Description Rate of ash generated per unit Bottom ash generated per unit BA generated per shift No of jet pumps in BA hopper BA evacuation rate Capacity of each jet pump
Value Unit 302.12 tph 60.42 tph 483.39 3.00 219.72 73.24 36.62 25.00 219.72 659.17 1318.34 6.60 8701.06 256.34 0.07 2.80 0.03 0.18 179.99 200.00 tonnes Nos tph tph m3/hr % m3/h m3/h m3/h hrs m3/day m3/hr m3/s m/s m2 m mm NB
Concentration of slurry by weight Water for each jet pump Total water in BA slurry for each unit Total water in BA slurry for both units No. of hrs of operation per day Total water per day BA Slurry pipe size Flow rate of slurry Velocity of slurry in pipe line CS Area of pipe Dia of pipe Selected Pipe size
9 10 11 12 13 14 15 16
Coarse ash collection rate Coarse ash generated per shift No. of economiser hoppers No of CA jet pumps Coarse ash evacuation rate Capacity of each jet pump Concentration of slurry by weight Water for each jet pump Total water in CA slurry for each unit Total water in CA slurry for both units No. of hrs of operation per day
15.11 120.85 7.00 7.00 54.93 7.85 3.92 25.00 23.54 164.79 329.59 6.60
tph tonnes Nos Nos tph tph m3/hr % m3/hr m3/hr m3/hr hrs
Total water per day CA Slurry pipe size Flow rate of slurry Velocity of slurry in pipe line CS Area of pipe Dia of pipe Selected Pipe size
1087.63 m3/day 27.47 0.01 2.80 0.0027 0.06 58.92 80.00 m3/hr m3/s m/s m2 m mm NB
Fly Ash Evacuation System Rate of Fly Ash generated per unit
241.70 tph
Remarks 20 % of total ash each unit each unit 8 hr generation in 2.2 hr operation dry ash basis considering 2 t/m3 particle density Considering ash conc as 25% w/w
Rounded off
5% of total ash each unit each unit each unit 8 hr generation in 2.2 hr operation dry ash basis considering 2t/m3 particle density Considering ash conc as 25% w/w
Rounded off