HEALTH, SAFETY AND ENVIRONMENT PROCTER AND GAMBLE, IBADAN PLANT SAFETY PLAN FOR PILLING TO PROTECT BOILERS

FOUNDATIONS BACKGROUND The Project MAMBILLA Contractor (Vita Construction Limited) needs pile at the making to protect the boilers foundations WORK SUPERVISION AND DURATION: 1 the work is proposed to start on 19th December, 2012 2 Supervision will be done by Mambilla Project civil project manager Mohammed WORK DESCRIPTION Barricade of the approved area with flexible barrier caution tape and latter by rigid barrier wood and zinc The area has been marked Demolition of the breaking of wall will be done manually with sledge/mason hammer and jack hammer (wall wail be demolish from the top to the bottom and cart away Clean up the broken concrete to lay down area with dumper and latter removed with tipper out of the plant Break the concrete floor and clean up Set up the pilling machine Drill to 3.5mdepth by 450mm diameter ( the drilled sand comes up as the drilling progresses) Cutting and tying of reinforcement will be done at lay down area Mix the concrete slurry and pour into the drilled hole Fix the reinforcement and push it into the concrete slurry This process is repeated for the rest of the piles Site cleaning Removal of hoarding

WORK SUPERVISION AND DURATION The contractor (Vita Construction Limited) is familiar with the scope of the work Any change will be communicated within 24hours ahead of implementation. Supervision will be done by the site Construction civil Engineer when the job is going on. There will be a dedicated P & G Safety Officer on site. There will be restrictive access for passage while performing the tasks except those that are working on the project.

ADDITIONAL CONSIDERATION 1. There will be a housekeeping programme to clear the site before and after work is completed 2. The following basic PPEs must be used by the contractor while doing the job; safety Rain shoes, helmet, hand gloves safety goggles etc 3. The area of work will be properly barricaded with caution tape 4. P & G approved disciplinary action/ matrix will be implemented on any personnel/contractor found violating safety rules 5. Any life threatening behavior will lead to an immediate dismissal of the affected individual from site

Alignment:

HSE OFFICER

P & G WORK SUPERVISOR

CONTRACTOR

RISK ASSESSMENT RECORD PROJECT: MAMBILLA DATE: 17/12/2012

RA NO: 010

CONTRACTOR: Vita Construction Limited LOCATION: MAKING AREA

ACTIVITY: PILLING TO PROTECT BOILERS FOUNDATIONS RISK ASSESSMENT TEAM: Initials & Surname Title/Appointment Supervisor Albert A Fatai k Safety Officer Project Manager Comments: Signature Project Manager Approved: Yes / No

RISK ASSESSMENT RISK ASSESSMENT FOR PILLING TO PROTECT BOILERS FOUNDATIONS List Activities of Task RISK POSSIBLE CAUSES

RA 010

DATE: 17/12/2012

MITIGATION MEASURES

RESPOSIBLE PERSON &

1, Tool box talk & permit Employees not Failure of the understanding the task employees to attend description(work order) thereby doing the toolbox talk or understand the working discussed with all relevant wrong thing order employees

Permit (work order)must be secured, RA, Kolawole Method Statement must be discussed Solomon and understood with/by all employees involved in the task. Questions will be asked to ensure that employee understood the method of task All personnel involve in the task must be well kitted with safety rain shoes, hard hat, reflective jacket and hand gloves

2, Transportation of the of pilling equipment, cements, tools & other materials

Road accident

transit - Driver not having valid driving license and experience Overturning or load Break failure falling (property damage) Over speeding, overturning, reversing, loss of reversing, loss of control. control.

Driver must possess current and valid Kolawole Solomon driving license -speed limit must be maintained ( 10km/hr) and vehicle inspection to be sure is in good condition -Ensure load is stable and secured on truck, Driver must be inducted Ensure driver did not drink before driving by smelling his breath Vehicle movement Close supervision by Vita safety officer and supervisor accident. Driver getting drunk before driving

&

3, Barricade of the approved area with caution tape and latter with rigid barrier (zinc)

Back pain and load falling on personnel leg (wound) property damage Load falling on personnel Cuts, bruises Hitting of fingers Bruises Nail puncture

Unsafe manual lifting load & awkward position Bad practice/poor planning of lifting/inadequate supervision None use of appropriate PPEs safety shoes, helmet, Reflective jacket

Area must be Barricaded with Kolawole caution tape before any activities on Solomon the site to prevent all unauthorized personnel. -proper manual lifting must be followed procedure

&

Personnel must be trained through toolbox talk There must be proper planning for all activities use hand glove to prevent scratch, cuts and bruises Goggles to prevent flying particles. All personnel involve in the task must be well kitted with safety shoes, hard hat, reflective jacket and hand gloves

4, Set up the pilling machine to drill to 3.5m depth

Back pain and load falling on personnel leg (wound) property damage Load(pipes) falling on personnel

Use of incompetent personnel Unsafe manual lifting load & awkward position Hydraulic failure Machine Bad practice/poor planning of lifting/inadequate supervision Lack of appropriate PPEs

Trained and competent personnel Kolawole (operator) must handle the work Solomon following the instruction proper manual lifting must be followed procedure

&

machine inspection before the work commences Personnel must be trained through toolbox talk There must be proper planning for all activities All personnel involve in the task must be well kitted with safety shoes, hard hat, reflective jacket and hand gloves

5, Cutting and tying of reinforcement (this will be done at lay down area)

Cuts, bruises Bruises Puncture reinforcement

Incompetent iron benders Lack of close from supervision None use of appropriate PPEs safety shoes, helmet, Hand gloves Reflective jacket

Competent iron bender/operators must handle the reinforcement Constant housekeeping during the task Close supervision by supervisor and safety officer use hand glove to prevent scratch, cuts and bruises Goggles to prevent flying particles. All personnel involve in the task must be well kitted with safety shoes, hard hat, reflective jacket and hand gloves

Kolawole Solomon

&

6, Mix the concrete slurry and pump into the drilled hole through pipe

Hit by machine Hydraulic failure Concrete splasheye injury Intestinal disorder

Incompetent operator Faulty Machine/machine check/inspection not done None use of sakfety glasses and cover all/hand glove

Operator must current license

have

valid

and Kolawole Solomon

&

He must be competent for operating the machine Fiory machine must be in good condition Mason/operator must put on appropriate PPEs Such as safety glasses, cover all hand gloves

7, Fix the reinforcement and push it into the concrete slurry

Back pain and load falling on personnel leg (wound) Cuts, bruises, hits Bruises Puncture from reinforcement

Incompetent iron benders Unsafe manual lifting load & awkward position Lack of close supervision None use of appropriate PPEs safety shoes, helmet, Handgloves Reflective jacket

Competent iron bender/operators must handle the reinforcement proper manual lifting procedure must be followed Constant housekeeping during the task Close supervision by supervisor and safety officer use hand glove to prevent scratch, cuts and bruises Goggles to prevent flying particles. All personnel involve in the task must be well kitted with safety shoes, hard hat, reflective jacket and hand gloves Good housekeeping must be maintained before the leaving work area.

Kolawole Solomon

&

8, Site cleaning

Trip & fall hazard, puncture, environmental damage/pollution,

Poor housekeeping

Kolawole Solomon

&

Note: 1, Special attention must be given to the boiler machines and pipes during this task and adequate barricade with constant housekeeping ADDITIONAL CONSIDERATION

6. There will be a housekeeping programme to clear the site before and after work is completed 7. The following basic PPEs must be used by the contractor while doing the job; safety Rain shoes, helmet, hand gloves safety goggles etc 8. The area of work will be properly barricaded with caution tape 9. P & G approved disciplinary action/ matrix will be implemented on any personnel/contractor found violating safety rules 10.Any life threatening behavior will lead to an immediate dismissal of the affected individual from site Alignment: HSE OFFICER P & G WORK SUPERVISOR CONTRACTOR