All electrical equipments are in good and normal Conducted roving, testing and inspection condition except ACB of syncronizing panel number to all electrical equipments. 4 (Report was submitted to FM suppliers submitted quoatations). All electrical equipments are in good and normal condition except ACB of syncronizing panel number 4 (Report was submitted to FM suppliers submitted quoatations). Done. Turn over to next shift
Common
Romel Borja
Every after three (3) hours monitoring of B2 Lawton LV Switchgear KiloWatt Hour Meter at Emergency panel for B2 Lawton LED only B2 Cameron LV Switchgear B3 Electrical Room Lawton Every after three (3) hours monitoring of KiloWatt Hour Meter at Emergency supply fo B1 to B3 LED Every after three (3) hours monitoring of KiloWatt Hour Meter at Emergency supply fo B3
Leo Castroverde
Common
All plumbing equipments are in good and normal Conducted roving, testing and inspection operation. All water tank are in normal level. to all plumbing equipments. Except Indoor pool electric water heater (quotation submitted for review) .
Leo Castroverde
Common
All plumbing equipments are in good and normal Conducted double roving, testing and operation. All water tank are in normal level. inspection to all plumbing equipments. Except Indoor pool electric water heater (quotation submitted for review) . All A/C equipments are in good and normal condition except the condesing unit at Machine Conducted roving, testing and inspection room Cameron, compressor is stucked up (PR was to all AC equipments. submitted). Only one condensing unit is operating for 24 hours Assist aquaterm in descaling the fillers of the CT Ongoing turnover to shift AC tech
Floarnte Ang
Common
All A/C equipments are in good and normal condition except the condesing unit at Machine room Cameron, compressor is stucked up (PR was submitted). Only one condensing unit is operating for 24 hours
Romy Cabanizas Allan Book John Ronald Adriano Cipriano Malakas Alex Maningas Crisaldo Luna
Plumber (Unit ) Electician (Unit) AC Technician (Unit) Carpenter (Unit) Painter (Unit) Utility/Carpenter (Common)
attended to calls for unit attended to calls for unit attended to calls for unit attended to calls for unit attended to calls for unit Repair exhaust blower bracket
Assit hidlao in the sales office and assit luna in fabricating the holder of fillers at the cooling tower Repair sewer line water leak at the sales office Repainting of Bms cabinet Repainting of ceiling at the health club hallway All elevators are operational. Generator room cameron still defective of A.C.B for sychronize panel tower #2 ongoing process of documents and proposal.
Done
Sales office
Conduct check and repair on the sewage line at the ceiling of the unit
Michael Advincula
Shift Engineer
Michael Advincula
Shift Engineer
Ongoing activity
PH3-D Cameron
Check the AHU of the unit due to water leak incident yesterday
Not operational chilled water pipe close, Check-up and repair will be done tomorrow as per DH
Turn over Stock Room Keys, Job Cards,work orders and camera (digital)