Вы находитесь на странице: 1из 24

TPM

Elimination of the seizing on the Morgoil bearing


Description of the problem Situation
1200

Analysis
The roll force decreases with the speed

Prsentation n

MALFUNCTION OF THE BEARING

COUPLED LINE : TANDEM MILL 5 STAND

MALFUNCTION OF THE BEARING


The break of the oil film generates a seizing
1000

Roll force

SEIZING
800

GOOD
600

400

THE OIL VISCOSITY AND THE OIL QUALITY LOWER THE CURVE

Population of rolled coils

200

Speed of rotation
0 1 10 100 1000

Film dhuile

Working process
THE BACKUP ROLL
F= env 2000tonnes

The key parameters Consquences


Most important origins of the seizing
Water comes into the oil by the bearing joint Too much water in the oil The water can be eliminated by decantation but it is not scheduled No check of the joint quality

Action plan

implementation of a standard to decante manually the water in the oil (no more seizing with this single operation in 2005) writing of operating modes monthly, analysis of the oil

Bad quality of the oil

Too much water in the morgoil tank

putting up of temperature sensors on the oil circuit : -at the input of the bearings, to control viscosity

Seizing of the bearing

Lots of mtal particles

Particles accumulated in the filters

Filters are only washed once a week whichever the pollution

- at the output, to prevent seizing alarm and stop the mill if the temperature thresholds are exceeded

Too high temperature Bad viscosity of the oil Too low temprature No measurement of the temperature at the input of the bearing

putting up of a self cleaning filtration system putting up of a decantation system

13

SITUATION IN 2004
The oil film protects the bearing
Film dhuile

Action A decantation standard


STANDARD de maintenance autonome
STANDA

Action B temperature sensors


A
lafiab ilitpo u rlon g temp s

8 seizing on stand 4 and 5 line stopped during 19 Hours

SUPERVISION DE LA REGULATION

EQUIPEMENT

Rv.

Rd acteur VIEiRA PH.

Vrificateur

RD TPM PLANIFI ZONE N: 3 Hydrauliq STANDA RD PLA N 001

. LIGNE : TANDEM 5 CAGES

Dcantation Rservoir Morgoil B

Date Visa

01/08/2005

Classifying of the equipments


Equipements couplage
Classement stratgique des quipements du couplage

total cost of the Morgoil bearing function :


N 1 Item Mthode Outillage Lunettes GAnts Lunettes GAnts Lunettes GAnts Lunettes GAnts X X Dure opration Actuelle Amliore P Priodicit J Responsab S M X le Consignati Applicat ion du mode opratoire on Morgoil

Equipe C Equipe C

MO Z3 003
Applicat ion du mode opratoire

232 K 0,21 /Ton

B Inversion des rservoirs

MO Z3 007
Applicat ion du mode opratoire

Dcantati on du rservoir

Equipe C

MO Z3 008 MO Z3 004

Dconsign Applicat ion du mode opratoire ation

Equipe C

Morgoil B SECURITE:

Munissez-vous dune lampe de poche pour accder la cave hydraulique.

14

15

25

morgoils

Action C filtration and decantation


20 15

2007 Objectives
0 seizing 0 stop total cost of the function : 0,045 /Ton
Eau & particules

10

Purification & filtration APRES


filtre Rgul pression

S L 1 1 B S E 1 E C E S E S E E N E T E P. E ES S S IL O K 5C IT E N K SE ION GE ES K1 K SE 5C BO 5 E G G UE G 5C IVE M IO U D O I A UT VO ID US U S D U A EN U R D D AG S E OI T A S E UR A Q T U R D S G IS RT LA TR LE EU A T E S T E AG IO N E R T IO S S R N C E LI IN C E C E R E N R CH IL O D AU RT N H R H EM EE U U F LU ER AT PO U B E ID U G C IN O TA M U E CT C R L A UT C EU EN O C A U AT O U SD A ED L A AC M O R S R M S P O EU U T SP O PE SP PE AIT SE -S R IO B P G O R N S O A ES D C O AC JA L E L C S U U S T IN YD E PIR A N E AM EV TR IL O U N M O ID PI N D IL A R EN A C AU T R H C U AS A TE SO IS G TR IS C C

Centrifugeuse

refroidissement

Nettoyage auto contre courant


filtre

Pompe
17

The results
NUMBER OF SEIZING PER YEAR
10

2003
9 8

2004 2002

Standards with manual decantation

7 6 5 4 3 2 1 0

Analysis starting

Oil temperature control

Automatic filter and decantation

2005

2006

2007

COST OF THE "BACKUP ROLL BEARINGS" FUNCTION (Spare parts and Morgoil oil)
0,2500
0,2100

0,2000 /TON 0,1500


0,109

divided by 10

0,1000
0,058

0,0500 0,0000

0,045 0,022

How to keep up the results

o Respect of the standards o Oil quality control o Maintenance of the filtration and decantation systems o Control of the oil temperatures

CO ST C O 200 ST 4 C O 200 O ST 5 BJ EC 20 0 TI VE 6 2 C OS 007 T 20 07 j an v07 f vr -0 7 m ar s07 av r- 0 7 m ai -0 7 ju in -0 7 jui l -0 7 ao t -0 7 se pt -0 7 oc t- 0 7 no v07 d c07

SITUATION 2004
19 heures darrt du laminoir en 8 grippages (sur cages 4 &5) 232 k ( 0,21 la tonne) de dpenses sur la fonction

OBJECTIFS 2007
ZERO GRIPPAGE

ARRIVER A 0,045 LA TONNE

8 SEIZING ON STAND 4 & 5

COUPLED LINE : TANDEM MILL 5 STAND

MALFUNCTION OF THE BEARING


The break of the oil film generates a seizing

Film dhuile

THE BACKUP ROLL


F= env 2000tonnes

The oil film protects the bearing

Film dhuile

MALFUNCTION OF THE BEARING


The roll force decreases with the speed
1200

Roll force
1000

SEIZING
800

GOOD
600

400

THE OIL VISCOSITY AND THE OIL QUALITY LOWER THE CURVE

Population of rolled coils

200

Speed of rotation
0 1 10 100 1000

Grippage palier appui Morgoil


Entre deau par les joints de tourillon des cylindres dappui dans le circuit morgoil. % deau trop lev Leau peut-tre vacue par dcantation mais pas de manire planifie Pas de contrle de la qualit des joints

Mauvaise qualit dhuile

Quantit deau leve dans les rservoirs Morgoil

Grippage de lempoise du cylindre dappui

Pollution de particules mtalliques des grippures antrieurs

La filtration accumule les particules

Les filtres sont nettoys 1 fois par semaine quelque soit la masse de pollutions

Temprature trop haute Mauvaise viscosit de lhuile Temprature trop basse Pas de mesure des tempratures entres paliers

LES PROBLEMES
Pas de standards planifis, pas de modes opratoires permettant de sassurer que: o Les joints dappuis soient en bonnes tats
o Il ny a pas deau dans lhuile o Il ny a pas de particules dans lhuile

Pas de connaissances de la temprature de lhuile

PLAN DACTIONS
A
Mettre en place des standards de dcantation manuelle Ecrire des modes opratoires

Mettre en place une analyse dhuile mensuelle.

Installer des mesures de tempratures lentre et la sortie des cages.

Mesurer les fourchettes de rgulation des tempratures avec des alarmes.

Mise en place dune filtration auto-nettoyant cages 4 & 5

B C C

Mise en place dune centrifugeuse extrayant leau & particules

STANDARD de maintenance autonome


STANDA

A
lafiab ilitp o u r lo ng tem ps

EQUIPEMENT

Rv.

Rdacteur VIEiRA PH.

Vrificateur

RD TPM PLANIFI E ZONE N: 3 Hydrauliq STANDA RD PLA N 001

. LIGNE: TANDEM 5 CAGES

Dcantation Rservoir Morgoil B

Date Visa

01/08/2005

N 1

Item

Mthode

Outillage Lunettes GAnts Lunettes GAnts Lunettes GAnts Lunettes GAnts

Dure opration Actuelle Amliore P

Priodicit J S M X

Responsab le

Consignati Application du mode opratoire on Morgoil

Equipe C Equipe C

MO Z3 003
Application du mode opratoire

B Inversion des rservoirs

MO Z3 007
Application du mode opratoire

Dcantati on du rservoir

Equipe C

MO Z3 008
Application du mode opratoire

Dconsign ation

Equipe C

MO Z3 004

Morgoil B SECURITE:

Munissez-vous dune lampe de poche pour accder la cave hydraulique.

SUPERVISION DE LA REGULATION

filtration AVANT
filtre Rgul pression

refroidissement

filtre
NETOYAGE DES PARTICULES EN MANUEL

Pompe

DECANTATION DE L EAU EN MANUELLE

Purification & filtration APRES


Eau & particules
filtre Rgul pression

Centrifugeuse
refroidissement

Nettoyage auto contre courant


filtre

Pompe

PERTES GRIPPAGES EMPOISES D'APPUI 5 CAGES "Pdr/Arrts/Nettoyage filtres/Huiles"


0,250

0,200

/T O N N E S

0,150

Baisse des pertes

0,100

0,050

0,000

06

06

07

r- 0

-0

6 pt se -0 oc

s-0

20

20

a i-

nv

ar

av

ja

j.

j.

Ob

Ob

ju

in

t- 0

-0

PERTES GRIPPAGES EMPOISES D'APPUI 5 CAGES " Pdr / Arrts / Nettoyage filtres / huiles"
0,250 0,200 /T ON NES 0,150 0,100 0,050
janv -06 m ars -06 M OY, 2006 s ept-06 av r-06 fv r-06 juil-06
Baisse des pertes
changement normal des chemises pour usure changement normal des joints en prventif

0,000
REEL 2003 REEL 2004 REEL 2005

O BJ , 2007

aot-06

m ai-06

juin-06

oc t-06

NOMBRE DES GRIPPAGES DES PALIERS D'APPUI


10 9 8 7 6 5 4 3 2 1 0
2003 2002 2004 Dbut de lanalyse Mise en place Std. Et M.O. Mise en place supervision Mise en place filtre auto & centrifugeuse 2005 Instrumentation et filtration des circuits des cages 1,2et3

0
6 02 03 04 05 -0 20 20 20

0
s -0

0
6 r -0

0
6 -0

0
6 -0 in

0
6 i l-

0
06

0
-0 pt se

0
6 t- 0

0
6

20

nv

ai

av

ar

ja

ju

oc

ju

o Respect of the standards o Oil quality control o Maintenance of the filtration and decantation systems o Control of the oil temperatures

PERSPECTIVES
Amliorer le montage des cylindres Amliorer ltanchit des paliers

NUMBER OF SEIZING PER YEAR


10

2003
9 8 7 6 5 4 3 2 1 0

2004 2002

Standards with manual decantation

Analysis starting

Oil temperature control

Automatic filter and decantation

2005

2006

2007

COST OF THE "BACKUP ROLL BEARINGS" FUNCTION (Spare parts and Morgoil oil)
0,2500
0,2100

0,2000 /TON 0,1500


0,109

divided by 10

0,1000
0,058

0,0500 0,0000

0,045 0,022

20 0 O ST 4 20 C 0 O O ST 5 BJ EC 20 0 TI VE 6 2 C O 007 ST 20 07 ja nv -0 7 f vr -0 7 m ar s07 av r- 0 7 m ai -0 7 ju in -0 7 ju il07 ao t -0 7 se pt -0 7 oc t- 0 7 no v07 d c07 C

O ST

COUT D'ENTRETIEN DU TANDEM 5 CAGES en Euros/T


2,00 1,50 1,00 0,50 0,00 Budget EC Ralis EC 2004 2005 Budget OF 2006 NC 2006 C Ralis OF 1,80 1,72 1,38 1,31 1,68 1,73 1,23 1,06 1,20 0,86 0,70 0,67

1,10 0,82 0,57 0,38