Вы находитесь на странице: 1из 5

Csg in Open Hole (No csg csg)

Csg Information: Inches 16.00 OD Top of lead cmt: 0.00 Inches 14.75 ID Enter 0 if cmt to surface Capacity 0.2113 bbls/ft Cement Information: Lead: Tail: Yield 1.15 ft3/sx Yield 1.15 ft3/sx Enter 0 in all cells if no tail cmt Weight 16.40 ppg Weight 14.00 ppg Mix Fluid 5.045 gals/sx Mix Fluid 4.340 gals/sx Excess 45% open hole Excess 35% open hole Total lead cmt: 4,693.00 Lead: Tail: csg/hole 0.2215 bbls/ft csg/hole 0.2215 bbls/ft hole 1,039.4 bbls hole 66.4 bbls cap ft3 5,836.1 ft3 cap ft3 373.1 ft3 cement 5,075 sxs cement 324 sxs Total sxs for job 7,879 sxs Excess 2,284 sxs Excess 114 sxs Total 7,359 sxs Total 438 sxs Mix Fluid 884 bbls Mix Fluid 45 bbls Total ft3 8,462 ft3 Total ft3 504 ft3 Slurry vol 1,507.2 bbls Slurry vol 89.7 bbls Top of Cmt Displacement: Lead sxs 7,359 sxs tail cmt: 4,693.00 With no DP Stinger Tail sxs 521 sxs ft 4,920.00 Head to FC or Shoe Lead Slurry Volume 1,507.2 bbls Capacity 1,040 bbls Tail Slurry Volume 106.6 bbls With DP as Cmt Stinger Total slurry volume==> 1,613.8 bbls ft 970.00 Head to FC or Shoe Total tail cmt: 300.00 bbls/ft 0.1776 Capacity DP Enter feet of tail cmt Capacity 172 bbls desired, if no tail, enter 0
If no Float Collar, enter Float Shoe depth====> Float Collar:

Hole Information: Inches 22.00 OD TMD 1000.00 Ft

ft

ft

ft

ft

4,913.00 80.00 4,993.00

TMD ft TMD

Shoe jt Cement Volume:


16.9 95 bbls slurry ft3 cement Mix Fluid 83

sxs bbls

Shoe jt Length: Float Shoe:

Csg + Csg + Open Hole


Csg Being Run Information: Inches 13.000 OD Inches 12.000 ID Capacity 0.13989 bbls/ft Cement Information: Lead in Open Hole: Tail in Open Hole: Yield 3.08 ft3/sx Yield 1.08 ft3/sx Weight 11.40 ppg Weight 16.60 ppg Mix Fluid 19.282 gals/sx Mix Fluid 4.533 gals/sx Excess 100% open hole Excess 100% open hole Lead in Open Hole: Tail: csg/hole -0.0243 bbls/ft csg/hole -0.0243 bbls/ft csg/hole -60.7 bbls hole -12.1 bbls cap ft3 -340.9 ft3 cap ft3 -68.2 ft3 cement -111 sxs cement -63 sxs Excess -111 sxs Excess -63 sxs Total -221 sxs Total -126 sxs Mix Fluid -102 bbls Mix Fluid -14 bbls Total ft3 -682 ft3 Total ft3 -136 ft3 Slurry vol -121.4 bbls Slurry vol -24.3 bbls
Total sxs in job (if all same class) Total mix fluid

Hole Information: Inches 12.00 OD TMD 4000.00 Ft

Csg Already Run: Inches 18.625 OD Inches 17.755 ID


Enter 0's in all cells if no tail cmt.

Top of lead cmt:

0.00

ft

Enter 0 if cmt to surface

Lead in Csg-Csg: Yield 3.05 ft3/sx Weight 11.40 ppg Mix Fluid 19.282 gals/sx Lead cmt Excess 0% csg between Lead in Csg-Csg: csg's csg/csg 0.1421 bbls/ft csg/csg 142.1 bbls cap ft3 797.6 ft3 cement 262 sxs Excess 0 sxs Total 262 sxs Mix Fluid 120 bbls Total ft3 798 ft3 Depth last Slurry vol 142.1 bbls Shoe Run 20.6 3.7 24.3 bbls bbls bbls 40 19

1,000.00

ft

1,000.00 ft sxs Lead sxs Tail

59 20.5

sxs bbls

Lead Slurry Volume Tail Slurry Volume Total Slurry Volume

Lead Csg & OH

2,500.00 ft

Displacement of Cement: With no DP Stinger With DP as Cmt Stinger ft 4,000.00 Cmt head to FC or Shoe ft Cmt head to FC or Shoe bbls 559.5 Capacity to FC or Shoe bbls/ft Capacity of DP or stinger bbls 0.0 Capacity to FC or Shoe

Top of tail cmt:

3,500.00

ft

Total tail cmt

500.00

ft

Enter feet of tail cmt desired in annulus, if no tail, enter 0 If no float collar, enter float shoe depth ==> RKB to FC

4,000.00 ft 200.00 ft 4,000.00 ft

Shoe jt Cement Volume:


28.0 157 bbls slurry ft3 cement Mix Fluid 145

16

sxs bbls

Shoe jt Length Float Shoe

Liner Csg/Open Hole/Csg


Csg Being Run Information: Csg Already Run: DP Information: Inches 7.750 OD Inches 9.625 OD Inches 5.00 OD Inches 6.560 ID Inches 8.535 ID Inches 3.25 ID Capacity 0.04180 bbls/ft Cement Information: Enter 0's in all cells if no tail cmt. Lead in Open Hole: Tail in Open Hole: Lead in Csg-Csg: Yield 1.24 ft3/sx Yield 0.00 ft3/sx Yield 1.24 ft3/sx Weight 17.50 ppg Weight 0.00 ppg Weight 17.50 ppg Mix Fluid 4.236 gals/sx Mix Fluid 0.000 gals/sx Mix Fluid 4.236 gals/sx Top of Cmt for above Excess 25% open hole Excess 0% open hole Excess 0% csg Liner top 15,125.00 ft Lead in Open Hole: Tail: Lead in Csg-Csg: Amount of cmt above Liner top csg/hole 0.0455 bbls/ft csg/hole 0.0455 bbls/ft csg/csg 0.0124 bbls/ft (0 if no cmt) 200.00 ft csg/hole -75.6 bbls hole 0.0 bbls csg/csg 23.7 bbls Top of cap ft3 -424.3 ft3 cap ft3 0.0 ft3 cap ft3 132.9 ft3 Liner: 15,325.00 ft cement -342 sxs cement #DIV/0! sxs cement 107 sxs (Enter TOL depth if cmt over TOL) Excess -86 sxs Excess #DIV/0! sxs Excess 0 sxs Top of lead cmt 15,325.00 ft Total cmt -428 sxs Total cmt #DIV/0! sxs Total cmt 107 sxs Lead between Mix Fluid -43.1 bbls Mix Fluid #DIV/0! bbls Mix Fluid 10.8 bbls Csg & Csg: 1,906.00 ft Total ft3 -530 ft3 Total ft3 #DIV/0! ft3 Total ft3 133 ft3 Depth last Slurry vol -94.5 bbls Slurry vol #DIV/0! bbls Slurry vol 23.7 bbls Shoe Run: 17,231.00 ft
Total sxs in job (if all same class) Lead mix fluid Tail mix fluid

Hole Information: Inches 10.34 OD TMD 17,231.00 Ft

-230 -23.2 0.0

sxs bbls bbls

Lead Slurry Volume Tail Slurry Volume Total Slurry Volume

-50.8 0.0 -50.8

bbls bbls bbls

-230 0
Csg & OH:

sxs Lead sxs Tail -1,662.00 ft

Displacement of Cement: Drill Pipe Displacement:


ft 14,219.03 Cmt head to Top Liner bbls/ft 0.01701 DP Capacity bbls 241.9 bbls to Top Liner
(Latch dart & Plug) Total bbls for displacement:

Csg Displacement:
ft bbls/ft bbls 105.13 0.04180 4.4
TOL to FC or Landing Collar Capacity csg bbls TOL to FC or landing collar Total tail cmt: Top of tail cmt:

15,569.00 ft

If tail cmt is used

246.3

bbls (Bump plug)

0.00

ft

Cmt above Liner Top:


bbls

Total cmt Mix Fluid Total ft3 Slurry vol

14.2 64 6.5 79 14.2

(Lead Cmt) In Csg above Liner top (no DP in Hole)

Enter feet of tail cmt desired in annulus, if no tail, enter 0

sxs bbls ft3 bbls Shoe jt Cement Volume:


5.8 33 bbls slurry ft3 cement Mix Fluid 26 sxs bbls

If no float collar, enter float shoe depth ==> RKB to FC or Landing Collar Shoe jt Length: Float Shoe:

15,430.13 ft 138.87 ft 15,569.00 ft

2.7

Squeeze Shoe w Pkr


Csg Information: Inches 13.625 OD Inches 12.375 ID Capacity 0.14877 bbls/ft DP Information: Inches 5.00 OD Inches ID Capacity 0.01701 bbls/ft

Cement Information: Yield 0.99 ft3/sx Weight 17.00 ppg Mix Fluid 3.874 gals/sx # sxs 500 sxs pump time 3 hrs

DP Volumes: DP to Pkr 205 Bbls

Csg Volume Pkr to Shoe: Pkr to Shoe 86 Bbls Top cmt before Hesitate squeeze 15 Bbls Top cmt after Hesitate squeeze 7 Bbls

Sxs: Cmt Cmt Cmt


488 84 42 sxs sxs sxs

Cap csg Mix Fluid Slurry vol

495 46.12 88

ft3 Bbls Bbls

Actual bbls squeezed into Formation: Bbls slurry left in csg Bbls Bbls slurry squeezed into formation Bbls Sxs cmt squeezed into Formation: Cmt in formation 0 sxs Cmt in csg 0 sxs

Pkr setting Depth: Feet of cmt left in csg before starting hesitation squeeze: (If hesitation squeeze is done) Feet of cmt left after hesitation :

12,059

ft

100 50

ft ft

Top of Cmt to be left in csg: Top of cmt after hesitation: Distance between Pkr & Shoe: Shoe Depth:

12,537 12,587 578 12,637

ft ft ft ft

Squeeze Shoe w Pkr

Вам также может понравиться