TOWOONG E&C
BH GIRDER
Universities
U.C. Davis (USA) Prof. Jonh Bolander Yonsei University (Korea) Prof. Yunmook Lim
Research Institute
GS E&C Corporation Infrastructure Research Team Towoong E&C Research Center
Structural Designer
Eurim E&D Sambo Engineering Yooshin Corporation
BH GIRDER
BH Girder Outlines
Half-Slab Bulb-Tee Shape
Girder Continuation
PCI Span Height Spacing Upper Flange Width Lower Flange Width 47.2 2.362 2.40
1.19
2.20(2.20)
0.81
1.40(1.30)
Half-Slab
Pre-stress Optimization
Simple Continuation
For Reduce of Expansion Joint
Other Type Continuation Method BH Girder Continuation Method
RM Space
Launching Girder
Uijeongbu Light Railway
Construction Process
PCI-I Span Height Spacing Upper Flange Width Lower Flange Width 41.1 1.829 2.40
1.07
2.20
0.71
1.30
Comparison
Beton Span Height Spacing Upper Flange Width Lower Flange Width
BH Girder
47.0
2.300 2.30
47.0
1.900 2.50
0.80
2.20
0.70
1.30
U-Girder Span Height Spacing Upper Flange Width Lower Flange Width 31.9 1.850 2.30
1.90
2.20
1.30
1.30
Super-T Span Height Spacing Upper Flange Width Lower Flange Width 40.0 1.750 2.25
1.96
2.20
0.70
1.30
Exclude Slab Form Installation Works Exclude Slab Form Disassemble Works Exclude Slab Form Supporting works Prevent Negligent Accidents Improvement of Workability
Improvement of Safety
Decrease Earthworks Amount than Another PSC Beams Possible the Securement Space below Girders
390 Days
60EA/4Days
140 Days
534 Days
234 Days
40EA/3Days
140 Days
377 Days
BH Girder 60.0m
Pier Construction Girder Installation Slab Construction
60%
~44%
156 Days
30EA/3Days
52 Days
211 Days
Decrease of Earthworks
23.8%
Reduce
Decrease of Piers
40.0%
Reduce
Decrease of Periods
60.5%
Reduce
48t-CO2 17t-CO2
4240
t-CO2
3072
1,199 Ton
PSC 30m
Remicon
t-CO2
BH 60m
Oil
Preparation
Girder Loading
Transporting
Process
1. Set and Install Pre-Assembling Forms 2. Pre-Assemble Rebars on the Ground
Expectation
Reduction of Construction Period : 35% Reduce Reduction of Construction Cost : 24% Reduce Minimize of Influence about Traffic Flow Improvement of Workability and Safety