Table of Contents
TABLE OF CONTENTS ....................................................................................................................................... 3 INTRODUCTION ................................................................................................................................................. 6 SOFTWARE ......................................................................................................................................................... 7 CIVIL 3D OBJECTS ............................................................................................................................................. 7 GENERAL REQUIREMENTS .............................................................................................................................. 8 FILE TYPES .................................................................................................................................................................8 DISCIPLINE CODES .....................................................................................................................................................8 DEFAULT FOLDER STRUCTURE ..................................................................................................................................8 FILE NAMING ............................................................................................................................................................9 OPTIONAL FILE NAME IDENTIFIER ............................................................................................................................9 DRAWING SETUP ............................................................................................................................................. 10 DRAWING TEMPLATE ..............................................................................................................................................10 BORDERS AND SHEETS - DESIGNCENTER ................................................................................................................10 SCALE AND UNITS ...................................................................................................................................................11 FONT & TEXT STYLES...............................................................................................................................................11 DIMENSION STYLES..................................................................................................................................................11 MULTILEADER STYLES (2012 VERSION ONLY) ........................................................................................................11 TABLE STYLES ..........................................................................................................................................................11 SYMBOLS AND BLOCKS ............................................................................................................................................12 LAYERS AND LAYER NAMING ....................................................................................................................... 13 LAYER NAMING .......................................................................................................................................................13 LAYER FILTERS .........................................................................................................................................................14 MASTER LAYER LIST ................................................................................................................................................15 PLOT STYLES ..................................................................................................................................................... 28 PURPOSE .................................................................................................................................................................28 DEFINITIONS............................................................................................................................................................28 USING PLOT STYLES.................................................................................................................................................29 CONVERTING LAND DESKTOP DRAWINGS TO CIVIL 3D ........................................................................ 30 POLICY ON MODEL SPACE VS. PAPER SPACE ............................................................................................ 30 POLICY ON EXTERNAL REFERENCES ........................................................................................................... 31 OPTIONAL CAD STANDARD REVIEW PROCESS ........................................................................................ 32 BRIDGE .............................................................................................................................................................. 33 FILE SUBMISSION REQUIREMENTS ...........................................................................................................................33 FOLDER STRUCTURE ................................................................................................................................................33 BRIDGE LAYER LIST .................................................................................................................................................34 BRIDGE PLAN REQUIREMENTS ................................................................................................................................35 BRIDGE SYMBOLS AND BLOCKS ...............................................................................................................................36 BRIDGE GRAPHICAL STANDARDS ............................................................................................................................37 LIST OF STANDARD ABBREVIATIONS .......................................................................................................................42
Page 3
ENVIRONMENTAL ........................................................................................................................................... 45 FILE SUBMISSION REQUIREMENTS ...........................................................................................................................45 FOLDER STRUCTURE ................................................................................................................................................45 ENVIRONMENTAL LAYER LIST .................................................................................................................................46 ENVIRONMENTAL PLAN REQUIREMENTS ................................................................................................................47 GEOTECHNICAL............................................................................................................................................... 48 FILE SUBMISSION REQUIREMENTS ...........................................................................................................................48 FOLDER STRUCTURE ................................................................................................................................................48 GEOTECHNICAL LAYER LIST ....................................................................................................................................49 GEOTECHNICAL PLAN REQUIREMENTS ...................................................................................................................50 GEOTECHNICAL SYMBOLS AND BLOCKS..................................................................................................................51 HIGHWAY DESIGN .......................................................................................................................................... 52 FILE SUBMISSION REQUIREMENTS ...........................................................................................................................52 CIVIL 3D OBJECTS ..................................................................................................................................................52 FOLDER STRUCTURE ................................................................................................................................................52 HIGHWAY DESIGN LAYER LIST ................................................................................................................................53 HIGHWAY DESIGN PLAN REQUIREMENTS ...............................................................................................................55 HIGHWAY DESIGN SYMBOLS AND BLOCKS .............................................................................................................56 HIGHWAY DESIGN ASSEMBLIES ..............................................................................................................................57 LANDSCAPE DESIGN ....................................................................................................................................... 58 FILE SUBMISSION REQUIREMENTS ...........................................................................................................................58 FOLDER STRUCTURE ................................................................................................................................................58 LANDSCAPE DESIGN LAYER LIST .............................................................................................................................59 LANDSCAPE DESIGN PLAN REQUIREMENTS ............................................................................................................60 LANDSCAPE DESIGN SYMBOLS AND BLOCKS ..........................................................................................................61 LANDSCAPE PLANTING PLANS ................................................................................................................................61 WETLAND REPLICATION PLANS ..............................................................................................................................64 LAYOUTS ........................................................................................................................................................... 65 FILE SUBMISSION REQUIREMENTS ...........................................................................................................................65 FOLDER STRUCTURE ................................................................................................................................................65 LAYER NAMING REQUIREMENT SPECIFIC TO LAYOUT LAYER USE ............................................................................66 STATE HIGHWAY LAYOUT (AND ALTERATION) LINESTYLE GRAPHIC ..................................................................66 LAYOUTS LAYER LIST ...............................................................................................................................................67 LAYOUTS PLAN REQUIREMENTS ..............................................................................................................................68 LAYOUTS SYMBOLS AND BLOCKS ............................................................................................................................69 RIGHT OF WAY ................................................................................................................................................ 70 FILE SUBMISSION REQUIREMENTS ...........................................................................................................................70 FOLDER STRUCTURE ................................................................................................................................................70 RIGHT OF WAY LAYER LIST .....................................................................................................................................71 RIGHT OF WAY PLAN REQUIREMENTS ....................................................................................................................72
Page 4
SURVEY .............................................................................................................................................................. 73 FILE SUBMISSION REQUIREMENTS ...........................................................................................................................73 CIVIL 3D OBJECTS ..................................................................................................................................................73 FOLDER STRUCTURE ................................................................................................................................................73 SURVEY LAYER LIST .................................................................................................................................................74 SURVEY PLAN REQUIREMENTS ................................................................................................................................77 SURVEY SYMBOLS AND BLOCKS...............................................................................................................................78 DESCRIPTION KEY SETS ...........................................................................................................................................79 FIGURE PREFIXES .....................................................................................................................................................79 TRAFFIC ............................................................................................................................................................. 84 FILE SUBMISSION REQUIREMENTS ...........................................................................................................................84 FOLDER STRUCTURE ................................................................................................................................................84 TRAFFIC LAYER LIST ................................................................................................................................................85 TRAFFIC PLAN REQUIREMENTS ...............................................................................................................................86 TRAFFIC SYMBOLS AND BLOCKS ..............................................................................................................................87 UTILITIES ........................................................................................................................................................... 88 FILE SUBMISSION REQUIREMENTS ...........................................................................................................................88 FOLDER STRUCTURE ................................................................................................................................................88 UTILITIES LAYER LIST ...............................................................................................................................................89 UTILITIES PLAN & PLOTTING REQUIREMENTS .........................................................................................................92 RESOURCE SECTION SUPPORT FILES........................................................................................................ 93 CIVIL 3D DRAWING TEMPLATE...............................................................................................................................93 DRAWING STANDARDS FILES ..................................................................................................................................93 PLOT STYLES ............................................................................................................................................................93 HIGHWAY DESIGN ASSEMBLY LIBRARY ...................................................................................................................93 SYMBOL LIBRARIES ..................................................................................................................................................94 PAPER SPACE LAYOUT SHEETS ................................................................................................................................94 SURVEY SUPPORT FILES ...........................................................................................................................................94
Page 5
Introduction
This document provides a single source location for the Massachusetts Department of Transportation (MassDOT), Highway Division, CAD Standards, as well as links to all support files necessary for the preparation of CAD files relevant to highway projects. The purpose of this CAD Standard is to standardize drawing information and improve electronic data sharing between disciplines within MassDOT and from consultants working for MassDOT. It is recognized that there remains existing documentation found within MassDOT which may conflict with some parts of this CAD Standard. All efforts have been made to resolve the instances of conflict but MassDOT does not guarantee that all discrepancies have been found or resolved. This document supersedes all CAD related requirements found within any documentation currently used within the MassDOT, Highway Division.
Please direct any questions or comments about this document to: Email: CAD.Standard@state.ma.us
Page 6
Software
The MassDOT Highway Division currently uses the following CAD software products. AutoCAD AutoCAD Map 3D AutoCAD Civil 3D AutoCAD Raster Design Autodesk Design Review AutoCAD 3DS Max Design
PLEASE NOTE: Actual software version used by MassDOT internally will change from time to time, therefore please refer to the specific project contract or contact the project manager for actual version and submission requirements. All new projects must use the latest version of the drawing template, available on the MassDOT CAD Standard website. Please download the current drawing template and supporting files prior to beginning any MassDOT Highway Division projects.
Civil 3D Objects
To ensure the integrity and continuity of an efficient workflow and design process throughout the survey, design, construction, and Building Information Modeling (BIM) processes, all MassDOT projects shall require the use of Civil 3D objects. The following design items must be created as Civil 3D objects and must be assigned MassDOT Civil 3D Object Styles using the provided MassDOT Civil 3D drawing template. POINTS SURFACES ALIGNMENTS PROFILES - SECTIONS CORRIDORS PIPE NETWORKS Not all Disciplines use these design elements, therefore some disciplines will not have a specific Civil 3D Object requirement. Please refer to each disciplines Civil 3D Objects section for details.
Page 7
General Requirements
File Types
MassDOT Highway Division now requires that all project submissions shall include the following file types. All project related Drawing Files shall be provided in all 3 supported formats, listed below. AutoCAD Drawing format (.dwg) AutoCAD Drawing Web Format (.dwf) Adobe Portable Document Format (.pdf) [Placed in DWG project folder] [Placed in DWF project folder] [Placed in PDF project folder]
Discipline Codes
The MassDOT Highway Division has established the following discipline codes to be used in all file naming and folder naming for all projects.
BR EV HD GT LD LO RW SV TR UT Bridge Environmental Highway Design Geotechnical Landscape Design Layouts Right of Way Survey Traffic Utilities
It is a requirement that each project drawing/sheet created for a project shall be published/plotted to DWG, DWF, and PDF, and placed in the appropriate folder. All external references (DWG, DWF, DGN, PDF, TIFF, MrSID, JPG, etc.) which are used in support of the creation of these project sheets shall be stored within the XREF folder only (Subfolder of DWG).
Page 8
File Naming
MassDOT Highway Division has adopted the following file naming standard for all CAD related files created, used, or submitted to the organization. This applies to all CAD drawings, DWFs, PDFs used in support of, or used in conjunction with this CAD Standard. File names shall begin with their actual project file/MEPA number assigned (available through the MassDOT Project Manager), followed by the percentage of submission enclosed in brackets, i.e [25%], [75%], [100%], and followed by the appropriate discipline code. If a project consists of multiple CAD files, assign the appropriate number to the end (ex. 1,2,3).
FINAL SUBMISSIONS
When completing the final submission (beyond 100%), remove the percentage identifier from the file names. 123456HD1(ABC Engineering)
Page 9
Drawing Setup
Drawing Template
1. The MassDOT Highway Division Civil 3D Standard drawing template can be found within the Resources Section. Click here (MassDOT_version_release.dwt) 2. All DWG files created for any MassDOT Highway Division project must use this default template. 3. This template includes MassDOT specific Civil 3D styles, fonts, dimension styles, (all prefixed with MassDOT), and most of the standard MassDOT Annotation, Design and Survey layers needed for completion of MassDOT projects. 4. Optional templates for the Civil 3D Plan Production Tool (for plan/profile, and sections) can also be found within the Resources Page. These can only be used on Civil 3D 2012 and above. 5. All project data must be located on the following; Horizontal Datum - Massachusetts State Plane Coordinate System of 1983 (NAD83) US Feet Vertical Datum North American Vertical Datum of 1988 (NAVD88) or as otherwise specified by the MassDOT Project Manager. 6. Any information referenced in design drawings shall not be moved or rotated from the original coordinates used in the drawing.
Page 10
Dimension Styles
The following dimension styles are approved for MassDOT use and are pre-defined within the drawing template. These shall be the only dimension styles used on Plan & Detail Sheets. NAME DOT-E DOT-P DOT-BR DESCRIPTION Existing Text (size 0.10) Proposed Text (size 0.12) Bridge Text (size 0.12) FONT RomanS Arial RomanS
Table Styles
The following table styles are approved for MassDOT use and are pre-defined within the drawing template. These shall be the only table styles used on Plan & Detail Sheets. NAME DOT-E DOT-P DESCRIPTION Existing Text (size 0.10) Proposed Text (size 0.12) FONT RomanS Arial
Page 11
Page 12
The Major Codes are: EX Existing Feature GE General Feature (general notes, sheets, title blocks) PR Proposed Feature OB Civil 3D Object Layers
Minor Codes (i.e. Discipline Codes) BR Bridge EV Environmental GT Geotechnical HD Highway Design LD Landscape Design LO Layouts RW Right of Way SV Survey TR Traffic UT Utilities
Optional Codes (up to a maximum number of 3) - can be created to provide additional information to the layer name. Each optional code cannot be larger than eight (8) characters.
Page 13
Layer Filters
A standard set of layer filters has been provided within the Layer Manager to organize all MassDOT layers into their unique discipline groups.
Page 14
LAYER NAME
0 Defpoints
COLOR
white white
LINETYPE
Continuous Continuous
PLOT STYLE
SOLID 100% SOLID 100%
DESCRIPTION
DO NOT USE Default Layer - DO NOT USE
EXISTING LAYERS
EX-BR-COMP EX-BR-COMP-HIDN EX-BR-HATCH EX-BR-REBAR EX-BR-TEXT EX-EV-REGL-BUFFER-100 EX-EV-REGL-FLOOD EX-EV-REGL-MHW EX-EV-REGL-OHWL EX-EV-REGL-RIVR-FRNT EX-EV-TEXT EX-GT-FEAT EX-LD-SITE-FEAT EX-LD-VEGE EX-LD-VEGINV EX-LO-CT 8 8 8 magenta yellow 240 magenta 212 212 221 magenta 9 170 green 12 yellow DASHDOT2 HIDDEN Continuous DASHDOT2 Continuous DASHEDX2 BORDERX2 BORDER BORDER2 BORDER2 Continuous Continuous Continuous Continuous Continuous CENTERX2 BR 50% BR 50% SOLID 25% BR 100% BR 50% ENVR EXIST ENVR EXIST ENVR EXIST ENVR EXIST ENVR EXIST ENVR EXIST BR 50% SURVEY 100% SURVEY 100% SURVEY 100% ROW 100% Existing Bridge Components Existing Bridge Components - Hidden Existing Bridge Hatching Existing Bridge Rebar Existing Bridge Text Regulatory 100 ft Buffer Zone Regulatory Flood Zones Regulatory Mean High Water - Tidal Regulatory Ordinary High Water - Non-Tidal Regulatory Riverfront Protection Zones Regulatory Riverfront Protection Zones Existing Geotechnical Features Existing Landscape Site Features Existing Trees, Shrubs, and Vegetation Existing Invasive Vegetation Existing County Layout Lines
Page 15
COLOR
yellow yellow yellow yellow yellow red red red red red red red 9 253 253 9 142 54 red 172
LINETYPE
EXIST RR SIDELINE Continuous Continuous PHANTOM PHANTOM2 DASHED EXIST RR SIDELINE CONST BASELINE Continuous DASHED2 DASHED DASHED2 Continuous Continuous Continuous Continuous DASHED DASHED2 Continuous Continuous
PLOT STYLE
ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% SURVEY 100% SURVEY 100% SURVEY 100% SOLID 50% SOLID 50% SURVEY 100% SURVEY 100% SOLID 50%
DESCRIPTION
Existing Railroad Layout Lines Existing State Highway Layout Lines Existing Text for Layout Information Existing Town/City Layout Lines Existing Turnpike Authority Layout Lines Existing Baseline - County Existing Baseline - Railroad Existing Baseline - State Highway Existing Baseline - Text Existing Baseline - City/Town Existing Baseline - Turnpike Authority Existing Baseline - Miscellaneous Existing Buildings, Decks Survey Point - Default Point Layer Survey Point - Text Labels Existing Bridge Items and Structures Existing Contours - MAJOR Existing Contours - MINOR Existing Contours - Text Existing User-Defined Contours
Page 16
COLOR
8 9 55 white 9 9 9 9 9 9 white cyan yellow white yellow red 9 9 9 white
LINETYPE
Continuous Continuous Continuous Continuous FENCECHAIN LINK FENCE-WOODRAIL GUARDRAIL-STEEL GUARDRAIL-WOOD Continuous Continuous LINE OF EASE PROP LINE STATE BNDY LINE Continuous CENTERX2 Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
SURVEY 100% SURVEY 100% SURVEY 100% SOLID 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% SURVEY 150% SURVEY 50% SURVEY 100% SURVEY 100% SURVEY 100%
DESCRIPTION
Existing Miscellaneous Detail Existing Driveway Items Existing Erosion Control Existing Survey Figure Undefined Code Existing Chain Link or Metal Fences Existing Wood Fences Existing Steel Post Guardrail and Barrier Existing Wood Post Guardrail and Barrier Existing Ground Surface Existing Soil, Gravel, and Stone Existing Easement Lines Existing Abutting Property Lines Existing State Boundary Lines Existing Boundary Line Text Existing Town/City Boundary Lines Existing Monuments, Survey Points Existing Pavement Markings Existing Roadway Items Existing Railroad Items Existing Surface - Border
Page 17
COLOR
white 8 104 31 104 9 163 163 blue 31 30 30 30 252 252 252 10 10 10 42
LINETYPE
Continuous Continuous Continuous Continuous Continuous Continuous RETWALL STONEWALL DASHED Continuous Continuous Continuous HIDDEN2 Continuous Continuous HIDDEN2 Continuous Continuous HIDDEN2 Continuous
PLOT STYLE
SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% ENVR BOLD SURVEY 100% UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST SV UTILITY EXIST SV UTILITY EXIST SV UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST
DESCRIPTION
Existing Surface - Faults, Breaklines Existing Surface - TIN lines Existing Survey Text Existing Traffic Items Existing Vegetation Existing Walkways Existing Walls - Retaining Existing Walls Balanced Stone Existing Wetlands, Ponds, Rivers Existing Traffic Items Existing Cable TV Structures Existing Cable TV Text Existing Cable TV Underground Existing Drainage Items Existing Drainage Text Existing Drainage Underground Existing Electric Structures Existing Electric Text Existing Electric Underground Existing Gas Items
Page 18
COLOR
42 42 42 42 42 42 80 80 80 42 42 42 30 30 30 30 30 blue blue blue
LINETYPE
Continuous HIDDEN2 Continuous Continuous HIDDEN2 Continuous Continuous Continuous HIDDEN2 Continuous Continuous HIDDEN2 Continuous Continuous HIDDEN HIDDEN2 HIDDEN2 Continuous Continuous HIDDEN2
PLOT STYLE
UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST SV UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST
DESCRIPTION
Existing Gas Text Existing Gas Underground Existing Oil Structures Existing Oil Text Existing Oil Underground Existing Utility - OTHER Structures Existing Sewer Items Existing Sewer Text Existing Sewer Underground Existing Steam Structures Existing Steam Text Existing Steam Underground Existing Telephone/Communication Structures Existing Telephone/Communication Text Existing Telephone/Communication Overhead Existing Telephone/Communication Underground Existing Traffic Underground Existing Water Systems Structures Existing Water Systems Text Existing Water Systems Underground
Page 19
GENERAL LAYERS
GE-IMAGES GE-MTCH GE-PROF-BASE GE-PROF-DESIGN GE-PROF-EGC GE-PROF-EGCT GE-PROF-EGL GE-PROF-EGR GE-PROF-FGC GE-PROF-FGCT GE-PROF-VGRID GE-SAMPLE-LINE GE-SAMPLE-LINE-GRID GE-SHEET GE-TEXT GE-VIEWPORT GE-XREF GE-XSECT GE-XSECT-EGC GE-XSECT-FGC white white white white 21 9 red green white white 252 yellow 252 white white white white white 21 white Continuous Continuous Continuous Continuous DASHED Continuous BORDER2 DIVIDE2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN2 Continuous BORDER SOLID 100% SOLID 100% SOLID 100% SOLID 50% SOLID 50% SOLID 50% SOLID 50% SOLID 100% SOLID 100% SOLID 75% SOLID 25% SOLID 75% BORDER BORDER BORDER BORDER SOLID 100% SOLID 50% SOLID 100% Default Images Layer Match Lines and Text Profile - Base Profile - Design Profile - Existing Grade Centerline Profile - Existing Grade Centerline Text Profile - Existing Grade Left Profile - Existing Grade Right Profile - Finish Grade Centerline Profile - Finish Grade Centerline Text Profile - Profile View Grid Lines Sample Line Base Layer Cross Section - Section View Grid Lines Default Border and Paperspace layer General Text Paperspace Text Default Paperspace Viewport Layer Default External Reference Layer Cross Section Cross Section - Existing Grade Centerline Cross Section View
Page 20
COLOR
white white
LINETYPE
Continuous Continuous
PLOT STYLE
SOLID 100% SOLID 100%
DESCRIPTION
Cross Section Text Cross Section View Base layer
COLOR
white white white white white white white
LINETYPE
Continuous Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
ROW 100% SOLID 100% SOLID 100% ROW 100% SOLID 100% SOLID 100% SOLID 100%
DESCRIPTION
Boundary Line CIVIL 3D OBJECT Feature Line - CIVIL 3D OBJECT Interference - CIVIL 3D OBJECT Parcel - CIVIL 3D OBJECT Surface - CIVIL 3D OBJECT Survey - CIVIL 3D OBJECT Utility Line - CIVIL 3D OBJECT
PROPOSED LAYERS
PR-BR-CENTER PR-BR-COMP PR-BR-COMP-HIDN PR-BR-CONST-CENTER PR-BR-CONSTJT PR-BR-DIMS PR-BR-HATCH PR-BR-REBAR PR-BR-TEXT cyan red red cyan white cyan blue magenta yellow CENTER Continuous HIDDEN CENTER ZIGZAG Continuous Continuous Continuous Continuous BR 100% BR 100% BR 100% BR 150% BR 100% BR 100% Greyscale BR 200% BR 100% Proposed Centerline of Components Proposed Bridge Components Proposed Bridge Features - Hidden Prop. Centerline of Const. and Survey Baseline Prop. Const. Joint and Prop. Conc. Surface Cut Line Proposed Bridge Dimensions Proposed Bridge Hatching Proposed Bridge Rebar Proposed Bridge Text
Page 21
COLOR
yellow yellow 131 131 131 white white white white white white white white white white 33 white 141 32 white
LINETYPE
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED DASHEDX2 DASHED Continuous DASHED2 DASHED2 Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
BR 175% BR 150% ENVR PROP ENVR PROP ENVR PROP BR 100% SOLID 100% SOLID 100% SOLID 100% ROW 200% ROW 200% ROW 200% ROW 100% ROW 200% ROW 200% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100%
DESCRIPTION
Proposed Bridge Section/Detail Text Proposed Bridge Sub-Title Text Proposed Environmental - Erosion Control Regulatory Mitigation Areas Proposed Environmental - Text Proposed Geotechnical Features and Text Proposed Assembly Proposed Assembly: corridor and section links Proposed Assembly: corridor cross section Proposed Baseline - County Proposed Baseline - Railroad Proposed Baseline - Highway Division Proposed Baseline - Proposed Text Proposed Baseline - City/Town Proposed Baseline - Miscellaneous Proposed Contours Proposed Corridor Proposed Corridor Patterns Proposed Corridor and Section Shapes Proposed Corridor and Section Shape Patterns
Page 22
COLOR
191 white 140 white 62 62 white 71 71 white white white 200 200 white 240 green white yellow red
LINETYPE
Continuous HIDDEN Continuous Continuous FENCE CHAIN LINK FENCE WOOD RAIL Continuous GUARDRAIL STEEL GUARDRAIL WOOD Continuous Continuous Continuous RETWALL STONEWALL Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
SOLID 100% SOLID 200% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100%
DESCRIPTION
Proposed Curbing Proposed Daylight Proposed Miscellaneous Items Proposed Edge of Pavement Proposed Fence Chain Link Proposed Fence Wood Rail Proposed Grade Proposed Guardrail Steel Posts Proposed Guardrail Wood Posts Proposed Gravel Proposed Sideslope Proposed Sidewalks Proposed Walls - Retaining Proposed Walls Balanced Stone Proposed Landscaping Details Proposed Landscaping Dimensions Proposed Ground Cover Proposed Hatching Proposed Ornamental Grass Proposed Perennial
Page 23
COLOR
240 green white 182 240 white 182 231 231 231 231 231 231 231 231 32 163 51 211 84
LINETYPE
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Dashed Continuous Dashed Continuous Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
SOLID 200% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 200% SOLID 200% ROW 200% ROW 200% ROW 200% ROW 200% ROW 200% ROW 100% ROW 200% ROW 200% ROW 200% ROW 200% ROW 200% ROW 100% ROW 100%
DESCRIPTION
Proposed Plant Tag Proposed Seed - Standard Proposed Shrubs Proposed Site Furnishings Proposed Landscaping Text Proposed Trees Proposed Tree Protection Proposed County Layout Lines Proposed Railroad Layout Lines Proposed State Highway Alteration Lines Proposed State Highway Discontinuance Lines Proposed State Highway Layout Lines Proposed State Highway Superseded Layout Lines Proposed Text for Layout Information Proposed Town/City Layout Lines Proposed Town/City Fee Taking Proposed Drainage Fee Taking Proposed State Fee Taking Proposed Miscellaneous Items Proposed Monuments
Page 24
COLOR
32 141 41 42 211 31 31 31 31 31 31 31 40 40 40 254 254 254 white 254
LINETYPE
LINE OF EASE LINE OF EASE LINE OF EASE LINE OF EASE Continuous Continuous Continuous Continuous Continuous Continuous Continuous Conduit Continuous Continuous Continuous Continuous DASHEDX2 Continuous Continuous Continuous
PLOT STYLE
ROW 200% ROW 200% ROW 200% ROW 200% ROW 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP
DESCRIPTION
Proposed Permanent Easement CITY Proposed Permanent Drainage Easement Proposed Permanent Easement STATE Proposed Temporary Easement Proposed Right of Way Text Proposed Traffic Items Proposed Traffic Lighting Proposed Traffic Pavement Markings Proposed Traffic Signals Proposed Traffic Signs Proposed Traffic Text Proposed Traffic Items - Underground Proposed Communication/CATV Proposed Communication/CATV Text Proposed Communication/CATV Underground Proposed Drainage Proposed Drainage Ditch Proposed Drainage Pipes Proposed Drainage Hatching Proposed Drainage Profile
Page 25
COLOR
254 11 11 11 44 44 44 93 93 white 93 93 40 40 40 40 150 150 white 150
LINETYPE
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP
DESCRIPTION
Proposed Drainage Text Proposed Electric Structures Proposed Electric Text Proposed Electric Underground Proposed Gas Items Proposed Gas Text Proposed Gas Underground Proposed Sewer Structures Proposed Sewer Pipes Proposed Sewer Hatching Proposed Sewer Profile Proposed Sewer Text Proposed Telephone/Communication Structures Proposed Telephone/Communication Overhead Proposed Telephone/Communication Text Proposed Telephone/Comm. Underground Proposed Water System Proposed Water System Pipes Proposed Water System Hatching Proposed Water System Profile
Page 26
COLOR
150
LINETYPE
Continuous
PLOT STYLE
UTILITY PROP
DESCRIPTION
Proposed Water System Text
Page 27
Plot Styles
Purpose
MassDOT Highway Division has created a standard set of plot styles to aid in plotting. These plot styles are intended to provide seamless integration while passing DWG files back and forth between the Survey Division, Design Divisions, as well as the other Divisions.
Definitions
MassDOT Highway Division has adopted the following named plot style standards; MADOT-C.stb MADOT-D.stb MADOT-E.stb MADOT-R.stb MADOT-S.stb MADOT-U.stb (use this for Color Plotting, i.e. presentations) (use this for all Design sections) (use this for all Environmental Color Plotting) (use this for all Right-of-Way, Layouts) (use this for all Survey) (use this for all Utility Color Plotting)
Page 28
PLEASE NOTE: The user will need to migrate existing CAD drawings to use these new standards before plotting. Doing so will provide the appropriate plot settings adopted by MassDOT. If the drawing is set to color-based plot styles, use the command CONVERTPSTYLES to switch your drawing and assign the appropriate plot styles to each layer.
Page 29
All drawing models shall be drawn in model space and shall be drawn to actual scale. Any additional item that helps define the model or add model data such as details, dimensions, elevations, names, descriptive text, etc. shall be drawn in model space.
Paper Space One of the two primary spaces in which objects reside. It is within paper space where a layout of specific views of the project model, border and title block, and general notes are placed in order to print a clean and consistent document.
All secondary drawing elements shall be placed in Paper Space. Title block, sheet notes, titles, and legends shall be considered secondary drawing elements. Note: Any information referenced in design drawings shall not be moved or rotated from the original coordinates used in the drawing. When copying model space information between drawings (NON-CIVIL 3D OBJECTS), verify that the UCS coordinates in both drawings are set to World prior to executing the copy-paste commands.
Page 30
All external referenced files (DWG, DWF, DGN, PDF, TIFF, MrSID, JPG, etc.) shall be stored within the Discipline specific XREF folder, found within each Disciplines DWG folder.
The use of temporary XREFs is allowed. However, when the temporary XREF is no longer needed, DETACH the temporary XREF properly through the External Reference Manager. DO NOT SIMPLY DELETE THE XREF WITHIN THE DWG FILE. *Note: Externally referenced data shall not be moved or rotated from the original coordinates used in the drawing.
Page 31
Page 32
Bridge
File Submission Requirements
All file submissions shall include the following file types: AutoCAD Drawing format ( .dwg) AutoCAD Drawing Web Format ( .dwf) Adobe Portable Document Format ( .pdf) Actual software version used by MassDOT internally will change from time to time; therefore please refer to the specific project contract or check with the Project Manager for actual version and submission requirements. Prior versions of the CAD Standard, including drawing templates, are available on the Resources page.
Folder Structure
All Bridge electronic file submissions shall be submitted within the following Folder Structure. Please see the Default Folder Structure in the General Section for descriptions of folders not listed here.
Page 33
LAYER NAME
EX-BR-COMP EX-BR-COMP-HIDN EX-BR-HATCH EX-BR-REBAR EX-BR-TEXT PR-BR-CENTER PR-BR-COMP PR-BR-COMP-HIDN PR-BR-CONST-CENTER PR-BR-CONSTJT PR-BR-DIMS PR-BR-HATCH PR-BR-REBAR PR-BR-TEXT PR-BR-TEXT-D PR-BR-TEXT-S
COLOR
8 8 8 magenta yellow cyan red red cyan white cyan blue magenta yellow yellow yellow
LINETYPE
DASHDOT2 HIDDEN Continuous DASHDOT2 Continuous CENTER Continuous HIDDEN CENTER ZIGZAG Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
BR 50% BR 50% SOLID 25% BR 100% BR 50% BR 100% BR 100% BR 100% BR 150% BR 100% BR 100% Greyscale BR 200% BR 100% BR 175% BR 150%
DESCRIPTION
Existing Bridge Components Existing Bridge Components - Hidden Existing Bridge Hatching Existing Bridge Rebar Existing Bridge Text Proposed Centerline of Components Proposed Bridge Components Proposed Bridge Features - Hidden Prop. Centerline of Const. and Survey Baseline Prop. Const. Joint and Prop. Conc. Surface Cut Line Proposed Bridge Dimensions Proposed Bridge Hatching Proposed Bridge Rebar Proposed Bridge Text Proposed Bridge Section/Detail Text Proposed Bridge Sub-Title Text
Page 34
CO1 = Construction First Sheet CO2 = Construction Subsequent Sheets SK1 = Sketch Plan First Sheet 1L = 1 Line Description 2L = 2 Line Description MBr = Multi Bridge Number MBin = Multi BIN SBr = Single Bridge Number SBin = Single BIN
No other borders will be accepted. The use of DesignCenter to drag-n-drop these layouts into a project DWG is recommended.
Page 35
ATTENTION Do not use the BRIDGE_SHEETS.dwg for any design related AutoCAD work. They do not contain the necessary layers, text styles, dimension styles or plot styles.
BRIDGE_SHEETS.dwg can be found in the Resources Section by clicking here.
Welding Symbols
Weld and welding symbols (found in the BRIDGE_SYMBOLS.dwg) shall be consistent with AWS 2.4 Standard Symbols for Welding, Brazing, and Nondestructive Examination. The symbol provided within the BRIDGE_SYMBOLS.dwg CAD file shall be modified as required to convey all information necessary to construct the welded joint as designed. Standard Welding Symbol
Page 36
Page 37
Centerlines
The PR-BR-CENTER layer shall be used to indicate the following: The centerlines of beams, both for dimensioning purposes and for indicating the location of beams on the plan view of an abutment or pier. The centerlines of bearings, on abutment or pier plan views, on bridge seat cross sections, on framing Construction Drawings, and elsewhere. The centerlines of bolts, holes, and any other object for the purpose of dimensioning. The PR-BR-CONST-CENTER layer shall be used wherever the centerline of construction or the baseline of survey needs to be indicated.
Witness/Hatch Lines
The PR-BR-HATCH layer shall be used for drawing witness lines when dimensioning, and for hatching and cross hatching.
Dimension Lines
The PR-BR-DIMS layer shall be used for all dimensions. The dimension style, DOT-BR, found within the MassDOT drawing template, shall be used.
Page 38
Page 39
Page 40
Abbreviations
Abbreviations may be used on MassDOT Bridge Construction Drawings. A standard list of abbreviations has been provided below. Periods, where shown, are not to be omitted so that the reader can be sure that these abbreviations are intentional rather than being misspelled words. When using abbreviations, the following guidelines will be adhered to: 1. An abbreviation may be used when there is no doubt of its meaning and when it saves significant space on the drawings. 2. Avoid abbreviations on the plan and elevation sheet. 3. Do not abbreviate important words in titles. 4. For words whose abbreviations are not universally recognized in the construction industry the word should be spelled out and followed with the abbreviation in parenthesis the first time it appears on the Construction Drawings. 5. Abbreviations should not be used in the text of notes unless they are conventional abbreviations, such as H.S. Bolt for High Strength Bolt.
Page 41
A
Abutment Alternate And Annual Average Daily Traffic Approach slab Approximate At Avenue ABUT. ALT. & AADT APPR. SLAB APPROX. @ AVE.
Drive
E
Each East East (for survey bearings) Eastbound Elevation Equal (as in equal spaces) Expansion Existing Exterior
B
Barrels BBL. Beam Number 1 BM. #1 Bearing, Bearings BRG., BRGS. Bench mark B.M. Bituminous BIT. Bottom BOT. Boulevard BLVD. Bridge Number A-01-001 BR. NO. A-01-001
F
Far Face F.F. Federal Highway Administration FHWA Figure, Figures FIG., FIGS. Floor Beam Number 1 F.B. #1
C
Catch basin Cast-in-place Cast iron pipe Cement Center To Center Clearance, Clear Concrete Construction Culvert Chamfer C.B. C.I.P. C.I. PIPE CEM. C. TO C. CL. CONC. CONST. CULV. CHAMF.
G
Galvanized Gage GALV. GA.
H
Hexagonal Head High Performance Concrete High Performance Steel High Strength Highway Horizontal Hot Mix Asphalt HEX. HEAD H.P.Concrete H.P.S. H.S. HWY. HORIZ. HMA
D
Degrees (angular) Degrees (thermal) Diameter Distance Dowel F DIA. or DIST. DWL.
I
Inside Diameter Interior I.D. INT.
Page 42
O.D. O. TO O.
J
Joint JT.
P
Pavement Perpendicular Point of Compound Curvature Point of Curvature Point of Intersection Point of Tangency Point of vertical curvature Point of vertical intersection Point of vertical tangency Polyvinyl chloride pipe Pounds per square inch Proposed PVMT. PERP. P.C.C. P.C. P.I. P.T. P.V.C. P.V.I. P.V.T. P.V.C. PIPE PSI PROP.
K
Kips Kips per square inch Kips per square foot K KSI KSF
L
Latex Modified Concrete Longitudinal Lump sum L.M.C. LONGIT. L.S.
M
Manhole Massachusetts Department of Transportation Maximum Miles per Hour Minimum Miscellaneous Modified M.H. MassDOT MAX. MPH MIN. MISC. MOD.
R
Radius = Railroad Reinforced, Reinforcing Remove Remove and Reset Required Retaining Wall Right Of Way Road Roadway Route R= RR. REINF. REM. R. & R. REQ'D RET. WALL R.O.W. RD. RDWY. RTE.
N
Near Face New Jersey Barrier North North (for survey bearings) Northbound Northeast(erly) Northwest(erly) Not to scale Number Numbers N.F. N.J. BARRIER N. N N.B. N.E. N.W. N.T.S. NO. or # NOS.
S
Seconds Section Sheet number 1 Sidewalk South South (for survey bearings) Southeast(erly) Southwest(erly) Southbound Spaces SEC. SECT. SH. #1 SDWK. S. S S.E. S.W. S.B. SP.
Page 43
O
On Center O.C.
S (cont)
Specification Speed (design speed) Square Square feet Square inches Stainless steel Station Stay-In-Place Forms Street Surfacing Symmetrical SPEC. V SQ. SF SI S.S. STA. S.I.P. FORMS ST. SURF. SYM.
T
Tangent Temporary Tons per square foot Typical TAN. TEMP. TSF TYP.
V
Variable Vertical Vertical Curve VAR. VERT. V.C.
W
Wearing Surface West West (for survey bearings) Westbound Wingwall Working Point Wrought Iron Pipe W.S. W. W W.B. W.W. W.P. W.I. PIPE
Page 44
Environmental
File Submission Requirements
MassDOT Highway Division Environmental Section requires that all file submissions shall include the following file types. AutoCAD Drawing format ( .dwg) AutoCAD Drawing Web Format ( .dwf) Adobe Portable Document Format ( .pdf) Actual software version used by MassDOT internally will change from time to time, therefore please refer to the specific project contract or check with the project manager for actual version and submission requirements. Prior versions of the CAD Standard, including drawing templates, are available on the Resources page.
Folder Structure
All electronic file submissions shall be submitted within the following Folder Structure. Please see the Default Folder Structure in the General Section for descriptions of folders not listed here.
Page 45
LAYER NAME
EX-EV-REGL-BUFFER-100 EX-EV-REGL-FLOOD EX-EV-REGL-MHW EX-EV-REGL-OHWL EX-EV-REGL-RIVR-FRNT EX-EV-TEXT PR-EV-EROS PR-EV-REGL-MITG PR-EV-TEXT
COLOR
240 magenta 212 212 221 magenta 131 131 131
LINETYPE
DASHEDX2 BORDERX2 BORDER BORDER2 BORDER2 Continuous Continuous Continuous Continuous
PLOT STYLE
ENVR EXIST ENVR EXIST ENVR EXIST ENVR EXIST ENVR EXIST ENVR EXIST ENVR PROP ENVR PROP ENVR PROP
DESCRIPTION
Regulatory 100 ft Buffer Zone Regulatory Flood Zones Regulatory Mean High Water - Tidal Regulatory Ordinary High Water Non-Tidal Regulatory Riverfront Protection Zones Environmental Text Proposed Environmental - Erosion Control Regulatory Mitigation Areas Proposed Environmental - Text
Page 46
The use of DesignCenter to drag-n-drop these layouts into a project DWG is recommended.
ATTENTION Do not use the ENVIRONMENTAL_SHEETS.dwg for any design related AutoCAD work. They do not contain the necessary layers, text styles, dimension styles or plot styles.
ENVIRONMENTAL_SHEETS.dwg can be found in the Resources Section by clicking here.
Page 47
Geotechnical
File Submission Requirements
MassDOT Highway Division Geotechnical Section requires that all file submissions shall include the following file types. AutoCAD Drawing format ( .dwg) AutoCAD Drawing Web Format ( .dwf) Adobe Portable Document Format ( .pdf) PLEASE NOTE: Actual software version used by MassDOT internally will change from time to time, therefore please refer to the specific project contract or check with the project manager for actual version and submission requirements. Prior versions of the CAD Standard, including drawing templates, are available on the Resources page.
Folder Structure
MassDOT Highway Division Geotechnical Section requires that all electronic file submissions shall be submitted within the following Folder Structure. Please see the Default Folder Structure in the General Section for descriptions of folders not listed here.
PHOTOS files associated with site photographs, pictures IMAGES scanned field notes, research, etc (Non-externally referenced images)
Page 48
LAYER NAME
EX-GT-FEAT PR-GT-FEAT
COLOR
9 white
LINETYPE
Continuous Continuous
PLOT STYLE
BR 50% BR 100%
DESCRIPTION
Existing Geotechnical Features Geotechnical - Proposed Features and Text
Page 49
The use of DesignCenter to drag-n-drop these layouts into a project DWG is recommended.
ATTENTION Do not use the GEOTECH_SHEETS.dwg for any design related AutoCAD work. They do not contain the necessary layers, text styles, dimension styles or plot styles.
GEOTECH_SHEETS.dwg can be found in the Resources Section by clicking here.
Page 50
NOTE: The use of DesignCenter to drag-n-drop these symbols and blocks into a project DWG is recommended.
Page 51
Highway Design
File Submission Requirements
MassDOT Highway Division Highway Design Section requires that all file submissions shall include the following file types. AutoCAD Drawing format ( .dwg) AutoCAD Drawing Web Format ( .dwf) Adobe Portable Document Format ( .pdf) Actual software version used by MassDOT internally will change from time to time, therefore please refer to the specific project contract or check with the project manager for actual version and submission requirements. Prior versions of the CAD Standard, including drawing templates, are available on the Resources page.
Civil 3D Objects
The following design items must be created as AutoCAD Civil 3D objects and must be assigned MassDOT Civil 3D Object Styles using the provided MassDOT Civil 3D drawing template. POINTS SURFACES ALIGNMENTS PROFILES - SECTIONS CORRIDORS PIPE NETWORKS
Folder Structure
All electronic file submissions shall be submitted within the following Folder Structure. Please see the Default Folder Structure in the General Section for descriptions of folders not listed here.
PHOTOS files associated with site photographs, pictures IMAGES scanned field notes, research, etc (Non-externally referenced images)
Page 52
COLOR
white white white white white white white
LINETYPE
Continuous Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
ROW 100% SOLID 100% SOLID 100% ROW 100% SOLID 100% SOLID 100% SOLID 100%
DESCRIPTION
Boundary Line CIVIL 3D OBJECT Feature Line - CIVIL 3D OBJECT Interference - CIVIL 3D OBJECT Parcel - CIVIL 3D OBJECT Surface - CIVIL 3D OBJECT Survey - CIVIL 3D OBJECT Utility Line - CIVIL 3D OBJECT
PROPOSED LAYERS
PR-HD-ASSM PR-HD-ASSM-LINK PR-HD-ASSM-XSECT PR-HD-BL-CT PR-HD-BL-RR PR-HD-BL-SHLO PR-HD-BL-TEXT PR-HD-BL-TN PR-HD-BL-XX PR-HD-CONT white white white white white white white white white 30 Continuous Continuous Continuous DASHED DASHEDX2 DASHED Continuous DASHED2 DASHED2 Continuous SOLID 100% SOLID 100% SOLID 100% ROW 200% ROW 200% ROW 200% ROW 100% ROW 200% ROW 200% SOLID 100% Proposed Assembly Proposed Assembly: corridor and section links Proposed Assembly: corridor cross section Proposed Baseline - County Proposed Baseline - Railroad Proposed Baseline - State Highway Proposed Baseline - Proposed Text Proposed Baseline - City/Town Proposed Baseline - Miscellaneous Proposed Contours
Page 53
COLOR
white 141 32 white 20 white 141 white 62 62 white 71 71 white white white 200 200
LINETYPE
Continuous Continuous Continuous Continuous Continuous HIDDEN Continuous Continuous FENCE CHAIN LINK FENCE WOOD RAIL Continuous GUARDRAIL STEEL GUARDRAIL WOOD Continuous Continuous Continuous RETWALL STONEWALL
PLOT STYLE
SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 200% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100%
DESCRIPTION
Proposed Corridor Proposed Corridor: corridor patterns Roadways: corridor and section shapes Roadways: corridor and section shapes hatching Proposed Curbing Proposed Daylight Proposed Miscellaneous Items Proposed Edge of Pavement Proposed Fence Chain Link Proposed Fence Wood Rail Proposed Grade Proposed Guardrail Steel Posts Proposed Guardrail Wood Posts Proposed Gravel Proposed Sideslope Proposed Sidewalks Proposed Walls - Retaining Proposed Walls Balanced Stone
Page 54
The use of DesignCenter to drag-n-drop these layouts into a project DWG is recommended.
ATTENTION Do not use the HWYDESIGN_SHEETS.dwg for any design related AutoCAD work. They do not contain the necessary layers, text styles, dimension styles or plot styles.
HWYDESIGN_SHEETS.dwg can be found in the Resources Section by clicking here.
Page 55
Page 56
Page 57
Landscape Design
File Submission Requirements
MassDOT Highway Division Landscape Section requires that all file submissions shall include the following file types. AutoCAD Drawing format ( .dwg) AutoCAD Drawing Web Format ( .dwf) Adobe Portable Document Format ( .pdf) PLEASE NOTE: Actual software version used by MassDOT internally will change from time to time, therefore please refer to the specific project contract or check with the project manager for actual version and submission requirements. Prior versions of the CAD Standard, including drawing templates, are available on the Resources page.
Folder Structure
MassDOT Highway Division Landscape Section requires that all electronic file submissions shall be submitted within the following Folder Structure. Please see the Default Folder Structure in the General Section for descriptions of folders not listed here.
PHOTOS files associated with site photographs, pictures IMAGES scanned field notes, research, etc (Non-externally referenced images)
Page 58
LAYER NAME
EX-LD-SITE-FEAT EX-LD-VEGE EX-LD-VEGINV PR-LD-DETAILS PR-LD-DIMS PR-LD-GRCOVER PR-LD-HATCH PR-LD-ORNGRASS PR-LD-PERNNL PR-LD-PLNT-TAG PR-LD-SEED PR-LD-SHRUB PR-LD-SITE-FURNISH PR-LD-TEXT PR-LD-TREE PR-LD-TREE-PROT
COLOR
170 green 12 white 240 green white yellow red 240 green white 182 240 white 182
LINETYPE
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
SURVEY 100% SURVEY 100% SURVEY 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 200% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 200% SOLID 200%
DESCRIPTION
Existing Landscape Site Features Existing Trees, Shrubs, and Vegetation Existing Invasive Vegetation Proposed Landscaping Details Proposed Landscaping Dimensions Proposed Ground Cover Proposed Hatching Proposed Ornamental Grass Proposed Perennial Proposed Plant Tag Proposed Seed - Standard Proposed Shrubs Proposed Site Furnishings Proposed Landscaping Text Proposed Trees Proposed Tree Protection
Page 59
The use of DesignCenter to drag-n-drop these layouts into a project DWG is recommended.
ATTENTION Do not use the LANDSCAPE_SHEETS.dwg for any design related AutoCAD work. They do not contain the necessary layers, text styles, dimension styles or plot styles.
LANDSCAPE_SHEETS.dwg can be found in the Resources Section by clicking here.
Page 60
NOTE: The use of DesignCenter to drag-n-drop these symbols and blocks into a project DWG is recommended.
Invasive Plants
If applicable, identify and delineate invasive plant species within and bordering the project limits. Include approximate area of plants.
Survey Layers
Show all layers such as utilities, signs, signals and lighting to avoid plant placement conflicts.
Tree Protection
Show tree protection measures on the Construction and Landscape Plans. protection for existing trees within or adjacent to construction staging areas. Include tree
Key Plan
Landscape key plans are useful on interchange, large corridor and shared-use path projects. Show a smaller key plan on each sheet with the corresponding sheet highlighted for reference (Optional).
North Arrow
Show a north arrow on all landscape plans except detail sheets.
Bar Scale
Show a bar scale on all landscape plans. Detail sheets may include bar scales as needed.
Plant Symbols
Show plant symbol graphics to accurately show proper plant spacing of plant material based on the species type and specified size. Link groups of the same plant species together with a continuous leader line and label with a quantity and an alphanumeric symbol that corresponds to the plant list. (See Plant List below).
Plant List
Provide a plant list on each sheet that corresponds to plants for that sheet. Include a summary plant list with the landscape details. Plant lists will include the following: Quantity for each species Symbol (alphanumeric) Description (per MassDOT-Nomenclature & List of Standard Items) Botanical Name Specified Size Comments/Notes Quantity per area (where applicable)
Legend
Provide a legend on each sheet for symbols, hatch patterns and other relevant information.
Notes
Add or remove notes from the standard note block as necessary. Notes should avoid repeating information contained in specifications to avoid conflicts.
Layouts
File Submission Requirements
MassDOT Highway Division Layouts Section requires that all file submissions shall include the following file types. AutoCAD Drawing format ( .dwg) AutoCAD Drawing Web Format ( .dwf) Adobe Portable Document Format ( .pdf) PLEASE NOTE: Actual software version used by MassDOT internally will change from time to time, therefore please refer to the specific project contract or check with the project manager for actual version and submission requirements. Prior versions of the CAD Standard, including drawing templates, are available on the Resources page.
Folder Structure
MassDOT Highway Division Layouts Section requires that all electronic file submissions shall be submitted within the following Folder Structure. Please see the Default Folder Structure in the General Section for descriptions of folders not listed here.
PHOTOS files associated with site photographs, pictures IMAGES scanned field notes, research, etc (Non-externally referenced images)
Page 66
LAYER NAME
EX-LO-CT EX-LO-RR EX-LO-SHLO EX-LO-TEXT EX-LO-TN EX-LO-TP PR-LO-CT PR-LO-RR PR-LO-SHALT PR-LO-SHDISC PR-LO-SHLO PR-LO-SHLO-SPRCD PR-LO-TEXT PR-LO-TN
COLOR
yellow yellow yellow yellow yellow yellow 231 231 231 231 231 231 231 231
LINETYPE
CENTERX2 EXIST RR SIDELINE Continuous Continuous PHANTOM PHANTOM2 Continuous Continuous Continuous Dashed Continuous Dashed Continuous Continuous
PLOT STYLE
ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 200% ROW 200% ROW 200% ROW 200% ROW 200% ROW 100% ROW 200% ROW 200%
DESCRIPTION
Existing County Layout Lines Existing Railroad Layout Lines Existing State Highway Layout Lines Existing Text for Layout Information Existing Town/City Layout Lines Existing Turnpike Authority Layout Lines Proposed County Layout Lines Proposed Railroad Layout Lines Proposed State Highway Alteration Lines Proposed State Highway Discontinuance Lines Proposed State Highway Layout Lines Proposed State Highway Superseded Layout Lines Proposed Text for Layout Information Proposed Town/City Layout Lines
Page 67
The use of DesignCenter to drag-n-drop these layouts into a project DWG is recommended.
ATTENTION Do not use the LAYOUTS_SHEETS.dwg for any design related AutoCAD work. They do not contain the necessary layers, text styles, dimension styles or plot styles.
LAYOUT_SHEETS.dwg can be found in the Resources Section by clicking here.
Page 68
Page 69
Right of Way
File Submission Requirements
MassDOT Highway Division Right of Way Section requires that all file submissions shall include the following file types. AutoCAD Drawing format ( .dwg) AutoCAD Drawing Web Format ( .dwf) Adobe Portable Document Format ( .pdf) PLEASE NOTE: Actual software version used by MassDOT internally will change from time to time, therefore please refer to the specific project contract or check with the project manager for actual version and submission requirements. Prior versions of the CAD Standard, including drawing templates, are available on the Resources page.
Folder Structure
MassDOT Highway Division Right of Way Section requires that all electronic file submissions shall be submitted within the following Folder Structure. Please see the Default Folder Structure in the General Section for descriptions of folders not listed here.
PHOTOS files associated with site photographs, pictures IMAGES scanned field notes, research, etc (Non-externally referenced images)
Page 70
LAYER NAME
PR-RW-FEE-CITY PR-RW-FEE-DRAIN PR-RW-FEE-STATE PR-RW-MISC PR-RW-MONU PR-RW-PERMEASE-CITY PR-RW-PERMEASE-DRAIN PR-RW-PERMEASE-STATE PR-RW-TEMPEASE PR-RW-TEXT
COLOR
32 163 51 211 84 32 141 41 42 211
LINETYPE
Continuous Continuous Continuous Continuous Continuous LINE OF EASE LINE OF EASE LINE OF EASE LINE OF EASE Continuous
PLOT STYLE
ROW 200% ROW 200% ROW 200% ROW 200% ROW 100% ROW 200% ROW 200% ROW 200% ROW 200% ROW 100%
DESCRIPTION
Proposed Town/City Fee Taking Proposed Drainage Fee Taking Proposed State Fee Taking Proposed Miscellaneous Items Proposed Monuments Proposed Permanent Easement CITY Proposed Permanent Drainage Easement Proposed Permanent Easement STATE Proposed Temporary Easement Proposed Right of Way Text
Page 71
No other borders will be accepted. The use of DesignCenter to drag-n-drop these layouts into a project DWG is recommended.
ATTENTION Do not use the ROW_SHEETS.dwg for any design related AutoCAD work. They do not contain the necessary layers, text styles, dimension styles or plot styles.
ROW_SHEETS.dwg can be found in the Resources Section by clicking here.
Page 72
Survey
File Submission Requirements
MassDOT Highway Division Survey Section requires that all file submissions shall include the following file types. AutoCAD Drawing format ( .dwg) AutoCAD Drawing Web Format ( .dwf) Adobe Portable Document Format ( .pdf) PLEASE NOTE: Actual software version used by MassDOT internally will change from time to time, therefore please refer to the specific project contract or check with the project manager for actual version and submission requirements. Prior versions of the CAD Standard, including drawing templates, are available on the Resources page.
Civil 3D Objects
The following design items must be created as AutoCAD Civil 3D objects and must be assigned MassDOT Civil 3D Object Styles using the provided MassDOT Civil 3D drawing template. POINTS SURFACES ALIGNMENTS PROFILES - SECTIONS PIPE NETWORKS
Folder Structure
MassDOT Highway Division Survey Section requires that all electronic file submissions shall be submitted within the following Folder Structure. Please see the Default Folder Structure in the General Section for descriptions of folders not listed here.
PHOTOS files associated with site photographs, pictures SCANNED IMAGES scanned field notes, research, etc (Non-externally referenced images) SURVEY DB location for the Civil 3D Survey Database
Page 73
EXISTING LAYERS
EX-SV-BL-CT EX-SV-BL-RR EX-SV-BL-SHLO EX-SV-BL-TEXT EX-SV-BL-TN EX-SV-BL-TP EX-SV-BL-XX EX-SV-BLDG EX-SV-BP-ALL EX-SV-BP-TEXT EX-SV-BR-DETL EX-SV-CONT-MJR EX-SV-CONT-MNR EX-SV-CONT-TXT EX-SV-CONT-USER EX-SV-DETL EX-SV-DRWY EX-SV-EROS
COLOR
red red red red red red red 9 253 253 9 142 54 red 172 8 9 55
LINETYPE
DASHED EXIST RR SIDELINE CONST BASELINE Continuous DASHED2 DASHED DASHED2 Continuous Continuous Continuous Continuous DASHED DASHED2 Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 50% SOLID 50% SURVEY 100% SURVEY 100% SOLID 50% SURVEY 100% SURVEY 100% SURVEY 100%
DESCRIPTION
Existing Baseline - County Existing Baseline - Railroad Existing Baseline - State Highway Existing Baseline - Text Existing Baseline - City/Town Existing Baseline - Turnpike Authority Existing Baseline - Miscellaneous Existing Buildings, Decks Survey Point - Default Point Layer Survey Point - Text Labels Existing Bridge Items and Structures Existing Contours - MAJOR Existing Contours - MINOR Existing Contours - Text Existing User-Defined Contours Existing Miscellaneous Detail Existing Driveway Items Existing Erosion Control
Page 74
COLOR
white 9 9 9 9 9 9 white cyan yellow white yellow red 9 9 9 white white 8 104
LINETYPE
Continuous FENCECHAIN LINK FENCEWOOD RAIL GUARDRAIL-STEEL GUARDRAIL-WOOD Continuous Continuous LINE OF EASE PROP LINE STATE BNDY LINE Continuous CENTERX2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
SOLID 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% ROW 100% ROW 100% ROW 100% ROW 100% ROW 100% SURVEY 150% SURVEY 50% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100%
DESCRIPTION
Existing Survey Figure Existing Chain Link or Metal Fences Existing Wood Fences Existing Steel Post Guardrail and Barrier Existing Wood Post Guardrail and Barrier Existing Ground Surface Existing Soil, Gravel, and Stone Existing Easement Lines Existing Abutting Property Lines Existing State Boundary Lines Existing Boundary Line Text Existing Town/City Boundary Lines Existing Monuments, Survey Points Existing Pavement Markings Existing Roadway Items Existing Railroad Items Existing Surface - Border Existing Surface - Faults, Breaklines Existing Surface - TIN lines Existing Text
Page 75
COLOR
31 104 9 163 163 blue
LINETYPE
Continuous Continuous Continuous RETWALL STONEWALL DASHED
PLOT STYLE
SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% SURVEY 100% ENVR BOLD
DESCRIPTION
Existing Traffic Items Existing Vegetation Existing Walkways Existing Walls - Retaining Existing Walls Balanced Stone Existing Wetlands, Ponds, Rivers
COLOR
white white white white white white white
LINETYPE
Continuous Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
ROW 100% SOLID 100% SOLID 100% ROW 100% SOLID 100% SOLID 100% SOLID 100%
DESCRIPTION
Boundary Line CIVIL 3D OBJECT Feature Line - CIVIL 3D OBJECT Interference - CIVIL 3D OBJECT Parcel - CIVIL 3D OBJECT Surface - CIVIL 3D OBJECT Survey - CIVIL 3D OBJECT Utility Line - CIVIL 3D OBJECT
Page 76
The use of DesignCenter to drag-n-drop these layouts into a project DWG is recommended.
ATTENTION Do not use the SURVEY_SHEETS.dwg for any design related AutoCAD work. They do not contain the necessary layers, text styles, dimension styles or plot styles.
SURVEY_ SHEETS.dwg can be found in the Resources Section by clicking here.
Page 77
Page 78
Figure Prefixes
A standard figure prefix database has been provided which automatically places field-to-finish line work onto the proper MassDOT layers. Please refer to the Resource Section for the appropriate version. A sample point file, MassDOT TESTPNTS.txt, and sample field book, MassDOT Points and Figures.FBK are available on the Resource Section for testing. The MassDOT Testpnts.txt file contains data for point codes, each with a different MassDOT description code. You may wish to import these points into a drawing as an example of the layers, description codes, and symbols. The Points and Figures.fbk file contains data for point codes and figure codes, each with a different MassDOT description code. You may wish to import this file into a drawing as an example of the layers, description codes, symbols, and figures. The following table contains both Description Keys and Figure Prefixes. Since the field-to-finish functionality uses the same codes, codes which do not have Figure Prefixes associated with them are SHADED. Any code that is not shaded is both a Description Key and a Figure Prefix.
Page 79
BD BLCL BLCT BLEA BLPL BLST BLTN BRAB BRAT BRCB BRCL BRCN BRDK BRFB BRFT BRIB BRJB BRMP BROT BRPR BRPS BRRL BRSM BRSS BRST BRWB BRWD BRWT BRXJ BS BWLL BYLL CB CC CH CI CL CR CS CUBC CUBS
BUILDING BOUNDARY - CONSTRUCTION LIMIT BOUNDARY - COUNTY LINE BOUNDARY - EASEMENT BOUNDARY - PROPERTY BOUNDARY - STATE LINE BOUNDARY - CITY OR TOWN BRIDGE - ABUTMENT BOT BRIDGE - ABUTMENT TOP BRIDGE - CONCRETE BEAM BRIDGE - COLUMN BRIDGE - CONCRETE BRIDGE - DECK BRIDGE - EXPOSED FOOTING BOTTOM BRIDGE - EXPOSED FOOTING TOP BRIDGE - I BEAM BRIDGE - JERSEY BARRIER BRIDGE - METAL PLATE BRIDGE - OTHER BRIDGE - PIER TOP BRIDGE - PIER (POINT) BRIDGE - RAILING BRIDGE - STRUCT MEMBER BRIDGE - STRUCT MEMBER (POINT) BRIDGE - STEEL BRIDGE - WINGWALL BOTTOM BRIDGE - WOOD BRIDGE - WINGWALL TOP BRIDGE - EXPANSION JOINT BOTTOM OF SLOPE BROKEN WHITE LANE LINE BROKEN YELLOW LANE LINE CATCH BASIN CONCRETE COVER CATCH BASIN HEADWALL CURB INLET CENTER LINE - MISCELLANEOUS CROWN OF ROAD CHANGE IN SLOPE CULVERT - CONCRETE BOX CULVERT - STONE BOX
CUCC CUCS CUTB CUTC CUTE CUTN CX DAMC DAMO DBEN DBIN DBKR DBPT DBUOY DBW DCAN DCNE DCNP DCSITE DECK DFNT DFPL DGC DGFP DGP DI DL DMBX DMHR DOC DPCN DPCR DPGR DPLE DPLN DPMT DPOO DPSQ DPST DPWD DREC
CULVERT - CONCRETE CIRCULAR CULVERT - STONE CIRCULAR CURB - BERM CURB CUT CURB - GRANITE CURB CUT CURB - SLOPED GRANITE CURB CUT CURB - CONCRETE CURB CUT CENTER OF ROAD DAM - CONCRETE DAM - OTHER BENCH - (e.g. PARK BENCH) STORAGE BIN BIKE RACK BITUMINOUS PATCH BUOY BORROW SITE TRASH CAN CONC PAD - ELEC TRANS CONC PAD CONSTRUCTION SITE DECK - HSE OR BLDG FOUNTAIN FLAG POLE GOLF COURSE GAS PUMP GRAVEL PIT DROP INLET DITCH LINE MAIL BOX METAL HAND RAIL OIL CAP POST - CONC PILLAR - CIRCULAR POST - GRANITE PILE PLANTER POST - METAL POOL PILLAR - SQUARE POST - OTHER POST - WOOD RECREATION EQUIPMENT
Page 80
DROC DRVB DRVC DRVG DRVO DRVX DSAT DSBR DSCN DSPP DSWD DTBH DTNK DTOW DVLT DVLV DVPP DWEL DWHL DYCL DYLL EC EG EHH EL EM EN EP ERED ERP ESDE ESDG ESOIL FCBW FCCL FCCR FCGA FCIP FCOT FCS FCWD
ROCK OUTCROP DRIVE - BITUMINOUS CONC DRIVE - CEMENT CONC DRIVE - GRAVEL/DIRT/OTHER DRIVE - RANDOM SHOT DRIVE - CENTER SATELLITE DISH STAIRS - BRICK STAIRS - CONC STAND PIPE STAIRS - WOOD TELEPHONE BOOTH TANK TOWER VAULT UNDERGROUND VALVE VENT PIPE WELL CONCRETE WHEEL STOP DBL YELLOW CENTERLINE DBL YELLOW LANE LINE EDGE COBBLESTONE EDGE GRAVEL ELEC HANDHOLE EDGE GRASS/LAWN EDGE MATERIAL PILE EDGE CEMENT CONC EDGE PAVE - BITUMINOUS EDGE ROAD - EDGE DRIVE EDGE RIPRAP EDGE OF STONE FOR DRAINAGE END EDGE OF DENSE GRADED CRUSHED STONE EDGE SOIL/DIRT/SAND FENCE - BARBED WIRE FENCE - CHAIN LINK FENCE - CEDAR RAIL FENCE - GATE (BOTH ENDS) FENCE - IRON PIPE FENCE - OTHER FENCE - SEDIMENTATION FENCE - WOOD
FL FN GCSL GCSR GCTL GCTR GFL GGT GMT GPL GPV GRET GRTD GRTL GRTR GRWD GRWL GRWR GTBH GTOW GTPZ GTTP GWA HB HC HHL HO HRCB HS HYD JBDF JBSF KB KC KF KG KO
STREAM/RIVER FLOW LINE FOUNDATION GUARD RAIL - CABLE - STL POSTS LEFT OF DIR OF SURVEY GUARD RAIL - CABLE - STL POSTS RIGHT OF DIR OF SURVEY GUARD RAIL - CABLE - TRIA POSTS LEFT OF DIR OF SURVEY GUARD RAIL - CABLE - TRIA POSTS RIGHT OF DIR OF SURVEY GAS FILL GAS GATE GAS METER GUY POLE PAVED GUTTER GUARD RAIL - END TREATMENT GUARD RAIL - STL THRIE BEAM DBL FACED GUARD RAIL - STL THRIE BEAM POSTS LEFT OF DIR OF SURVEY GUARD RAIL - STL THRIE BEAM POSTS RIGHT OF DIR OF SURVEY GUARD RAIL - STL W BEAM DBL FACED GUARD RAIL - STL W BEAM POSTS LEFT OF DIR OF SURVEY GUARD RAIL - STL W BEAM POSTS RIGHT OF DIR OF SURVEY BORE HOLE OBSERVATION WELL PIEZOMETER TEST PIT GUY WIRE ANCHOR HAYBALES FOR EROSION CONTROL HEADWALL - CONC HANDHOLE HEADWALL - OTHER GRANITE TRANSITION CURB - WHEEL CHAIR RAMP HEADWALL - STONE HYDRANT PRECAST CONC BARRIER (DBL FACED) PRECAST CONC BARRIER (SINGLE FACED) EDGE WALK - BIT CONC EDGE WALK - CEMENT CONC EDGE WALK - FLAGSTONE EDGE WALK - GRAVEL/DIRT/OTHER WALK - RANDOM SHOT
Page 81
KR KWA KWC KX LOAM LPDL LPL MBMK MCTB MDHL MELP MFLY MGPS MHC MHD MHE MHG MHM MHO MHS MHT MHW MIPE MMHB MMON MPHH MPHV MPKN MRRS MRST MSBD MSTN MTBD MTRV MTSN MXCT OS OW PELH PELL PELV
EDGE WALK - BRICK WHEELCHAIR RAMP - ASPHALT WHEELCHAIR RAMP - CEMENT CONC WALK - CENTER LOAM LIGHT POLE - DOUBLE LIGHT LIGHT POLE - SINGLE LIGHT MON - BENCHMARK MON - COUNTY BOUND MON - DRILL HOLE MON - ESCUTCHEON PIN LEAD PLUG MON - SURVEY CHECK SHOT MON - GPS CONTROL POINT MANHOLE - CATV MANHOLE - DRAINAGE MANHOLE - ELECTRIC MANHOLE - GAS MANHOLE - STEAM MANHOLE - OTHER MANHOLE - SEWER MANHOLE - TELEPHONE MANHOLE - WATER MON - IRON PIPE MON - MASS HIGHWAY BOUND MON - MONUMENT MON - PHOTO CONTROL POINT HORIZONTAL MON - PHOTO CONTROL POINT - VERTICAL MON - PK NAIL MON - RAILROAD SPIKE MON - TOWN LINE ROAD STONE MON - STONE BOUND MON - STAKE & NAIL MON - TOWN CORNER BOUND OR WITNESS MON - TRAVERSE STATION MON - MASS TRIANGULATION STATION MON - CROSS CUT ON SLOPE OVERHEAD WIRE SPOT ELEV - HIGH POINTS SPOT ELEV - LOW POINTS SPOT ELEV - INTER SHOTS
R1 R2 RRRM RRSG RRSW RRTK SI SLCT SLMH SLRR SLTN SLTP SWA SWEL SWGL SWLL SYEL SYGL SYLL TACB TB TC TE TFCC TFFB TFHS TFMA TFMT TFPB TFPD TFRR TFS1 TFS2 TFSC TFSG TFSN TFSO TFSS TFSW TFUL TL
RIGHT EDGE OF WATER LEFT EDGE OF WATER RUBBER MAT RAILROAD SIGNAL RAILROAD SWITCH RAILROAD TRACKS SILL - DOOR, BUILDING, FOUNDATION SIDELINE - COUNTY HIGHWAY LAYOUT SIDELINE - MASS HIGHWAY LAYOUT SIDELINE - RAILROAD LAYOUT SIDELINE - TOWN OR CITY LAYOUT SIDELINE - MASS TURNPIKE LAYOUT SWALE SOLID WHITE EDGE LINE SOLID WHITE GORE LINE SOLID WHITE LANE LINE SOLID YELLOW EDGE LINE SOLID YELLOW GORE LINE SOLID YELLOW LANE LINE ASPHALT CURB TOP OF BERM - BITUMINOUS TOP OF CURB - GRANITE TOP OF EDGING - SLOPED GRANITE TRAFFIC SIGNAL CONTROLLER CABINET FLASHING BEACON PARKING HANDICAP SPACE - SIGNAL POINT TRAFFIC SIGNAL MAST ARM POLE PARKING METER PULL BOX TRAFFIC SIGNAL PEDESTRIAN RAILROAD SIGNAL SMALL SIGN - SINGLE POST SMALL SIGN - DOUBLE POST SIGNAL CONDUIT TRAFFIC SIGNAL POST MOUNTED BILLBOARD OR OTHER LARGE GROUND SIGN OVERHEAD SIGN (LOCATION OF OVRHNG) OVERHEAD SIGN (LOCATION OF SUPPORT) TRAFFIC SIGNAL SPAN WIRE ASSEMBLY POLE LOOP DETECTOR TRAILER
Page 82
TN TPCE TPL TRNP TS UC UDDI UDMP UDOT UDPP UDRC UE UFB UG ULT UM UO UPDL UPL USOT USPC USRC UT UWDI UWOT VF VGBU VGCA VGHE VGST VGT1 VGT2 VGT3 VGTO VGWA VGWF VGWL WC WGT WLBR WLCN
TOP OF CONC CURB CONC EDGING TROLLEY POLE CROSS COUNTRY TRANSMISSION POLE TOP OF SLOPE UTILITY - CABLE LINE UTILITY - DUCTILE IRON UTILITY - METAL UTILITY - DRAINAGE, OTHER UTILITY - CORRUGATED PLASTIC UTILITY - REINFORCED CONCRETE UTILITY - ELECTIRC UTILITY POLE WITH FIRE BOX UTILITY - GAS UTILITY POLE WITH SINGLE LIGHT UTILITY - STEAM UTILITY - MISCELLANEOUS UTILITY POLE WITH DOUBLE LIGHT UTILITY POLE UTILITY - SEWER, OTHER UTILITY - POLYVINYLCHLORIDE SEWER UTILITY - REINFORCED CONC SEWER UTILITY - TELEPHONE UTILITY - DUCTILE IRON WATER UTILITY - WATER, OTHER ELEVATION FINISH FLOOR BUSH CULTIVATED AREA EDGE HEDGE STUMP SMALL DIAMETER TREE (<12) MEDIUM DIAMETER TREE (12-24) LARGE DIAMETER TREE (>24) UNKNOWN DIAMETER TREE SWAMP/MARSH OR WETLAND OUTLINE WETLAND FLAG (with number) WOODS OR BRUSH LINE WOOD CHIP MULCH WATER GATE WALL - BRICK (FACE @ GROUND) WALL - CONCRETE (FACE @ GROUND)
WALL - DOUBLE FACED (FACE @ GROUND) WALL - OTHER (FACE @ GROUND) WALL - POINTED WALL (FACE @ GROUND) WALL - RETAINING (FACE @ GROUND) WALL - STONE MASONRY WALL - STONEWALL WALL - TOP (ANY TYPE) WATER METER EDGE OF WATER (RIVER,POND) PAVED WATERWAY
Page 83
Traffic
File Submission Requirements
MassDOT Highway Division - Traffic Section requires that all file submissions shall include the following file types. AutoCAD Drawing format ( .dwg) AutoCAD Drawing Web Format ( .dwf) Adobe Portable Document Format ( .pdf) PLEASE NOTE: Actual software version used by MassDOT internally will change from time to time, therefore please refer to the specific project contract or check with the project manager for actual version and submission requirements. Prior versions of the CAD Standard, including drawing templates, are available on the Resources page.
Folder Structure
MassDOT Highway Division Traffic Section requires that all electronic file submissions shall be submitted within the following Folder Structure. Please see the Default Folder Structure in the General Section for descriptions of folders not listed here.
PHOTOS files associated with site photographs, pictures IMAGES scanned field notes, research, etc (Non-externally referenced images)
Page 84
LAYER NAME
EX-TR-FEAT EX-UT-TR-UGND PR-TR-FEAT PR-TR-LGHT PR-TR-PVMK PR-TR-SGNL PR-TR-SGNS PR-TR-TEXT PR-TR-UGND
COLOR
31 31 31 31 31 31 31 31 30
LINETYPE
Continuous CONDUIT Continuous Continuous Continuous Continuous Continuous Continuous CONDUIT
PLOT STYLE
SURVEY 100% UTILITY EXIST SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% SOLID 100% UTILITY PROP
DESCRIPTION
Existing Traffic Items Existing Traffic Items - Underground Proposed Traffic Items Proposed Traffic Lighting Proposed Traffic Pavement Markings Proposed Traffic Signals Proposed Traffic Signs Proposed Traffic Text Proposed Traffic Items - Underground
Page 85
The use of DesignCenter to drag-n-drop these layouts into a project DWG is recommended.
ATTENTION Do not use the TRAFFIC_SHEETS.dwg for any design related AutoCAD work. They do not contain the necessary layers, text styles, dimension styles or plot styles.
TRAFFIC_SHEETS.dwg can be found in the Resources Section by clicking here.
Page 86
Page 87
Utilities
File Submission Requirements
MassDOT Highway Division - Utilities Section requires that all file submissions shall include the following file types. AutoCAD Drawing format ( .dwg) AutoCAD Drawing Web Format ( .dwf) Adobe Portable Document Format ( .pdf) PLEASE NOTE: Actual software version used by MassDOT internally will change from time to time, therefore please refer to the specific project contract or check with the project manager for actual version and submission requirements. Prior versions of the CAD Standard, including drawing templates, are available on the Resources page.
Folder Structure
MassDOT Highway Division Utilities Section requires that all electronic file submissions shall be submitted within the following Folder Structure. Please see the Default Folder Structure in the General Section for descriptions of folders not listed here.
Page 88
LAYER NAME
EX-UT-CATV-STRC EX-UT-CATV-TXT EX-UT-CATV-UGND EX-UT-DRAIN-STRC EX-UT-DRAIN-TEXT EX-UT-DRAIN-UGND EX-UT-ELEC-STRC EX-UT-ELEC-TXT EX-UT-ELEC-UGND EX-UT-GAS-STRC EX-UT-GAS-TXT EX-UT-GAS-UGND EX-UT-OIL-STRC EX-UT-OIL-TXT EX-UT-OIL-UGND EX-UT-OTHR-STRC EX-UT-SEWER-STRC EX-UT-SEWER-TXT
COLOR
30 30 30 252 252 252 10 10 10 42 42 42 42 42 42 42 80 80
LINETYPE
Continuous Continuous HIDDEN2 Continuous Continuous HIDDEN2 Continuous Continuous HIDDEN2 Continuous Continuous HIDDEN2 Continuous Continuous HIDDEN2 Continuous Continuous Continuous
PLOT STYLE
UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST SV UTILITY EXIST SV UTILITY EXIST SV UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST
DESCRIPTION
Existing Cable TV Structures Existing Cable TV Text Existing Cable TV Underground Existing Drainage Items Existing Drainage Text Existing Drainage Underground Existing Electric Structures Existing Electric Text Existing Electric Underground Existing Gas Items Existing Gas Text Existing Gas Underground Existing Oil Structures Existing Oil Text Existing Oil Underground Existing Utility - OTHER Structures Existing Sewer Items Existing Sewer Text
Page 89
COLOR
80 42 42 42 30 30 30 30 30 blue blue blue
LINETYPE
HIDDEN2 Continuous Continuous HIDDEN2 Continuous Continuous HIDDEN HIDDEN2 HIDDEN2 Continuous Continuous HIDDEN2
PLOT STYLE
UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST SV UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST UTILITY EXIST
DESCRIPTION
Existing Sewer Underground Existing Steam Structures Existing Steam Text Existing Steam Underground Existing Telephone/Communication Structures Existing Telephone/Communication Text Existing Telephone/Communication Overhead Existing Telephone/Communication Underground Existing Traffic Underground Existing Water Systems Structures Existing Water Systems Text Existing Water Systems Underground
COLOR
40 40 40 254 254 254 white 254 254
LINETYPE
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP
DESCRIPTION
Proposed Communication/CATV Proposed Communication/CATV Text Proposed Communication/CATV Underground Proposed Drainage Proposed Drainage Ditch Proposed Drainage Pipes Proposed Drainage Hatching Proposed Drainage Profile Proposed Drainage Text
Page 90
COLOR
11 11 11 44 44 44 93 93 white 93 93 40 40 40 40 150 150 white 150 150
LINETYPE
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN Continuous Continuous Continuous Continuous Continuous Continuous Continuous
PLOT STYLE
UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP UTILITY PROP
DESCRIPTION
Proposed Electric Structures Proposed Electric Text Proposed Electric Underground Proposed Gas Items Proposed Gas Text Proposed Gas Underground Proposed Sewer Structures Proposed Sewer Pipes Proposed Sewer Hatching Proposed Sewer Profile Proposed Sewer Text Proposed Telephone/Communication Structures Proposed Telephone/Communication Overhead Proposed Telephone/Communication Text Proposed Telephone/Comm. Underground Proposed Water System Proposed Water System Pipes Proposed Water System Hatching Proposed Water System Profile Proposed Water System Text
Page 91
Page 92
Please Note These files will be updated periodically. Please check for updates and download the
latest versions of all files prior to beginning any project.
Plot Styles
The currently available plot styles are listed here. The information can be found and downloaded by clicking here. MADOT-C.stb for Color Plotting MADOT-D.stb for Design Sections Plotting MADOT-E.stb for Environmental Color Plotting MADOT-R.stb for Right of Way Plotting MADOT-S.stb for Survey Plotting MADOT-U.stb for Utility Color Plotting
Symbol Libraries
Each discipline has a standard set of pre-defined symbols, blocks, and title blocks, as listed below. The information can be found and downloaded by clicking here. BRIDGE_SYMBOLS.dwg HWYDESIGN_SYMBOLS.dwg GEOTECH_SYMBOLS.dwg LANDSCAPE_SYMBOLS.dwg LAYOUT_SYMBOLS.dwg SURVEY_SYMBOLS.dwg TRAFFIC_SYMBOLS.dwg