Increasingly, road designers select tunnels as a good alternative, considering the ability of road tunnels to reduce some components of the environmental impact such as visual intrusion of infrastructures and noise pollution. Nevertheless some impacts remain or are even increased by such a choice. Despite all policy efforts to try to control and even reduce traffic, it is expected that traffic will increase during the next decades; so environmental issues linked to road traffic need to be considered. The PIARC tunnel committee deeply and specifically investigated air pollution phenomena considering: 1. Pollution inside tunnels as the technical basis for the dimensioning of road tunnel ventilation systems; 2. Pollution outside of the tunnel as direct evolution of know-how within the committee. In fact, when considering air pollution, choices concerning the type of ventilation system determine the basis for designing the locations and flowrates of exhaust air; the operation regime and air quality set points for the ventilation control can often be more effective in delivering the required targets for local pollutant concentration than the selection of more complex ventilation systems. Road traffic and (consequently) vehicle emissions constitute a serious environmental concern particularly in confined spaces as tunnels. These emissions are characterized by the presence of various pollutants, which, at high concentrations, can cause adverse effects and consequences. The PIARC tunnel committee traditionally assesses vehicle-induced emissions and air quality inside tunnels. To this purpose, common modelling theories are reviewed, relevant air quality standards are defined and existing conditions are characterized. Measured and simulated pollutant concentrations are compared with air quality standards. Finally, mitigation measures are proposed to insure proper air quality management inside the tunnel (Section 8.5). Tunnel emissions affect the air quality within a relative short distance from the points where emissions are dispersed, however the adjacent road network inuences the environment in a broader area. Accordingly the air quality implications of tunnels should be examined in the context of the outside road network of which they are a part (Section 5.1). Other important environmental issues are noise and vibration. Noise pollution can arise during the phase of construction causing environmental hazards, because a high noise level is often generated. In addition, high volumes of vehicles during normal traffic operation can generate large noise levels, which may be above permitted levels. Increasingly, noise pollution tends to be a problem adjacent highly trafficked roadways. The strategies for noise abatement follow long-established standard procedures in the planning and construction process. Major steps forward have been made to abate noise at the source: the use of special noise-absorbing pavements can reduce it, sound insulating and sound proofing barriers have become more and more efficient, as well as the use of combined features and the deployment of improved construction machines can minimize the generation of noise and vibration (Section 5.2). Water impact is another aspect that has to be analyzed during the life cycle of an infrastructure such as a tunnel. Detailed investigation of surface and subsurface hydrology should take place before and during construction. The least damaging route and structural elements should be chosen to get minimum interruption and alteration of hydrology patterns and processes. Drying up caused by the manner of building infrastructure is a topic which is becoming more and more important. Several studies can be carried out, which give insight into the effects of infrastructure on the hydrology of areas in the surroundings of tunnel and how to mitigate these effects. Water pollution caused by the leakage of construction materials during worksites can be reduced using containers that are designed to exclude leakage (Section 5.3). The final objective of tunnel designers and managers is to achieve sustainable operation from both a functional and an environmental point of view, in order deliver a reasonable level of safety and to

http://tunnels.piarc.org/en/environmental-issues/

2/8

PIARC ROAD TUNNELS MANUAL

PIARC

reduce as far as possible any negative impacts on environment. Different elements in order to improve the operational sustainability of tunnel are considered and analyzed (Section 5.4). Contributors This Chapter was written by Working Group 4 of the C4 committee (2008-2011) in which:

Roberto Arditi (Italy) authored section 5.0 and coordinated the work Antoine Mos (France) and Hans Huijben (The Netherlands) authored Section "5.1 Tunnel impact on outside air quality"

Antoine Mos (France) authored Section "5.2 Noise and vibration"


Manuel Romana (Spain), authored Section "5.3 Water impact" Fathi Tarada (UK) reviewed the full chapter.

http://tunnels.piarc.org/en/environmental-issues/

3/8

PIARC ROAD TUNNELS MANUAL


5.1. Tunnel impact on outside air quality

PIARC

In the field of road tunnels, air quality is traditionally considered in relation to the level of concentrations of vehicle exhaust inside a tunnel. However, the concentrations of pollutants outside a tunnel can be harmful or annoying to people. Such pollutant concentrations rapidly reduce from a portal or exhaust shaft to the surrounding environment according complex mechanisms such as the speed and direction of the wind and the neighbouring topography. Consequently, it is recognized that air quality in the vicinity of tunnel portals or other exhaust points is of interest when the traffic intensity increases and when tunnels are constructed in an urban environment. Above a tunnel, the air quality is expected to be better than if an open air road section was situated at the same location. However at the portals and shafts, polluted air is set free, when a longitudinal or transverse airflow is discharged by the piston effect of traffic and/or by ventilation systems. Depending upon background concentrations and other sources localized close to a tunnel portal or shaft, the concentration levels of pollutants can exceed the maximum levels set by authorities. In that case measures must be taken to improve the air quality in the vicinity of the tunnel. Measures may include civil or mechanical works, planning of the land use around the tunnel, etc. Most often it may be possible reduce the pollution concentrations based on operational measures such as changes in the ventilation regime. PIARC has published the Technical Report 2008 R04 "Road Tunnels: A Guide to Optimizing the Air Quality Impact upon the Environment", which focuses on outside air quality related to tunnels and it is a guide to enhancing the urban environment by altering the emissions from vehicles and changing their spatial distribution within the space surrounding a tunnel. The guide considers a wide range of design and operation opportunities to mitigate the impact of tunnels on outside air: from the selection of the most optimum location of a tunnel, to gradients, ventilation type, air discharge management, traffic management, tunnel maintenance and finally (if still useful) contaminant removal techniques.

http://tunnels.piarc.org/en/environmental-issues/outside-air-quality.htm

4/8

PIARC ROAD TUNNELS MANUAL


5.2. Noise and vibration

PIARC

Noise is generally regarded as one of the key nuisances perceived by humans, which can significantly affect urban areas. It should therefore be taken into account in the design of tunnels, especially for those urban tunnels that have a high concentration of acoustical receptors in the immediate vicinity of portals and shafts. Traffic-generated noise is not specific to tunnels. Underground infrastructures are generally regarded as having a positive influence on the acoustic environment, but there might be specific issues near the portals in some configurations. In most developed countries, noise impact studies are performed for every new infrastructure project (or significant modification), and the existence of tunnels is, of course, to be taken into consideration at that stage. The main source of noise impacting the environment surrounding tunnels is the traffic. Part of the noise from vehicles running inside tunnels is reflected by the tunnel lining and reaches the portal that itself becomes a source of noise. Under certain conditions the noise level near the portal of a tunnel can be higher than the noise level of a related open air section. However, this kind of effect is significant only for those acoustic receptors lying in the immediate vicinity of the tunnel portal: moving away from the portal noise levels rapidly diminish, since the noise coming from the tunnel is attenuated by the prevailing effect of noise generated by vehicles in the open air sections. There are also sources of noise that are associated with the tunnel infrastructure, the main one of which is the ventilation system. In the case of transverse ventilation, or longitudinal ventilation with extraction shafts, fans and air flow through inlets and outlets may generate significant noise, and in some cases they have to function even at night time when noise environmental standards are set at lower targets. One solution may be to reduce the use of the ventilation system by optimising its control, but this can only be achieved to a limited extent. The most effective solution is to take these problems into account at the design stage. Considering that the most prominent noise effects are geographically limited, air inlets/outlets may be located as far away as possible from neighbouring buildings, but this may result in significant increases in cost. The air velocity should be kept at relatively low values at air inlets/outlets to reduce noise generation by making the size of these openings large enough. Additionally, silencers are most often necessary to prevent the noise generated by the fans from "leaking" out of the ventilation plant. In the case of longitudinal ventilation, the noise impact from fans on the environment is generally moderate because, on the one hand, jet fans should not be located too close to the portals for maximum efficiency (consequently the noise of fans is "diluted" within the traffic noise), and on the other hand, silencers are usually fitted to the fans to maintain an acceptable noise level inside the tunnel. However, for particularly sensitive configurations, it might be necessary to select specific designs or operational measures. Traffic-generated vibration is rarely a significant issue in the operation phase of a road tunnel (unlike rail tunnels, because trains generate much more vibration than road vehicles). Should such a problem occur, there is generally little that can be done apart from prohibiting access to the heaviest vehicles. Another source of vibration is the fans. These should be carefully balanced to avoid excessive vibration. However, fan vibration is generally not perceivable in the environment; it affects primarily the machine itself, and can compromise its longevity. It can also become a safety issue because jet fans, for example, may lose parts or even fall down from the tunnel ceiling due to excessive vibration. Vibration monitoring is crucial for the reliability and safety of jetfans. Vibration is much more problematic during the construction phase, especially when explosives are used. Tunnel construction and related environmental measures are outside the scope of the PIARC committee on road tunnel operation; specific recommendations are published by the ITA.

http://tunnels.piarc.org/en/environmental-issues/noise-vibration.htm

5/8

PIARC ROAD TUNNELS MANUAL


5.3. Water impact

PIARC

The impact of road infrastructure on water quality can be very significant during both normal operation (leaking of hydrocarbon products, tyre wear, etc.) and accidental situations (spilling of large quantities of pollutants). The existence of a tunnel does not change the problem very much. As on any road, there is a need for water treatment (decanting, removal of pollutants) before releasing it into the environment. A few tunnel-specific facts should however be taken into account when designing water management systems. First, tunnels need to be cleaned on a regular basis, as often as every month for heavily trafficked urban tunnels. This generates large amounts of waste water containing cleaning products. Second, tunnels in which dangerous goods transports are allowed are generally equipped with specific gutters in order to limit the spread of flammable liquids on the pavement. If an accidental spill occurs, the flow rate of pollutant liquid in these gutters may be higher than what is encountered on a regular road surface, and the water management system should be capable of coping with these flow rates. Very challenging issues related to water may be encountered during the construction phase in sensitive environments, for example regarding the turbidity of the construction site effluent. Appropriate measures should then be taken. In some cases, they represent significant constraints and cost for the construction works. Tunnel construction and related issues are outside the scope of the PIARC committee dedicated to road tunnel operation. The reader is therefore encouraged to consult ITA recommendations for further details. Water impact is another aspect that has to be analyzed during the life cycle of an infrastructure as tunnel. Most of the impact of tunnels on water (and water on tunnels) happens during their construction, but some of the impacts remain for a long time and can become a hindrance to the tunnel operation and maintenance. Due attention must be given to these processes during the tunnel planning and design stages, in order to avoid adverse, and costly, consequences. Detailed investigation of surface and subsurface hydrology should take place before and during construction. The least damaging route (and structural elements) should be chosen to obtain minimum interruption and alteration of hydrological patterns and processes. Theoretically, tunnels can be: impermeable (allowing no ingress of water and developing the full water pressure on the lining) and permeable or semi-permeable (allowing some ingress of water and avoiding the development of full water pressure on the lining). In practice most tunnels are permeable during their construction and semi-permeable during their operation. Fig. 5.3.1 shows water ingress in a tunnel built with segments and designed to be impermeable.

Fig. 5.3.1 : Water ingress in a tunnel built with segments

http://tunnels.piarc.org/en/environmental-issues/water-impact.htm

6/8

PIARC ROAD TUNNELS MANUAL

PIARC

In non lined tunnels (or with a permeable lining) water ingress can be important. Fig. 5.3.2 shows water flowing through a permeable basalt layer in Canada.

Fig. 5.3.2 : Water flowing through a permeable basalt layer


The drying up of groundwater levels caused by the manner of building infrastructure is a topic which is becoming more and more important. The effect usually does not finish during tunnel operation, and the groundwater original levels almost invariably go down, with an irreversible impact on water supply wells.

Fig. 5.3.3 : Drainage water flowing and lime calcium hydroxyls precipitating in concrete lined tunnel

Fig. 5.3.4 : Similar effect in construction joint

The water entering a tunnel can dissolve the free lime hydroxide in the concrete lining, becoming more alkaline and releasing solid deposits in the drainage systems. This effect is more frequent in old tunnels with out-dated drainage systems. Fig. 5.3.3 shows drainage water flowing and lime calcium hydroxyls precipitating in a concrete lined tunnel. Fig. 5.3.4 shows a similar effect in a construction joint.

http://tunnels.piarc.org/en/environmental-issues/water-impact.htm

7/8

PIARC ROAD TUNNELS MANUAL

PIARC

5.4. Sustainable tunnel operation The current international trend is to demand from road operators and road authorities that they should promote an efficient use of energy and to adopt sustainable methods for the construction and operation of public roads. PIARC throughout its history has published several reports aiming at improving the efficiency of tunnel operations, the reduction of operating costs, and the mitigation of environmental impacts. The "sustainable tunnel operation" as a whole will be a basic topic to be dealt by PIARC during next cycle (2012-2015).