Sl. No. 1 Details of measurements Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5 metres including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 metres a. Hard/Dense Soil. Providing and laying cement concrete in foundation and plinth excluding the cost of centering and shuttering a. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Reinforced cement concrete work in foundation footings, bases of columns etc. and mass concrete, excluding cost of centering, shuttering and reinforcement, a. 1 :2 : 4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). i. base of foundation- 1 ii. base of foundation- 2 iii. Columns, pillars, posts and struts (square, rectangular or polygon in plan) Nos L B H Q Unit Explanation
2.5
2.5
1.7
10.63
cum
1.11 @ page- 54
2.5
2.5
0.1
0.63
cum
2.1.7 @ page-61
1 1 1
2. 1.3 0.7
2 1.3 0.7
3.1.3 @ page - 67
cum
Reinforced cement concrete work in columns, pillars, piers, abutments, post and struts upto floor two level i/c plastering the exposed surface with cement 1:3 (1 cement:3 fine sand) of thickness not exceeding 6 mm thickness to give a smooth and even surface but excluding the cost of centering-shuttering & reinforcement a. 1:1:2 (1 cement: 1 coarse sand: 2 graded stone aggregate 20 mm nominal size). Providing form works i/c centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for insitu reinforced concrete and plain concrete work in a. Foundation, footings, bases of columns etc. and mass concrete. i. base of foundation- 1 ii. base of foundation- 2 b. Columns, pillars, posts and struts (square, rectangular or polygon in plan).
0.45
0.45
2.975
0.60
cum
3.4.3 @ page - 68
4 4 4
2. 1.3 0.7
2 1.3 0.7
0.45
2.975
Reinforcement for RCC work i/c bending, binding and placing in position complete. Tor-steel bars 8mm @ 200mm c/c in stirrup 8mm @ 250 mm c/c in stirrup
kg
4 4
5.25 5.25
1 1
1.579 2.467
kg
2nd class (local first class) brick work in foundation and plinth in cement mortar 1:3 (1 cement: 3 fine sand) a. b. (A) CEMENT PLASTER IN FINE SAND 12 mm cement plaster 1:3 (1 cement: 3 fine sand) 4 4 4 Finishing walls with water-proofing cement paint of approved quality on new work (three or more coats) to given shade. 4 0.45 2.5 1 4.50 0.45 1.75 1.25 2.5 0.3 0.3 1 1 1 4.50 2.10 1.5 8.1 1 1 1.75 1.25 1.75 1.25 0.3 0.3 0.92 0.47 1.39
cum
5.1 @ page - 78
Sqm
Sqm
ABSTRACT OF COST Name of work: Construction of GPS Pillar at Langthabal Khouphum, Canchipur, Imphal
Sl. No. 1 Details of measurements Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5 metres including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 metres a. Hard/Dense Soil. Providing and laying cement concrete in foundation and plinth excluding the cost of centering and shuttering a. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Reinforced cement concrete work in foundation footings, bases of columns etc. and mass concrete, excluding cost of centering, shuttering and reinforcement, 1 :2 : 4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). 2.1.7 @ page61 Rate (Rs.) Amount Rs. P.
Quantity
Unit
REMARK
10.63 2
cum
484.30
5148
11
1.11 @ page54
0.63
cum
4554.70
2869
46
4.18
cum
6249.1
26121
24
3.1.3 @ page 67
Reinforced cement concrete work in columns, pillars, piers, abutments, post and struts upto floor two level i/c plastering the exposed surface with cement 1:3 (1 cement:3 fine sand) of thickness not exceeding 6 mm thickness to give a smooth and even surface but excluding the cost of centering-shuttering & reinforcement a. 1:1:2 (1 cement: 1 coarse sand: 2 graded stone aggregate 20 mm nominal size). Providing form works i/c centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ reinforced concrete and plain concrete work in Foundation, footings, bases of columns etc. and mass concrete. Columns, pillars, posts and struts (square, rectangular or polygon in plan). Reinforcement for RCC work i/c bending, binding and placing in position complete. Mild steel bars Tor-steel bars
0.60
cum
10,089.10
6053
46
3.4.3 @ page 68
5.36
Sqm
394.80
2116
13
a) b)
14.93 84.97
kg kg
85.7 88.2
1279 7494
50 35 5.1 @ page - 78
2nd class (local first class) brick work in foundation and plinth in cement mortar 1:3 (1 cement: 3 fine sand) CEMENT PLASTER IN FINE SAND 12 mm cement plaster 1:3 (1 cement: 3 fine sand)
1.39
cum
7779.5
10813
8.1
Sqm
214.7
1739
07
Finishing walls with water-proofing cement paint of approved quality on new work (three or more coats) to given shade.
4.5
Sqm Total
63.7
286 66166
3705 661
65 27 31
Say- A
Add 5.6% L.S.T of A Add 1% CESS of AAdd 4% service charge of AGrand Total
66
2646
65
73179
89 (say)
73179
00