosion due to exposure to weather if left exposed and unencased for more than three weeks. High yield strength deformed bars Fe 500 MT 517 62500 32,312,500

F1.6

Carrying out routine load test on selected piles by Engineer-in-charge to one and half times the working load (465MT) on the above piles in accordance with IS 2911 (Part-IV) 1980 with latest amendments, including all necessary arrangements such as platform kentledge, jacks, measuring devices, etc. all complete as per specifications . a) 1000mm dia 26m long (Pile Capacity Safe Each Load 310 MT) Low strain (Sonic) integrity test on piles, all Nos. complete with all labour, material, equipment, handling, transportation, testing as per specifications, drawing and instruction of the Engineer for pile of following diameter and vertical load capacity. As per IS:4893-2001

600000

4,800,000

F1.7

431

1600

689,600

Total
#NAME?

128,022,400

97

(ANNEXURE F2)

BOQ FOR TEST PILING WORK FOR High Rise Residential Towers ( A,B,C & D) ARAYA in Sector-62, Gurgaon
S.No Description Unit Quantity Rate Amount

F2.1 Installation & construction RCC cast-in-situ bored piles with ready mix concrete (RMC) M-25 with rotary rig , in accordance with the execution drawing and specification including setting out cordinal points, boring through all strata upto the founding level of piles using Bentonite slurry. The quoted rate shall include the boring using hydraulic rotary rig, lowering of reinforcement cage, providing & placing the concrete by tremie pipe method, vibrating & compacting of concrete, disposal of bored material as directed by Engineer-in-Charge. (The length of pile from shoe bottom level to cut off level shall be measured for payment).( Reinforcement steel shall be paid seperately) F2.1.1 1000mm dia 28m long , RCC M-25 Grade cast-in-situ Nos. bored piles. Note :- The RMC shall be Design Mix Of M 25 Grade with min. 400 Kg of cement per cum of concrete( Maximum fly ash allowed is 18%). F2.2 Providing and Laying reinforcement steel in piles including decoiling, straightening, cutting, bending, welding, binding with 18 gauge annealed steel wire and placing in position in piles with approved concrete/ PVC cover blocks (of same grade of concrete as in piles). High yield strength deformed bars Fe 500 MT F2.3 Carrying out initial vertical load test of piles for 850MT or up to failure or as per drawing, whichever is earlier as per IS: 2911 Part IV latest revision. The rate shall include preparation of pile head, concrete cutting, all arrangement like kentledge / platform to reaction (Anchor) pile, brick wall to mobilize the required reaction (minimum 1.25 times the test load) and test apparatus etc. all complete. All test procedures and equipments shall be subjected to approval of Engineerin-Charge. (The rate shall also include the cost of reaction pile including RCC & Reinforcement.) The rate shall also include analysis of result conclusions, submission of test report for approval.The load on the pile shall be removed in such a way i.e., in stages to get the rebound/reverse curve also. F2.3.1 1000 mm dia piles. (Pile shall be tested for 850MT or Nos up to failure whichever occurs earlier.) F2.4 Low strain (Sonic) integrity test on piles, all complete with all labour, material, equipment, handling, transportation, testing as per specifications, drawing and instruction of the Engineer for pile of following diameter and vertical load capacity. As per IS:4893Nos 2001
#NAME?

300000

600,000.00

3.4

62500

212,500.00

1025000

2,050,000.00

3000 TOTAL

6,000.00 2,868,500.00