Work Order (WO)

Work Order No. Project Title Work Order Title Project Phase Department Section To
: : : : : : :

WO # xxx Contract No : STC-0759 BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering Detail Engineering Project Engineering PT. Depriwangga Engineering
Rev : A

We hereby order you through this Work Order to perform the following service (s) :
Scope of Work :

( Attached )

This WO is lumpsum Basis/Manhour Basis/Unit Price Basis/Reimbursable This WO is including Close-Out Report and Close-out Document , soft copy back-up (CR-Rom / diskette) if any

All attachments are a part of this WO

Value limits of WO Value of Previous WOs Total WO value to date Total Contract Value Remaining Contract Value

: : : : :

US$ US$ US$ US$ US$

BUDGET/NO BUDGET CHARGE TO : MAJOR DETAIL PROJECT CO DOI COST CENTER Work commence date

: YES

: : : : : : : STATUS COST CENTER : COST CENTER BUDGETED Work completion date : Mei 17, 2013

CLIENT REPRESENTATIVE
Instructed by
:

CONTRACTOR REPRESENTATIVE
Name :

Sutrisno

Signature Title

: :

Signature Title

: : Project Manager

Date

Date

BP-F.A.L AUTHORIZED APPROVER


Approved by :

BP-CONTRACT HOLDER/S.P.A APPROVER


Approved by : Accepted by

WORK ACCEPTANCE :
:

Signature Title
Comments 1.

: :
:

Signature Title

: : Contract Holder

Signature Date

: :

The works will only be executed by contractor after the said work order is approved by PHE.

Note: A copy of this instruction signed by PHE representative should be attached to the Contractor's invoice

PT. DEPRIWANGGA - Engineering


PROJECT CLIENT JOB NO. WO NO. DISCIPLINE SUBJECT : : : : : : BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering BP Tangguh WO # xxx Multidiscipline Summary of Cost Estimation

Summary of Cost Estimation


No 1 Description Manpower Cost Process Process safety Instrumentation Electrical Mechanical - Piping Structural Civil General Estimate WO Value (US$) Remarks

Grand Total

Page 2 of 11

PT. DEPRIWANGGA - Engineering


PROJECT CLIENT JOB NO. WO NO. DISCIPLINE SUBJECT : : : : : : BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering BP Tangguh WO # xxx Multidiscipline Basis of CTR

Basis of CTR
General :
1. 2. This WO is lumpsum Basis This CTR will be executed by PT Depriwangga Engineering after receiving the approved BP

Scope of Work :
1 Perform engineering study encompassing engineering calculation and engineering design with respect to related discipline such as process, mechanical/piping, rotating, civil/structure, instrument, and electrical. Provide cost estimation to implement the scope of modification above, including procurement and installation cost. Arrange HAZOP study related to the modification.

2 3

Project Duration :
1 2 3 Kick Off Meeting Detail Engineering Close Out : 1 Day : 22 Weeks : 1 week

Basis of Proposal :
1 2 3 The CTR is made based upon the requirement . Maximum duration for BP to review and respond documents is in 5 ( five ) working days and it can automatically be raised to the next approval cycle if it is due. There are only 2 cycles for document approvals i.e , issued for Review ( IFR ) and issued for Approval ( IFA ).

Term of Payment :
1 2 3 4 5 Draft Prepare Draft Complete IFR IFA AFC 10% 30% 45% 80% 100%

Page 3 of 11

PT. DEPRIWANGGA - Engineering


PROJECT : CLIENT JOB NO. WO NO. DISCIPLINE SUBJECT WO # xxx : General : Manhour Estimate ACTIVITY NO. DELIVERABLES PM A 1 2 Document Management Cost Estimate Report Close Out TOTAL = PE PC Doc SE COST USD NO. OF DOC. A4 A3 A1 REMARKS BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering BP Tangguh

No Yes No -

$ $ $ $

Page 4 of 11

PT. DEPRIWANGGA - Engineering


PROJECT : BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering CLIENT JOB NO. WO NO. SUBJECT BP Tangguh 195 WO # xxx : Manhour Estimate ACTIVITY NO. ACTIVITY DESCRIPTIONS DELIVERABLES SE A 1 2 B 1 C 1 2 3 4 D 1 2 Process Design Engineering Project Basis of Design Technical and economic evaluation of suitable water treatment technology Process Data sheet (Activity) Process Data sheet (Activity) Process Design Calculations Process and utility demand / Requirement calculations Line Sizing Calculation Hydraulic Calculation Equipment sizing Process Drawings PFD, UFD, H&MB Process Flow Diagram - revise existing Process Flow Diagram - new water treatment package P&ID Drawings PID - revise existing PID - new C&E, Process ESD Logic Process Control & Operating Philosophy Process Relief, Vent Line List Process Line List - revise existing Report Hazop Close out report Yes Yes JE LDeS Des SPEC $ $ $ $ $ $ Yes Yes Yes Yes $ $ $ $ $ COST USD 1 1 1 1 NO. OF DOC. A4 1 1 A3 A1 REMARKS

DISCIPLINE: Process

No

Yes Yes

$ $

2 2

1 2 E 1 F G 1 H 1

Yes Yes

$ $

5 3

Yes

Yes

Yes

TOTAL =

12

Page 5 of 11

PT. DEPRIWANGGA - Engineering


PROJECT : BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering CLIENT JOB NO. WO NO. SUBJECT WO # xxx : Manhour Estimate ACTIVITY NO. ACTIVITY DESCRIPTIONS DELIVERABLES SE A 1 2 B C HAZOP/HAZID Studies HAZOP Session HAZOP report Escape Route, FF, Safety Equip & Layout HSE Register TOTAL = $ No Yes JE LDeS Des SPEC $ $ COST USD NO. OF DOC. A4 A3 A1 REMARKS DISCIPLINE: Process safety BP Tangguh

Page 6 of 11

PT. DEPRIWANGGA - Engineering


PROJECT : BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering CLIENT JOB NO. WO NO. WO # xxx DISCIPLINE: Instrumentation SUBJECT : Manhour Estimate ACTIVITY NO. ACTIVITY DESCRIPTIONS DELIVERABLES SE A 1 2 3 4 5 6 7 B 1 Instrument Datasheets, Specs, List & Calculations Control Valve Datasheet I/O list Cause & Effect Chart DP Datasheet Level Transmitter Datasheet Control Valve Sizing Instrument Cable Schedule Instrument Layouts Instrument Location Plan (lnclude instrument JBs and Cable Layout/Routing and Tubing Routing) Instrument Design Drawings Wiring Termination Drawing Marshalling Cabinet Termination Detail Instrumentation Impulse Line Hook-Ups Instrumentation Air Line Hook-Ups Instrumentation Electrical Signal Line Hook-Ups Loop Diagram MTO Instrumentation MTO JE LDeS Des SPEC COST USD NO. OF DOC. A4 A3 A1 REMARKS BP Tangguh

Yes Yes Yes Yes Yes Yes Yes

$ $ $ $ $ $ $

Yes

C 1 2 3 4 5 6 D 1

Yes Yes Yes Yes Yes Yes

Yes

$ $ $ $ $ $ $ $ $

TOTAL =

Page 7 of 11

PT. DEPRIWANGGA - Engineering


PROJECT : BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering CLIENT JOB NO. WO NO. WO # xxx DISCIPLINE: Electrical SUBJECT : Manhour Estimate ACTIVITY NO. ACTIVITY DESCRIPTIONS DELIVERABLES SE A 1 2 4 5 B 1 C 1 2 3 4 5 6 7 8 9 D E 1 F 1 Single Line Diagrams Overall Key Single Line Diagram LV Switchboard Single Line Diagram Outdoor Lighting & Small Power Distribution Board Earthing Single Line Diagram Electrical Analysis & Studies Load Flow Study Electrical Layouts, Drawings, Schedule Electrical Drawing Index Electrical Equipment Layout Earthing Layout Cable Lader / Tray Layout Typical Schematic Diagram 400V LV Switchboard Electrical Control Interface Block Diagram Electrical Cable Schedule Electrical Electrical MTO Typical Installation Details Lighting & Small Power Power Distribution Study Lighting and Small Power Equipment Lighting and Small Power Layout Electrical Datasheets, Specs, MTO LV Switchboard/ MCC JE LDeS Des SPEC COST USD NO. OF DOC. A4 A3 A1 REMARKS BP Tangguh

Yes Yes Yes

$ $ $

Yes

Yes Yes Yes Yes Yes Yes Yes Yes Yes

$ $ $ $ $ $ $ $ $

1 1 1

Yes

Yes

TOTAL =

Page 8 of 11

PT. DEPRIWANGGA - Engineering


PROJECT : BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering CLIENT JOB NO. WO NO. SUBJECT WO # xxx : Manhour Estimate ACTIVITY NO. ACTIVITY DESCRIPTIONS DELIVERABLES SE Mechanical Equipment Design and Specs (include weight estimate) Tank Specification Tank Datasheet Effluent Treatment Specification Effluent Treatment Datasheet Equipment List Update Master Equipment List RFQ/MR Effluent treatment packaged Tank Rotating Rotating Equipment Design and Specs (include weight estimate) Pump Specification Pump Datasheet RFQ/MR Pump RFQ TBE Pump TBE VDR Pump VDR Piping Engineering Piping Tie-In Schedule/List Piping Specification (include ball valves, globe valve, check valves, and gate valves) Equipment Layout General Layout - existing General Layout - new Piping Drawings & Details Piping Drawing Index Piping Keyplan Piping Plans Piping Elevation View Looking North Piping Elevation View Looking East Piping Isometrics Isometric Drawing Index Piping isometrics Piping MTOs Piping Bulk MTO Valve Bulk MTO Pipe Supports Bulk MTO (include suuport MTO & support weight estimate) Pipe Stress Analysis Piping Stress Design Basis Pipe Stress Analysis Report Piping SP Items Datasheet and List Datasheet Piping Special Item List Piping Special Items Specification Pipe Support Details & Drawings Pipe Support Drawing Index Pipe Support Drawings (include pipe support list and standard) Piping Hook Up And Interface Standards Pipe Support MTO & Weight Estimates PDMS PDMS Model Review Report PDMS input, modelling JE LDeS Des SPEC COST USD NO. OF DOC. A4 A3 A1 REMARKS DISCIPLINE : Mechanical - Piping BP Tangguh

A 1 2 3 4 B 1 C 1 2

Yes Yes Yes Yes

Yes

Yes Yes

$ $ $ $ $ $ $ $ $ $ $ $ $

1 1 1

D 1 2 E 1 F 1 G 1 H 1 2 I 1 2

Yes Yes

$ $

Yes

Yes

Yes

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Yes Yes

Yes Yes

3 4 5 6 7

Yes Yes Yes Yes Yes

8 9 J 1 2 3 K 1 3 L 1 2 3 M 1 2 3 N O 1 2

Yes Yes

Yes Yes Yes

Yes Yes

Yes Yes Yes

Yes Yes Yes

No No

TOTAL =

Page 9 of 11

PT. DEPRIWANGGA - Engineering


PROJECT : BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering CLIENT JOB NO. WO NO. DISCIPLINE: Structural SUBJECT : Manhour Estimate ACTIVITY NO. ACTIVITY DESCRIPTIONS DELIVERABLES SE A 1 B 1 2 3 4 5 Miscellaneous Structural Det Des Miscellaneous Structural Detailed Design Report Structural Drawings, MTO General Notes Drawings - plan Drawings - elevation Drawings - details MTO JE LDeS Des SPEC COST USD NO. OF DOC. A4 A3 A1 REMARKS #REF! BP Tangguh

Yes

Yes Yes Yes Yes Yes -

$ $ $ $ $ $ $ $ $

1 3 2 4 1 2 10 -

Page 10 of 11

PT. DEPRIWANGGA - Engineering


PROJECT : BP Tangguh - Waste Water Tank, Pumps & Effluent Treatment Detailed Engineering CLIENT JOB NO. WO NO. SUBJECT WO # xxx : Manhour Estimate ACTIVITY NO. ACTIVITY DESCRIPTIONS DELIVERABLES SE A 1 2 3 B C 1 D 1 2 3 4 5 E 1 Foundation Detail Design Basis Design Tank Foundation Cal. Packaged Foundation Cal. Pump Foundation Calc. Computer Model and Load Formulation Report Miscellaneous Civil Detail Design Miscellaneous Civil Detailed Design Report (include joint, foundation, pavement for access and drainage) Civil Drawings Drawing Index Tank Foundation drawing Packaged Foundation drawing Pump Foundation drawing Pipe support and misc. Foundation drawing (include joint, foundation, pavement for access and drainage) MTO MTO JE LDeS Des SPEC COST USD NO. OF DOC. A4 A3 A1 REMARKS DISCIPLINE: Civil BP Tangguh

Yes Yes Yes

$ $ $

Yes

Yes Yes Yes Yes Yes

$ $ $ $ $

Yes -

$ $

Page 11 of 11