CESM
ClVlL ENGINEERING STANDARD METHOD OF MEASUREMENT
THIRD EDITION

European Procurement Law


Recent developments ln European Law have led the Standing Revlew Committee on CESMM to consider careNly whether any changes are necessary to CESMM2 in order that it may continue to be used for contracts awarded by public authorities within the United Khgdom. . .
<

"

The problem arises from a decision of the European Court in the Irish Case I C o ~ s i o of n the European Communities (supportedby the Khgdom of Spaln. Intervenor)]v Ireland. Building Law Reports. volume 44. P I. In this Case the Court declared that a spedflcatton which called for mate* to comply with an Irish Standard was fflegal. ?he Court ruled that this was contrary to ArUcle 30 of the Treaty of Rome and that the spedflcation should have called for the materials to be to the Irlsh Standard'or equivalent' Thls decision only affects contracts let by Government Agencies and Local Authorities at the present Ume. Howww, these contracts represent a substantial propomon of the UK cML engineering workload and the c w h e wlll extend further If the present draR Excluded Sectors DirecUve Is Implemented. Strictly speaktng. CESMM does not specify what materials are to be used in cM1 englneerlng works. It only prescribes how thatwhich has been speclfled Is to be measured. In the opMon of the committee it follows that. generally. compllers of BUls of Quantities can conttnue to use CESMM without any f f l compuers wish to amendment. ?he committee adopts the view that. If B speclfy BS components (such as relnforclng steel]. they should use the CESMM code number and descrfption for that item. Howeyer, If they arc now prohlblted from so specifying they could adopt a more general description of the component and use an appropriate code number which would. in effect. requlre the use of the so-called 3 items'. The consequence of the above approach is that many Bills of uantitfes would then cease to have standard numbering and item descriptions for a large amount of their content. particularly reinforcement and plpework. and one of the major obJectlves of CESMM would thus be undermined.
A more pragmatic approach. therefore, may be for compuers of BUS of Quantities to include in their Preamble a statement to the &ect that:-

Any reference to BriUsh Standards appearing withirrthese Bills of Quantities shall be deemed to be foilowed by the worda 'or equivalent'. Provldlng that this is done. it should permit Bffl compllers to conUnue to use the standard item numbers and descriptions set out in CESMM wen where those contain a reference to a British Standard. It may also be prudent for a similar statement to appear somewhere within the speciacation but that i sa matter to be addressed in thedrafling of the speclflcation.

-,

CESMM2 GUIDANCE NOTE

Straight specials and the errors on pages 41 and 73

where partlcuLar non-statidard len([tty. z p p le are expressly required. y means shown on DelhlUonL.6 says t h a t 6 &%&ion " ~ r e s s l rqutred" the D S & . & , de&rlb& fn'th;~~eclftcatI&o:ordered by the Engineer pursu;iht:io mmeitns that stmight specials are not measured - the ContracC T%' where non-stqdardkngths & r e nkessitated only by the layout of the work. .. , "

- , .
q "

: : ..: ,-- - -'

When pm-g tender docum&ts; it is lmiortant to ensure that the d o c u ~ t a clear andconahtent with nspect to non-standard lengths of pipe. For example. it can be unhelpful when descrlblng pipework leading into manholes to statethat two Joints <arerequired w i t h a spcdfffled distance of avoitt: uncertainty iri the measurement of such work. it the manhde waJwaU-To Lengths oLpipe are to be left at the shouldbe.&& clear whether t h ~ r e s u l t h g they are to be of particular stated lengths. ~ontractor'~dlscretion.orwhether specials: In the In the former &e. they should not k measured as stra~ght latter caee they should.

overagef for fabric fcinforcment items in class R: Roads and pavings, items R 44-51-8 ,_, There is no coverage rule refenlng to supporting reinforcement at this poht in n class G for slrnllar material in the CESMM 2nd edition equivalent to rule Cl I reinforced concrete g e n d y . Forthe avoidance of doubt. it is recommended that. whereit (s lntended that Items for fabric ranforcementin concrete pavements should be deemed to W u d e 8UDDOrtlng reinforcement other than steel suppons to top reinforcement. thls s h h d be stated I n the preamble to 5.4 of the CESMM. the BU of Quantities Ln accordance with -graph SMlarly. it is recommended that an appioprlate statement should be nthe Preamble Kcoverage ln these terms is not intended. lncluded I
v "

. .

CESMM3
ERRATA
The CESMM3 as publshed in 1991 contams the followlng errors Page
6

Reference
3.2

Error The references to 'm~ld steel bar' ~nllnes 4 and 5 should read 'plan round mlld steel bar'. m e reference to 'm~ld steel bat' ~nItne 3 should read 'plain round mild steel baf The reference to 'the CESMM' should read 'CESMM3'.

17

Addnlonal Descnpt~on Rule A1

m e word 'Substant~al'should appear in front of 'Complet~on Certmcate'

m e word 'and' should appear between 'pns' and 'trenches' In place of the comma Descnpt~on Rule A12
73

Measurement Rule MI 1

A new Rule MI1 should be Inserted under Rule M7 as follows 'MI1 The lenghs measured for cumng off surplus lengrhr of lnterlockmg steel plles shall be the mean undeveloped horizontal lengths to be cut (mcludlng lengths occup~ed by speclal plies) ' The exlstlng Rule 'M11' should be renumbered 'MI2

Reference R6'5 Note a ! top of page Coverage Rule


C4

m e number '5' should appear in front of 'Transrt~ons' In the Th~rd Division The reference to 'page 73' should read 'page 75' The reference to rule 'MY should read 'M10' The comma after 'masonry' should be del

Addn~onal Description Rule A 2 Addnlonal Descrtpt~on Rule A4 Deflnnion Rule D8 Note at foot of page

A bracket should be Inserted after ' l w ~ e sand ' the bracket after Yomery' should be deleted
li

The word 'plpe' should be ~nsened in front of 'fimngs' The note should be extended after 'plpefinmgs' wnh the follow~ng. provlaeo that the york included 1 s ioemd~ed In nern descnptlons in accoroance wnh Parawam 5 12 and the amroorlate statements are gwen in the preamble% accordance with paragraph 5.4.'

.. .

.. - .. . .-

. .-

: , Published for the lnnftutlon of Ctvrl" Engtneers by Thomas Telford Servtces Lfd.
1 Heron Quay. London El4 QID

Second edltlon 1985 Thud edltlon 1991 Reprrnted wtth corren~ons 1992 IMPORTANT NOTE Smce CESMM3 was published in 1991, several errors have been ~dem~fied and the opportunity has been taken to correct these errors in t h ~ s reprint. For ease of reference the changes between thts second prlntlng and the first printmg are glven below. Page 6 Reference Change In hnes 4 and 5 the words 'plaln round mild steel bar' have replaced 'm~ld steel bar' In lme 3 the same change as above has been made The word 'CESMMJ' has replaced 'the CESMM'.

32

- --r
*

Descrlptton Rule A1

Theterm 'Cerbficateof Substantla1Completion' has been mserted In mle'A1' The word 'and' has been Inserted between 'plts' and 'trenches' In place of the comma Anew rule'M11'has been Inserted and theprevlous rule'M11'has become rule'M12' The number'5'has been msertedin front of 'Transtt~ons' In theThwd D~vis~on The reference to rule 'M10' has replaced the reference to rule 'M9' A comma wh~ch prev~ously appeared after 'masono' has been deleted

..-

Addlttonal Description RuleA12 Measurement Rule M I 1 Reference R 6 . 5 Coverage Rule C4 Addttlonal Descrlptlon Rule A2 Addltlonal Descrtptlon Rule A4 Deflmtion Rule D8 Note at foot of

A bracket has been inserted after 'trusses' and a


bracket wh~ch appeared afIer >ornery' has been deleted The word 'p~pe'has bsen Inserted in front of 'fmngs' The note has been extended w ~ t h the wordmg beglnnmg 'provtded that . '

0 The lnnltutfon of Cwtl Eng~neers and The Federatton of Cwll Engmeenng Contractors, 1991

PREFACE
The Cjvd Eng~neermg Standard Method of Measurement, t h ~ r d edit~on (CESMM3). has been approved by the sponsors--the lnst~tut~on of CIVII Engmeers and the Federat~on of Clvd Eng~neenng Contractors--for use in works of clvll englneerlng construction T h ~ s th~rd edtt~on supersedes the second e d ~ t ~ o publ~shed n In 1985. Reference to CESMM3 in the Appendlx to the Form of Tender, as prov~ded for by of Contract, s ~ x t h ed~t~o (January n 1991) IS sufflclause 57 of the ICE Cond~t~ons clent to glve effect to the use of thls standard method of measurement for a part~cular contract CESMM3 may be used w ~ t h other cond~t~ons of contract such as the ICE Cond~t~on of s Contract for Ground lnvest~gat~on and the ICE Condit~onsof Contract for Minor Works. When other cond~t~ons of contract are used, paragraph 1.2 and clause numbers referred to in CESMM3 should be amended by a statement in the Preamble In accordance w ~ t h paragraph 5 4 The Committee under whose gu~dance CESMM3 has been prepared wlil keep the use of the document under revlew and cons~der any suggestions for amendment. These should be addressed to The Secretary, The lnstltut~onof Civd Engmeers. 1-7 Great George Street, London SWlP 3AA Revwon of the document will be made when such actton seems warranted

CONTENTS

"

- . . . ' .
,

Foreword to the first e d ~ t i o n Foreword t o t h e second edmon Foreword to the thtrd e d ~ t i o n


~

3
4

Sectton 1 Sect~on 2. Sect~on 3. Sect~on 4. Sect~on 5 Sect~on 6.

Defin~tions General principles Applicat~on o f the Work Class~ficatlon Codlng and numbering o f items Preparat~on of t h e 6111 of Q u a n t ~ t ~ e s Completion, pricmg and use of the Bill of Quantltles

6 8 9
13 14 15

Sectton 7.. Method-Related Charges

8. Sect~on

Work Class~ftcat~on Class A Class 8. Class C Class Kv Class E Class F Class G. Class H. Class I. Class J Class K. Class L Class M Class N Class 0 Class P . Class Q Class R Class S Class T Class U Class V Class W Class X Class Y Class Z General Items, 16 Ground Investrgatron, 20 Geotechntcal and other spec~allst processes. 28 Demolmon and slte clearance. 32 Earthworks, 34 In satu concrete, 40 Concrete anc~llar~es. 42 Precast concrete, 46 P~pework--pipes. 48 P~pework-fittmgs and valves. 50 Ptpework-manholes and p~pework anc~llartes.52 Plpework-supports and protection, anclllar~es to laymg and excavation. 56 Structural metalwork, 60 Mtscellaneous metalwork. 62 Timber, 64 Plies, 66 Pll~ng anc~llartes. 70 Roads and pavlngs. 74 Ra~l track. 78 Tunnels, 82 Bnckwork, blockwork and masonry. 88 Palntlng, 90 Waterproofing. 92 Miscellaneous work. 94 Sewer and water matn renovation and ancillary works. 96 Slmple b u ~ l d ~ n works g lncldental to ctvll englneerlng works. 102

In 1964 the Councll of the lnstltutlon of Clvd Engmeers set up a Committee underthe Cha~rmansh~p of T A. L. (now SirAngus) Paton, CMG, BSc(Eng). FICE, to propose revlstons to the Standard Method of Measurement of Crvrl Engrneering Quantrtres. In 1971 the workof revcslon was undertaken by Martm Barnes, PhD, BSc(Eng), MICE, who worked tn~t~ally under an agreement w ~ t h the Un~vers~ty of Manchester lnst~tute of Sc~ence and Technology and, after he left the Unwers~ty in 1972, under a d~rect agreement w ~ t h the lnst~tut~on of C~vdEngmeers A Steermg Commmee was appomted by the Councd of the lnstltutlon of Clvd Engmeers to supervtse the work The Steer~ng Comm~ttee was enlarged in 1972 by the appotntment of an addit~onal representatwe from each of the lnst~tut~on of Ctvd Engmeers, the Assoc~at~on of Consultmg Engmeers and the Federat~onof Civd Engmeermg Contractors. The member appo~nted in 1971) were members of the commtnee (* md~cates *D C . Coode, FICE, FIEAust, Cha~rman *M. Agar, BSc, FICE, FIStructE, lnstltut~on of CIVII Engmeers of Civ~l Engmeers F J Cave, BSc, FICE, FRICS, MTPI, FIMunE, FRSH, Inst~tut~on 'H R Oakley, MSc(Eng). FICE, MIWE, FASCE, Assoc~at~on of Consultmg Engmeers P B. Ahm, MSc, FICE. Assoc~at~on of Consultmg Engmeers +R B HIII, BSc, FICE, FIStructE, Federatlon of Clvd Engmeermg Contractors J A. Sneden, FRICS, FIQS, Federat~on of C~vd Engmeermg Contractors J B B Newton, BSc(Eng), FICE, co-opted N C . B. Br~erley,BSc(Eng), FICE, co-opted Late in 1972 a draft of the rev~sed standard method of measurement was c~rculated for comment to 71 representatwe bod~es Tr~al Bills of Quanttt~es were prepared by 20 organizat~ons D~scuss~ons w~th mterested bod~es connnued throughout 7973 and 1974 and the form of the present document owes much to the suggestions made durmg thts tame by bod~es outs~de the commlnee The Steermg Comrn~ttee IS mdebted to the many people who helped in t h ~ s way The object of the work has been to make lmprovements whde retamng the good of n the standard method of measurement The features of the prevlous e d ~ t ~ o prlnclpal Improvements sought are ia) to standard~ze the layout and contents of Bills of Q ntltles prepared accordmg to the standard method of measurement ( b ) to provtde a systemattc structure of b ~ l l(terns leadmg to more un~form Itemwatton and descr~pt~on of on work Into Items so that a more sensltlve and (d to revlew the s u b d ~ v ~ s ~ balanced descr~ptton of the value of work in a contract IS prov~ded (4 to take account of new techniques in cwll engmeermg constructlon and management. thew mfluence on the work ltself and on the adm~n~strat~on of contracts A Bill of Quant~t~es wh~ch in essence ts no more than a prlce l ~ sof t the Permanent Works no longer adequately reflects the many variables tn the cost of c~vd engtneenng constructlon whtch have resulted from developments in construct~onal techn~ques and methods It has therefore been dec~dedto prov~defor some addmonal ttems of measured work and for other items, entered at the optlon of the tenderer, d~rectly related to methods of constructlon A system of work classtficat~onhas been adopted as the bass of the method of measurement so that Bills of Quantmes can be comp~led and used moreeasdy The system should enable mu& of the repetltwe clertcal work assoc~ated with the use of Bills of Quant~t~es to be s ~ m p l ~ f ~ and e d , make the use of computers easler The Work Class~f~cat~on tncorporates a reference number for each type of work component These reference numbersmay be used asa slmple code for ident~ficatlon of work The~ruse as part of the ttem numbers in Bills of Quant~tiesIS suggested, but IS optlonal The codmg IS sufflclently flex~blenot to m h ~ b ~ t descr~pt~on of the part~cular work in each contract

FOREWORD TO THE SECOND ,. ., .EDITION - <*..= :

, .

*;;..;

-.

'<~ , .

"

'2 *~

- . , . . -I~. .

- . .
ca

.
,

In 1983 the Counc~lof the lnst~tut~on of CIV~ Eng~neersmstructed the CESMM , Rev~ew Comm~ttee to prepare-a second e d ~ t ~ o of n the C I V I Eng~neermg Standard Method of Measurement The members of the Rev~ew Comm~ttee were
,

H R dakley, CEE, FEng, MSc(Eng), FICE, chalrman


- .

"

- .. . - , - , , :

. , ,-

D C. Coode, CBE. FCGI, FlCE N C B. Br~erley,BSc(Eng), FICE


N M. L Barnes,-BSc(Eng), PhD, .FICE. . FCIOB, AClArb, MBCS
..

--

The work of analysmg the comments recewed on the f~rst ed~tlon and of draftmg the -second edit~on was undertaken by Mamn Barnes and Partnerswho were ass~sted b) -McGkII and Partners.
-

* s.

..

Many organlzatlons contr~butedcomments and suggesttons for amendment o the document and others pan~c~pated by revlewmg drafts and glvlnl adv~ce. The Review Committee 1 s Indebted to the many people who helped in t h ~ way, and part~cularlyto the Federation of C~vdEng~neer~ng Contractors whi appo;nt2?d a comm~ttee to revnew and comment upon the drafts.
I The object of the amendments made in the second e d ~ t ~ o was n twofold F~rstly was'to take account of developments in c w ~ engmeermg l technology and in th s~gn~ficance of d~fferent costs of c w l englneermg work wh~ch have taken place sinc the first e d ~ t ~ o was n publ~shed. Secondly t t was to take the upportuntty of alterm the wording of the small number of provlslons of the first edmon whlch experlenc had shown were not workmg e~ther as smoothly as they mtght or in the way whic had been intended. The second ed~tton of the CESMM is consequently not a radw departure from the first ed~tion, but an update and general overhaul

The two most not~ceablechanges are the categortzatlon and upgradmg of tt. former notes in the work class~ficatlon and the mtroduct~on of a standard method r measurement for sewer renovatlon work The rearrangement of the former note IS intended to make the document easker to use in two ways Firstly, the notes ha\ been re-named rules in order to emphas~ze that the~r provwons govern how wo of quantltles and th should be described and measured in c w l englneenng b ~ l l s they have equal status w ~ t h rules in any other part of the document Secondly, the the four separate functions wh11 have been d~vided Into four categories to md~cate they perform and have, as far as possible, been l a ~ d out alongside the parts of tt class~fication tables to wh~ch they relate The sectson for measurement of sewer renovatlon work has been ~ntroduced order to prowde for the cons~derably~ncreased volume of work of t h ~ s type nc bemg undertaken The method of measurement for sewer renovatlon In t t document is based upon that devlsed origmally for the Water Research Centre at lncluded in thew standard spec~flcat~onThe lnstrtut~on of C~vil Engmeers and t ' Federat~on of Civd Engmeermg Contractors acknowledge the assistance glven the Water Research Centre in allowmg t h ~ s method of measurement to be embod~ In the CESMM

,,-,

'.
*

S"

Althpugh ; h e second kdit~onof the C ~ v dEngmeermg Standard Method of Measurement was publrshed in T985, a number of factors have combmed to cause the need for a t h ~ r d edit~on.The maln changes incorporated in the thwd edrt~on(CESMM31 are amendments to enable its use w ~ t h the ICE Conditions of 1 9 9 1 ) .and the ~ntroduct~on of a standard method Contract. s ~ x t h ed~t~o (January n of measurement for water mam renovatlon and for simple burld~ng works ~nc~dental to cwil engmeerlng works (classes Y and Z) Account has also been l technology and the opportunity taken to take of developments in c ~ v iengineering make minor amendments and correctrons to the text of the second edrt~onThere are no changes in princ~ple or in the general arrangement. The Rev~ew Committee is mdebted to a number of organrzatlons and ~nd~v~duals who have contributed comments and suggestrons for amendment The committee 1 s parttcularly indebted to E . C Harrw Quant~tySurveying whose proposals formed the bass for the new class Z . The work of analyslng the comments and suggestlons and draftmg CESMM3 was undertaken by Coopers & Lvbrand Delo~tte. The members of the Review Comm~ttee were H R Oakley. CBE, FEng, MSc(Eng), FICE. Chalrman N. M L . Barnes, FEng, BSc(Eng), PhD, FICE, FCIOB, ACIArb, MBCS, CBlM MISS R. Beales. Barraster-at-Law J Banyard, MICE H. A. Jones, MICE, Secretary The wmmrttee is lndebted to Dr Barnes of Coopers and Lybrand Delortte for his rnvaluable adv~ce and assistance throughout

SECTION 1. DEFINITIONS
.

-,"

<

:~

1.1 in this document and in, ~llls:of.huantltlis prepared accordlng to the, proce$ure set forth herem the following words and expressions have the meanlngs requires. hereby ass~gned to them, except where the context othetw~se

1.2. 'Cond~t~ons of Contract' means the ICE Condtttons o f Contract, slxth e d ~ t ~ o n by the lnst~tutlonof CNII Engmeers jomtly wlth the (Januav 1991). Assoc~at~on of Consultmg Engineers and the Federation of Civll Engmeermg Contractors 1.3. Words and expressions def~ned in the Cond~t~ons of Contract have the same meanings herem 14 : All references to clauses are references to clauses numbered in the Cond~tlons of Contract and references to paragraphs are references to paragraphs numbered herem:

work to be carr~ed out, goods, materlals and servlces 1.5 The word 'work' ~ncludes to be suppl~ed,and the liab~l~t~es, obl~gat~ons and r~sks to be undertaken by the Contractor under the Contract means shown on the Drawmgs, descr~bed 1 6 The expression 'expressly requ~red' ~nthe Spec~ftcat~on or ordered b y the Engmeer pursuant to the Contract

.,_, -. 1 7 '8111of Quantities' means a list of Items givlng br~ef ~dent~fy~ descr~pt~ons ng of the work comprised in a Contract. and estimated quantit~es
work on the bass of tune spent by the 1.8 'Daywork' means the method of valu~ng workmen, the materials used and the plant employed.
19

'Work Classtf~cat~on' means the Work Class~f~cat~on set out in sectlon 8

1 10 'Ongmal Surface' means the surface of the ground before any work has been carr~ed out 1 11. 'Fmal Surface' means the surface lnd~catedon the Drawmgs to wh~ch out excavatton IS to be carr~ed
1 12 'Commenc~ng Surface' means. In relat~on to an Item in a 8111of Quant~t~es, the surface of the ground before any work covered by the Item has been carr~ed out to a group of Items in a 8111of Quantmes 'Commenc~ng Surface' means, In relat~on for work tn d~fferent mater~als tn an excavatlon or a bored, dr~lled or dr~ven hole, the surface of the ground before any work covered by any Item in the group has been carr~ed out

1 13 'Excavated Surface' means. In relatmn to an Item in a 6111of duant~t~es, the surface to wh~ch excavatlon mcluded in the work covered by the Item IS to be carr~ed out 'Excavated Surface' means. In relat~on to a group of Items in a 6111of Quantmes for excavatlon in d~fferent mater~als, the surface to wh~ch excavatlon ~ncluded in the out work covered by any Item in the group IS to be carr~ed 1.14 A hyphen between two dmens~onsmeans a range of dlmens~ons wh~ch mcludes all d~menstons exceedmg that preced~ng the hyphen but not exceedmg that followmg the hyphen 1.15. 'BS' means B r ~ t ~ s Standard. h References to Brltlsh Standards are deemed; t o include equ~valentnat~onal standards of member states of the Europea? Commun~ty and European Community standards. &

Title application and extent

2 t - . T h e title of thiddocument is. the C V II Engrneer~ng Standard Method of --Measurement'th~rdedmon, w h ~ c hts abbrev~atedto CESMM3. CESMM3 IS mtended to be used in conjunction with the Cond~tionsof Contract and only in connectton wtth c i v ~engmeering i works and s~mple bu~ldmg works incidental to civd engineenng works. . -.,

'

- --

2.2. CESMM3 provtdes for s~mple buildmg works inc~dental to c ~ v ~ l engmeering works to be measured in accordance w ~ t h class 2. CESMM3 does not deal w ~ t h the preparat~onof Bills of Quant~t~es for complex mechan~calor electrical eng1ne&ng work, or complex budding work or work wh~ch IS seldom encountered in civd engmeering contracts Where any such work IS to be mcluded shall be ~tem~zed and described in the In a Contract for c ~ v d engcneermg work, ~t B ~ lof l Quant~ties in suffic~ent deta~l to enable tenderers to prlce it adequately and the method pf'measuiement shall be stated in the Preamble to the Bill of Quantit~esin accordance with paragraph 54.

1'1
!I'

:'(

I///:

j' ?I;l
/I1
1 ;:

j:j

I' II ,

/I'
'11
111
I

Object of CESMM3

2 . 3 . The object of CESMM3 is to set forth the procedure according to whlch the
Btll of Quant~ties shall be prepared and prlced and the quantltles of work expressed and measured

{I

1/

/I)

Objects of the Bill of Quantltles

2.4.

The objects of the Bdl of Quant~t~es are


I

(a) to prov~desuch ~nforma&on of the quantltles of work as to enable tenders to be prepared effic~ently and accurately (bl when a Contract has been entered into, to provide for use of the pr~ced 0111of Quant~t~es in the valuat~on of work executed
2.5 in order to anam these objects, work ould be ~tem~zed in the B ~ l l of Quant~t~es in suff~nent detad for it to be poss~bl to d~stmgu~sh between the d~fferent classes of work, and between work of the sa e nature carr~edout in d~fferent locat~onsor in any other cwcumstances wh~ch may glve rlse to d~fferent cons~derathese requirements the layout and content of the B ~ l l tlons of cost Consistent w ~ t h of Quant~t~es should be as smple and br~ef as poss~ble

:i

2 6 . All work which Quant~t~es.

IS

expressly requlred should be covered in the B ~ l l of

2.7 CESMM3 seeks to attam these objects prlnclpally by the use of the Work Class~f~cat~on Th~s defines

1;

(a) how work IS to be dw~ded Into separate Items in the B ~ lof l Quant~t~es (bl the ~nformat~on to be gwen in Item descr~pt~ons ( c ) the unlts in w h ~ c h the quantmes agalnst each Item are to be expressed (dl how the work 6 s ro be measured for the purpose of calculatmg quantmes

-6

SECTION 3.

, . . APPLICATION OF THE WORK CLASSIFICATION


." -*
^-

. -.

--

"

-'..'.

*, . ,

-- , --..

ltem descr~ptions,' -7 3
".%

:2 -

>

--

,:

. .
A

. "

' ,C r 3 : 1 .
,

c
.

'

,-*

. ., The Work Classificat~on dlvides work commonly encountered in .clvll.engineering contracts into 26 main classes. Each class comprises up to three divisions whlch classify workat successive levels of deta~l.Each d ~ v i s ~ o comprises n a list of u p t o eight descr~ptwefeatures of work. Each Item descr~ptionin the Bill of Quant~tlesshall ~ d e n t ~ the f y component of work covered with respect to One feature from each dlvlsion of the relevant class, e.g
"

,.
-

-,

- .* ,

Class H (precast concrete) contams three divis~onsof classif~cat~on. The first classifies d~fferent types of precast concrete un~ts, the second class~f~es different units by t h e ~ r d~mens~ons, and the third class~fies them by t h e ~ r mass. Each item descr~pt~on for precast concrete unlts shall therefore ~dentlfy the component of-work in terms of the type of unn. nts d~mensions and mass.

..
-

.I
,: >

, -

"

k ' '

Mode i f desc"ption

3 . 2 . To avoid unnecessary length. Item descnpt~ons for Permanent Works shall


generally identify the component of the Works and not the tasks to be carr~ed Out by the Contractor, e.g. An Item should be described as 'Plam round m ~ i steel d bar remforcement t o BS 4449 nomlnal slze 20 mm', not as 'Supply, dellver, cut, bend and fix plam round mild steel bar remforcement to BS 4449 nommal size 20 mm'

3.3. Where the work ~denufied by an ltem shall be stated in the item descript~on, e.g.

IS

specifically limited, the llmitatlon

'Plain round mild steel bar remforcement to BS 4449 nominal slze 20 m m exclud~ng supply and deliveiy to the S~te.' ltem descnpt~onsfor work whlch Ilmbtatlons to be stated, e g
IS

drvlded between two classes requlre such

for m~scellaneous metalwork Inserts whlch are to be cast into ltem descr~pt~ons concrete require approprlate addlt~onaldescrlptlon if Items are glven In both class G for castlng in the mserts and class N for supplylng the lIE.ertS
c

Separate items

34. The work shall be dlvrded Into Items In the Bill of Quantltles so that the component of work whlch 1 s ~ncluded in each Item does not e x h ~ bmore ~ t than one feature from each dlvls~on of any one class of the Work Class~f~cat~on, eg

One ltem for precast concrete work shall not lnclude more than one of the types of concrete untt llsted in the first d ~ v ~ s l o of n class H, ne~thershall it Include d~fferent units whose dlmens~ons are not w ~ t h l n one of the ciasstf~cat~ons l~sted In the second dwsion of class H, nor shall it include different unlts whose mass does not he w ~ t h ~ one n of the ranges l~sted in the t h ~ r d dlvls~on of class H Umts of measurement
3 5. The untt of measurement for each Item shall be that stated for the ltem in the Work Classif~catron The unit of measurement stated against a descr~ptlve feature In the Work Classiftcat~on shall apply to all Items to whlch that descr~ptlve feature appl~es

Measurement rules

3.6. Measurement rules in the Work Class~ficat~on set out the cond~t~ons undel whlch work shall be measured and the method by wh~ch the quantities shall be computed if other than in accordance w ~ t h paragraph 5 18

Definit~on rules

3 . 7 .

Deflnit~on rules in the Work Classlflcat~on define the extent and llmlts of thi class of work represented by a word or expresston used in the Wori CESMM~ Classlflcat~onand in a Bill of Quant~tiesprepared in accordance w ~ t h

Coverage rules

3.8. Coverage ~ l e in s the Work Classificat~onprovlde that the work stated deemed to be ~ncluded in the approprlate items to the extent that such work ~ncluded in the Contract A coverage rule does not state all the work covered by

*-

--

Additional description rules

item and does not preclude any of the work stated bemg covered by a ~ e t h o d Related Charge.
3.9. Descr~pt~on of an ltem in a d d ~ t ~ oto n that requ~redin accordance w ~ t h by any provtslon of sectlon 5 or by any paragraph 3 1 shall be glven where requ~red appltcable add~t~onal descr~pt~on rule in the Work Classlficatlon. Where addlt~onal descr~pt~on IS glven, a separate ltem shall be glven for each component of work exh~b~t~ an different g addit~onal feature, e.g

Addit~onaldescription rule dl of class H requlres that the spec~f~catlon of the concrete in each precast concrete unlt shall be stated. Accordmgly. t h ~ s rule also means that separate Items shall be glven for unlts cast from concrete of d~fferent spec~ficattons.

3.10. Where a descr~ptwe feature in the Work Classlficatlon identifies a range or group of dlmenslons and an appl~cableaddlt~onaldescr~pt~on rule requlres the particular dimens~on to be stated, the range or group of d~mens~ons shall not also be stated, e g
Addittonal descr~pt~on rule A2 of class I requlres that the nomnal bores of plpes shall be stated in Item descr~pt~ons The range of nomlnal bore taken from the of the class~ficatlon of class I shall not also be stated second dlv~ston Applicability of rules 3.11 Rules prlnted on a r~ght-hand page above a double h e apply to all work in the class. Other rules on a r~ght-hand page apply to particular groups of ttems as shown by the classif~cat~on table

SECTION 4. CODING AND NUMBERING OF ITEMS,<;


.~

.>I
/

Coding

~.

. ,

4.1. For conven~ence of reference each ltem in the Work Class~f~cation has been ass~gned a code numbercons~stmg of a letter and not more than three dlglts The the ltem occurs letter corresponds to thecla&iirrthe Work Classlficatlon in wh~ch and the dlg~ts gtve the poslt~on of the item in the first, second and thrrd div~slons Of t-,e'class, e & ' " ' 0 . - . -, ' -c. . > , . " Code H 1 3 6 ~ d e n t ~ f ~ an es ltem as
?

.,

class H first divis~on 1 . . second d w s ~ o n 3 - '. . o n6 , t h ~ r d ~ v ~ s ~,

precast concrete beams length 7-10 m mass 5-10 t

4.2. The symbol ; IS used in the rules to the Work Class~ficat~on to ~nd~cate all numbers in the approprlate dlv~s~on, e g. H 1 3 -.means the group of code numbers from H 1 3 1 to H 1 3 8 inclusive

ltem numbers

4.3. Code numbers may be used to number the Items in the Bill of Quant~t~es, the Items wrthln the 6111of Quant~t~es bemg l~sted in order of ascending code number 44. Code numbers used as Item numbers in the 6111of Quantmes shall not form pan of the ltem descr~ptlons or be taken Into account in the Interpretatton of the Contract

II I

Coding of unclassified items

4.5.. Where a feature of an ltern IS not l~sted in the Work Class~ficat~on the dlglt 9 shall be used in the appropriate posltlons in the code number

s an item to whrch a drvrs~on of classlftcation does not apply or 4 6 Where there 1 for whlch fewer than three dlvlslons of class~f~catlon are given the dlglt 0 shall be used in the approprlate posmons in the code number Numbering of items with additional description descnpt~on glven for an !tern in accordance with-paragraph 3 9 IS 4 7 Addrt~onal not represented by the code number Where code numbers are used as ltem numbers a suff~x number shall be used to dlstmgu~sh Items whlch have the same descrkpt~on. eg code number but d~fferentadd~tlonal Addlt~onaldescr~ptlon rule A1 of class H requlres that addit~onal descr~pt~on be glven for precast concrete unlts statlng thew posltlon in the Works and the specjf~catton of the concrete used If three Items are required w ~ t h ~ one n part of the 6111of Quant~t~es to allow for precast concrete beams havmg the same code but d~fferent add~t~onal descr~ptron,the Items should be numbered

SECTION 5. PREPARATION OF THE BILL OF QUANTITIES


, -

, , .3
. .

' I

"_

<'

Measurement of completed work


.

5 . 1 , . ~ ~ ~ r o i r tprov~slons ate of thls sectton shall also apply to the measurement of ' compl6ted work % : -. . . ' , -,.L

--

- -

Sections of the Bill of Quantities

- 5 2.

Jhe Bill i f ~ u a n t l t l e s shall be,dlv~dedInto the followmg sectlons

(a) List of prtnclpal quantittes (b) Preamble (c) Daywork Schedule (dl Work Items (grouped Into parts) (e) ~ r a n d ~ u m m a &

Llst of principal quantities

53. A list of the prmclpal components of the Works w ~ t h thew approxlmate estimated quantttles shall be glven solely to asslst tenderers In makmg a rap~d assessment of the general scale and character of the proposed Works pnor to the examlnatlon of the remainder of the Bdl of Quant~t~es and the other contractual documents on whlch thelr tenders will be based.
5.4. The Preamble shall state the methods of measurement other than CESMM3. tf any, which have been adopted in the preparation of the Bill of Quantltles and are to be used for the measurement of any part of the Works Such methods of measurement shall comprtse those adopted and to be used for any work not covered by CESMM3 and any amendments to CESMM3 wh~ch have been adopted and are to be used. Amendments comprlslng abbrevlatlon of CESMM3 are usually necessary for Contractor-des~gned work and work wh~ch is Intended to involve selection between akernahves at the discretion of the Contractor The extent of the work affected all amendments to CESMM3 shall be stated in the Preamble.

Preamble

5 5. Where excavatton, bormg or drwmg IS Included in the work a deflnttton of rock shall be glven in the Preamble and thls deftn~tion shall be used for the purposes of measurement

Davwork Schedule

5 6. The Daywork Schedule, ~fany, shall comprlse e~ther

and plant for whlch Daywork (a) a 11stof the varlous classes of labour, mater~als rates or prtces are to be Inserted by the tenderer together w ~ t h a statement of the cond~t~ons under whtch the Contractor shall be p a ~ for d work executed on a Daywork bass, or (b) a statement that the Contractor shall be patd for work executed on a Daywork basts at rates and prlces calculated by addrng the percentage addtttons stated In the Schedules of Dayworks carrred out rncrdental to Contract Work Issued by the Federat~onof C~vtlEng~neermg Contractors to the rates and prlces contatned in the aforement~oned Schedulesand by makmg further adjustments as follows Schedule 1 Schedule 2 Schedule 3 Schedule 4 Labour Mater~als Plant Supplementary charges* add~t~onldeduct~on* of - tper cent addit~onldeduct~on* of - tper cent addtt~on/deduct~on* of - tper cent add~tton/deductton* of - tper cent

'Appropr~ate delet~on to be made by the Contractor when tender~ng tpercentage to be mserted by the Contractor when tender~ng *Supplementary charges shall not include the charges referred to in notes and cond~t~ons Z(ii1. 3 and 6 o f schedule 4

"

Payments shall be made under the cond~t~ons and ustng the rates and prlces contamed In the edltton of the aforementloned Schedulescurrent at the date of execuhon of the Davwork

Work items Dmsfon of the 6111of Quantmes mto parts

5.7. Provisional Sums for work executed on a D a h o r k basis may-be .. . comprising ' separate items for labour, materials, plant'-and supplem charges. Where a Daywork ~ched;le'of the form stated in sub-paragraph paragraph 5.6 is used each Provisional Sum shall b e followed by an Item for: > .. ." adjustment referred to in that sub-paragraph. The piice inserted against ea such rtem shall be calculated by applying the percentage addition or deduct10 inserted bv the Contractor in the Davwork Schedule to the amount of th associated Provisional Sum. 3 3 5.8. The items in the Bill of Quantities which are to be priced and to contribute to the Tender Total may be arranged into numbered parts to dtstingu~sh between those parts of the work of which the nature. location, access, Ilmitation on sequence o ; timing or any other special characteristic is thought likely t o give rise to different methods of construction or wnsideratlons of cost. General items (class A) may be grouped as a separate part of the Bill of Quantifies ltems in each part shall be arranged in the general order of the Work Classification

--

.%

Headings and sub-headmgs

5.9. Each part of the Bill of Quantities shall be given a heading and groups of Items within each part be given sub-headings. Headmgs and sub-headings shall be read as part of the Item descriptions to which they apply. A llne shall be drawn across the item description column below the last rtem to which each heading or sub-heading applies. Headings and sub-headings shall be repeated at the start o f each new page whrch lists items to w h ~ c h they apply.

Extent of rtemrzatron and descnptron

5.10. All work shall be itemized and the items shall be described in accordance with the Work Classrfication, but further rtemrzatron and addrttonal descript~on may be provided if the nature, location, importance or any other special characteristic of the work is thought likely to give rise to special methods of constructlon or considera tions of cost

-5 11. Descriptions shall identify the work covered by the respective items, but the exact nature and extent of the work IS to be ascertained from the Drawings, Specification and Conditions of Contract, as the case may be, read in conjunction with the Work Classification.
5.12. Any de!ail of description required to be given in accordance with the Work Classrfication may be omitted from an item description provided that a reference is given in its place which identifies precisely where the omitted information may b e found on a drawing or in the Specification

5 13 Where an item description compiled in accordance with the Work Classifica tion would be insufficient to identify clearly the particular work covered by the item I addltronal descnptron shall be grven to identrfy the work by reference to rts locat~on or other physical features shown on the Drawings or described in the ~~ecificatron!
Ranges of drmensrons

I 5.14. Where all the components of work included in an item are of one dimensron, within a range given in the Work Classification that dimension may be stated i n th item description in place of the range of dimensions.given.

Prfme Cost Items

5.15. The estimated price of work to be carried out by a Nominated sub-contractol/ shall be given in the Bill of Quantities as a Prime Cost Item. Each Prime Cost Itenti shalt be followed by
(a). an item for a sum for labours in connection therewith which. In the absence d' $1 any express pmvrsron in the Contract to the contraw, shall rnclude only $1 fi (i) in any case in which the Nomrnated Sub-contractor is to carry out wofi'
-, -

ii

, . .
.

, *

. '

<--.

on the S ~ t e for allo&ng h m to use temporary roads, scaffolding, ho~sts. : messrooms, sanktary accommodation and welfare fac~lit~es wh~ch are prov~ded by the Contractor for h ~ own s use and for prowding space for office accommodat~on and storage o f plant and mater~als,for d~sposmg of rubbish and for pmv~ding light and water for the work of the Nommated Sub-contractor, and in any case in which the Nominated Sub-contractor is notto carry out work on the S ~ t e for unloading, storlng and ho~stmg materials supplied by h ~ m and returnmg packmg materials. and
(11)

<

IL

; /I)/ I,
s ,

0
I

!, I//$,

1/11

an Item expressed as a percentage of the price of the Prime Cost ltem in respect of all other charges and proft.
5.16 Where any goods. materials or sewaces suppl~edby a Nommated Subcontractor are to be used by the contractor in connectton with any item, reference of that item, or in the appropriate headmg or subshall be made in the descr~pt~on headmg, to the Prlme Cost ltem under which the goods or materials or servlces are I . " to be supplied

!'

I"

Provrsronal Sums

5 17. Prov~s~on for contmgencles shall be made by glvlng Prov~sional Sums tn the B ~ lof l Ouantlties and not by mcreasmg the quantltles beyond those of the work Sums for specific contlngencles shall be given expected to b required Prov~s~onal A Prov~s~onal Sum for a general In the genera items of the Bdl of Quant~t~es. contmgency a owance. ~frequ~red,shall be gwen in the Grand Summary in accordance w ~ t h paragraph 5 25.

9,

Quantrtres

5.18. The quantities shall be computed net usmg dttnensions from the Drawmgs. unless d~rected otherwise by a measurement ~ l In e CESMM3 or by the Contract, and no allowance shall be made for bulkmg, shnnkage or waste. Ouantlties may be rounded up or down where appropriate. Fractional quantlhes are not generally necessary and should not be glven to more than one place of decmals . 5.19

Unrts of measurement

The followmg unats of measurement and abbreviat~ons shall be used Untt ' Abbreviatton M~ll~metre mm m Metre Square m~ll~metre mmz or mm2 Square metre mZ or m2 Hectare ha Cub~c metre m3 or m3 K~logramme kg t Tonne sum Sum Number nr h Hour wk Week

Work affected by water

5.20. Where an exlstlng body of open water (other than groundwater) such as a rwer, stream, canal, lake or body of t ~ d awater l 1 s e~ther on the Site or bounds the S~te, each body of water shall be ~dent~fied tn the Preamble to the 6111 of Ouant~t~es A reference shall also be gwen to a drawmg md~catmg the boundar~es and surface level of each body of water or, where the boundar~es and surface leyeis fluctuate, theu ant~c~pated rpnges of fluctuat~on 5.21. The Commenc~ng Surface shall be ~dent~fied in the descr~pt~on of each stem for work mvolving excavation, bormg or drrvmg for whlch the Commencing Surface IS not the O r ~ g ~ n a Surface l The Excavated Surface shall b e ~dent~fied in the

Ground and excavatron levels

Form and semng


' '

descr~ptionof each Item for work involving excavation for whtch the Excavat Surface 1 s not the Final Surface. The depths of excavation stated in accordance W the Work Classif~cation shall be measured from the Commenc~ng Surface to th Excavated Surface l Quant~ties should be set out on paper of A4 size The work ite 5.22. The B ~ lof should be set out wlthin columns headed and ruled consecutively as follows. Column heading Number ltem descr~pt~on Unlt Quant~ty Rate Amount. f P Column wrdth 20 mm 90 mm 10 mm 20 m m 20 mm 20 m m 8 mm

..-

5 23. ~ r o v k l o shall n be made for the ;mounts inserted on each page to be totalled and carr~ed to a summary of each part of the 8111of Quantrtles and for the total of, each Part Summary to be carned to the Grand Summary *

Grand Summary

5.24. The Grand Summary shall contain a tabulation of the parts of the Bill of Quant~ties with provksion for lnsertlon of the total of the amounts brought forward .from the Part Summaries

/I
i

General Contmgency Allowance

5.25. A Provis~onalSum for a general contingency (the General contingency the total o!, Allowancel, if required, shall be given in the Grand Summary follow~ng the amounts brought forward from the Part Summaries

Adjustment ltem

5.26. An Item descr~bedas the Adjustment ltem shall be glven In the Grand Summary following the total of the amounts brought forward from the Pa% I Summaries and the General Contingency Allowance. ~f any (see paragraphs 6 3, 6 4 and 6.5)

Total of the Prtced Bfll of Quantrtres

5 27. Provision shall be made for Insertion of the total of the amounts brought i forward from the Part Summaries, the amount of the General Contmgency \ I Allowance. rf any, and the amount of the Adjustment ltem

SECTION 6. COMPLETION, PRICING AND USE OF THE BILL OF QUANTITIES


I n s e ~ o of n rat& and prices

'

*-

"

--

3 - 2

6.1. Rates and prlces shalt be ~nserted in the rate column ofthe Bill of Quantmes in pounds sterllng with pence inserted as decmal fract~ons of one pound.
shall be totalled and the totals carr~ed to the 62. Each part of the Bill of Quant~t~es Grand Summary

Parts t o be totalled

Adjustment Item

6.3. A tenderer may Insert a lump sum a d d ~ t ~ oor n deductton agalnst the Adjustment ltem gtven in the Grand Summary in adjustment of the total of the prlced BIN of Quant~tles
6.4. For the purposes of clause 60 lnterlm add~ttons or deduct~ons on account of the amount. ~f any, of the Adjustment ltem shall be made by instalments in lntertm cert~ficates in the proportion that the amount referred to in clause 60(2)(aI bears to the total of the pr~ced Btll of Quant~ties before the addwon or deduct~on of the amount of the Adjustment ltem and a statement to thls effect shall appear In the Preamble to the B I N of Quantities. Such tntertm addmons or deduct~ons shall be made before deduct~on of the retentloo moneys, and shall not exceed in the aggregate the amount of the Ad~ustment ltem If by the date of issue pursuant to clause 48 of the Certtficate of Substantla1 Complet~on for the whole of balance of the amount of the Adjustment ltem 1 s outstandmg it to or deducted from the moneys then due
6.5. In determ~nmgthe Effectwe Value for the purposes of the Contract Price Fluctuar~ons clause, ~f apphcable, account shall be taken of any additlor! to or deduct~on from the amounts due to the Contractor under clause 60 in respect of the Adjustment ltem

-14

SECTION 7. METHOD-RELATED CHARGES-Definitions

:: , ,:: , : 2 ~--.: .

,+c --

- -*

7.k For ihe p u r p o s k o f th!s sectlon the following words and expresstons s . have the meanlngs hereby asslgned them. _- '

'

'Method-Related Charge' means the sum for an Item Inserted In the Bill duantlties by-d tenderer in'accordance with paragraph 7 2. (b) Time-Related charge' means a Method-Related Charge for work the cost wh~ch is to be cons~dered as proportlonal to the length of time taken to execug . the work. . (c) 'Fixed Charge' means a Method-Related Charge whlch IS not a Tlme-Relat+ ,. Charge 8 (a)
'

Insertion by a tenderer

7.2 A tenderer may insirt in the Bill of Quant~t~es such ltems for Method-Related
Charges as he may declde to cover items of work relatlng to h ~ Intended s method of executmg the Works, the costs of which are not to be cons~dered as proportlonal to he has not allowed In the rates and the quantltiesof the'other Items - and . for w h ~ c h prices for the other items poss~ble the itemization of Method-Related Charges should follow the 7 . 3 ~ h & e order of classificat~onand the other requtrements set out in class A of the work Class~f~cat~on, distmgu~shingbetween T~me-Related Charges and Fixed Charges. Method-Related Charges may be inserted to cover ttems of work other than ' set out in class A

7 4. Each item for a ~ethod- elated Charge Inserted in the Brll of Quant~tres shal! be fully descr~bed so as to define precisely the extent of the work covered and to , identify the resoukes to be used and the particular Items of Permanent Works or Temporary Works, r f any, to which the item relates ; j
Contractor not bound t o adopt method The tnsertlon by the Contractor of an Item for a Method-Related Charge in the B ~ lof l Quant~tres when tendering shall not bmd hlm to adopt the method stated tn the ltem descr~pt~on in executmg the Works.

7.5.

Charges not to be measured

7 6 Method-Related Charges shall not be subject to admeasurement but shall be deemed to be prlces for the purposes of clauses 52(1), 52(2) and 56(2)

Payment

7 . 7 . Method-Related Charges shall be cert~fledand p a ~ d pursuant to clauses1 60(l)(d)and 60(2)(al and a statement to t h ~ s effect shall appear in the Preamble to the B ~ lof l Quantltles.
7 8. In the event of the sat~sfactory execut~on of any part of the Works whlch has been the subject of an Item for a Method-Related Charge uslng, whether in whole or in part. a method other than that descr~bed in the Item the Contractor shall nevertheless be entltled to payment of the Method-Related Charge or the balance thereof, as the case may be, by such lnstalments at such tlmes and upon such events as may from tlme to tlme be agreed between the Engmeer and the Contractor In default of such agreement the Method-Related Charge. or the t were an additlon to the Adjustment balance then unpaid, shall be treated as if a ltem referred to in paragraphs 6 3, 6 4 and 6.5 and allowed to the Contractor by way of instalments in Interm certlf~catesaccordingly The amount of a Method Increased nor decreased by reason only of a n Y Related Charge shall be ne~ther change in method made by the Contractor, unless such change has been ordered by the Eng~neer,In which case the pmvlslons of clause 52 shall apply

Payment when method not adopted

SECTION 8. WORK CLASSIFICATION _ , ; *.. -_ . 2, - s: >


Class A: Class B Class C: Class 0. Class E. Class F. Class G Class H: Class I: Class J Class K. Class L. Class M Class N Class 0 Class P. Class Q: Class R Class S Class T Class U Class V Class W: Class X Class Y Class In situ concrete, 40 Concrete ancillaries, 42
-

General items, 16 ,, . 2 ' -.,v..,-,. ~ 2 , ..a-.rp Ground investigation. 20

//_

_-7/.

.;.*. ,

., -

91

:
~

.i
',

4:

Geotechnical and other specialist processes. 28 Demolition and site c l e a r & & 3 2

...*- -

. ---

-.

Precast concrete, 46

Pipework-pipes, 48 Pipework-fittings a d valves, 50

Pipework-manholes Pipework-supports

. .

and plpework ancillaries, 52

and protection, ancillaries t o laying and excavation, 56

Structural metalwork, 60 Miscellaneous metalwork, 62 Timber, 64 Piles, 66 Piling ancillanes, 70 Roads and pavings, 74 Rail track, 78 Tunnds. 82 Brickwork. blockwork and masonry. 88 Painting, 90 Waterproofing, 92 Miscellaneous work, 94 Sewer and water main renovation and ancillary works. 96 Simple budding works incidental t o civil engineering works, 102

Includes: - General obligations, site services and facdities, Temporary Works, testing of materials a n d work. Provisional , : &s-j;ll-I : --% P. . . 5 Sums a n d Prime Cost Items ltems to cover elements of t h e cost o f t h e work w h ~ c are h n o t to be considered as proportionalto the quantities of t h e Permanent Works : - : .. ..

,. -

: i -

-I - . - . - c

.
m <-

FIRST DIVISION
1 Contractual requlrements

SECOND DIVISION
1 Performance bond Z lnsuranceof the Works 3 Thwd party Insurance

2 Spec~f~ed requlrements

1 Accommodat~on for the Engmeer's staff

1 Off~ces 2 Laboratorles 3 Cabms

Serv~cesforthe Eng~neer's staff

1 Transport vehtcles 2 Tele~hones

3 Equlpmentfor use by the Eng~neer's staff

1 Officeequlpment 2 Laboratoryequlpment 3 Suweytng equlpment 1 Drtvers 2 Chammen 3 Laboratow asststants

4 Anendance upon the Engmeer's staff

5 Testmg of mater~als 6 Test~ng of the Works 1 Traff~c dlvenlons 2 Traff~c regulat~on 3 Access roads 4 Br~dges 5 Cofferdams 6 Pumpmg 7 De-waterlng + 8 Com~ressed alr for tunnelllna

3 Method-Related Charges

1 Accommodatton and bu~ldtngs

1 Offices 2 Laboratorles 3 Cabens 4 Stores 5 Canteens and messrooms

1 Electnclty 2 Water 3 Securlty 4 Hoardmgs 5 Slte transport 6 Pencnnel transport 7 Welfare 3

Plant

1 .

Cranes

2 Transport 3 Earthmovlng 4 Compaction 5 Concrete mixlng 6 Concretetransporn

4 Plant

1 Pipelaylng 2 Paving ' " 3 Tunnelltng 4 Crushmgand screening 5 Bonng and drllltng

CLASS A
MEASUREMENT RULES M1 The u n ~of t measurementfor general Items shall be thesum.except where another unlt of measurement is used in accordance wlth rule M2 C1 ltemsfor Insuranceclassed as contractual requrrementsshall be deemed to tnclude only prowslon of msurance i n accordancewlth clauses 21 and 23 unless otherwise stated M2 Aquantln/ shall be gwen agamst all Itemsfor specified reqvtrementsof wh~ch the value 1s1obe ascenamed and determmed by admeasurement 10 accordance wlth clause 56111 A umt of measurement mall be D l All work otherthan the Permanent Works whtch is expressly stated in the Contractto be carrled out by the Contractor and ofwhtch the natureand extent is expressly Rated in the Contract shall be classed as gpenfiedrequrrements A1 ltemdescnpt~onsforwork classedasspeuf~ed requrrementswhlch s t o be carned outafterthe Lssueofthe Certificateof Substant~al Complet~onshall sostae
A2 ltemdffcr!pt~ansforwork classed as speafiedrequlrements shall dlstrngulsh between the establtshmentand removal of servlcesorfac!l#tlesand thetr

IEFINITION RULES

I COVERAGE RULES

ADDITIONAL DESCRIPTIONRULES

M3 ltemsshall be gwen m thls class for all teshngforwhlch Items are not glven separately as set out in other classes

of rnaterralsana tesfmg of the

Wonlssnall tncwde pan~cularsof samples and of methadsaf

M4 ltemsfar Method-Related Charges, d any. shall be mserted by the tenderer in accordance with sealon 7

lfem aescrtptlonsfor Method-RelatedCharges shall ommaunsh between Fmed and T & a iie i td Charges
A4

NOTE

"

-.
. :

. .--, . 2.:'. .- , A < .

.'7.

-->.

--

--

5 Temporary Works

FIRST DIVISION
3

Method-RelatedCharges k o n h n ~ e d

6 Temporary Works

8 Compressed alr for tunnelling 1 Access scaffoidlng 2 Support scaffold~ng and ProPPW 3 Phng 4 Formwork 5 Shaftsand pits 6 Hardstandings 1 Supe~~slon 2 Admlnlstratlon 3 Labourteams
,,

7 Supervlslon and labour

4 Prov~s~onal Sums

1 Daywork

1 Labour 3 2 Percentage adjustment to Provts~onal Sum for Daywork labour ' I 3 Mater~als 4 Percentageadjustment to Provbs~onal I Sum for Daywork materials q 1 5 Plant 6 Percentage adjustment to Provlslonal Sum for Daywork plant 7 Supplementary charges 8 Percentage adlustment to Provlslonal Sum for ~ayw&ksupplementarychar!3es

-.

2 Other Provlslonal Sums


Nommated Subcontracts whlch ~nclude workon the Slte 6 Nominated Subcontracts whlch do not mclude work on the Slte
5 1 Prlme Cost Item

2 Labours
3 Spec~al labours 4 Other charges and profit

3 CLASS A
1s6e ru~; af head of class on page 171

\.

,
, -,

%-

MEASUREMENT RULES M4 ltemsfor Method-Related


Charges. dany, shall be inserted by the tenderer in accordance with sectton 7 ,

ADDITIONAL DESCRIPTION RULES A4 ltem descnptlons for


Method-RelatedChaqesshall dtR#ngu#sh between Faxed and Time-Related Charges

-.

M5 Items for percentage adlustmenr to Prowsron~l Sums forDayworkshall be gwen only where a Dayworx Scheaule in accordance wlrh alternatwe f o m (bl of paragraph 5 6 is gwen n the Btll of Quantmes Ad#urtments
Items to carrespo~dwwlth the adjustments, d any, msened by the tenderer in the Daywork Schedule

M6 Each Pnme Cost Itemshall be followed by an ttem for labours and an Item for other charges and profit in accordance with paragraph 5 15 Where labours otherthan or in addltbon to those Rated in sub-paragraphla1of paragraph 5 15 are to oe prowded the .lem for labours shall be desqnatw as for special labours

ltem descrtpt~ons for Pnme Costltemsshall ~denttfy the work tncluded

A6 The laboursshall bestated i n


,tern descrtptions for specral labours

CLASS B: GROUND INVESTIGATION

,$
Includes Tnal pits and trenches, boreholes, samples. site and laboratorytests, i n s t r u m e n t ~ ~ b s e ~ a t i o n s professional,l ~nd sewices in connection with groundinvestigation Excludes: Excavation not carriedout for the purposeof ground investigation (includectinclassE) ii Boringfor piling (includedin dassesP .. . andQ) a",-. . .., : - , -* -- ---

2
% !

-2
$

FIRST DIVISION
1 Trial p~tsand trenches

SECOND DIVISION
-

IRD DIVISION nr nr Maxgmum depth not exceed~ng 1m 1-2 m 2-3 m ? + 5 m

1 Number in materlal otherthan rock 2 Number In materlal whlch ~ncludes rock

%lorn
10-15m -. 15-20m stated exceeding 20 n

3 Depth in mater~al other than rock Deoth In rock 5 bepth supporred 6 Depth backfilled, materlal stated
7 Removal of obstructions

m
IT

n n
t
t

8 Pumpmg a t a stated mlnlmum extraction rate

2 L~ght cable percussion boreholes

1 Number

n In holes i f max~mum depth not exceedmg 5 m 5-10 m 10-20 m 20-30 m 30-40 m stated exceedlng 40 m
a

6 Depth backftlled. materlalRated


7 Chtselllng to prove rock or to penetrateobstructlons

1 Number 3 Depth wnhout core recovery 4 Depth wtth core recovery

1 in holesof max~mum depth

2 3
4

5
6

not exceedlng 5 m 5-10 m 10-20 m 20-30 m 3 w m stated exceed~ng 40 m

5 Depth cased 6 Depth backfilled, materlalstated T Core boxes, length of core stated

m m nr

MEASUREMENT RULES

DEFINITION RULES

COVERAGE RULES
C1 Itemsforground mvestrgatlon shall be deemed to mclude preparatronand subm~sion of records and results CZ Itemsforground ~nvestzgatlonshall bedeemedto tncluded~sposal of excavated materlal and removal of dead SBrVICes

ON RULES

;,

A1 nemdescrlptlons forthe number anddepth of rnalp!rsand trenchesshallstate themenmum plan area atthe bottomofthe p r ortrench or.vherethewrk~s undertarento locateservlces,the maxlmum length ofthe trench
~

numberanddepth ofinalprtsand 'mncheS(B114.1shall1dentlfv jeparatelythosewhnchare ?xpreSlyrequwedto be ?xcavatedby hand

P3 item descnpt~ons for


pump~ngshall stateanyspectal de-watenng methods whtch are expressly requlred
1
I

I I

'I
A4 ltem descnpt~onsforthe number and depth of lrghf cable percussron boreholes shall state the nom~naldmmeter of the bases of the boreholes
II

j iI

M I Ch!sellrng to prove rock or to penetrateobstrucnonsshall be measuredonly where is expressly requlred D l RotarydnNed boreholesshall be cfass~fed as such whether the bormg iscarrled out by a ng or by an attachment

A5 ltem descrlptlons for mlary


drtlledboreholesshall staterhe nommal mmmum carediameter

A6 ltem descnpttonsforthe
numberof rotarydnlled bareholes shall state thosewh~ch arecontlnuatlons of hghtcabfe percusston boreholes

D2 Core b o x a sha.1 be deemed to become the propew of the Employer unlessathermse stated

M The maxmum depth used for classsf~catson of mrarydrdled boreholeswhtch are contlnuattons of light cable percussion boreholes shall be measured from the Commencmg Surfaceof me lmht cable

A7 ltem aescrlptlons for rotary


drdled boreholes whch are lnclmed shall natethe angleof

..- FIRST DIVISION 4 Samples

- -

<

-SECOND DIVISION nr 1 From thesurfaceor from t r ~ a p~tsand l trenches

1 From boreholes

1 Opentube

2 D~sturbed 3 Groundwater
4 5 6 7 Statlonan, plston Swedlsh fall Delfi , B~sho~sand

5 Stte tests and observations

2 Groundwater level

3 Standard penetration

Penetration vane 5 Vane tn borehole


6 Pressure meter
nr .-

1 Plate bear~ng

2 Self-bormg pressure meter 3 Cal~forn~a bear~ng ratlo 4 Stattc cone sound~ng

nt
n~

nr

5 lnsltudensaty 6 Mack~ntosh probe

nr; 1 ;

7 Hand auger borehole

no

6 Instrumental observations

1 Pressure head

1 2 3 4

Standp~pes Plezometers Install covers Readtnas

3 Settlement gauges 4 Res~stlvlw 5 Sesmtc 6 Magnetometer 7 Self-potentlal 8 Gravlmetrtc

bee rules at head of class on page 211 ADDITIONAL DESCRIPTION RULES


A8 Item descnptwnr for samplesshall state thew stre, type and class in accordance wuth 8S 5930

MEASUREMENT RULES

DEFINITION RULES

COVERAGE RULES

i,
/,

A9 ltem descrlptzons for


perrneabr1,tytesfs shall state the type and gwe parnculars of the tern

A10 ltem descrlptlons for


gro~ndwarerIevelob~e~af~ons shall state when the measurements are to be taken

h11 ltem descrrptlons for


srandardpeneirabon tens shall *ate whether they are in lhgM :able Denxlssaon boreholes or .otaridnlled boreholes

912 ltem descnptlons for plate


>earmgtests shall state whether hey are in pots and trenches or loreholes or at the surface

\13 ltem descrlptlonsfor srarm :onesoundmg testsshall sate he maximum deoth of theeone ind. where electrlc cones are tsed. the maxmum capacltyof he machme

\14 ltem descrlptlons for hand lugerboreholetests and Ibsewatlons shall state tne nlnlmum dmmeter the ~~- and naxtmum depth ofthe boreholes 415 ltemdescrlphonsfor
nnmmenralobsewar~on~~halI itatedeta8lsofthehoeaf *swations and t6etvpe of Xotectlvefenm

416 ltem desntptlons for


ndmorneterr and renlemenr lauoesrhall state whether the

24

CLASS B

- ,

..
'

FIRST DIVISION

-'

ECOND DIVISION nr Classlflcatlon

HlRD DIVISION Moisture content Atterberg l m t s Speclticgravtty Partsclesue analysts bys~eve Paruclestzeanalys~s byplpetleor hydrometer Frost suscepttbll~ty Organlcmatter Sulphate pHvalue Contaminants Standard
! Heaw

1
!

7 Laboratolytests

Chemical content

. -

Compactton

: V~bratory
Oedometercell
! Trraxlalcell
I

Rowecell Constant head

! Fallmg head

Sod strength

I Qutckundra~ned tnaxlal 1 Consol~datedundra~nedtrtax~al, wlthP water pressuremeasurement 3 consoltdateddralned trtaxtal.w~th volumechange measurement I Shearbox peakonly 5 peakand res~dual 6 res~dualonly 7 rmg shear B Cahfornla beartng ratlo

samples Consoladateddramedtr~ax~al.wlth volumechange measurement 3 Braztltan 4 Rtngshear 5 Pomtload

[see rules at head of class on page 21)

MEASUREMENT RULES

DEFINITION RULES

COVERAGE RULES

ADDITIONAL DESCRIPTION RULES

A17 ltem descnptmns fortens for conramrnanrssha I state the standards required and the contammants to be analvsed

418 ltem descrlpt~ons for maxral celland Rowecelltensshall nate thenumber of lncrernentsand the ?ffectwepressures

p~~

h19 ltem descnptmns for qurck undrarnedrrrax,altests shall state the d~ameter and whether a smgle, multtstage or set of three rpeetmens is requtred

A20 ltem descrptonsfor


consd,dared rnaxtal tests shall statethe ammeter and the effect ve pressures Multistage tests ma11 be tdentlfea n tem A21 ltemdescr~pt!onsfor shearboxtests shall state the normal pressures and the slzeof theshearbox

A22 ltem descnpt,onsfor


Ca1,fomra bearrng ratrotests shall state the compactwe effort. surcharge and whether soaklng 1 s requtred

A23 Itemdescnpt~ansfor
uneonfinedcompess~vesrength testsshall statethed~ameterand the height ofthesamples

A24 Itemdescrmt~onsfor
consolrdareddra!nedrax!altests shall natethedfameterandthe he~ghtofthesamplesandthe effectwe pressure

A25 ltem oescr8ptwms far B ~ z ~ l ~ s n r e n s s statethe hall dmmeter and the length of the samples

A26 ltemdescr~pnonsfornng sheartestsshall statethe normal


Dressureandthedwneterofthe A27 ltemdescnpt~ansfarpo,nr loadtens shall natethe woeof tenrwukredanathemlnlmum

4 Vmts to the Stte 5 Overntghtstays in connecflonwlth vlsm to the S ~ t e

. n~

nr

. -.

"-

. * .

, _2 - :

_.I^

COVERAGE - . RULES

ADDITIONAL DESCRIPTION RULES

M2 Professronalservrces
shall be measured only where they are expressly requ~red for analyslsof records and results

I, I

M3 The haurs measured shall be warkmg haurs and shall exclude hours occupted in travel. meals. etc

C5 Itemsforpmfess,onal serwcesshall bedeemed to mcludepreparatton and subm~sstonof reportsand keeplng recordsofumespent

11
1

!
I
I

C6 Itemsfor v1s11sto theS,reand overn,ghtSldyS,nconnmf,on wlrh wsrrsro theS&-shall . bedeemed -.--to mclude tmvellmg, meals. aecommodat~onandotner lncldental expenses

5-

- CLASS -.-- C: GEOTECHNICAL AND OTHER SPECIALIST PROCESSES


Includes. Geotechnical processesfor altering t h e properties of soils and rocks Other specialist processes as listed

SECOND DIVISION 1 Drdlmg for grout holes through materlal other than rock or anlficlal hard materlal 2 Drdlmg for grout holes through rockor a r t ~ f ~ chard ~ a l mater~al 3 Dr~vmg tnjectton plpes for grout holes 1 Vert~cally downwards 2 Downwards at an angle Oe-45" to the verncal 3 Hor~wntally or downwards at an angle - less than 45" to the horuontal 4 Upwards at an angle O0-45"tothe honzontal 5 Upwards at an angle less than 45" to the vemcal

THIRD DIVISION 1 In holes of depth; not exceedmg 5 m 2 5-10 m 3 10-20 m 4 20-30m . 5 3 m stated exceedmg 40 m 6

br

rn m

rn
-

rn rn

1
4 Grout holes

n f

1 Number of holes 2 Number -.of . rtaoer - -- - 3 Smgle water pressure tests 4 Mult~ple water pressure tests Cement Pulver~zed fuel ash Sand 4 Peagravel 5 Benton~te 6 Chemicals 1 2 3 4 5 6 7 Number of mlect~ons Neat cement grout Cement and stated filler grout Chem~cal grout Other stated grout Smgte packer settmgs Double packer settmgs nr

5 Grout matertals and lnlectlon

t
t

t
t nr nr

6 D~aphragm walls

1 Excavat~on in matenal other than

rock or a r t ~ f ~ chard ~ a l matenal 2 Excavat~on in rock 3 Excavatlon in anlftctal hard materlal

m3 m3 m3

Max~mum depth. not exceedmg 5 m 5-10 m 1C-15m 15-20 m 2525 m 6 25-30 m 7 stated exceedmg 30 m

4 Concrete 5 Plam round steel bar remforcernent to BS 4449 6 Deformed h ~ g y~eldsteel h bar reinforcementto BS 4449

m3

10 mm 12 mm 16 mm 20 mm 25 mm 32 mm or areater

7 Waterproofed ]oms 8 Gu~de walls

sum m

3
MEASUREMENT RULES M1 The Commencmg Surface
aooptco in the preparation of tne Bul of Quamttes shall be aoopteo for the measurement of the completed work

~ - ~ AC SS

:!I1

! I
1 1 ,

DEFINITION RULES
Drdlmg and excavatlon for work in t h class ~ shall be deemed o be in materral other than mckor

COVERAGE RULES
Cl Iternsforworkm thlsclan
shall be dsemedto include d$snosalafexcavatedmaterlaland

ADDITIONAL DESCRIPTIONRULES

~!!
; 1,
1

.I

.-

. .

-.
".:

' -. -

11 !I
1;
I

/I

MZ The depths of grout holes,


holes for groundanchorages and dramsshall be measured along the holes lrrespenwe of mclmatlon

M3 Drlllmgthrough prewously
grouted holes in thecourse of stagegroutmg shall not be measured Where holesare expressly requ~red to be enended.the number ofholes shall be rneasured and drlllmg through previously grouted holes shall be measured as dr~llmo through rock orartlficral h a 2 matenal

A1 The daameters of holes shall


be stated in Item desulptlons for drrllmgand dnvrng forgroutholes and gmuthofes

. ..-

-.

M4 The number ofstages


measured shall bethe total number of groutmg stages expressly requmd

M5 The mass of grout matenals


measuredshall not tnclude the mars of mlxmg water

A2 Thetypeof matenals shall be stated I n item descnpttonsfor groutmatenals

M6 The numberofrnpcnons
measured shall be thetotal numberof !n]ecftons expressly requ~red

M7 The mass of grout ~n~ectron measured shall not Include the massof m w n g water

A3 ltemdescr~pt~onsfor the number o f m,ecUonsshall ldentlfy thosewhch are in stages dtstmgurshmg between those whacharein ascending and descendmg stages

M8 Formworkforvo~ds, rebates
and fillets in dtaphragm walls shall be classed as concrete anc~llartes (class G1

D2 DJaphragmwallsare walls construefed usmg bentontte slurry or other support flulds

C2 Items for excavatlonfor


dtaphragm wallsshall bedeemed to mclude preparatton and upholdmg sades of excavatlon

PI The thcknesses of maphragm wallsshall be stated in Item descrlpttons for exwvatron and concrerefor diaohragm walls

D3 The nommal sire stated in


M9 The depths of concrete in
dmphragmwalls shall be measured from the cut-off levels expressly rewved Thevolumeof concrete snall becalculated as set our in mles M1 and M2 n class F Item descrlptlans for bar remforcement~n dnaphragm walls shall be me cross-sentonal sue aefmed in BS 44A3

W ltems for concrete In


draphragm walls shall be deemed to ~ncludetnmmmg thefacesof dlaphragm walls and prepanng thewtopsto recewe otherwork C4 Items for remforcement In d~aphragm wallsshall bedeemed to include supporting remfonement and prepanng protrudmg remforcement to recewe other work

AS Thenatureofthe material shall be stated in Item descnptrons for excavabon m amfic~al hard rnatenal
A6 The mlxspectflcat!ons or strengths shall be stated in item dessr~pt~ans for mncretem dlaphragm walls

MI0 The mass measured for


remforcemenrm dlaphragm walls Shall mclude that of stlffenlng. ltitlng and supporting steel cast
I"

M l l The mass of steel


remforcementshall betaken as 0 785 kglm per 100 mm2of crosssenton (7 85 Wm3) The mass of other remforcmg materials shall betaken asstated in the Contract

MI2 Gutde wallsshall be measured each side of the dta~hraom wall

30

CLASS - ,,. C

,.C ' SECOND DIVISION


-

'

--

'*

7 Ground anchorages

1 Numberm mater~al otherthan rock - or - artlfmal hard rnaterlal to a stated rnax~mum depth 2 Total lengtn of tendons in rnater~al other than rock or anlficlal hard rnatertal 3 Number in material whlch mcludes rock or arnfmal hard materlal to a stated maxlmum depth 4 Total length of tendons in materlal wh~ch includes rock or arttflclal hard rnatertal
1 Nntmherof - -..drams .. 2 Number of predr~lled holes 3 Depth of overlymg materlal 4 Depth of drams of rnaxlrnum depth not exceeding 10 m 5 1C-15m 6 1520rn 7 20-25 m 8 stated exceedma 25 rn

nr m nr m nr nr rn m m rn m rn

1 'Temporary 2 Temporav w ~ t h single corroslon pmtectlon 3 Temporarywlth doublewrros~on


protection 4 Permanent 5 Permanent wlth slngle corroslon protmon 6 Permanent with double corroslon ~rotmon

.7

8 Sand, band and wlck drains

1 Cros~-secf~onal d~menslon not exceeding 100 mm 2 100-200 mm 3 20C-300 mrn 4 300400 mrn 5 400-500 mm 6 stated exceedmg 500 rnm

i-.

> . :

$2.

..

~.

*..

MEASUREMENT RULES
MI3 The lengrhsofrendonsfor ground anchorages shall be measured between the outer ends of anchorages

DEFINITION RULES

COVERAGERULES

ADDITIONAL DESCRIPTION RULES A7 The composttlon, locatlon and


workmg load and detalls ofwater and grout testmg, pregmuting and oroutsno shall bestated in Item

I!

M14 The number of prednlled hole~meaSUre0 for sand. band an0 w!c<drams~nall be the number expressly requored to be preonlleo througn averly~ng marerml

A8 Sand drams, band drams and wckdrams shall be separately xdemlfied i n Item descrlptlonsand the materjals of wh~ch they are composedstated

32

CLASS D: DEMOLITION AND SITE CLEARANCE


Includes. Excludes Demolition and removal of natural and artificial articles, objects and obstructions which areabove t h e Origi Surface Removal of articles, objects. obstructions and materials (other than tree roots) a .t. or below t h e Original Surf (included in classes C, E, I ,J, K. L , R. T ,X and Y) , I-&, .* = -. .' .. _ - -... . .

- ,.:

__

FIRST DIVISION
I Generalclearance

SECOND DIVISION ha

2 Trees

nr - - ..

1 Gwth 500 mm-1 m 2 . -1-2m.. 3 2-3 m 4 3-5 m 5 exceedmg 5 m 1 O~ameter150-500 mm

. . .

3 Stumps

500 m m l m exceedmg 1 m Butldlngs 5 Other structures


4

1 Volume not exceedmg 50 m' 2 5~-100 mJ

3 Masonry 4 Metal

100-250 m"

'I

I
6 Plpehnes

:Fiidommant

materlal

7 8

2500-5000 m3 stated exceedmg 5000 m3

1 Nominal bore 10G300 mm

2 3

300-500 mm exceed~ng 500 mm

"

.- ,. *

.- *

>5-&

"%

MEASUREMENT RULES

DEFINITION RULES

= r. - . - ,COVERAGE RULES

-+

-ADDITIONAL. > : DESCRIPTION RULES

,
'

C l ltems fordemol~t~onand slte clearance shall be deemed to mclude dsposal of the materials ansons

A1 ltemdescnpt~ons for work


from wh~ch the matertals arlstng reman the propew of the Employer shall so state

,I

I
I
I

D l GeneralcleeranceshalI

--.

lnclude the demolmon a d removal of all arttcles. and obstrualons whlch areexpressly requved to be cleared. except those forwhlch separate ttems are gwen as setout in thls class

04-

C2 ltems forgeneralclearance whtch ~ncludetheremoval of hedgesshall bedeemed to Include the removal of hedge stumps of anydtameter where theseare also requtred to be removed

A2 Item descnpttons for general clearanceshall tdent~fy the area mludedunfess tt lsthe total area of the Site.
A3 Where holes left by stump removal are to be backfilled, ltem descr~pt~ons for general clearance. treerand state the . . . . . - slurnosshall .nature ofthe b&kfill~ngmatenal

I
,'I

DZ Gmhsof treesshall be measured 1 m above ground level

7 ..

U Itemsforclearanceoftrees shall be deemed to lnclude removal of the rmmps where they arealso requtred to be removed

,-

03 The volume used in tne :lassd~catlon of butldtngsand ~rhernrunuresshal< be lheu spproxmatevolume occupied. axcludmg any volume below the 3ngmal Surface
~ ~

A4 Buddmgs and otherstructures shall be identdled in ktem desenpttons

M I Prpelmeswlthmbulldmgs and other structures shall be measured only where thev nommal bore txceeds300 mm

C4 ltems for demolmon of p,pelmesshall be deemed to ~ncludedemollt!on and removal of supp0Tts

. :34
,

CLASS E: EARTHWORKS . .
Includes Excludes:
, ' Excavation for.

, - -

Excavation, dredging. filling, compaction, disposal and landscaping


,,

--

-groundinvestigation (includedin clas;~) diaphragm walls andground anchorages (included in class C) pipes and sewen. manholes, trenches and ditches. pipe headings, thrust boring and pipe iacking, and pip : jointing (includedirrclasses I , J. K, L and Y) piles [included in classes P and 0) - foundations for trafficsigns (includedin class R) tunnels, shafts, headings and other subterranean cavities (included in class T) foundations for fences and gates (included in class X) Reinstatementfollowing pipe laying (included in class K)
_ ) _

.. - . . ./ ,-

,-

RRSTDlVlSlON
1 Excavation by dredging 2 Excavat~on for cunmgs 3 Excavat~on for foundat~ons 4 General excavation

SECOND DIVISION t&&al otherthan topsoil. rock Or arufic~al hard rnaterlal


Rnrk

Stated an~fmal hard materlal exposed at thecomrnencmg Surface Stated artlficlal hard material not exposed at thecommenctng Surface

1 Max~murn depth not exceedmg 0 25 m + 4 O2545rn .2 3 0 5-1 rn 4 1-2 m 3 5 2-5 r n 6 S-10 r n T 7 1C-15rn . 8 stated exceeding 15

. ,

MEASUREMENTRULES M1 lnaccordancew~th
paragraph5 18thequantmesof earthworksshall becomputed net usmgdlmenslonsfromthe Drawmgsw~th noallowancefor bulk!ng.shrlnkageorwasie Where boundaraes between dnfferentmatertalsare not shown an theDraw~ngs,measurement shall bemadeonthesite

> DEFINITIONRULES

COVERAGE RULES

ADDITIONAL DESCRIPTIONRULES

,-

M2 TheCommenclng Surfzc~, adopted in the preparatton of the Bdl of Quant~ttesshall be adopted forthe measurementof the completed work M3 Excavatlon classed as by
dredgmg in the Boll of Quantmes shall be measured as by dredgmg lrrespeawe of the method of excavatlon adopted by the Contractor

11 Excavated matertal shall be leemed to be materralother than 'opsorl, mckor amfiual hard natenalunless otherwse stated n Item descr~ptvms

M Excavatlon in or under an !mbanrment, executed prior to llaclno of flll shad beclazscdn.


13 Excavatlon from wthm lorrow plts shall be classed as ;enera/ excavatjon

C l ltemsforexcavat~on shall be deemedto ~ncludeupholdmg sidesofexcavat~on,addtt~onal excavatton to prowdeworknng spaceand removal of dead sewtces
CZ Items for excavatlon wlthm bor~ow ptts shall be deemed to mcluoe removal ana reo.acement of overburden and unshtable materlal

A1 The locatton and l ~ m ~ t s o f


excavmon by dredgmgshall be stated in ltem descript~onswhere ~ t extentwould s otherwse be uncemm

A2 ltem descr~pttons for


excavat!on below a body of open water ldentlfied in the Preamble .n accordancew~th paragraph 5 20 shall ldenttfy the body ofwater

M4 Measurement of excavatron
by dredgmgshall be made from sounomos unless otherwsa stated

M5 An Item shall be glven for


each separate stage oiexcavar~on wnere separate stages in the conduct of the Worns are expressly requ~red

A3 The locallon and lmxs of excavatlon for foundanonsshall bestated In ntem descrtpttons where the lmnte would olhelwtre . . . . . . . be uncertain Excavat~on around ~ l l e s h a and b for undermnnmo ;hall each beso descr~bLd andclassed as excavatron for foundattons

M6 Thevolumemeasured for
theexcavatm of a structureor foundatmn shall be the volume whtch is to be etther occup~ed by or verttcally above any pan of the structure orfoundatmn

M7 Thevolume measured for excavatlonbelow a body of open water shall be thevolume below waterwhen the watersurface is at the level (orthe hlgher level of fluctuat~on if appllcablel shown on the drawmg to whech reference in the Preamble ~n ~sgwen accordance wtth paragraph 5 20

A4 The Commenc~ng Surface shall be tdentlfied in the descrtpt~on of each (ternfor work lnvolvlng excavatlanfar whlch thecommenctng Surface is not theongmal Surface The Excavated Surface shall be ldentlfied in the descrlptlon of each Item for work ~nvolvmg excavatlonforwhlch the Excavated Surface is not the Ftnal Surface A5 ltemdescnpt~onsfar excavatlon wlthm borrow pcts shall SO state A6 ltemdescnptmnsshall
ldentlfyseparately excavatlon whlch ~sexpressly requ~redto be carwadoutby hand

M8 An lsolated volumeof
amftc!al hard rnatenalor rock occurrmg wlthtn other matertal to be excavated shall not be measured separately unless 11s volume exceeds 1 m' except that the mmmum volume shal be 0 25 m3wherethenet wmatn of excavatlan 8 s lessthan 2 m

M9 The volume measured for


excavatlon wlthln borrow plts shall be the net volume measured forfillmg

CLASS E -.>a

FIRST DIVISION

Dredgmg to remove sllt

m3

Excavation of mater~al below the Final


Surface and replacement w ~ t stated h materlal Timbersupports left in Metal supports leftln

To structures Embankments General To stated depth orth~ckness

m3
r n "

m3 m2

1 Excavatedtops011 Imported tops011 ?' 3 Non-selectedexcavatedmaterlal other ' than topsod or rock 4 Selected excavated materlal other than tops011orrock 5 Imported natural mater~al other than tops011or rock 6 Excavated rock 7 lmported rock 8 lm~orted artlflclal materlal

CLASS E
bee rule at head of class on page 3!

MEASUREMENT RULES
Trmmmg of excavate surfacer shall be measured to surfaces wnmh are to reeewe no Permanent Works whether trtmmmg is expressly requwedbr

COVERAGE RULES
04 :~,sposal of excavated mater,alshall be deemed to be dmposal off the S~te unless atherwtse stated in ttem descrtpttons d~sposalano double handlrng shall be deemed to oe cawed aLt upon materm atner than tapsod. rack or amflc!al nara matenal mless otherwtse stated in #tern

ADDITIONAL DESCRIPTION RULES

MlO

A7 ltemdexnptionsforexcavatron
anclllanesm connection wlth excavalon bydredgmgshall beso

described

not M l l Prepranon of excavated


surfacesshall be measurea to surfaces whoch are to recewlr .. . . . .. Permanent Warrs wnether preparatmn ~sexpressly requtrea or not exceot surfaces whlch are to recewefillmg or landscapmg and surfacesforwh~ch formwork 1 s measured M1Z Thevolume of d!sposalof shall be the o~fference between the total net volume of excavatjon and the net volume of excavate0 materlal used far flllmg

A8 ItemdescnptlonsfortrtmmIng
ofexcavatedsurfacesand preparabon ofexcavatedsurfaces shall ~dent~fvsurfaceswhtch are la1 tnclmed atan angleof 10Q45" to the honzontal Ibl 1ncl1nedatanangleof45"-90' tothe honzontal Icl vertical

A9 Wherematenalrsfordtsposal
on the Sitethe locatton ofthe disposalareasshall bestatedm Item descrcptlonsfordrsposalof excavatedmatenal

M I 3 Double handlrng of excavatedmatenalehall be measured only to the extentthat it 1 s expressly requtred Thevolume measured for double handlmg shall be that of the "old formed in the temporary stockpile from whch the matenal IS removed M14 Dredgmg to remove srlt shall be measured onlyto the extent that it is expressly requared that slit w h ~ accumulates h after the Final Surface has been reached shall be removed MlS Thearea measurea for omoer or metal suppons leh ,n mall oe the of - area - . . .zunnonm . .. . . . surfaces for whch thesuppons are exoresslv to be left in . reau~red . M16 F d h g o f excavatrons around completed structures shall be measured only to theextent that thevolume fnlled is also measured as excavation in accordance w t h rule M6 M I 7 Where fillrngto form
temporary roads is subsequently approved by the Engmeer for mcorpotatlon ~ n t o permanent flllmg thevolume placed shall not be deducted from the measurement of fllllng

D6 Fdlmg maternal shall be deemed to be "on-selected excavated matenal other than topsodorrocL unless otherwse stated in rtem descnptmns
07 Ftllmg material shall be classed as excavatedrockonly where the use of rack asflllmg at stated locations is expressly requrred

C3 Items for f,llmgshall be


deemed to ~ncludecompactton

A10 Thematenalsshall be ident~fied in ltemdescnpt~onsfo! filllng with mportedmatena/edmatenaI A l l Whered~fferenteompact~on


requlrementsarespectfiedforthe samef~llrnomatertalthevshallbe stated in it& descr~pttonsfor f~lltng

A12 Wherethe rateof deposmon of filllngmaterlalisl1m8tedthe


Itmitatton shall bestated in ztem descnptms for fdlmg

08 Ftll~ng shall be classed as to


stated depth or thtcknesswhere materm1is prowded of uniform Iota1compacted depth or thtckness suchasmdram,ge blankets, topsoll!ng, pltchmg and beachmg Bulkflllmg shall not beclassed as to stated depth or thtckness notwlthstandlno that it mav be compacted in separate layers of materm1of stated thsckness

M18 Addmanal fillmg necesslfated by settlement of orpenetratlon tnto underlymg maternal shall be measured only to the extent that ~ t depth s exceeds 75 mm

A13 The mater~alsshall be ldentlfied in ttem descnpt~onsfor


filling tostateddepth orthtckness

A14 Item descr~pt~ons forf,lf,ng to


stateddepth or th,cknessrhall idennhlwork upon surfaceswhlch are la1 lnclmedatanangleof 10'45" tothe honzontal 161 . . lnclmedatan anoleof45"-90' tothe honwntal" Icl venical

M I 9 The volume of rmponed


hllrngmater~al measured shall be thedlfference between the net volumeof fdlmg and the net volume of excavated materm1 derwed from work wlthnn classes E and Tused for fhlllng

MZO Where rock fillmg is oepastea mto soh areas the volume shall be measured n therransoort vehlcles at the placeof depositon

M21 Where fillmg #s to be deposlted below water, and thcquantaty cannot be measured sattsfactonly Dv any atner means. 11svolume Enall be measurea in thetrampon vehicles at me place of oepos~tcm

: CLASS E
'-2-r,s*

FIRST DIVISION iECOND DIVISION I Trtmrnbng of fdled surfaces ! Preparat~on of f ~ l l e d surfaces


.
, d l =

p-,

-..-

,<

,.

. - .

F~lllng ancdlarles

m2 m2 4 Stated art~fioal hard materlal

I Turfing

! Hydraulic mulch grass seeding I Other grass seedmg I Plants, stated specles and slze j Shrubs, stated specles and slze 5 Trees. stated soecles and slze

mz m2 m2 nr
nr

nr
--

7 Hedges, stated specles. sue and spac~ng

1 Smglerow 2 Doublerow

(see rule at head of class on page 35)

.:
"

.*l

. .~ - ..
"
~

,"

-. ,

. -. .

CLASS E

11
,'I

MEASUREMENT RULES M U Trrrnrnmg of filled surfaces shall be measuredto surfaces whch are to recewe no Permanent Works whethertr~mmmg is expressly requmd or not

DEFINITION RULES W Tnmmmgand pieparatlon shall bedeemed to becarred out

COVERAGE RULES

ADDITIONAL DESWUPTlON RULES anctllar~esshall ident~fy work upon surfaceswh!ch are fa/ mclinedatanangleof IW-45" to the honzontal Ibl mnclmedat an angieof &-9(P tothe honzontal I d verncal

descrrpttons

M23 Preparatton of filled surfaces


Shall be measured to surfaces wnlch are to recerve Permanent Works whether oreoaratlon 1 s expressly requr;ed br notexcept surfaces which are to recelvefllllng or landscaping and surfaces for whch formwork is measured
M24 Thearea of addmonal geotextrlesm lapsshall not be measured M25 The~engthsafnedges measurea shall betherdeveloped lenglh~alongcentrellnes
C4 Items for lanascapmgsna~l be

oeemed to nnclude fentl~zmg. trmmma and areoarallon of


918 ltemdescnpttonsformrf~ng mdgrass seedrng shall )dent,% Norkupon surfaceswhlchare ncltnedatan angleexceedmg 10" othe horlmntal

1 ,

-40

CLASS . - F: IN SlTU CONCRETE


Excludes
. .

In situ wncretefor. capping of boreholes (includedin class Bl diaphragm walls (includedInclassC1 '.excaGtion ancillaries (includedin class El granolithic and other applied finishes (includedin class GI drainage and pipework (includedin classes K and L) piles (includedin classes P and 0 ) roads. pavings and kerbs (includedin class R) tunnel and shaft linings (includedin class T) foundatlonsforfencesand gates (included in class XI

, -

.,.
~

<'

-.. -

-.
.- .

-.

...:
. >

: ,
A

,~

FIRST DIVISION Provc;,on of concrete


1 Standard mix
. .

SECOND DIVISION

THIRD DIVISION

1
m3

provwon ofconcrete 2 Des~gned mtx

1 Grade C7 5 2 C10

Cementto BS 12orSS 146 1 10 mm aggregate 2 14 mm aggregate 3 20 m m aggregate 4 40 mm aggregate Other stated cement 5 10 mm aggregate 6 14 m m aggregate 7 20 mm aggregate 8 40 mm aggregate

Provmon of concrete 3 Deslgnedmlx

m3

I Grade F3

;
4

Prov!sron ofconcrete Prescribed mlx

1
1 Thickness not exceedmg 150 mm 2 150-300 mm 3 30W500 mm 4 exceedmg 500 m m 1 cross-sect~onal area not exceeding 0 03 mZ o 03-0 1 m2 2 3 0 1-025m2 4 0 25-l m2 5 exceeding 1 m2 6 Specxal beam sectlons
4

m:
1 811ndlng 2 Bases. footings, p ~ l caps e and ground slabs 3 Suspended slabs 4 Walls

Plac~ng ofconcrete 5 Mass 6 Retnforced 7 Prestressed

Columns and piers 6 Beams 7 Casmg to metal sectlons


5

8 Other concrete forms

MEASUREMENTRULES
M l The volume of concrete
measured shall mcludethat occupted by la1 remforcement and other metal sectlons Ibl Prestressing components IcI Cast-ln components each no exceedkng 0 1 m3i n volume Id) rebates, grooves. throats, fdlets, chamfers or mternal splays each not exceedmg 0 01 m2in cross-sectvmal an (el pockets and holeswhich are defined as large or smalt voids in accordancewtth rull 03 of class G if)jolnts or jotnt components between adjacent volumes o I n sltu Concrete M2 The volume of concrete measure0 shall exc uderhat ofmt O r eXtern.9 s ~ l a v each s nor sectlanai area
'

DEFINITIONRULES

COVERAGERULES

: - :-: DESCRlPTIONRULES

:-

--

D l Items for provrsmn of concretesnall beclasslfied ,n sccordance wjlh BS 5328

DZ Aconcretemlxshall be :lased asastandardmrxwhere he mlx IS to beselectedbythe :ontractorfrom therestrtcted l ~ s t w e n msectlon4af 855328 'an2

b1 The spec1ficat80n of the :onCrete mlx in accordance wnth 35 5328 shall be stated in Item iescnpt~ons for pmvwon of xncreteunless a mlx reference is itated for whlch the speclficatton sglven elsewhere In theConrract

) 3 Aconcretemlxshall be
lassedas a des,gnedmtx wnere heoerformanceisnated inthe :ontractandthemlxproponxons (reto be selectedby the :Ontractor Aconcretem~xshall be lassedasaprescnbedmrx where hemlxpraponlonsaresated in he Contract
)4

M3 Columns and prers mtegral Wlth a wall shall be mrasured as Pan of thewall, exceptwhere expressly requtred to be cast Separately M4 Beamsrntegral wtth a slab mall bemeasureaaspan of the %ab,except where exoressly rww(ed to becast separately

)5 Prestressed concrete whlch


3

also reinforeco mall bemsseo

U ltem descrlptlons for placmg


)fconcretewh~ch 1 s expressly equlred to be placed agamst an !xcavated surface lother than lltndtngl shall so state

s prestressedconcrete
I6 The tnlckness dseo far lass~fl~ar#on of blrndmgsha,l be le mmmum thckness 1 7 The thickness used for lasslficat!on of gmundslabs, uspendedslabsand walls shall XCIude the addmonal thtckness f !ntegral beams, columns. poem no other prarenjons 1 8 Concrete in suspendedslabs nd waflslessthan 1 m w ~ d e a r . Ing shall be classed as concrete 1 beamsand columns 3spectwely I9 Beamsshall bedassed as Peoal beamsecfmnswheeethew rass-sectronprofiles are ?ctangularorapproxmately 'ctanaular aver less than 415 - of lelr length orwhere they areaf ox or other composre sectton

h 3 Thecmss-sect~onal Itmenslonsof spectal beam :entonsshall be stated in Item lescnptlons. except where a leam typeor mark number is tated forwhlch d~mens~ons are lxven on theDraw~ngs
14 ltem dewnpt,tlonsfor comlonents classed as other concrete ormsshall ~dentlty the component n d Includeoneof the followng a 1 theprtnctpal dlmenstonsof the concrete component bl atypeormatknumber of a concrete component for which principal dirnens~ons areawen on the Drawnos c0ncretecornponer;t for which prtnclpal dlmensaons areglven on the Drawtngs

" . . ~- . -. . In accordancewith paragraph 5 lothe location of concrete members in the Works may bestated in ntem deswptronsfor p l a n n g o f m n c m t e v r h e m r ~ ~ ~ a l characterstm may affect the methodand rate of placcng concrete

NOTE

. ~,.
FIRST DIVISION
p~~

ECOND DIVISION Plane horlrontal Plane sloplng Plane battered Plane vertlcal Curved to one radlus in one plane Other curved m2

-MlRD DIVISION
1 Wzdth not exceedmg 0 1 m 2 01-02m 3 0-2-0-4 m I 0 4-1 22 m ! 5 exceed~ng 1 22 m

rn

1 Formwork rough f~nish 2 fa~rfmish 3 other stated fin~sh 4 stated surface features

rn

m2
rn2

m2

1 Small votd depth. not exceed~ng 0-5 m 0 5-1 m

m
1 Beams 2 Columns 3 Walls 4 Other members 5 Projections 6 Intrusions

1-2 m stated exceeding 2 m

For concrete components of constant cross-section

~~

-.
t
I
1
1

Plam roundsteel barsto BS4443 Deformed h ~ g y~eld h steel barsto BS4449 Stamlesssteel barsofstatedquallhl 4 Re~nforcing barsof otherstated matenal

1 Nomlnalslze 6 m m 2 8 rnm 3 10 m m 4 12 mm 5 16 m m 6 20 m m 7 25 mm 8 32 m m or greater

6 Steelfabr~cto 884483 7 Fabricof otherstatedmatenal


m2 m
2

1 Nomlnal mass not exceedlng 2 kg/m2,

2
3 4

-,.

: A

., r

-,-

56 T E

2-3 kglm2 3-4 kg/m2 4-5 kg/rn2 5 6 kg/m2 2 6-7 kg/mz 7 4 kglm2 .e 1-2 stated exceedmg 8 kd? ~ ~
, .

IC

. ,

- 43

,/"l

- CLASS G

I/
1 ,

Excludes

Reinforcementin diaphragm walls (included in class C) Pre-tensionedprestressing (included in class H) Formworkandreinforcementinprecast concrete (included in dass H) -- Formwork and reinforcement ancillaryto drainage and pipework (includedin classes K and L) Formwork and remforcementin piles (induded in classes P and 0) Formwork and reinforcement forconcrete mads and pavings (includedin class R) Formworkfor tunnel and shaft linings (includedin classT) Formworkfor foundations forfences and gates(inc1uded in class XI

(1
ij
L :

. .
MEASUREMENT RULES
M I Formworkshall be measured for surfaces of in sltu concrete whlch requare temporary supporf dunngcastmg exceptwhere otherwlsestatedmCESMM3 , MZ Formworkshall not be
measured for the followmg la1 edgesofblmdingconcme notexceediiig 0 2 m wlde lbl lolnts and associated rebates and grooves Id temporary surfaces formed at thedlscretlon of theContracto (dl surfacesof concretewh~~h are expressly requwedta be cast agamst an excavated surface (el surfaces of concrete whtch are cast agamst excavated surfaces tncltned at en angle less than 4F to the hormontal

ADDITIONAL

COVERAGE RULES
D l Plane formworkshall be classfled acwrdmg to 11sa n g l e d mclmatlonas follows

DESCRIPTION RULES
A1 Formwork left in shall beso descnbed in ltem descrlptlonsfor formwork A 2 ltem descnptbons for
formworkwhlch ts to upper surfaces shall so state, except where the surfacesare ~nclmed at an angle not exceedmg tWto the

. .

' t ,
Class ~ngle of ~nchnatton
10 the vertical

~onz6nrai

8 V 9 0 '

Slopng VenlcaI Battered

02 Formworkshall be deemed to be for planeareas and to exceed 1.22 mwlde, unless otherwsestated

A3 ltem descnpttonsfor formworkshall state where the formwork is to blmdmg concrete


A4 Radll of curvedformwork shall be stated in Ifem descrlpttons as follows

D3 The class~f~catton of largeand small votdsshall be as follows

M3 Formworkto upper surfaces of concreteshall be measured to surfaces ~nclmed at an angle exceeomg 15'totne haruontal an0 to other upoer surfaces for whch formwork is expressly requrea
M4 Formwor&forthe surfaces of volds larger than those classed as laroevoaos n accomance w m rule ~ 3 i h a lbe l measured asset out;". thls class for formwork gene& Theddpths of volds shall be measured perpendccularlyto the adjacent surface of concrete D4 Ntbs and external splays not exceedmg 0 01 m'm crosssectional area shall be classed as pro~ectfons

la) to one radtus ,n one plane Iwl~ndncall. radtusstated (6) to one rad~us in two planes (sphencall, radws stated Icl varylng radtus lconaall. maxlmum and mlnlmum r a d ~ stated

P15 ltem dexnptcons for forrnwork for concrete componentso f constant crosssemon, other than prolecfronsand mtrusrons. shall state the pnnctpal :ross-sectional dmenstons of the :omponent and 1 % mark number. ocatlon or other unque ldentttymg feature W Formworkforcurved concretecomponents of constant cross-secttonshall be so descnbednatlng the radt~

M5 Formworkfor the surfaces of Prolenlonsand mtruslons exceeding 0 01 m2mcross-seettonalarea D5 Rebates, grooves, Internal shall be measured as setout in t h ~ splays, throats. f~llets and chamfers class for formwork generally not exceedmg 0 01 m2!n crosssectional area shall be classed as M6 Theareaofformworn mtmsmns measuredshall Indudethe areaof f o r m w o k o ~ r e bv d
(a) formsfot largeandsmal/ votds (b) formsforpro~ectronsand IRtUZIDnS lc) tnsem

MI

The mass of steel rernforcementshall be taren as 0 785 rglm per 100 mm201 crosssectton 17 R5t,m31 Themassol

06 Thenommal slzestatea ln
ltem oesCrlpUansfor bar remforcemenrsnall be thecrass. sen!onals~zeoefined in BS4449

taken as stated in the Contract

C1 Items for remforcement shall be deemed to ncluoe rupponmg remforcement other than steel ~supports to top remforcement
~ ~ ~ ~ ~ ~

D7 Welded, swage0 or screwed


sleevelomts in remfarclng bars shall beclassed as spenalloms

Pil ltem descnptmns for bar relnforcementshall state the lengthsol bars to the next hogher multlpleof 3 m wherethcy exceed 12 m before bendmg
A8 ltem descnpt~ons for spenal ~o~ntsshall state thetype of lorn and type and srze ofremforcmg bar
A9 ltemdescrlpUonsforseeI
fabrtcm SS4483sha11statethe

ME The mass of remforcement


measured shall include the massof Steel suppons to top re~nfarcernent . " .
~

M9 Thearea of addmonal fabnc In lapsshall not be measured

"

fabncreference In accordance w~lhBS4483orthewreand mesh anangememm accordance wtfh BS 4466.

ltem descr!ptmnsfor fabnc ofotherstated matenalshall sfate thestzasand nommal mass per square metre.

NOTE Formwork may be measured by length as one #tern tnsteadof by area in rternsforthe separatesurfaces where the formwork s f o r concrefecomponentsof
ConStanf cross sec,ron

--

-244

- CLASS G
FIRST DIVISION

. -.. e.-- -.-.> ?


Cv

SECOND DIVISION
I Open surface plam Z Opensurfacewithf~ller 3 Formed surface plaln 4 Formed surface with flller

. ""

.I"

. - .

. --..,
.

mZ mZ -m2 m2 m m

Averagewldth. notexceedingo 5 m ,..,.-. i.Q.5-lm - , .statedexceedlng1 m


~

...

5 Plastlcs or rubber waterstops 6 Metal watemtops

Average width not e x d l n g 150 rnm; 150-200mm . -'+? 200-3w m m -" stated exceeding 300 rnm

,x -

':

8 : @

7 Sealed rebates or grooves


8 Dowels

-m

.,
-.

nr

Plam or greased' Sleeved or capped Length- notexceeding 5 m E-7 m


7-10 rn . . ...

n i n sltu 1 Horizontal Internal tendons a concrete 2 lncllned orvert~cal ~nternal . tendons . . . i. n in SI~U concrete 3 Horizontal mternai tendons i n precast . concrete 4 Inched or vertical Internal tendons In Drecast concrete 5 External lacking operatlons
8 Concrete accessorles 1 Flntshlng of top surfaces

- -

15-20 m 2~-25 m 25-30 m stated exceeding 30 m

m2

Wood float Steel trowel Other stated surface treatment Granol~th~cf~n~sh Other stated applled finish Aggregate exposure using retarder Bush hammenng Other stated surfacetreatment carried out after strlkmg formwork

2 Ftnlshmg of formed surfaces

mZ

3 lnserts

Llnear mserts Other lnserts

Grouting under plates

nl

1 Area not exceeding 0-1 m2 2 0-1-0 5 m2 3 05 1 mz 4 stated exceeding 1 mZ

,.
MEASUREMENT RULES
M I 0 Jo,nrsshall be measdred
only where they are at locations where ,oms are exoresslv

"

,*. .

D E R W O N RULES
D8 J o m t s f o r w h ~ h temporaw * suooon of the whole surface area of cbncrete is requlred durlng castlng shall be classedas formed surfacelo~nrsOtherlolnts shall be classed as open surfaceprnts

COVERAGE RULES

. - .i.
'

-.

ADDITIONAL DESCRIPTIONRULES A l l Thadlmensionsand nature


of components shall be stated in ltem descrlpttonsforlomfs

C Z Itemsforopen surfaceand forrnedsurfacelo~nrsshall be


deemed to lnclude lnterrnedtate surface treatment where expreall requlred '

M l l Thewldthsof/o!nfsshaII' be measuredbetweentheouter

C3 ltemstorlomrsshall be
deemed to ~nclude formwork

.~

iengms of waterstopsshall be measuredalongthetrcentrellnes

C4 ltemsfor waterstopsshall be deemed to rnclude cumng and lommg ofwaterstops and provlslonofspec~al fltttngsat angles and functmns
-

M I 2 Prestressmgshallbe
measured by the number of tendonswhere tendons are used and by the number of external ~ackmg operattons where stress is Inducedby lacking only

D9 Profiledtendons In horizontal wmponentsshall be :lass& as hormontaItendons.

Dl0 The lengthsof tendonsused


'or classlflcatmnshallbpthelr leveloped lengths betweenthe luter faces of anchorages

C S - ltemsfor prestress~ngshall b~ leemed to ~ncludeducts, grouting indother comaonents and tasks

A12 ltem descnpuons for


preslressrngshall ldentlfy the concrete component to be stressed and state me composmon of the tendon and pamculars of the anchorage

M13 Surfacetreatmentsshall not be measuredto surfaces formed at the Contractofs dlscretton M I 4 Theareasof topsofwalls and othersurfaceswh~ch are not
glven Separatefinlshlng treatment shall not be measured

X Items for ganohthreand othe natedapp1,ed fincshshall be jeemed to mclude matenals. wrfaatreatmem lotnts and formwork

A13 The matenals. thtcknesser


and surface treatments of granol~thrcand other stated applced finrshshall he stated m ttem descr~ptions

M I 5 Nodeductlonfrom the
areasmeasuredforfm~shmngshall be maoefor holes andope&ngs In thefnnlshedsurfaceseachnot exceedmg 0 5 m'

>I1 Componentscastorgrouted
regunredto begrouted into preformedopen!ngrthe formworKrhall be measured nto n n s~tuconcreteexcept ~emntorcement, prestressmgand olntmg materralsshall beclassed a : nsem

Z Items for msemshall be leemed to mclude lhelr supply m l e u o t h c r v m stated

A14 ltem descnptlons for msem shall ndent~fy thecomponents to be can or arouted in and state thelr A15 ltem descnptrons for mserrs
shall ~denttfy (a1 those whlch projecf from one surface of theconcrete IM those whnch project from two surfaces of the cancrete those whlch aretotally w~thin the concrete volume

A16 Where m e m a r e expressly


requ~redto begrouted onto preformed openlngs In concrete ttem dercnpt8onsshall so state for gmunng and swes of Matcr~als ooenmas shall be stated

A17 Mater~alsshall bestated in


ltem descnptlons for groutmg under plates

NOTE
Slrndar rnsenswhch varv in sue may be added together and clarsafied by slntmthm ranges

: ; \

46

&

CLASS H: PRECAST CONCRETE

M" s n ~ h & r e . erection. ioining and fixing of precast concrete units .. Includes: i'" Excludes - <;Post-tensioned prestressing (included in class G) --. . , . ..-. - - Precastconcretepipework (included in classes Iand J) .Precast concrete manholes. catchpits and gullies (included in class K) Precastconcrete piles (included in classes P and 0) ~a~i~...kerbs and traffic sign supports (included in class R) , .="" ----..-.----.~~~". Precast concrete tunnel linings (included inclass T) & a s t concrete blockwork (included in class Ul Precast concrete fencing (included in class X)

...

SECOND DIVISION
-

THIRD DlViSlON
1 Mass: not exceed~ng 250 kg 250400 kg 500 kg-1 t - 4 1-2 t 5 2 4t 6 Slot . 7 10-20 t 8 stated exceed~ng 20 t

1 Beams 2 Prestressedpre-tens~onedbeams 3 Prestressed ~ost-tensioned beams

nr nr nr

5 Slabs

:.

3.

nr

1 ~kn~th-notexceedlng 5m m - - -5-7 7-10 m 4 - - - - ---l(t15rn 5 * - 15-20m 6 20-30m exceed~ng 30 m 7 : -

2 3

1 Area not exceed~ng 1 rn2 1 4 rn2 3 4-1 5 rn2 4 1S 5 0 mZ 5 exceedtng 50 mZ

. -

--

6 Segmental unlts

nr

7 Un~ts for subways, culverts and ducts rn

8 Copings, s~lls and welr blocks

T Cross-sect~onal area not exceedlng

01-05m2 o 5-1m2 exceed~ng 1 rn2

MEASUREMENTRULES

DEFINITION RULES D l The mass used for

COVERAGE RULES

ADDITIONAL DESWUPTlONRULES A1 The posmon in the Works and spewficatlon of the mncrete to be used In each type of precast unlt shall be stated ~nstem descrtptlons
A2 Item descnpnonsshall state the mark ortype number of each precastconcrete unlt U n m with d~fferent dlmens~onsshall be glven different mark ortype numben A3 Panlcularsof tendons and prestressing shall be stated o n Item desuipt~ons for prestressed pre-tensioned unlts
A4 The cmss-sectlontype and princtpal dimenstons shall be stated ln rtem descr~ptlons for beams. columns, segmentalunrts, unmforsubways. culverts, ducts. copmgs, s,lls and wew blocks
A5 The average th~cknessshall bestated in Item descrlpttonsfor slabs
A The mass per metre shall be stated in !tern aescrmonsfor units For subways, culvem, duns. co~mos. sdls and wew blnrks

C l Items for precastconcrete


shall bedwmedto Include nnforcemem,formwortr.~otnts and finshes

in thethtrddlvtston classlf~catjon shall be the mass of each unlt

D2 Concretecomponentswh~ch
arecast otherthan in thetrfinal pos~tron shall generally be classed as precastconcreteun~ts

M1 Thelength measured for


unns forsubways, culverts and ductsand for copmgs, sdls and werr blocksshatl be the total length of ldenttcal unm

D3 Wheresole precastlngof unm IS adopted for reasons other than toobtam mulr~oleuseof formwork and the nature of the in sltu work is characterfst~cof concrete, but involves the movement of the cast unlts mto thew final poslt~ons. theunltsshatl be classed as m srtu concreteand n class Afor tne ,temsg,ven i Temporary Works associated wath the movement of the unns

CLASS I: PIPEWORK
Includes. Excludes:

-PIPES .i
.
%

Prov~sion. laying andjointingof pipes .... $- .; , Excavatingand bacffilling pipetrenches r s ; Work included in classesJ, K, LandY . . Piped buildingsewices (included in clasSZ)+ -

.
-

.--

> .

FIRST DIVISION
1 Clay plpes

SECOND DIVISION

THIRD DIVISION
1 Not In trenches 2 In trenches, depth not exceedlng 1 5 m ' 3 1 E4.m A 2-2 5 m

1T

Nominal bore not exceedlng 200 mm


700-300 m m

2 Concreteplpes 3 lronplpes 4 Steetplpes 5 Polyvinyl chlor~deplpes . 6 Glassre~nforced plastlcplpes 7 High densttypolyethyleneplpes 8 Medlum dens~typolyethylene pwes

CLASS I

MEASUREMENTRULES
M1 The Cammencmg Surface adopteo in the preparation of the Boo1 O~ant!t!es s n d be adopted far the measurement of the - completed work

DEFINITION RULES
D l Plpes norm rrenchesshall mclude plpes suspended or suooorted above the around or othkr surface, ptpes tlheadmgs. tunnels or shafts, popes Installed bythrust bormg and p~pejackmg and ptpes laid wtthm volumes measured separately for excavatson

COVERAGE RULES C1 ltemsfor plpesshall be deemed to tnclude the supply of all materials bytheContractor unless otherwsse stated Items shall be deemed to lncludeplpe cumng
C2 ltemsfor ptpesrn trenches shall bedeemed to tnclude excavatton. preparaton of surfaces. dtsposal of excavated matenal, upholding stdesof excavatton, backfillmg and removalof dead serwcesexceot totheenentthatsuchworkis Included in classes J , Kand L

ADDITIONAL DESCRIPTIONRULES A1 The locatlon ortype of


p~pework in each nem or group of Items shall benated in Item descrlptlons so that the plpe runs mcluded can be fdentnfied by reference to IheOrawlngs

MZ Backfillmgof trenches shall


not be measured except asset out tn class K for f~llmg of French and rubble d r a m s a n d i class Lfor backfillmg wtth matenal other than that excavated from the trenches

DZ Pbpes norm trenchesshall be cassed as such only where owes are expressly requlred not lo De laid i n trenches D3 Depths used for class!ficatton of ptpes m trenchesshall be measured from the Commencmg Surface to the mvem of the plpes

A2 The matenals.lolnttypes. nominal bores and llntng requlrementsof p~pesshall be stated in Item dewnottons and reference gwen to abplmble Br~ttsh Standard speclficat~ons and spec~fied qualmes
A3 ltemdescnpttons for pipes norm trenchesshall dmngulsh between the dtfferentcatqlones of ptpes hsted in rule01
A4 TheCommencmg Surface shall be ldentlfied in the descrlotlon of each Item for work mvolvkg excavatzon for whlch s not the Commencing Surface 1 alsothe Orzgmal Surface

M3 Lengthsof prpes shall be


measured along thewcentre lhes Lenoths of moes in trenchesshall tnclide len$hs occupted by ftnmgs and valves and exclude lengthsoccupled by ptpes and f~ncngs comprmng backdrops to manholes ~ e n ~ t of hs p~pes nor m rrenchesshall exclude lengths occupled by fmngs and valves

M4 Addmonal ltemsshall be gwen in classes K and L forwork rn c o n n e n m wbth oloes norm trenchesothertha" the provwon. laylng and jolnttng of plpes

A5 Where more than one p p e ts


expressly requlred to be laid in one trench the ttem descnptlons for each plpeshall so stateand also !dent@ the mpe run Where plpesarelald i n French or rubble d r a m Item descr~nttons shall so state

M5 Lengths of pipes entermg


. manholeiand other chambers

shall be measured to the rnstde surfaces of thecnamoers except that pipes an0 fonmgs comprlsrng bacroroon l a mannoles snatl be measured in class K

A6 Trench depths exceedmg


4 mshall bestatedm Item descrlpttonsto the nexl h~gher mult~pleofo 5m

A7 ltemdescrlpt~onsshall ~dentlfy separatelyexcavatton whlch tsexpresslyrequmdto be carrledout by hand

<>

50

CLASS , . .,.. J: PIPEWORK


Includes Excludes.

-FITTINGS AND VALVES

Fittings and valves for p i p e w o r k Work Included in classes I ,K, L a n d Y Piped building services (included in class Z)

FIRSTDIVISION

'

iECOND DIVISION
I Bends ! Junctlons and branches 3 Tapers I Double collars 5 Adaptors i Glands I Bellmouths 3 Stra~ghtspeclals

THIRD DIVISION
1 Nominal bore. not exceed~ng 200 m m 2 200-300 m m 3 300400 m m

1 Clay plpefinlngs nr 2 Concretep~peflnlngs nr 3 Iron or steel plpefinlngs nr 4 Polyv~nylchloridep~pefittlngs nr 5 Glass retnforcedplantc p~pefinlngs nr 6 Y~ghdens~typolyethylenep~pef~nlngs nr 7 Medwm dens~typolyethylene plpe fttttngs nr

8 Valves and penstocks

n!

1 Gate valves hand operated 2 power operated 3 Non-return valves 4 Butterfly valves' hand operated 5 power operated 6 Awvalves 7 Pressure reducing valves 8 Penstocks

MEASUREMENT R W S

DEFINITION RULES

7 , -, . C~VERAGE RULES --, -- .


7
ir

. a -

Ct Items forfimngs and valves shall bedeemed to cnclude the supply of materials bythe Contractor, unless athewlse stated

Q ltemsforfnmgsandvalves shall bedeemed to mclude


surfaces, d~sposal of excavated matenal,upholdings~desof excavatton, backfdllngand removal of dead servlcesexcept mtheeaemthst such workm

M1 Ppe linmgscampr~smg oackdropsro manholessna.1be mcludeo in the Items far manholesmeasured in class K M2 Stra!ghtspenalsshall be measured only where they are expresslyrequred Straight spenalsshall not bemeasured wherethey are necessctatedonly by the layout ofthewark Plpe runs between manholes. chambersand other structures whoselengthsare not an exact mult~oleaf astandard oee lendh shallbedeemed toreduk're strarghtspectalsonly if they are expressly requred as rocker wes

D l P8pe fintngs on pmes of


otfferent nommal bores shall be classKed in thethlrd Oivnslon accordmg to the nommal bore of the largest plpe DZ Astra,ghtspecral~salength of p!peerthercutto lengthor made to order -

C3 Items far straght speclais shall bedeemed to ~nclude cunlng

nomlnal bores and imng requirements of pipe fmngsshalt be stated in Item descrlpt~onsand referenceglven to applccable antlsh Standard spec~ficatlons and speclfied quallttes Finmgs w t h ouddle flanoes shall be so

A1 The matenals, lotntwpes. ~.

A2 Item descr~pt~onsfor pnpe


fimngsto can Iron or spun Iron plpeworkof nommal bore exceedlng300 m m and to all steel p~pework shall state the pnnc~pal d~mensronsof each flttmg

A3 Vemcal bends In papework of which the nommal bore exceeds 3W mm shall be so described
A4 F~umngsto plpework not in trenches shall be so descrtbed

A5 Ftffmgsto rellned water mamsmeasured mclassYshall besodescnbed A6 Thematenals. nommal bores and any addmonal requacements such aslotnts, dramcocks. eaenslonsptndles and brackets shall bestated in Item descnptlonsfor valvesand penrtocksano referencegwen to appl,cableBrmsh Standard speclficanonsand speclfied
A7 Vabesandpenstocksto rellnedwaterma~ns measuredin classYshall besodescrtbed

--

r-

Manholes and other chambers, ducts, culverts, wosstngs and reinstatement, other ancillaries as listed Includes. Excludes Woreinduded in classes I,J, Land Y . , . z 2 . 4 - . - :.. .' " ' ""s-i 'DU&~ buildingfervices(includedin~ass_Zl_ -- . _ . .
~

-. - - - --

-_ _

,.g _ .$ .
,C

ARSTDIVISION 1 Manholes 1

iECOND DIVISION

WIRD DIVISION

-_ - --..- --

--

. - . nr

.--

I Brlck
2 Br~ck wlth backdrop % In sltu concrete t In satu concrete with backdrop 5 Precastconcrete 6 Precast concrete with backdrop I Brtck 3 In snu concrete 5 Precast concrete 1 Clay Z Clay trapped 3 In sltu concrete I In s ~ t u concrete trapped 5 Precastconcrete 6 Precast concrete trapped 7 Plast~cs B Plastlcs trapped
-

1 Depth not exceeding 1 5 m 2 --15-2117 .. - . 3-' 2-25m 4 25-3m * _ 5 , 3-35171 6 3-m 7 stated exceeding 4 m

--

2 Other stated chambers

nr

4 Frenchdra~ns, rubble drains, dltches and trenches

1 Ftllmg French and rubbledramswlth graded materlal 2 F~llmg French and rubbledralnswlth rubble

m3 m3 m m m m m m 1 Cross-secnonal area not exceed~ng 0 25 m2 0 25-0 5 mZ 05-075m2 0 75-1 m2 1-1 5 m2 1 5-2 m2 2-3 m2 stated exceedmg 3 mZ 1 Not in trenches 15m 2 In trenches. depth not exceed~ng 1 5-2m 2-2 5 m 25-3m 3-35m 3-m exceeding 4 m

3 Trenches for unptped rubble drams


4 Rectangular section d~tchesunl~ned . - . - . llned . 5 6 Vee sectlon dltches unlmed 7 l~ned 8 Trenches for plpes orcables not to be l a ~ by d the Contractor

5 Ducts and metal culverts

1 Cable ducts 1 way

2 3 4 5 6 7 8

2 way 3 way stated number of ways exceedmg 3 Sectlonal corrugated metal culverts. nornmal mternal d~ameter not exceedmg 0 5 m 05-lm 1-1 5 m exceedmg 1 5 m

MEASUREMENT RULES

DEFINITION RULES

COVERAGE RULES

ADDITIONAL DESCRIPTION RULES

D l Thecentre llnefor multlple p~pes. ductsor~~l~e shall r t s be the h e equldmant betweenthe mslde faces of the outer plpe walls

C1 ltemsforworklnth~sclass shall be deemedtoinclude excavatton.preparaion of surfaces, dasposalof excavated matenal, upholding srdesof excavation bacldillmgand removal of dead sewices, excepttotheextentthatsuch wo* IS tncluded in classes I.
Q Itemsforwork In th~sclass shall be deemed10 tnclude concrete. remforcement. formwork, p n t s and fin~shes

--

- * >
A

..

D2 The depthsaf manholes and other chambers shall be measured from the tops of coven lo cnannel .nvertsor tops of base slabs. whichever e the mower

0 3 Drawpm shall Oeclassed as


orher Slatedchambers

statedchambers and gullresshall be deemed to mcludeall *emsof metalworland pspework, other thanvafves, whch occurwtthm or atthesultaceoftne lrem C4 Items for manholeswtth backdrops shall be deemed to ~nclude the p~pework and assaaated fittmgscomprlsmg the backdrop

A1 Typeor mark numberjshall be stated in l t m ~ desulmlons for manholes. otherstated chambers and gullresof wh8ch details are gwen elsewhere tn the Contrad

42 Typesand loadmg duttes of =oversshall be stated in Item jescnptlons for manholes, other stated chambers and gullfes
manholes, otherstatedchambers ~ndgullresshall ldenttfy ieparatelylhosewh#ch are rxorenlv rwuwed to be

M1 Excavatton and plpe laytng far pped French and rubble dratnsare measured in class I

94 Thenatureofthefillmg natenal shall bestated m Item iescrlpnonsforhlI~ng Fmchand ubble drams.


45 Mafertalsanddtmens~onsof ~n~ngstodmhesshall bestated in tem d e r n ~ t z o n s

M2 Theerass.sect~ona1 areas of ltned dmher shall be measbred to the Excavaleo Surface

M3 The rules in class I for popes


shall also apply to ouclrand meralmlvensin tnlsclass exceot that the lengths measured for duns and metal culverts not in trenchesshall mclude lengths occup~ed by fttt~ngs

C5 Items for ducts andmetal CUIVERS shall be deemed to ~ncluae cuttong and flttmgs

46 The rules tn c l a u l forplpes shall also apply10 ductsand melalculverrrln thlsclass

NOTE
Manholerandotherchambersmay be measuredi n detall assetoutinothcrclassesof CESMM3
$

54

CLASS K

FIRST DIVISION 6 Crosslngs


nr

iECOND DIVISION
;

THIRD DIVISION 1 Ptpe bore not exceedlng

! I 1 i i
1

Rwer, stream or canal, wldth 1-3 m 3-10 m stated exceeding 10 m Hedge Wall Fence Sewer or dram Other stated underground servlce

stated exceed~ng 1800 m m

I Breakmg up and temporaly retnstatement of roads ! Breaklng up and temporary remstatement of footpaths 3 Breaklng up, temporary and permanent remstatement of roads I Breaktng up, temporaly and permanent remstatement of footpaths j Re~nstatement of land 6 Str~p topsod from easement and reinstate

1 Plpe bore not exceedmg 300 m m 2 300-900 m m R 900-1 800 m m 4 stated exceedtng 1800 m m

8 Other plpework anclllarles

1 Remstatementof f ~ e l d dram Marker posts 3 ~ , m b esupports r left in excavatlons 4 Metal supports left in excavatlons
2
~p

m
nr

mj m'
--

5 Connecttons to exlstmg manholes and other chambers 6 Connecttons to extstmg pipes, ducts and culverts

Ptoe bore not exceedlng 200 m m 200-300 m m 30M00 mm 600-900 m m 5 900-1200 m m 6 1200-1 500 m m 7 150&1800 m m stated exceedlng 8 1800 m m

CLASS K
iseerulesat headofclasson page531

MEASUREMENT RULES

DEFINITION RULES

COVERAGE RULES
C6 Itemsfor crossrngsshall be deemed to mclude retnstatement unless otherwsestated

ADDITIONAL DESCRIPTION RULES


A7 Where lmmgsto rivers, streamsorcanalsare to be broken throughand remstatedthetype of lmngshall benated in ttem descrlptlons

M4 Crossingsshall be measured
for plpes, ducts and metal Culverts

M5 Crossrngs ofstreamsshall
be measured only where thew wldth exceeds 1 m

thewatersurfaceis~tthelevel (or the hlgher level of fluctuatron if apploablelshown onthedraw~ng towhlch reference 1sglven in the Preamblein accordancewjth paragraph 5 20 usedfor D7 Thed~mensmn class fcat~onafborem thetnira d~vtsmnsnall bcrhemax!mum namlnal dlrlanee oetween rhe insia~ied

M6 Remstatementshallbe
measured for plpes, ducts and metal culverts shall be measured along centre llnesand shall include lengths occup~ed bv manholes and other chambers

D7 Thedlmenslon used for :lasslflcatlon ofborein thethlrd iwslonshall bethe maxmum lomlnald!stance betweenthe nslde faces ofthe outerwalls of :he pwe, duct orculvertto be nstalled

C7 Addmonal relnstatement shall bedeemed to be ~ncluded in the Items for manholes and other chambers
C8 Removal and relnstatement of kerbs and channels shall be deemed to be mcluded inthe rtems for breakmg up and rernstatementof roads and footpaths

A8 Typesanddepthsof
surfactng. mcluomg bsseandsuooasecourses, shall bestateo in ,terndescrlptlons faroreakmg up and remstaremenr ofroads dno footpaths

M8 Stnp topsorl from easement an0 remsrareshallbe measure0


only where t s cxoressly rcqwred lnat a w 0th of ground grealer l n m m e nornlnal trench ~ ~ 0 t h defined in accordance wlth rule Dl in class L is to be strlpped of topsoil before trench excavatmn and subsequently remstated

38 Crossmgsaf roadsand paths ahall beclassedas breakmgup mdre~nstatementof roadsand laths

A9 ltemdescr~pt~onsforsrrrp topsodfrom easementand retnsfateshallstateany lhm~tat~onson thewtdth to be stnpped and remstated

C9 Items for sfnp topsorl from


easement andrernstateshall be deemed to mclude stcrmg and orotectma toosad and relnstatement of land
" 7

A10 ltemdescrtpt~ansfor remstatementof landandforsfr,p topso,lfmm easemenrand rernstateshalld~st~ngu~sh between grassfand,gardens. SDortSf~eldSand cultwated land A l l S~zesandtypesof marker oostsshall bestated in Item descnptrons
A12 Item descr8ptnns far connecl!ons to exmmg manholes andorherchambemano ro ex~st,ngp~pes, ductsandculvertS shall ldentlfy the natureofthe exlstlng servm and the extent of theworkto bemcluded

M9 Otherptpework ancrllanes shall be measured far plpes, ducts and metal culverts M10 The lengths measured for
remstarementoffgeld drams shall be the nommal trench wldth defmed in accordance wlth rule Dl in class L

07 Thedmenscon usedfor :lass~f!cat~an of borein thethrd jlvtsion shall be the maximum ?ommald~stance betweenthe ns~defacesoftheauterwallsof :hep~pe.ductoreulverttobe nstalled

C10 Itemsfor reln~tarementof


f,elddrams~hall be deemed to mciude connectmns to exlst~ng feld d r a m

M11 Thearea measured for suppons efiin excavarmnssnal bc me ~noeve ope0 area in
Contacl w t n 1nesd"accs for an ch the suo~orts 3recxureab.v

CLASS L: PIPEWORK - SUPPORTS AND PROTECTION, ANClLLARlES TO LAYING AND EXCAVATION


Includes Extras t o excavation and backfilling of trenches for pipework, ducts and metal culverts, manholes and other chambers, headings. thrust boring and pipe jacking Pipe laying in headings and by thrust boring and pipe jacking I Prov~sion of supports and protection t o pipework. ducts and metal culverts Work included in classes I ,J , K and Y Insulation t o building services (included in classZ)

Excludes

FIRST DIVISION 1 Extras to excavation and backfllllng m3

iECOND DIVISION In pipe trenches In manholes and other chambers : I n headmgs In thrust borlng In ptpe jackmg

1 Excavation of rock 2 Excavat~on of mass concrete 3 Excavatnon of remforced concrete 4 Excavation of other artifictal hard rnatenal 5 Backf~ll~no above the Final Surface wnh concrete 6 Backfllllna abovethe Fmal Surfacewlth stared rnaterlal other than concrete 7 Excavation of natural matertal below the Fmai Surface an0 backf,llmg wnn Concrete 8 Excavation of natural materlal belowthe Fmal Surface and backfnlling wlth stated maternal otherthan concrete

~~

CLASS L
DEFINITION RULES COVERAGE RULES
C1 Itemsforwork ~n th~sclass shall bedeernedtomclude excavatlan. preparation of surfaces,dtsposalof excavated matenal,uphald~ngs~desof excavatmn, backfllllng and removal of dead services. except tatheextentthat such workis lncluded mclassesl, J and Korm the ltemsfor extrasto excavatton and backf~llmg inthasch& C2 Items forwork in t h class ~ shall be deemed to mclude concrete, reinforcement. formwork, lams andfmshes

MEASUREMENT RULES

ADDITIONAL DESCRlPTlON RULES

M1 Items shall be glven ln thm class i n addltlon to the ltems far pravlsmn, laying andpntmg of ptpes, ducts andculverts and for theexcavation and backftlllng of trenches in classes I and K ltems shall be glven in thls class in addition to the ,terns for manholes and other chambers in classes K and Y
MZ Work in this classassoc~ated
with ductsand metal culverts
shall be measured as set out for work assmated with pipes The dimenstan used for classlflcat~on In the thwd dwwon IL2-8 r *I shall bethemaximum nommal dstance between the inside faces of the outer duct orculvert walls

M3 Break~ng upand reanstate


men1of roads and pavcngsshall be tncluded in class K
M4 Thevolume of extras10 excavatlon and backflllmg mprpe frenche~shall be calculated bv multlply~ng together the average depth and length of the materlal removed or backfilled and the nominal trench wrdth

31 Thenomma1trench width if 10t stated in the Contract shall be :aken as 500 mm greaterthan the maxmum nommal d~stance xiween the mskde faces of the mter plpe walls where thls

~dentlfyseparat;ly excavatlan wh~ch isexpressly requ~red to be carned out by hand

M5 h a ua ume o f e x t r a s la excavatlon ano oacd img ra mmhows m a ofher cndmoers shall be measured autscde the maximum plan area of the manhole or other chamber

M6 The volume of extras to excavatlan and backfllllng for pwe

, ,

"

matertal excavated or backfclled in headmgsshall not be Pack~ng measured

M7 Backfrllrngabovethe Fmal SutfaiaceiL 1 * 5-6lshall be measured only where it is expressly requ~red that the matertal excavated shall not be used for backflllmo Excavafron below the Fma1~;rfaceand backfllltng (L1 * 7-81 shall be measured only where it 1s expressly requared
M8 An ~solated volume of rock. concrete or orheran!fraal hard materdoccurrtng wlthm other matertal to be excavated shall not be measured separately unless its volume exceeds 0 25 m'

-. -

FIRST DlVlSlON 2 Speclal plpe laylng methods m

SECOND DIVISION
1 In headmgs 2 Thrust bormg 3 P~pejacklng

1 2

;j

9
f

I Nominal bore. not exbeedw 200 m m > u 200-300 m m 2 3 30C-600mm . " 3 , 600-900 m m 900-12W m m '*' 1200-1500 m m '*' 1500-1800 m m stated exceedmg 1800 mm

'L"

,A

3 Beds 4 Haunches 5 Surrounds

1 2 3 4 5

Sand . Selected excavated granular materlal Imported granular mater~al Mass concrete Remforcedconcrete

6 Wrappmg and lagging

7 Concrete stools and thrust blocks

nr

1 Volume not exceedmg 0 1 m3 2 01-02m' 3 0245m3 4 0 5-1 m3 5 1-2 m3 6 2-4 m3 7 4-6 m3 8 stated exceeding 6 m3 1 Height not exceedmg 1 m 2 1-1 5 m 3 15-2m 4 2-3 m 5 3-4m 6 4-5 m 7 5-6m 8 stated exceedmg 6 m

8 Other ~solated p~pe suppons

nr

CLASS L
(see rules at head ofclass on page 571

.. .- --DEFINITION RULES COVERAGE RULES


U Items for spenalprpe laylng methodsshall bedeemed to mclude crossmgs, provlslon and removal of access plts, shaftsand jackmg blocks unless othenwse stated and other work assoc~ated with spectal pope laymg methods not ~ncluded in the ttemsfor provwon, taymg and jolntlng of plpesglven In class I

MEASUREMENT RULES
M9 Spenar pape laying methods soall be measured only where rhey are express v rewtred

ADDITIONAL DESCRIPTIONRULES
A2 ltem descr~pttons for spectal
pfpe l a r n g rnefhodsshall identrfy the run of plpe or plpes The type of packing shall be stated in Item descrlptlonsfor prpes m headmgs.

M I 0 Access pits. shafts and ~ackmg blocks. where expressly. stated in thecontract to be executed by the Contractor and of whlch the nature and extent are expressly stated in the Contract. shall be measured as Spec~fled Reqwremena in class A
Ml1 Lengthsof beds, haunches and surroundsshall be measured along ptpe centre lmes lncludmg lengths occupted by fmlngs and valves but notmcludmg lengths occupled by manholes and other chamberr through whlch they are not contmued

02 lremsforhaunchesand surroundsshall tnclude beds of thesame mater~al

A3 Materials used for beds, haonhesand surroundsand the depths of beds shall be stated i n Item descnptlons
A4
Beds. haunches and surroundsto multwle ppes mall be so descnbed rtarmo the

D3 ltemsfor beds, haunchesand


surroundsto multlple plpes shall beclasstfled in the thwd d ~ v w o n accordmg to the nommal dstance between the m t d e faces of the outerplpe walls

between the lnsldefaces afthe outer ome walls

M I 2 .engthsaf wrapptngand
raggmgshall oe measured along each DlDe centre lhne mcludinq lengthsoccuped by finlngs a i d valves but not mcludmg lengths occup$ed by manholes and other chambenthrough whlch the ppes are not contmued

C4 Itemsfor wrappmgand laggrng ofp~pesshall be deemed to rnclude wrappmg and laggmg of fimngs. valves and jomts

A5 Materials used for w r a p p q


andlaggtngof plpes shall be descrlpllons slared tn #tern

04 Thevolumes used for


class~ficatlon of concrete stools and thrust blocksshall exclude thevolumes accupled by ppes

C5 Items for concrete stoolsand thrust blocks shall be deemed to mclude aloe . . fixmas

A6 ltem descnptlons for concrete stools and thrust blocks shall state thespecffxcatlon of the concrete and whether it is remforced

05 The hengnt of p,pesuppom "sea forclass#ficatlanshall be measure0 fromlhearound or othersupportmg & f a c e to the tnvert of the h ~ g h e n plpe where pjpes aresupporfedfrom below and of the lowest plpe where pipes are supported from above D6 Where two or more ptpes are

A7 Prlnclpal dlmensronsand matertals shall be stated in Item descrlptlons for prpesuppons

carried by one suppan, the ttem


for rhe ruooon shad be clasd>ed tn the thtrh'd~valon bv the aggregate bare of thepwes
S U D D O ~ ~ ~ ~

. - CLASS M: STRUCTURAL METALWORK


Excludes: Metalwork in concrete (included in classes C, G and H) Metalwork in pipework (included in classes I, J, K and L) Miscellaneous metalwork (included in dass N) Metalworkin piles (included in classes P and Q) - - Metalwork in fences (included in class X)
,

- - .-

FIRST DIVISION 1 Fabncatlon of maln members for br~dges

..
t

' 2

WIRD DIVISION
. , *X

SECOND DIVISION 1 Rolled sectlons 2 Platesor flats 3 Built-up box or hollow sectlons

I Stra~ghton plan . ,, ! Curved on plan zi I Stra~ghtonplan andcambered . I Curvedon plan andcambered , , ; .


I'.

-.
.

i.

2 Fabrlcatlonof subsldlav members for br~dges

I Deck panels
1

2 Brac~ngs
3 External dlaphrasms

3 Fabr~cat~on of members for frames 4 Fabrlcat~on of other members

1 Columns 2 Beams 3 Portal frames O Trestles. towers and bulk-up columns 5 Trusses and bulk-up girders 6 Bracmgs. purlms and claddmg ratls

t
t

t
t

Stra~ghton plan Curved on plan Stra~ghton plan and cambered Curved on plan and cambered

"s -.
-4.

'*

,. r?

t t t
nr

.s,

-.
,,

7 Gr~llages B Anchorages and holdmg down bolt assembiles

% = :

it-

..

5 Erectton of members for brldges 6 Erectton of members for frames 7 Eremaon of orner members 3 Stte bolts black nr 4 HSFG general grade nr 5 HSFG htgher grade nr 6 HSFG load mdlcatmg or loau hmtt types, general grade nr 7 HSFG load ~ndlcattng or load I~m~ttypes, htghergrade nr
8 Off sltesurfacetreatment

not exceeding 16 mm 1 6 2 0 mm 20-24 mm 24-30 mm 30-36 mm 3 2 mm stated exceedmg 42 mm

mZ

1 Blast cleanmg

2 Plckllng
3 4 5 6 7 Flame cleanmg Ware brushing Metal spraylng Galvantrrng Pamtma

MEASUREMENT RULES IEFINITIONRULES

MI

ltems shall be mluded in m~scellaneous metalwork (class N) for metal components not lnc~udedin t h ~ s class but assacmted wlth metal structures

M2 The mass of memoem, otner than places or flats. shall be calculated from the averall lengthsof the members wlth no deductlons for splay-cut or mltred ends
~~ ~~ ~ ~~

: 1 ltems for fabr~catronof netalworkshall bedeemed to nclude delwerv of fabrtcated netalwork to the Slte

41 The materials and grades of mater~als used shall be stated In tern descrlpttonsfor fabrrcatlon of members

IU

M3 Themass of members measured shall be that of plates. roled sections. shear connectors. stjffenem, cleats, packs, spllce plates and other fin.ngs

ltem descrlptlons for fabncat#on ofmembersshall identtfq tapered or castellated members

M4 No allowanceshall be made m the measurements for rolllng margm and other perm~ssrble dewattons The mass ofweld fillets, bolts. nuts. washers, w e t s and protenwe coatlngs shall not be measured
M5 No deductlons shall be made for the mass of metal removed to form notchesand holeseach not exceeding 0 1 m2 tn area measured in plane
M6 The mass of steel to BS4360 shall betaken for measurementas 785 kg/m2per 100 mm thlckness 1 7 85 t h 3 ) The masses of other metalsshall betalenasslated i n theSpeclflcatlon or, wherenot so slatea.asstated mtnesuppller's catalogue

P3 ltem descnptlons for fabrrcarron olmembersother than b r portal frames shall ldentlhl cranked members
A 4 Detasls of the members compnsmg boom and mflll canstructlon shall bestateo In ltem descrtptlons for trestles, towers and budt-upcolumnsand trusses and built-up g~rders

A 5 ltem descriptions for ancharagesand holdtng down bolta~sembBesShal1 state part~culars of thetypeof anchorage or assembly

M7 Anchoragesand hold~ng down bolt assembbesshall be measured by the number of complete assemblies

C 2 Items for erection of membersshall be deemed to ncldde woncarrleo out aher delwev of fabrtcaled metamwor* to the Sate

A6 ltem descrtpttonsfor erection shall separately identlhl and locate separate bndges and structural frames and, where appropnate. parts of bndges or frames.

C3 Items for sne boltsshall be deemed to ~nclude supply and delwew to the Stte

~p~

A7 Wherefwng cl~psand reshent paas are used to secure overhead ralls. !tern .. . - - crane .descnanons shall so'state

M8 Surfacetreatment carrled out on the Snte shall be classed as p a m n g (class VI

A8 Matenslsand number of
appl~cattonsshall bestated in Item descrlptmns for metal spraymg, galvanmngand parntmg

CLASS N: MISCELLANEOUS METALWORK


Excludes Metal reinforcement for concrete(included in classes C. G. H and R) Metal inserts in concrete (included in classes G and H) . .-. , Pioework(included in classesl, J , Kand L) - *.- . . . . .. -, ~iructura metalwork l (included in class M) Fittinas and fastenings t o timber (included in class 0 ) Piles in classes P and 0 1 . . . . . fincluded ,~~~~~~~~ Traffic agns (~ncluded in class R) Rail track and accessories (included in dassSl Fences (included in class X)
~

FIRST DIVISION 1

SECOND DIVISION
I Stalways and landlngs

HlRD DIVISION t t m m m

? Walkways and platforms

r
S

Ladders

Handrails

5 Brldge parapets

I Angle sectlon

! Channel sectlon
I Isectlon I Tubular section

7 Platefloonng 3 Open grldfloortng

mz m2

Claddlng Welded mesh panelling D u n covers

mz
m2 m2

S Tke rods

nr

I Roller 2 Sltde 3 Rocker $ Cylmdncal i Sphertcal 5 Plam rubber 7 Lammated rubber 3 Rubber pot

7 Uncovered tanks 8 Covered tanks

MEASUREMENT RULES M I Pa~ntmg carved out an the


Slte shall beclassed as palntlng lclass V)

/
I

- ,

DEFlNlTlON RULES

COVERAGE RULES C1 ltemsformlscellaneous

ADDITIONAL ''DESCRIPTION RULES

I
I

A1 Item descnpt~onsshall state


the speaficatton and thtcknesses of metal, surface treatments and pr~nc~pal dlmenslons of miscellaneous metalwork assembiles

M2 Masses a : culated lor m ~cellaneous metalworl asremales shall mclude he mass of all metal com~onents and attached pteces.
n

metalworkshall bedeemed to Include flxlng to otherwork, supply of fixmg components and drdlmg or cumng of otherwork

M3 NOdeductton from the - masses orareasmeasured for mscellaneous metalwork shall be

M4 The lengths of laddersshall


be measured along the lengths of stringers The lengths of handrah and bndgeparapetsshall be measured along thelrtop members

A2 Where ladders~nclude safety loops, rest platforms or returned stnnaers. Item descr~otlons shall " so state

M5 The lengths of
m,scellaneous frarnmg shall be measured along the enernal pertmeter of frammg

CZ ttemsfor plateand opengnd floonngshall be deemed to melude supportmg metalwork unless otherw~se stated
C3 Items for weldedrnesh panellmgand ducrcoversshall be deemedto mcludesupportmg metalwork unless otherwise stated

C4 remsfor rlerodsrhall be Deemed l o mcluae concrete. remfarcement an0 ,oms

NOTE
A s m alternatwe tothe addltmnal descnptlongwen as requ~red by rule A1 ltem descrlptlonsmay ldcnt!fyasrernblle5by mark number in accordancewcth paragraph 5 12

CLASS 0 :TIMBER
Includes. Excludes Timber components and fittings Timberdecking , - . 2 ,= : : : Fittmgs and fastenings t o timber components and decking. _ . .- . I . Formwork t o concrete (included i n class G I Timber pdes (included i n class P I Timbersleepers (included in class S) Timber suooorts i n tunnels (included in class TI .... ~imberfel%n (included ~ i n class X) Carpentry and joinery in slmple building works incidental t o c ~ v iengineering l works (indudedi n classZ)

I _ j

,y"~-,.

,.-

~~

FIRST DIVISION
1 Hardwood components

SECOND DIVISION
m m 1 Cross-secttonal area not exceedlng 0 01 m2 2 0 01-0 02 m2

THIRD DIVISION
1 Length not exceedmg 1 5 m 2 1 E-3m 3 3-5 m 4 -- -. 5 8 m 5 8-12m 6 12-20 m 7 stated exceedmg 20 m

Softwood com~onents

o i - 0 2 m2
02-04mZ exceeding 0 4 m2

3 Hardwood deck~ng
4 Softwood deckcng

1 Thickness- not exceedmg 25 mm 2 2S50 mm 3 50-75 mm 75-100 mm 4 5 100-125 mm 6 125-150mm 7 exceeding 150 mm nr 1 2 3 4 5 Straps Spckes Coach screws Bolts Plates

Fbnmgs and fastenings

CLASS 0
:
MEMUREMENT RULES DEFINITION RULES
-i.:

--.,,.
A.

COVERAGERULES

ADDITIONAL DESCRIPTIONRULES

C1 ltems'fortimbershall be deemed to mclude f~xmg, bofing. cuttzng and jomtmg

M1 The length of tmber componentsmeasured shall be thew overall lengths w t h no allowance for scarfed or other ]Ol"tS

D l Thecross-senlanal areas stated for classtflcatlonof tmber componentsshall bethew nomtnal gross cross-secttonal areas

A1 The nomtnal grosscrosssen~onal d~meneons. - -, thicknesses, grade or specles and any tmpregnatton requirements or sDeclal surface fimsncs shall be stated in Item descnpt~onsfor tlmber components
~ ~~ ~ ~

Thestructural use and locat~on of tmber mmponenfs shall be stated in Item descnpt~ons for components longerthan 3 m M t koaeducrlon from the areas measured for IlmDer decxrngsha.l be maae far ooentnos " ano - ha ca each not exceedmg 0 5 rn2in area

AZ

D2 Theth~cknessnated for classdtcat~on of t~mber deckmg shall bethe nommal gross thtckness

A3 The nommal gross crasssect~onal d~menemns,th~cknesses.spectes and any lmpregnatlon requirements or speclal surfaceflntshes shall be stated in item descr~pt~onsfor timber deckmg
P 1 4 Materials. types and smes of fimngs and fasfenmgsshall be stated in Item descrlptlons

CLASS N: MISCELLANEOUS METALWORK


Excludes. Metal reinforcement for concrete (included in classes C, G, Hand R) , , Metal insertsin concrete (included in classes G and H) . . Pipework(inc1udedin classes I ,J. K and L) . . Structural metalwork (included in class M) Fittmas and fasteninas t o timberlincluded in class Ol Piles 6ncluded in classes P and Q) Traffic signs (included in class Rl Rail traekand accessories (included in class S) Fences (included in class XI

FIRST DIVISION

SECOND DIVISION 1 Stalways and landmgs 2 Walkways and platforms 3 Ladders 4 Handrads 5 Brldge parapets
t

THIRD DIVISION t m m m

, .&
r

7 1 i

1 Anglesectlon 2 Channel senlon 3 Isectlon 4 Tubular sectlon

7 Plate floormg 8 Open gndfloormg

1 Cladding 2 Welded mesh panelltng 3 Duct covers

m2

m2 m2

4 Tie rods

nr

1 Roller 2 Shde 3 Rocker 4 Cyhndr!cal 5 Spher~cal 6 Plam rubber 7 Lammated rubber 8 Rubberpot

7 Uncovered tanks 8 Covered tanks

nr

1 Volume notexceedmg 1 m"

nr

3
4 5 6 7 8

1-3 m3 5-10m3 1C-30 m3 3C-100 m3 10C-300 m3 30C-1000 m3 stated exceedmo 1000 m3

64

CLASS 0:TIMBER
Includes:

. :.- Timberdecking ".

. Fitt~ngs and fasteningsto timber components and decking


~ n %

Timber components and fittings

.--&

, -

. ," . .3 >"A . .

I -

~xcides.-- Formwork t o concrete (included in class G ) Timber piles (included in class P) Timber sleepers (included in class S) Timber supports in tunnels (includedin class T) Timber fencing (included in class X) Carpentry and joinery in simple building works inadental t o civd engineering works (included in c l a s s 4
FIRST DIVISION 1 Hardwood components 2 Softwood comDonents SECOND DIVISION
1 Cross-secttonal area not exceed~ng 0 01 mZ 2 0 01-0 02 m2 0 02-0 04 mZ 3 . . - . . . 4 . . 0 04-0 1 m2 5 0 1-02m2 02-04mZ exceedmg0 4 mZ

.-*
>*%
U

W?,i:

GL a$<,
- 4

? . ,a ~m,k ,

THIRD DIVISION 1 Length not exceedmg 1 5 m c " c 2 1 5-3 m .,- ' 3 3-5m :am 4 5-8 m Gd. 5 8-12 rn .- - . . 6 12-20 m 7 stated exceeding -. 20 m %

-.--

3 Hardwood deckmg 4 Softwood decking

1 Th~ckness not exceed~ng 25 mm 2 2E-50 mm 3 50-75 mm 4 75-100 mm 5 100-125mm 125-150 mm 7 exceeding 150 mm
-

Fmngs and fastenings

nr

1 Straps 2 Sp~kes 3 Coach screws 4 Bolts 5 Plates

ADDI,~,C
MEASUREMENTRULES DEFINITION RULES
C1 ftemsfort~mbershall be
deemed to Includefixlng, bonng, cuttmg andJotnttng

??O* ::?

DESCRIPTIONRULES

M I The length of tmber componentsmeasuredshall be theu overall lengths wlth no allowance for scarfed or other joints

D l Thecrosssectkonal areas stated for class~fcat~on oftmber componentsshall be thelr nommal gross cross-sectional areas

A1 Thenomtnal gross crosssentonal dlmenslons, thtcknesses, grade or species and any ~mpregnit~on requwements orspeclal surfacefin~shesshall be stated in nem descnpttonsfor tmber components.

A2 Thestructural useand
locat~on of tmber components shall be stated in Item descnpt~ons for components longerthan 3 m MZ Nadeduct~on from the areas measurea for tlrnoer aecrrngsha.1 De maae tor ooenlnos " atlo holes each notexceedmgo 5 m2m area

D2 The lhcrnessstated for class~f~cat~on 01 tmber deckmg shall be !he nomrnal aross

A3 The nominal grosscrossnesses. species ano any mpregnatoon requmments or specnl surface flmshes shall be nared in ![em aescrtorvms far ttmber deckmg

A4 Matenals.types and slzesof ftmngs and fasfenmgsshall be stated in ltem descn~tlons

CLASS P: PILES
Excludes Boringfor site ~nvest~gation (included in class 8) Ground anchors (included i&class C).,?,J -- - Walings and tie rods(~ncludedindass Nl . .- - c* P h g ancillaries (included in class Q)

.=

,I . -.

. -

7.

-.

~.

. . ..

ARST DIVISION
1 Bored cast In place concrete plies 2 Drwen cast l n place concrete plles

SECOND DIVISION

HlRD DlVlSlON

Numberof pdes

! Concreted length

I Depth bored or dr~ven to stated maximum depth

3 Preformedconcrete p~les 4 Preformed prestressed concrete plies 5 Preformedconcrete sheet piles 6 T~mberpdes

1 Cross-sectional area not exceeding 0 025 m2 2 0 025-0 05 m2 3 0 05-0 1 mZ 0 1 4 Ism2

Number of p~les of stated length ! Depth drwen

nr

. -m

7 Isolated steel plles

1 Mass not exceed~ng 15 kg/m 15-30 kglm 3 3-0 kglm 4 6 5 1 2 0 kalm 5 12G250 Eg~m 6 255500 kg/m 7 500 kglm- 1 W m 8 exceedmg 1 W m

I Number of pdes of stated length ! Depth drlven

nr

CLASS P
ADDITIONAL DESCRIPTION RULES
--

MEASUREMENT RULES
M l Bored and drlven oepths shall be measure0 along the axes of p les from meCammenclng Surface to the toe levels a1 bore0
bf driven cast in place plies andio the bottom of the toes of other drwen p k s The Commencing Surface adopted in the preparatlon of the Bill of Quantmesas thesurfaceat wh cn b o m g or drwng is expected to oegln shall be adapted for the measurement of thecompletea work

DERNiTlON RULES

COVERAGE RULES C1 ltemsforpdesshall be


deemed to mcluded~sposal of excavated material

A1 Mater~ats of whlch pilesare composed shall bestated In ltem dexnptlons


Preltmrnatyp~lesshall be tdenttf~ed in ttem descnptlons Raked pllesshalt be identlfied in ttem descnptlons and thew lnclmatmn ratlossfated

A3 The structureto be suppaned and the Cammencmg Surface shall be tdent~fled in ltem descnptlons

M2 Each group of ltemsfor cast


m placemncretep#nesshall
comprise

(a) an ttem forthe numberof p,les (P 1-2 1I (bl an atem for the total concreted lenathof odes fP 1-2 * 2) (d an $ ; e m for the total depth boredordnven (P 1-2 + 31

Item descrlptlonsforthedepth of castm place concrete p~lesshall be the depth whch is not exceeded by any pde mcluded ,n the Item

44 Thedrameter shall be stated n Item descrtpt~ons for castrn place concrefe pdes
45 Contiguous bored pllesshall oe ~denttfied in Item descrlptlons

M3 The concreted lengths of cast m place concrete pdes shall be measuredfrom the cut-off levels expressly requwed to the toe levels expressly requtred

M4 Each groupof ltemsfor


preformed concrete and omber prlesshall comprlse (a) oneor more ,terns for the number of plfes of stared length(P3-6+ 11 (bl an Item forthe total depth drrven (P 3 4 2 1

----+-02 Pdes camprlslng a drwen permanent steel caslng whlch 3 s fllled wkth concrete shall beclassed as dnven cast tn place concrete ptleswhere the pdes are descgned forthe load to becarrled an the wnerete

D3 The lengths of preformed concreteand trmberprlesshall be the lenoths exoresslv reowed to


butm&dmg headsand shoes

46 Thecross-sectiontypeand crass-sectional dlmenslons or dtameter shall be stated In ltem descrlptvmsfor preformed concreteand ttmberplles A7 Detads of treatments and C O J I ~ ~ shall S be stated in ltem aesertotmns far the number of A8 Detads of drwng heads and of shoesshall be stated in Item descrlptlansforthe numberof

M5 Each group of Items for ~~olatedsteelprles~hall camprlse


(a) one or more ltemsfor the number of plies of stated length (P7 1 I (bl an (ternfor the total depth drrven lP 7 2 1

D4 The lengths of rsolatedsteel pdesshall be the lengths expressly requwed to besupplted excludtng extenskons

The mass per metre and cross-sect~onal dbmenslons shall be stated in stem descnptlonsfor solafed steel pdes

D5 Plies comprwng a drwen


permanent steel casmg which is fllled wath concrete shall be classed as csolatedsteelpdes where the poles aredeslgned for the load to becarrled on the casmg Fdlmg such pdes shall be classed as frlbng holfowp,les wtth concrefelQ 53 4

A7 Detatls of treatments and coaungs shall be stated In ltem descrtpttonsforthe number of mfes

68

CLASS P
. a

:2
: L
8A'.
;

, . d

*.

- .
"

i ; i

- . -,..
.

FIRST DIVISION

-- -- -

, I

.-u

-3-

- .. .

SECOND DIVISION 1 Sect~on modulus not exceed~ng 500 cm3/m 500-800 crn3/m no@-1 ZOO cm3/m

BIRD DIVISION

. . .,.'..?.-~ . --, . ' " . - ,"


.

2:

.. . ----

8 lnterlockmg steel piles

Length of specla1 plles


! Dnven area of length I Area of p~les

m 'm.
rn
m: m:

I i

not exceeding 14 m 14-24m exceeding 24 m

exceedmg 5000 cm3/m

.. . - . -

69

..

.
. - " - * r,, . .

CLASS P

see rulesat headof classon page67) MEASUREMENT RULES


M6 Each group of items for mrerlockmg steelprlesshall camonse
(a) one or more Items forthe
total length

/
I

~-

- .

DELlNlTlON RULES
D6 The lengths of mterlockmg sreelprlesshall be the lengths expressly requtred to be suppl~ed excludm~e&ns~ons
D7 lnterlocktng steel corner, ~unct#on. closure and taper pdes shall beclassed as rpectalprles

COVERAGE RULES

ADDITIONAL DESCRlPTlON RULES


A10 The sectton reference or mass per metre and sectlon modulus shall be stated in rtem descnpttons for rnterlockrngsfeef p 1 1 e . 5 A l l Detatlsof treatments and watlngs shall beaated in Item descr~pttons for area ofprles. A12 Thetype of specral p~leshall bestated in Item dewrlpt~onsfor the length ofspec,afp!les

*'
'a

spenal p k , f any IP 8
an Item lor
one or

1I driven

Of

areaofp1lesIP8.21 more ,terns for the Iota8 &ofprlesdtv!ded lnto the ranges of length glven in the th~rd dwslon (P 8 3-51

M7 The areas of mterlockmgstee ptlesshsll becalculated by mult$plymgthe mean undeveloped horizontal lengthsof the pile walls formed lmcludmg lengths XNPIW by specla1pdesl by the depths measurm in accordance Nltn rule M I in the case of ltems lorthednven areas IP8 2) and bv the lengths defmed in accordance' with rule D6 in thecase of ltems for the areas of poles IP8 + 3-51
~ ~ ~~ ~~

M8 Closure and taper plies classed as spenalprles shall be measuredonly wherethey are expressly requmd

CLASS . . Q: PILING ANCILLARIES


Includes Excludes Work ancillary to piling Ground anchors (includedin class C ) Piles (included in class P) Walings and tie rods (included in class N)

FIRSTDIVISION

- .

..
ECOND DIVISION Pre-bormg Backf4llng empty bore with stated matenal Permanent casmgs each length notexceed~ng 13 m exceedmg 13 m Enlarged bases Cun~ng off surplus lengths Preparmg heads

THIRD DIVISION I Dcameter 300 mm or 350 mm 400 mm or 450 mm Z 500 mm or 550 m m 3 600 mm or750mm 1

,---

1 Cast in place concrete plles

4 "W ' *u
C1

.
.

>d > .

Cast m placeconcrete plleS

1 Stratghtban. nomlnal size '2 not exceed~ng 25 m m i 2 exceeding 25 m m c 3 Heltcal barsof stated nomlnal slze I. ,-,

3 Preformedconcrete ptles 4 Tmberplles

Jenlng Fdlmg hollow plles wlth concrete . Number of pole extensions , Length of pule extenslons, each length not exceedmg 3 m exceedmg 3 m Cutting off surplus lengths I Preparing heads

m m nr

m m m nt

1 Cross-sectional area not exceed~ng-' 0 025 mZ -*" : 0 025-0 05 me 005-0 1 m * 0 1-0 15m2 015-Q25mZ o 2 ~ 50 rn2 3 E-1 m2 stated exceedmg 1 rnZ

5 Isolated steel poles

1 Pre-borbng

2 Jenmg 3 Fdlmg hollow pdes wlth concrete 6 Number of pde extensons 5 Length of pile extensaons, each length not exceeding 3 m 6 exceed~ng 3m 7 Cuntng off surplus lengths 8 Preparing heads

n n

7 -

1 Mass notexceedlng 15 kglm 1. 53 0 kolm .-

n
n r
r
P

3 4 5 6 7 8

3 M 0 k&r 60-1 20 kglm 12&250 kglm 250-500 kglm 500 kglm- 1 t h stated exceeding 1 tlm

MEASUREMENTRULES M 1 Work in thls class, otherthan


backfrllrngernpfy bore for cast in place concrete p h s , shall be measured only where it is expressly requtred

DEFINITION RULES

COVERAGE RULES
C1 ltemsfor plllng anclllanes shall be deemed to mclude dlsposaf of surplus materials unlessotherw~se stated

ADDITIONAL DESCRIPTIONRULES

M2 The lengths01 permanent iaslngr shall be measure0 fram me Commencmg Sdrface to tne bottom of the casmg

D l The dtameterused for classlfacatmnin the thwd d~wston shall be the d~ameter of the pdes

C2 ltems for permanent casmgs shall be deemed to mclude drtwng heads and shoes

A1 The dlameters of enlarged


bases for bored plles shall be stated i n Item descnpttons

A2 Materials. thickness and deta~ls of treatments and coatmgs shall be stated in item descnpt~ons for permanent casmgs Item descnptlons for cumng offsurplus lengthswhreh Include permanent casings shall SO state
M3 The mass measure" far remforcemenrshaml nc.uae tne mass of rclnforcemenl n laps

M4 The mass of steel remforcernentshall be taken as 0 785 kg/m per 100 mm2of cross-sealon (785 tIm31 The mass of other
relnforcmg materials shall be taken asstated in the Contract M5 Drlvtng extended poles shall be mcluded in the measurement O f the ltems for drwen depth in class P

D2 Thenommalstze usedfor classtficat~on in btem descnpt~ons for barremforcementshall bethe cross-sealonals~zedef!ned in BS 4449

C3 ltemsfor remforcementshall bedeemed to !ncludesupportmg remforcement

A3 Matenalsshall beststed in Item descrtptmns for remforcernent


A4 Deta#lSof couplers lor h gh renslle Steel relnforcemenl wn ch are expressly requued sna be state0 m (tern dercr~nttnnr for

D3 The cmss-secrmnalarea used for classzflcatmn in the t h ~ d dlv!slon shall be the crosssect~anal area of the pdes

CI ltems for pre-bonngshall be deemed to Include groutmg votds =&ween the pile and the bore
C 5 ltems for pde enenstonsshall ?edeemed to mclude the work lecessary to anach the enenslo" :Othe ptle

A5 ltem oescrlptlans for filimg hollowp~fer m t h concrete shall Sate the soectficatvm of the concrete

M6 Each group of {ternsfor pde


extensronsshall comprm (a1 an ltem for the number of 0 3 4 4 +I plle extensrons 1 ibl oneortwo ctemsforthe length afprle extensfom dwded mto the ranges of length gwen in the second dwslon IQ 3-454 +I
M7 Tne lcngrn o l ~ c r e extensrons measurco snad not ,nc uoe lengtns formed fram materm< arm no from cuntng off surplus lengths of other
plies

A6 Matenalsofwhchptle
extensronsareeomposedshall be stated in item descrlptlonsfor the~rlengrh

36 Itemsfor filfrng hollowprles ~ t concrete h shall be deemed to nclude removal of matenal from wlthln the plle before concretmg

M8 The length measured for tlmber pde extensmns shall tnclude lengths occupied by scarfed or otherfomts

M5 Dnwng extended pdes shall be mcluded i n the measurement of the !terns for driven depth in class P
M9 Each group of (ternsfor pde extenslonsshall comprlse la) an Item for the nurnberofpde extensronsia 5 4 * I (bl oneortwo !ternsfor the length o f p h extensmns dwded into the ranges of length gwen in the second dlvs.lon IQ 5 5-6 t l M7 The length ofpde exrensrons measured shall not mclude lengths formed from rnatertal arlslng fram cuttmg off surplus lengths of other
DII~F

D4 The mass used for llasslflcatlon in the thwd dwlslon shall be the mass of the pdes

X ltems for pre-bonngshall be ieemed to lncludegrautmg vmds letween the plleand the bore ltems for pde extensrons shall l e deemed to include the work lecessav to anach the extenson o the prle

h5 ltem descnpt~ons for filfmg hollow pries m t h concrete shall State the speclfncat~on of the mncrete
A6 Mater!alsofwh$chprle
extenstonsare composedshall be stated in Iterndescnpuonsfor thewlength

36 l t e m for ~ hrlmg hollowprier ~ t r concreteshall h be deemed to nclude removal of materlal from -~ wlthlnihe plle before concret8"g
~

CLASS 0

.
FIRST DIVISION

,-

...

k.

MlRD DIVISION Pre-bormg


! Jenlng '

6 lnterlockmg steel plies

I Number of plle extenslons i Length of p ~ l extenslons, e each length not exceed~ng 3m ; - exceedlng3m r Cunrnq off surplus lengths I preparing heads

m m nr m m m
nr

I Sectton modulus not exceed~ng 500 cm3/m Z 500-800 cm31m . p < 800-1200cm3/m I 1200-2000 cm3/m 5 2000-3000 cm3/m 5 3000-4000 c m 3 h 7 4000-5000 m31m 8 stated exceeding 5000 cm3/m

7 Obnructlons

p~

8 Ptle tests

reactions

2 Constant rate of penetration 3 Horizontal loadtng

2 3 4 5

1 Test load not exceed~ng 100 t 100-200 t

200-300 t 300-400 t 400-800 t 800 t


It

exceed~ng 1000 t

CLASS Q
bee rulesat head of classon page711

,,

_
COVERAGE RULES C5 hems for prle extenstons shall be deemed to mcfude the work necessary to attach the extenston to the plle ADDITIONAL DESCRIPTION RULES
A6 Materials of whlch prle extensions are composed shall be stated in ltem descrlptlons for thew length

MEASUREMENT RULES
M5 Drlvtng extended pdes shall be Included in the measurement of the Items for drwen depth in class P MlO Each group of Items for ode extens~ons shall camprose
(a) an ltem for the number of 6 4 *I ptle extensrons (0 rbl one or two Items for the length o f prle extensrons dbvtded ~ n t o the ranges of length glven in the second 6 56 *I dlvlslon ((1

DEFINITION RULES D5 The sectton modulus used n the thwd for classdlcatlon o dw~s~o shall n be the senton modulus of the ptles

M7 The length o f prle . sxtensrons measured shall not nclude lengths formed from natenal anslng from cutting off .urplus lengths of other poles .
H H The lengths measured for unlng off surplus lengths of nterlockmg steel pales shall be he mean undeveloped lonmntal lengths to be cut lncludmg lengths occupled by .pectal pdesl

MI2 Obstructmns shall be measured only for breakmq out rOCK or anhcml hard mate& encountered above the foundmg slratum of bareu p , e s

47 ltern dexr~pt$ons forptle 'ests shall identtw those whch we to preltmlnary pdes
48 ltern descnpnons for oadlng tests shall state the load Nhere the load is applled to 'akmg pdes ttem dernpftons ;hall SO state

74

C U S S R: ROADS AND PAVINGS


Includes Excludes Sub-base. base and surfacmg of roads, runways and other paved areas Kerbing and light duty pavements,footways and cycle tracks Traffic signs and markings Earthworks (included in class El -. Drainage (included in classes I, J. K and Ll ' . Fences and gates (~ncluded in class XI Gantr~es and other substantial structures supporting trafficsigns Maintenance of roads and pavings
~

, -

-.
'-1

FIRST DIVISION
1 Sub-bases, flexlble road bases and surfacmg I Granular mater~al DTp Specrfled type 1 2 Granular material DTp Spec~fled type 2 3 So11 cement 1 Cement-bound granular materlal j Lean concrete DTp Spectf~ed strength 3 Hardcore m2 m2 m mZ mz m2 mZ m3 mZ m2 mz m2 m2 mz m2 mZ mZ m2 m m2 m2 t

THIRD DIVISION
-~

1 Depth not exceeding 30 mm 2 30-60 mcl 3 60-100 mm 4 100-150 mm 5 150-200 mm 6 200-250 mm 7 250-300 mm 8 exceed~ng 300 mm

,'i

7 Geotexttles 8 Add~lronal depth of stated materlal


-

Sub-bases, flexable road bases and surfacmg

1 2 3 4 5 6 7

Wet m ~ macadam x Dry bound macadam Dense bttumen macadam Open texture bttumen macadam Dense tarmacadam Open texture tarmacadam Dense tar surfactng

3 Sub-bases. flex~ble road bases and


surfacing

1 Cold asphalt weanng course 2 Rolled asphalt 3 Slurrysealmg 4 Surface dresslng 5 Bmmmnousspray 6 Removal of flex~ble surface 8 Regulatmg course of stated materlal

1 Depth not exceedmg 30 mm 2 30-60 mm 3 60-1 00 mm 100-150mm 4 5 150-200 mm 6 200-250 m m 7 25C-300 mm 8 exceedmg 300 rnm *

4 Concrete Davements

Carrrageway slabs of DTp Speclfred pavbng qual~ty concrete 2 Other carnageway slabs of stated strenoth 3 0the;m sttu concrete slabs of stated strength
1

rn2 m2 m2

1 Depth notexceedmg 30 mm 2 30-60 mm 3 60-100 mm 4 100-150 mm 5 150-200 mm 6 200-250 mm 7 250-300 mm 8 exceedmg 300 mm mass not exceedmg 2 kg/mz 2-3 kg/m2 3-4 kg/m2 4-5 kg/mz 5-6 kg/mz 6-7 kg/m2 7-8 kg/mz stated exceedmg 8 kg@

Steel fabr~c remforcementto BS4483 5 Otherfabrlcre~nforcementof stated matertal

m' m2

6 Plan round steel barremforcementto BS 4449 t 7 Deformed hlgh yleld steel bar reinforcement to 8 s 4449 1

1 Nomlnal stze 6 mm 8 mm 3 10 m m 4 12 mm 5 16 mrn 6 20 mm 7 25 m m 8 32 mm orgreater


2

>,?:
~ &

'.

i -

8 Waterproof membranes below concrete oavements

-4
m

CLASS R
COVERAGERULES kDDlTlONAL DESCRIPTIONRULES

MEASUREMENTRULES

DEFINITIONRULES

, Departmentof Transport

C1 Items for work in tnls class mvolwng in sttu concrete shall be deemed to mcluoe formworr and flnlshes to concrete

i t ltem descnptmns for all :ourses of pavlng, road maklng naterlalsand oavement slabs ihall ~dent~fy the materral and rate the depth of each course or ;lab and the spread rate of lppltedsurfacefintshes
ltem d&npt~onsforwork in hrs class whlch is applled to Lurfaces lncllned at an angle !xceedtng 1O'to the horizontal ihall so state

M t T h e w nth of each eaurseof materoals shall be measure0 at the toosurfaceof that course Tne other mtrusjons rnto a course shall not be deducted where the area of the ~ntruston is less than 1 m'

MZ Theareaafaddmonal geotexr~lesm lapsshall not be measured

t3 The ryee and graoe of naterml shall be stated in Item lescrlptfons for georexrdes

M3 Theateas of addttlonal
fabncmnforcemenr in laps shall not be measured

2 Items for remforcemenrsna~l le deemeo to mclude suppanlng


.emforcement other than steel :upports to top reinforcement

94 kemdescnptlonsforsreel 'abncrernforcementto 8S4483 shallnatemefabrlcreference8n accordancewtth BS4483 orthe mre and mesh arrangement)" sccordancewnh BS4466 Item iescnptlonsforotherfabrrc wnforcementshall state the slzesand nomtnal mass per :quare metre

M4 The mass of steel rernforcementshall be taken as 0 785 kglm per 100 mm2of crosssectIan 1 7 85 tlm31 The mass of other remforctng msterlals shall be taken as stated i n the Contract

DZ The nammal stre stated in


ltem descrptansfor bar remforcemenrshall be the crosssectional swe defmed ,n 85 4449

M5 The mass ot rernforcemenr measured shall mclude the mass of steel supports tOqOP remforcement M6 The areas of addmonal warer~roofmembranes In laps shall not be measured A5 ltem descnpt~onsfor warerprwfmembranesshall state thew materials and lhlckness

-~ .
-~

. ...

-2

a"'-,-

-."
~

--. .

- ,

SECOND DIVISION

.-

FIRST DlVlSlON 5 Jomts ln concrete pavements

- THIRD DIVISION
2 3
4

~.

:.-e

:fi - .

.>a& 1 - - L t
'.A

,,

1 Long~tudmal lo~nts

1 Depth of lomt not exceedmg 30 mm,:

I ,

2 3 4 5 6

Expans~on lomts Contraction lolnts Warplng lolnts Bunlolnts ConstrUdIonIolnts

5
6

7 8

30-60 mm 60-100 mm 100-150 mm 150-200 mm 2OC-250 mm 250-300 mm exceedmg 300 mrn 12mCurved to radlu;not Quadrants -Drops Transitions

6 Kerbs, channels and edg~ngs

1 Precastwncrete kerbsto BS7263. Part 1 2

3
4

5 6 7
8

f~gure l(bl.(c)andLd) Precastconcretekerbsto BS 7263 Part 1 figurel(a)and(e) PrecastconcretechannelstoBS7263 Part1 f~gurel(flandLgl PrecastconcretechannelsmBS 7263 Partl figurellh) Precastconcreteedgmgsto BS7263 Partl hgure l(m1. Wand lpl lnsttuconcrete kerbsand edgmgs Asphalt kerbs Asphalt channels

2 3 4 5

e&eedmg 12 m n
-4

-. ---

-li
"

;- n ..'.-.

e n

7 ~lghtduty pavements

rn2

1 Granular base 2 Hardcore base 3 Tarmacadam 4 Rolled asphalt 5 B~tumen macadam 6 Densetar 7 in s ~ t u concrete of stated strength 8 Precast concrete flags to stated speclf~catton 1 Trafftc slgns 2 Surface markmgs

1 Depth not exceedmg 30 mm 2 30-60 mm

3
4 5

6 7 8

60-100mm 100-150 mm 150-200 mm 200-250 m m 250-300 mm exceedmg 300 mm


n
i i
P F i

1 Non-~llummated :
2 lllummated 1 Non-reflectmgroad studs 2 Refkctlng road studs

3 Letters and shapes


4 Cont~nuous llnes 5 lntermment lmes

(see rules at head of class on page 75)


a

. " .
>

' .
~

.. .,.--.,.=" .* . ... . .c -;su: r ~ ~


? .

.* - . . . , ..
t-

2 2 : L

MEASUREMENT RULES

DEFINITION RULES

COVERAGE RULES

DESCRIPTION RULES

M7 C o n ~ r r ~ c f l o n ~ o ~ n nbe shall measuredonly wherethey areat locatlonswhereconstructlon )arntsareexpressly requwed

A6 Thed~mensions.spacmg and natureof sealed grooves and rebates, waterstops, dowels and other mmponents shall be stated tn Item descr~pt~onsfor,olntsfn concretepavements

M8 Excavattonandf~lllngfor kerbs, channelsandedg~ngsshall beclassed asearthworks lclass El

edgrngsshall be deemed to ~nclude beds, backtngs.

d~menstonsof kerbs, channels and edgrngsand thew beds and descnptmns

M1 The wtdth of each course of materials shall be measured at tha tar, surface of that course The areas of manhole covers and other mtruslons onto a course shall no1be deducleo w e r e the area of the mtrunon s ess than 1 rn'
C4 ltems for trafftc slgns other than traffic slgns measured m accordance w ~ t h rule MI0 shall be deemed to tnclude foundations, suppornmg posts. excavation. preparation of surfaces, dtsposal of excavated material, removal of exlstlng sewces, upholding sides of excaval$on,backfilling, concrele. remforcemenr and Iomls

M9 Lengthsmeasuredfor Itnear surfacemarkmgsshall exclude gaps in mtermlnent makings


MI0 Itemsfors~ppoTtgantr~e~ and other substanttal structures assoc~ated wlth rraff,cs~gns whtch areconstructed in concrete, structural metalwork orother

A8 The maternal, size and dlaaram number taken from T&C srgns, regulatronsand gener. I drrecttons, ~ssued by the Depamnent of Transport shall be stated in Item descnptlons for traffkstgnsand surface markrngs
AS Theshape and wlour of aspeasshall be stated in Item descr~pttons for reflectmg mad studs

NOTE

Eanhworks far kerbs. channeisandedgrngr may be mcludcd in the rems tn ths class provldcd that the work lncluded is ldentlfied in the ltem descrlptlons acd that appropriate statementsategweo in the Preamble in accordance wnth paragraph 5 4

CLASS S: RAIL TRACK


Trackfoundations, ra~ls. sleepers. fittings. switch- and crossings includes Overhead class M) . ~ ~ ~ l u d ~ s . ,- crane rails lincludedin etrackfoundations (included in classes F and G II Concret,

FIRSTDIVISION

HlRD DIVISION m3 m' mZ mZ mZ

--. . -

.,

SECOND DIVISION

--

..

- -.

1 Track foundations

..

"

1 Bottom ballast 2 Top ballast 3 Blmdtng 4 Blankets 5 Waterproof membranes

--

. -

1 Bullhead rails 2 Flat bottom ralls k crane rails 3 ~ o c and 4 Check and guard ralls 5 Conductor rads

1 Plam track I Turnouts i Diamond crossings

m m n~ Bufferstops Retarders Wheel stops Lubrtcators Swttch heaters 6 Sw~tch levers


I 2 3 I 5

8I Sundr~es

-3 Llftmg, packmg and s l e w w


nr
I Bullhead rad track 1 1! Bullhead rail track wlth turnout I Flat bottom rall track AI Flat bottom rat1track with turnout i Bufferstops I

-I Bullhead ralls Flat bottom ra~ls 3 Dock and crane rails Checkand guard ralls !5 conductor rails I6 Twlstralls

2 3 4
n r

20 kglm 1 Mass not exceed~ng 2 ~ 3 kglm 0 3&4C kglm 4C-50 kglm 5 exceeding 50 kglm
1 Timber 2 Concrete

7 Sleepers

1 Turnouts 2 Diamond crossings

1 2 3 4 5 6 7

Chatrs Baseplates Pandrol rail fastenings Plam f~shplates lnsulatedfishplates Conductor rad ~nsulators Conductor rad s~de ramps

nt nl
1 Buffer stops 2 Retarders 3 Wheel stops 4 Lubricators 5 Swttch heaters 6 Sw~tch levers 7 Conductor rail guard boards

8 Sundr~es

CLASS S

-.

MEASUREMENT RULES M1 The volume of top baltasI measurea snall tncluoe the volume occuplea I., sleepers M2 The areas of addmonal waterproof membranes i n lap; shall not be measured M3 Thelengthoftak,nguppla,n trackshall be measured along the centreheof the trackltwo radl an0 shall exclude lenatns

DEFINITION RULES D l Bottom ballastshall be ballast placed before the track IS laid D2 Top ballastshall be ballast placed afterthe track is lald

COVERAGE RULES

ADDITIONAL DESCRIPTION RULES A ltem descrtptlons for track foundat~onsshall statethe matenal

A2 ltem descrlptlonsfor
blmdmg, blanketsand waterproof membranesshall state them th~ckness C1 ltems for takrng up turnouts and d~aamondcmssmgsshall be deemed to mludecheck, guard and conductor ralls A3 ltem descrlptronsfor takmg up trackshall state theamount of dtsmantlmg, defa~ls of disposal of the track and thetype of rail. sleeper and lomt A4 ltem descrlptlons for takmg up bufferstopsshall state thew approxmate weight and type of COnStruCtlO"

M 4 The lengths of takmgup check guard and conductor rads shall bemeasuredalongthe lengthsofthe rall lone radl anu snall excluoe lengths w l n m turnoutsand ommano crossmgs

D3 The length of track stated in


tem descrapttonsfor linmg, oackmg andslewrng trackshall be :he length measured along the :emre lhne of the track (two radl nndshall be taken overall roads jwltch roads shall be measured from the toes of swttches

ltems for bfmg, packmg and slewmg trackshall be deemed to include openlng out, packtng and box~ng in wtth ballast and msertmn of closure ratls

A5 ltem descrlptvxs for Bftmg, packmg andsfewtng tradsha.1 Ratethe lenoth of track. the maxlmum dystanceof slew and the maximum lift A6 Whereextra ballast is requtred Item descrlptlonsfor bhmg. packmg andslewrng shall SO state

M5 The mass measured for supplymg rarlsshall mclude the mass of twlst ralls M6 F!shplatesshall be measured by the number of pars

Q Items for supplyrngshall be


deemed to mclude delwew of components to the Sate
C4 ltemsfor supplymg sleepers shall be deemed to mcludefmngs anached by the suppher

A7 ltem descnptlons for supplymg sleepersand fittmgs shall state the type ltemsforsupplymg sleepers shall statethesm of the sleepers and ldentlfv the fin!nos whtch are attached b ; thesupphr A9 ltem descr$ptlonsfol supplymg radsshall state elther tne s e c ~ ~ a reference n and the mass per metre or the crosssecrmnal domenslons and the .. . mass per metre

C5 Items for supply~ng hmngs shall be deemed to ~nclude ftxlngs, keys, cllps, bolts, nuts. screws, spikes, ferrules, track C W C U K~nsulators, ~ pads and condudor tall insulator paekmgs

M7 Conductor rat! guard boards shall be measuredeach shde of the red

Q ltems for supplymgsha~, be aeemea 10 tnclude oewery of components to tne S.te

A10 Itemdescnottonsfor supplytng turnoursand dtamond cmssmgsshalfstatethe type A l l ltem descnpttons for supply~ng sundnesshall state the A12 ltem descnptlons for supplymg bufferstopsshall sate iherrappmxrmate welght

C6 ltemsforsupplylng turnouts
and d,amondcrossrngsshall oe aeemedta mcluoet~mbers. fitungsandcheckra~!~
C7 Items for Supply8ng condunor radguard boardssnall be deemed to mcluas hxmos

-FIRST DIVISION 6 Laylng SECOND DIVISION 1 Bullheadrads 2 Flat bottom ralls 3 Dock ralls 4 Crane ralls THIRD DIVISION 1 Plam track 2 Form curve in plam track radlus not exceedmg 300 m 3. Form curve in plam _ ' . exceeding 300 m track rad~us
4 ' Turnouts

m
,

.-

m m

5 O~arnond crossings 7 Welded jomts


8 Spot re-saeepertng

nr

nr
nr ni

5 Check ralls
6 Guard rails 7 Conductor ralls

1 Ball 2 Length ends 3 S~de ramps 7 Welded lolnts


-

m nr
nr nr
-

1 2 3 4 5

Bufferstops Retarders Wheel stops Lubr~cators Swltch heaters 6 Swltch levers 7 Conductor rat1guard boards

nr . nr ni nr ni

nr
rn

IEASUREMENT RULES 1 8 The length of laymgplarn ackshall bemeasuredalong the wrelmeofthe track(two raall ~dshall mcludethe lengths :cupled byturnoutsand amandcrassmgs 1 9 The lengths of lay~ng check, uardand conductorrarlsshall be leaswed along the lengths of the 181 lane ralll 1 7 Conductor rarlguard boards >allbe measured each slde of ,e rad

DEFINITION R U ~ S . -

. - -".
"2

"A...,

.- .
3.
) .

?.

; -'.,-..'c? ,
COVERAGERULES

.-

--.-,

"

ADDITIONAL DESCRIPTION RULES

- .

0 4 Spotre-sleepenngshall be , replacing sleepers in pre. fabrlcated track notsupplled by thecantractor

C8 ltemsforlay,ngshall be deemed to mludeworkcarrled autafrer delwery of components to the Sne or, where track is not to be supplied bythecontractor, to the locatlon stated in accordance wnh rule A13

A13 ltem descrlpttons for laylng rall track whlch 1 s not to be suppl~ed by the Contrano. shall state tne farm in whlch it ts lo be suppled and the locatlon A14 ltem descnpttons for laying plarn trackshall ldentlfy prefabricated lengths

W Itemsfor/aymgshall be
deemed tomcludelaylng sleepers,fmmgs. twist allsand shon lengths betweenturnouts anddlamondcrosslngs C10 Itemsfor laymgswttches and crossmgs shall be deemed to mclude laymg check ralls

A15 ltem descrtpt!onsfor layrng radsshall state thetype and mass per metre of rall and the typeaf jomt and sleeper
A16 ltem descrtpt~msfo, bymg turnoutsand d,amondcmssmgs shall statethew typeand length

A17 ltem descrtpt~onsfor weldedlomt~~hall state the rad sectlon and the type of weld A18 ltem descrlptrons for layrng buffer srops snall state tnelr apvroxmate welght

82

CLASS T: TUNNELS
Includes Excludes:
-

Excavat~on, linlng and securing of tunnels, shafts and other subterranean cavities Geotechnical Drocesses carned out from the ground surface (included i n class C) - -- illi in^ within iunnels (included in class EJ . . - Reinforcement in i n situ lining (included i n class G) ,J , K and L) Pipe laying i n headings, tunnels and shafts (included i n classes I ' Cut and cover tunnels
.

SECOND DIVISION
-

I Tunnels in rock

2 Tunnels in other stated matenal 3 Shafts tn rock $ Shafts in other stated materlal 5 Other cavttles in rock ; Other cavltles in other stated matertal

m3 m3 m3 m3 m3 m"

I Stated dtameter. notexceedrng 2 m '

! I I i i
I

2-3 m
3-4 rn 4Sm 5-6m 6 7m 7-8 m exceedmg 8 m

I I ;
I

7 Excavated surfaces in rock 8 Excavated surfaces tn other stated mater~al

mz
m

ASUREMENT RULES
Tunnels constructed by cut 1 cover are excluded from thts 35 The earthworks. ~n sltu ~crete and other components unnels constructed by cut and rer shall be classed xopnately

DEFINITION RULES
D l Transltlons, breakaways and lntersectjonsbetween tunnels and shafts whlch tnclude work jutstde the normal profiles ofthe tunnels and shafts shall be classed as othercavlt!es

COVERAGE RULES

ADDITIONAL DESCRIPTION RULES


A1 Where tunnelhng-wtrk is expressly requmd to beexecuted under compressedair. dems shall be so descrrbed item dexrtpnons shall statethegauge pressurein stages The firststageshall be gauge pressure notexceedmg 1 bar Subsequent stagesshall be gauge pressures In lncremenfs of 0 4 bars. The orowsoon ana ~- . operation of plant and servlces assocxatedwlth the use of compressed arr shall be classed as spenfied requtrements in class A
~

A 2 ltem descnpttons for excavatton and llnmg of other cav,tnesshalf ldenttfy the cavw
1

Thevolume measured for cavat,on shell be calculated to payment lhnes shown an the lwmgs or, where no payment es are shown. to the net nensmns ofthevolumes to be & & Excavatloo lother than erbreakl outside the normal ,ss-sectional proflle of tunnels d shafIs shall be classed as cavatlon of other cavmes 3 An lsolated volume of rock curnng wlthtn other marenal to excavated shall not be easured separately unless its lume exceeds 0 25 m3 The area measured for cavatedsurfacesshall be the eaofthepaymentsurfaces o w n on the Drawings or, where I payment surfaces i r e snown e net areas of the surfaces of the >,unesto oe excavate0
4

D2 The a ametet used far :la~shcat~on and slateo in tern 3escr ol onssnall be thecnernal 3,arneierof the extavatlon crosssectcon of tunnels, shaftsand other c w l t r e ~

C1 ltemsforexcavatronshall bedeemed to ~nclude dtsposal of excavatedmaterial offthe Sbte end removal of dead servtees unlessotherwlsestated in ttem descrtpttons

A3 ltem descrvmonsfor
excavatlonshall state whether tunnels and shafts are strarght. curved or tapered ltem descrlpt#ons far excavafronsnall state tne gradlent of tunnels s.opmg at a gradlent of 1 in 25 or steeoer and the inc matton to the ve-nkal of melmed shafts

A4 Where mater~al is far


disposal on the Site the locatlon of the dlsposal areas shall be stated in !tern descnptlons for excavatmn Where excavated rneterlel is to be used as f~lllng, Item descnptlons shall so state
A5 Detalls of 1811 ny for volds causea by overbreakshal be stated in tem descrmtons for

A6 Where tunnels, shaftsand


othercavmesare not of clrculal cross-sectton,them maximum external drmensron of crosssectton shalt besuostttuted for the d ameter and the r external cross. senlonal omenssonsshall be
!',I

~~

CLASS T

FIRST DIVISION

,I
-.

-..-..- -.--.... -. .. ..
".
.

SECOND DIVISION

THIRD DMSION
- . - .

1 flockbolts.

1 Mechan~cal 2 Mechan~cal grouted 3 Pre-grouted~rnpacted 4 Chernlcal end anchor 5 Chem~cal grouted 6 Chern~cally f~lled 1 Steel arches supply 2 erection 3 T~rnbersupportssupply 4 erectlon 5 Laggtng 6 Sprayed concrete 7 Mesh orlmk

-.

<-

,I

2 Internal support

r
rc rc m rc
r
I

I
3 Pressuregroutlng

I
I

'

1 Sets of drillmg and groutlng plant

2 Face packers

3 Deeo oackers of stated size I 4 ~r~lil and n'~ flushmg to stated d~ameter i 5 Re-dnllmgandflushtng I 6 lnject~on of grout materials of stated composltlon 4 Forward probmg m

CLASS T

\il~ 1;
II
I
'8

1 :

MEASUREMENT RULES
M8 Both temporary and permanent supporrand stab,lrrat,onshall be measured

DEFlNlTlON RULES
D3 Remfarcmg materials added to the mcx for sprayedconcrete
shall not beclassed as remforcement

COVERAGE RULES
C4 Items for facepackersshall be deemed to mclude collarrnp secunng and makmg good lrrltngs on completlan

ADDITIONAL DESCRlPTlON RULES


A14 ltem descrlptlonsfor rock boltsshall state thew sm, type, shank detatl and maxtmum length A15 The materrals used for ' laggmg and for packtng or groutlng behtnd laggmg shall be stated in ttem descrlpttons A16 ltem descrlptnons for sprayeo concrete support~hall Yate the soeen7catmnof the
reonforced and the m l n t & n thckness ltem descrlpttons for mesh or hnksupporfshall state the slzeand massof mesh or lmk fabrtc

M9 The mass measured for sreel archesshall be calculated as set outln class M.Thevolume of tmberaupportmeasured shalrbe thevolume of support in umber cnmponents calculated as set out In class 0 The areaof sprayed concretesuooortshall be .. measured atthe payment lmes shown on the Drawmgs or. where no payment lmes are shown. to the net dlmenstons of the supporr to be provlded MI0 The numberof facepackem and deeppackersmeasuredshall be the number of mlecttons MI1 The mass measuredfor' lnlechon ofgrout rnatenalsshall not ~nclude the mass of mtxlng wafer

05 Mesh or I nx remforcement in 5praye(lconcretesup~onshall be classed as mesn or lmk suppan

A17 The lengthsof holes shall 3e stated i n stages of 5 m in ttem iescrlptlons for drdlmg and re-dnllmg holes for pressure grouting and i n Item descrgpt8ons :or forwardprobmg

CLASS U: BRICKWORK. BLOCKWORK AND MASONRY


Excludes Brickwork i n manholes a n d other brickwork incidental to p i p e w o r k (included in class

Brickwork m sewer renovation (included in class Y)

K)
. Z

L .

> - :

2, %

FIRST DlVlSlON 1 Common brickwork 2 Facmg br~ckwork 3 Engtneermg br~ckwork 4 Llghwetght blockwork 5 Dense concrete blockwork 6 Art~ftc~al stone blockwork 7 Ashlar masonry 8 Rubblemasonry .

XOND DIVISION Thtckness not exceedmg 150 mm 150-250 mm 250-500 m m 500 mm-1 m exceedtng 1 m mZ m2 mz m2 m3

HlRD DIVISION

.Verttcal stra~ght walls


Ven~cal curved walls Battered strafght walls Battered curved walls ~e facma l - rtlca " to concrete Banerea facmg l o concrete Castng l o metal sectlons
~~

Columns and plers of stated crosssecttonal dmens~ons

-m

Surface features

Copmgs and s~lls, materlal stated ! Rebates and chases I Corntces I Band courses i Corbels i Pilasters 1 Pl~nths 3 Fa~rfacmg

I Jomt retnforcement Z Damp proof courses 3 Movement lolnts 1 Bonds to extsting work 5 lnfdls of stated thickness 6 Ftx~ngs and ttes 7 Butlt-m popes and ducts cross-secffon area not exceedmg 0 05 m2 8 stated exceedmg 0 05 m2

MEASUREMENT RULES

IELlNtTlON RULES

COVERAGE RULES

ADDITIONAL DESCRlPTlON RULES

M I Each skm of brxkwork is in blockwork or masonry wh~ch cavttv o r ~ o m p o s ~ t e ~ o n ~ f r ~ ~ t t a n shall be measured


M2 Volumes and areas measured far bnckwork, blockwork and masonry shall include the volumes and areas of Iomts. and exclLoe tnase of caplngs an0 sil s No dadwtnn from o r a a o r m n 10 .vo~..me+ann .- . . .areasmeasured shall be made far intrudlno or orarectlno surface feature;~a'deduct!on from the volumes and areas measured shall be made for holes and opentngs in walls or surfaces each n crossnot exceedwig 0 25 m2d Sectronal area

M3 Mean d mens ansshall be JS~O to mculatc the areasana vo umes of walls. lactnn " to concreteand casmg to metal sectronsandthe hmghts of columns and mers

)1 Wallsor facmg battered on me or both sides shall be classed IS banered wallsor battered

C1 ltemsfor masonryshall be deemed to mclude fatr facing

A ltem descrlptrons for walls. faclng to concrete, casmg to metal semins, columns andp;ersshall

lassed as precs

Standard speci~;at!ons

) 3 In determmng the
h cxnesses of r v a k lacrng m a ,3rmg, the presence of surface eatdessna.t oc gnored
1 4 The th~cknesses of battered vall~shall be thetr mean h~cknesses

A2 ltemdernpt~onsfarmsonv walls, facmg to concrete, casmg to metalsectrons, columnsand p!ersshallstatethesurfacefrntsh


A3 The bondmg panern, Wpe of monar andtype of p n t l n g and oomlmo " shall be stated in !em descraptlons for walls, factng to concrete casrng to metal semons, columns and prers
A4 ltem descrtpt8onsfor walls, faemg to concrete. casrng to metal sect,ons, columns andprers whch are in c a v q or compos~te construmon shall so state A5 The nommal thtckness of walls, facmg to concreteand casmg to metalsecnonsshall be n ztem descr~pttons stated i

1
1i 8 1

i;
8,

M4 The lengths of surface features measured shall be mean lengths The areas measured for f a r fanngshall be those expressly requ~red and shall be measured at the face

1 5 Coldmns an0 Pers attachca 3 walls orfaclng of the same nalerlal shad be classes as

A6 Item descr~pttons for surface featuresshall mclude suffment detad to tdentrty specla1 masonry and specla1 or cut brccksand blocks The spacmg of mtermntent surfacefeatures shall be stated in item descr!pt~ans A7 Thecross-sect~onal d~mensmnsaf surface features shall be stated in ttem descrlpttonswhere the crosssectlanal area of tne surface feature exceeds 0 05 m'

M 5 The length of addmonal rnaterlal in lapsoflolnr rernlorcemenrand dampproof coursesshall not be measured M 6 The areas of fixmgsandt,es measuredshall betheareasof Orlckwor~. blockworkOrmaSOnry Flxedort~ed Wheretwoareasof br~kwork. b l o c ~ w o r ~rnasonw or arefixed ortledtoeachother.
onlythesmallerofthetwoareas shall bemeasured

C2 Itemsfor butlt-!n prpes and


ductsshall bedeemed to mclude thew supply unless otherwise stated

A8 The materials and dlmenslons of p n r remforcement and damp proofcourses the matercals of mfdlsand the type and spacmg of f!x,ngs and ties shall be stated in Item descnptlons A The dtmenstons and nature of components bncludmg face or mternal detads shall be stated rn ttem descrnptlonsfor movement 10mts
A10 The lengths of butlt-I" plpes and ducts shall be stated in ttem descnptlons where they exceed 1 m

'

CLASS V: PAINTING
*
-w-P

: * * : P

"

---

lnclud&,,>-, l n s i t u painting ' ' Excludes. -Painting carried o u t prior todelivery of components t o t h e Site

--

..

- . .- --

--

--*a:

,.

.. FIRST DIVISION
1 Lead, xon or ztnc based prlmer pamt 2 Etch prmer palnt 3 011 oatnt 4 gloss palm 5 Emuls~on paint . . 6 Cement pamf . - 7 Epoxyor polyurethane pamt 8 B~turnmous or coal tar palnt

* - u.
; "
%"

. w ' * .
2 % L

.-

"

csri pi,

. , .

.,+
?

.~ ,
.
%

SECOND DIVISION
1 Metal. otherthan rnetal secttonsand

MlRD DIVISION
I

-Upper surfaces ~nchned at an angle ":'


not exceedmg 30" to the honzontal

, .-

kid

2 3 4 5 6

p~pework T~rnber Smoothconcrete Roughconcrete Masonry Brtckworkand blockwork

m 3 Surfaces lncllnedafan an$le&cee$ mg 60"tothe honzontal . .-- - m 1I Soffn surfaces and lower surfaces lncl~ned at an angle not exceedmg 60" to the horizontal * % ,, 5 Surfaces o f w ~ d t h not exceedmg ,' 300 mrn r 1 Surfaces of wldth 300 mm-1 m

Z Upper surfaces tncltned at 30b0"to:, the horizontal

' I

n,

--

3 Isolatedgroupsof surfaces

-MEASUREMENT RULES M I NOdeductron from theareas measured shall be made for holes and openmgs in the palmed surfaces each not exceeding 0 5 m%ln area DEFINITIONRULES

.&.>*

'

COVERAGERULES

'

C1 items forpa~ntmg shall b e deemed to mclude preparation of surfaces before pamtlng

A1 Item desnphans for


palntmg shall statethe materlal used and ellherthe number of coats orlhe film thickness. Preparat~on of surfacesshall be ldenttfled in ttem descnptlons where more than one rfpe of preparanon is spec~fied for the same surface

M .

M2 Surfaces of wotn not exceeomg 1 m shall not be ommgulsned oy inc matron

M3 lsolatedgroupsofsurfaces of different shape or dmenslons shall be measuredas separate ,terns M4 In calculatmg the pamted area of metalsect,ons the presenceof connectmgplates. brackets, nvets. bolts, nutsand stmolar pro~ecfcons shall be hgnored M5 Tne area mcasureo for palntmg pnpeworksna~l be tne engln multlplleo by Ihe g nhof each lenolh of o oeor laoaedo oe for flanges, valves, other proleamg flnmgsand hangers

D l lsolatedgroupsofsurfaces shall be classed as such only where the total surface area of each orouo does not exceed 6 m2

A3 item descrrpttons for molafed


groups ofsurfacesshall ndentlfy the work to be panted and 1 s locatlon

U Palntlng of meralsectrons shall be deemed to rnclude pamtrng the surfaces of conneamg plates, brackets. rwets, bolts, nuts and slmllar projecttons
deemed to h u d e pamtmg the surfaces of flanges, valves, other prolectmg finrngs and hangers

NOTE Pamtlng may be measured by the number of rsolatedgroupsofsurface~ofthesame shape anddmenskms mstead of by the length or area of theseparate
surfaces

1,

,I

YL

CLASS W: WATERPROOFING
Includes Excludes: Damp proofing,tanking and roofing Waterproofedjoints (includedin classesC, G. H. I, J. K. R. 1 , U, X and Y) - . Dampproof courses in brickwork. blockwork and masonry (included in class U) . . - .- Surfacefinishes and linings in simplebuilding works incidentalto civil engineeringworks(inc1uded in d a s d

FIRST DIVISION
1 Damp prooflng 2 Tankmg 3 Roofing

SECOND DIVISION
1 Asphalt 2 Sheet metal 3 Waterproof sheetmg 4 Waterproof coatlng 5 Rendermg in ordmarycement mortar 6 Rendermg in waterproof cement monar 7 Tiles

THIRD DIVISION
1 Upper surfaces mclined at an angle not exceedmg 300 to the hor~zontal 2 Upper surfaces mcllned at 3O04O"to the horizontal . 3 Surfaces mclmed at an angle exceedmg 60'to the horizontal 4 Curved surfaces 5 Domed surfaces 6 Surfaces of w ~ d t h not exceedmg 3W mm 7 Surfacesof wldth 300 mm-1 m

rn2

- .

m2 m2 m2 rn2
rn

rn
nr

8 Isolated groups of surfaces

4 Protectwe lavers

1 2 3 O 5

Sand asphalt Flex~blesheetlng Sand sand and cement screed Tiles

at an angle 1 Upper surfaces ~nclmed rn2 not exceed~ng 30" to the honzontal 2 Upper surfaces ~nclmed at 30-60'to the honzontal mi 3 Surfaces tncl~ned at an angle exceed. mg Wotothe hornontal 4 Curved surfaces 5 Domed surfaces m2 6 Surfaces of w ~ d t h not exceedmg 300 mm ~r 7 Surfaces of wldth 300 mm-1 m rr

8 Isolated groups of surfaces

n r

5 Sprayed or brushed waterproofmg

m2

93

,"

CLASS W
I

.A

ADDITIONAL DESCRIPTIONRULES
A1 ltem aescrlpt!ons far waterproofing shall state the materials used andthe number and thlckness of coatmas or layers.

MEASUREMENTRULES M1 The areas measured shall be those of thesurfaces covered No deductlo" from the areas measured shall bemade forholes and menlnos in the watemmafed surfades eagh not exceed& 0 5 m2~narea
M2 Surfaces of wtdth not 4 exceedmg 1 m shall not be dtstlngu~shed by incllnat~on or by curvature

DEFINITION RULES

COVERAGE RULES

C1 Items for waterproofmg mall


be deemed to mcluae preparing surfaces. farmma ~amts. avertaos. edges&di& cambers tofalfsor
'

D l Waterproofing shall be classed as to curvedor domed surfacesonly wherea radius of curvature of thesurface is less than 10 m

M3 Waterproofmg classed asto curveaor dornedsurfilcessha~l


not be dmnoushea bv

M4 Isolated groups of surfaces


of drfferent shape or dlmenslons shall be measured asseparate Items

D2 Isolated groups ofsurfaces shall beclassedas suchonly "here the total surface area of 3ach group does not exceed 6 m2

42 ltem descr~pttons for rsolated groupsofsurfacesshall jdent~fy :he work to be waterproofed and state its locaton

M2 Surfaces ofwtdth not exceedmg 1 m shall not be dlstlngu~shed by mclmatIonor by curvature


M3 Waterproofmg classed as to curvedor dornedsurfacesshall not be dmngulshed by mclmatlon

Dl Waterproofing shall bc
classed as to curvedor domed of smfaceronlv . . ...-, where a rad.us ~ curvature of the surface is less than 10 m
~

M4 lrolateo groups of surfaces


of alfferent shape or amenslons shad oe measured as separate

D2 lsolareo groups of surfaces snall be classea as suchonly where the total sudace area of each group does not exceed 6 m'
~ ~

42 rem descrlptmns far solared groupsof surfacesshall dent ty Ine worr to be waleroraofed and state its location

NOTE
Waterproofmg may be measured by the number of ciolatedgroupsofsurfacesof the same shape and d~mensmns mstead of by the length or area of the separate surfaces

CLASS X: MISCELLANEOUSWORK " " .


Includes Fences, gates and their foundations Drainageto structures above ground ., Rock filled gabions
\-

- - -., ,-

FIRST DIVISION
1 Fences

THIRD DIVISION m 1 Timber post and rad

=rj

2 Tlmber post and wlre 3 Concrete post and wlre


4 Metal post and wlre 5 Coated metal post and wtre 6 Tlmber close boarded 7 Metal guard ratls 8 Metal crash barr~ers

exceeding 3 m

.*

2 Gates and stlles

nr

1 Timberfleld gates

2 limber wlcketgates
3 Metal field gates 4 Metal wlcketgates 5 Stlles

1 Width. not exceedmg 1 5 m 2 152m 5 2-2 5 m

6 7

4-5 m exceeding 5 m

Dramage to structures above ground

1 Mild steel 2 Cast iron 3 Plastlcs 4 Asbestos cement

1 Gutters

2 Fmngs to gutters 3 Downp~pes


4 F~ttlngs to downp~pes

4 Rock filled gabtons

1 Box of stated sjze 2 Mattress of stated thickness

nr m2

...
~Z

%-

..
'

MEASUREMENT RULES M1 Lengthsof fences5hall exclude lengths accup~ed by gates and stiles

DEFINITION RULES

:- COVERAGERULES

* - ..

. . ,
I

ADDITIONAL DESCRIPTIONRULES A1 ltem descrlpttons for fences whlch are erectedtoa curve of rad~us not exceedmg '00 m or on a surface lncllned at an angle excezdlng 10' shall so state

D l The hetghts used for classlf~catlon of fencesshall be measured from the Commenctng Surface

Cl ltemsfor fencesshall be deemed to mclude excavat!on, preparatton of s~rfaces~d~sposal of excavated matenal. upholdmg sldesof excavatean, backfkllmg. removal of exlstlng servces. concrete, formwork and reinforcement
Q Itemsfor fencesshall be deemea to mlude en0 posls. anale oosts. stra~n~na oosts and

A2 The types and pnnctpal


dunenstons of fencesand of thesr foundat~onsshall bestated in Item descrtpt~ons

D2 The wldth use0 for 01 garesandst~les clas~tftm shall be measurea between the

A3 The types ano prtnctpal dlmenslons of gatesandsnles shall be stated in m m


A4 Itemaescr,ptmns for gates composeaaf morethan one leaf shall laentlfv thenumber of

D3 fimngs toguttersshall tnclude bends, angles, stop ends and outlets Flttlngs to downppes shall include bends.swan necks. shoes and roof outlets fixed dlrenly to downp~pes
04 Rock filledgabrons exceedmg 300 mm thlck shall be classeo as box gabfans and those nor exceedmg 300 m m l h m as manrersgab~ons Fdl ng snall be oeemeo la be .mooned unless othewse stated

C3 Items for dramage to


strucruresabovegroundshall be deemed to lneludesupports

A5 ltem descrtpttonsfor dramageto structuresabove groundshall statethetype. pnnclpal dtmens~onsand materlalsofthe components
-

A6 ltem descrrpt!onsfarrock fllledgabronsshall state thetype andgradlng offnllmg, thesueof mesh and thedrameterof mesh wore Detatlsof protenwe coatlngsshall bestated

--

--

--

- - ~

~.. -~..

AND WATER MAIN

AND ANCILLARY
, -,

Preparationand renovationof existing sewers and water mains New manholeswithin thelengthof exist~ngsewers Worktoexisting manholes Grouting carried outfrom outsidethe sewer (includedin classC) Excludes New pipework (included in classes i-Ll Newfitt~ngsandvalves used in water main renovation (includedin class J) - ' Extrasto excavation and backfillingfornew manholesand other chamberslincluded inclassL) Includes
.

s L

~.

---

-. .

. -

.-

- - - -

. .

. .

~:>*

.- -

FIRST DIVISION
1 Preparatton of ex~stlng sewers

SECOND DIVISION 1 Cleaning

THIRD DIVISION

rn

1 Laterals. bore not exceedmg 150 m m

2 Laterals, stated profile and slze exceed11


150 m m in one or more dunenston

3 Other stated arttflcral mtruslons


3 4

Closed-c!rcuttteIevlslonsuweys

m nr m
1 Bore not exceedlng 300 m m , 2 Stated proflle and size exceeding 300 n In one or more dlmenslon

Pluggtng laterals. mater~als stated Fdlmg laterals and other pipes, materials stated

'

6 Local mternal r e ~ a ~ r s

nr

1 Area not exceedmg 0 1 m' 2 01425mZ 3 stated exceeding 0 25 m2

2 Stabhratlon of exlstlng sewers

1 Polntlng. materials stated 2 Plpe jomt sealmg, materlals stated

m2
nr

3 External groutmg

1 Number of holes 2 lnlectlon of grout, rnaterlals stated

MEASUREMENTRULES
-

DEFINITION RULES

COVERAGE RULES

ADDlTlONAL DESCRIPTIONRULES A Thelocatson of the work in each Item orgroup of ttems shall bestated so that the work can be ldentlfied by referenceto the Drawmgs

M1 Lengths of sewers shall be measured along thev centre lhnes between the msde surfaces of manholes but shall exclude lengths occup~ed by plpes and flttlngscomprwng backdropsto manholes
M2 Whereworklsexpressly requlredto becarrtedout by , excavatton, crossings. remtatementandotherp~pework anclllarlesshall bemeasured in class Kand extrasto excavatton and backfallmg shall bemeasured I n class L

C1 ltemsforworkwhchis
expressly requdredto becarred out bvexcavatlon shall be deemedto tnclude preprratlon of surfaces, d~sposal of excavated materlal,upholdlngsldesof excavatlon, backfillmg and removal of dead sewlces

A 2 Prlnctpald~mens~ons and profiles of sewers shall be Rated tn Item descrtptlons A3 Workwhich 1 s expressly requlredto becarrledout manually orby remotely wntrolled methodsshall each be sostated in ltemdernpt~ons
A4 ltem descnptlons shall identify workwhmh isexpressly requaredto be camed out by excavationand [except for manholes) shall statethe maxlmum depth of excavauon in slagesof 1 m measuredto the lnveRofthesewerorwater maon

renovatronandlareralJshall sate thematend formmg theexmng sewer orwater mam

C2 ltemsfor cleanrngshatl be deemed to ~nclude makmg good resultant damage

I 1 ltemsshall beclassedas
-emowngmtrusmns where ntruslons mtothe boresof ?mstlngsewersare to be removed morto renovation

W Items for removlng !ntr~~!onsshall be deemed ta include maklng good

96 ltem descnpt~ons for removrng ,ntrcis!onsshall state the materlalsformmg the ntrus~ons

12 The areas stated in item


iescrlpttons for local rnternal .epawsshall be the fmshed iurface areas
M3 No deductnon shall be made from the areas of sewer surfaces measured for porntrngfor openmgs or voids each not exceedmg 0 5 m2~n area

C4 ltemsfar local mternal reparsshall beaeemea to mcluoe cunmg out and rcpomtmg

C5 Items for polnnngand pme lomf sealrngshall be deemed to include preparatton of p n t s

M4 Externalgro~tmgshall be
measured only where groutmg is expressly requred to be carned out as a separate operatlon from annulus groutmg (Y 3 6 01

13 Externalgmunngshall be 3routlng of volds outsade the lxlstlng sewer from wlthm the amstmg sewer otherthan votds grouted in thecourse of annulus lroutlna

47 Where enernalgmurrng 1 s :arned outthrough ptpelomts. descnottons of ftems for the numb& of holes shall so state

CLASS Y

THIRD DIVISION . 3 Renovatton of extst~ng sewers


c

_ ,.

. ..
:.L

1 Polyethylene 2 Polvpro~ylene

1 Polyethylene 2 Polypropylene 3 Glass remforced plastlc

3 Segmental llnlng

3 Glass remforced plast~c 4 Glass remforced concrete 5 Cast gunlte 6 Resm concrete

I Stated proprtetary h n g i Gunlte coatlng of stated thickness 5 Annulusgrout~ng, materials stated

m m m3

Laterals to renovatedsewers

1 Bore not exceedjng 150 mm 2 150-300 m m 3 Stated profde and sfreexceed~ng 300 mm In one or more d~menslon
. . .

! Flap valves of stated sze

nr

1 Remove exlnlng 2 Replace exlstlng 3 New flap valve of stated type


1 Nommal bore notexceeding 200 m m

5 Water maln renovatfonandancillary works

Clean~ng Removtng mtruslons P~pesample~nspect~ons Closed-c~rcu~ttelev~s~on surveys Cement mortarlmng Epoxy 11n1nq nr Brlck ! Brtck w ~ t h backdrop I In sltu concrete I In situ concrete wlth backdrop i Precast concrete i Precast concrete wlth backdrop
I

m
nr

2
3 4

nr m m m

5
6

200-300 mm 300-600 m m 600-900 mm 900-1200 mm statedexceedlng 1200 mm

6 Newmanholes

1 Depth not exceedtng 1 5 m Z 1 5-2 m 3 2-2 5 m 4 253m 5 s35m 6 3-m 7 stated exceedtng 4 m

7 Ex~stmg manholes

Abandonment

CLASS Y
(see ~ l e s aheadof t classon page97)

MEASUREMENTRULES

DEFINITION RULES

COVERAGE RULES

ADDITIONAL DESCRIPTION RULES


A8 ltem descnptlons forsllp.

.- .
"

. .

segmental lmmg and stared


proprietary Immp shall state the

type of Ilnmg. 6 1 s muwnum finshed mternal sole and its

AS ltem deecnpt~onsfor In srtu lomtedp,pe ftnmg and segmental Immgshall state the offset where the h n g iscurved to an offsef whlch exceeds 35 m m permetre

M5 Thevolume measuredfor annulusgmutmg shall not ~nclude the volume measured for eqernal groutmg (Y 2 3 2)

D4 Annulus groutfng shall be groutmg of theannularvotds between new lmngsand exletmg sewen andaf other voads grouted m thecourse of groutlng annular vmds

C6 Items for lateralsshall be deemed to mclude the work mvolveo in connenlng to the lmng wlthtn 1 m fromthemslae face01the lmed sewer

A10 ltem descrlptlonsfor


(o~nnnglateralsshall state the typeof l m n g to which the laterals are to beconnected and identlfy those laterals whlch are to be rwraded

be measukd along the~rcentre ltnesandshall mclude lengths occupaed byfinmgsandvalves

D5 P!pesample,nspecttonsand closed-nrcurt re/ev,s~on surveys shall ~ncludework carrled out e~therbeforeoraftercleanlngand llnlng

A11 ltemoeScr~pt~onsforl!nlng
mspectlons snall be aeemed to mcludereplactngthe lengrn removed by new plpeworr shall naterhematerlals. nommal boresana thcknesses of the

D.5 Thedepthofmanholesshall bemeasuredfromthetopsof coven to channel inverts ottops of baseslabs, whichever Isthe lower

be deemed to mcludeexcavat~on. preparatlanof surfaces, a sposal of excavated material, upnoldmg s~desof excavatlan, bacrfillmg. concrete. rernforccment. . retnstatement.

bestated in ltemdescr!ptlonsfor manholesol whlchdera~!sare grven elsewhere in the Contran manholes

A13 Typesand loadmgdut8esof


C9 ltemsfornewmanholesshall bedeemedto mfudeallttemsof metalworkandp~peworkwhtch accurw!thtnoratthesurfaceaf themanhole
covenshall bestated in !tern dexr~pftonsfornewmanholes

A14 llemaescrlpt~onsshall
separately ldemlfy new manholes w h m replaceexlstmg manholes

ClO Itemsfornewmanholes wlth backdropsshall bedeemed to tncludetheptpesandfla!ngs comprwngthe backdrop C11 Itemsfornewmanholes
wh~chreplaceex!stlngmannales sna.1 bedeemedto .ncluae breakmg out an0 olsposalaf exsungmanhoes

A15 lterndescr~pt~onsfor
ex,sr,ngmanholesshalI state detadsoftheworkreautred

NOTE
Manholes may be measured ln detall assetout in otherclassesof CESMM3

CLASS Y

FIRST DIVISION
8 lnterruptlons

.-.
h

: .rz
SECOND DIVISION
.

-, >

-. I

.. ,

..
.

r -

THIRD DIVISION

. -.

- -

. . .

1 Preparation of exsstmg sewers 2 Stabdtzatlon of exastmg sewers


3

Renovation of exlstlng sewers

1 Sllptsnmg 2 in sstu Jolntedptpe lmng 3 Segmental lmng 4 Stated proprsetary lsnlng 5 Gun~te watlrg 6 Annulusgroutrng

4 Work on laterals to renovated sewers 5 Work on manholes

(see rules at head of class on page97t

. . '
,

..,

". . , .
, :

.*,.'
COVERAGE RULES

MEASUREMENT RULES M7 lnterruptmnsshall be


measured only where a rntnlmurn pumpmg capaclty is expressly requrred and for perlads of t m e durmg normal workmg hours when the flow m the sewer exceeds the ~nstalled pumptng capactwand work ts mterrupted

-.

DEflNmON RULES

. -. .
-

.-

ADDITIONAL DESCRIPTION RULES

we=.
5:

:CLASS -, * . *, Z: SIMPLE BUILDING WORKS INCIDENTAL TO CIVIL ENGINEERING WORK%?: .' ?hjS
Includes Carpentryandjolnery Insulation windows, doors and glazing Sutfacefinishes, liningsand ~ artit . io -n -. s ". -' -Piped buildingservices Ducted budding services Cabled building servlces

.-~ ~ ,

-- .

,..,-SECONDDIVISION
I Structuraland carcass~ng timber

<-..
%

THIRD DIVISION -,
1 Floors 2 Wallsandpart~tlons 3 Flatroofs 4 Pttchedroofs 5 Platesand bearers Struts . .-

- c

i n i n

rn
i n

--

--

rn
' -in

7 Cleats 8 Trussed raftersand rooftrusses


-

nr nr

2 Strrp boardlng 3 Sheet boardlng

1 Floors 2 Slopmg uppersurfaces 3 Walls 4 soffits

Stamand walkways

1 Sta~rwaysandlandings 2 Walkwaysand platforms 3 Isolatedbalustrades 4 Ladders


1 Sklnmgs 2 Architraves 3 Trlms 4 Shelves 1 Baseunbts 2 Wallunits 3 Worktops 4 Not~ce-boards

'r

1 . Sheet. ... . . . 2 cults 3 Boards

1 2 3 4

Floors Slopmg uppersurfaces Walls soffits

1 T~mber 2 Metal 3 Plastics

1 W~ndows 2 Wmdowsub-frames 3 Doors 4 Framesorllnlngsets 5 Screensand borrowed l~ghts 6 Roof lhghts

lronmongery

1 2 3 4

Hmges Doorclosers Locks Bolts 5 Handles 6 Plates 7 Brackets

Excludes.

-A*

-:.

Drainage below ground (included in classes I-L) , , . + e . ,.,~ u c t and s trenchesforelectrical servicesbelow ground or outsid&e building (in&ded in classes LLF-.:. Metalwork (induded in class N) - . . . -. . e - s . ., ,.. -. Civil engineering Umber works lincluded in class 0 1 ~rickw&k,blochork and masonry (included in dass U) Painting (included in class V) Asphaltwork (included in class W) Roofing, cladding and coverings(includedin class W) Drainageto structures above ground (included in dass X)
a

. :

c k sz
.

- --

MEASUREMENTRULES M I Thelengthsandareas measured for carpentryand lornervltemsshall bemeasured n e t w i h noaflowanceforlo~ntsor laps M 2 Nodeduct~onfromtheareas
measuredshall bemadeforholes ando entngseach natexceedtng 0.5m marea

COVERAGERULES

C l Itemsforcarpentryand lomeryshall bedeemedto tnclude fix~ng, bortng,cunlng.jolntlng. supply of fixmg componentsand

drtll~ngorcumngassoclated
D2 Ce~lmglo~stsshall beclassed a~p!tchedroof~whe~etheyare assoctatedwlth patched roofs D3 Vmberandother manufactured boarassnall be classedassheerboardmg D4 Boar~and,nsulaoonshall be classffledaccordmgto thelr angleof lncllnatlon asfollows
work

A1 ltemdescr~pttonsfor cwpentryand10,netyshall state thematertals usedand ldentlfv whetherthey aresawn or wroughtandanytreatment. selection or protectton for subsequenttreatment

A2 Item descnpttonsshall state thenom~nalth~cknessof boardmg


A3 Thewldthof boarcrngshall bestated in ltemdescr~ptlonsln 100 mm stageswhere it does not exceed 300 mm A4 ltem descnpt~ons for structural and camasstng tmber (other than cleats, raRers and trussesl and m,scellaneous /ornery shall state the overall nomlnal gross cmss-semonal dtmenstons and the number of different cross-sectton shapes where there are more than one

M3 Struts between lolstsshall be measuredon planacross 101SS

Surfacesofcolumnsshall be classed as walls Surfaces of beamsshall be classed assoff,ts

f f i ltem descr~ptvmsshall
tdentlfyappl~ed lammatesand covermgs

b6 ltem demnptlons shall ~dent~fythe shape,stze and llmlts of starrsandwalkwaysandun,h andfinrn~s


A7 Itemdescnptaonsfor msulattonshall state the materials andthewoverall nomlnal hckness

C2 Itemsforw!ndows. d o o n andglazmgshall bedeemeo to ~ n c l u d e f ~-. xtno u~~ fixma l v o" f . ..s . componentsand drbll~ng or cuttmg of assoctatedwork

A8 ltem descnptlons for


wmdows, doom and glazmg IZ 3 1-3 4 shall tdentlfy the shape, sae and lhmlts of the work

A9 Materialsshall bestatedm
ttem descnptlonsfor ronmongery

NOTE
Wmdowsand t h e l r s u b h m e s 113 1-3 1-21, doorsana thew framesorlrn1ngsetslZ3 1-3 3-41ana theassocmed rmnmongery may be ncluded In the measurement of doonorwtndowsprowded thatthework~ncludea 1 s ldentlfled in atem descr~pt~onsmaccordancew~th Daragraph 5 12 anatheaPPro~rlate statements aregwen inthe Preamble !naccordancewlth paragraph 5 4

~. 1 Glass2 Glass In large panes 3 -Spectal glass

mi

m2
nr nr nt

4 Hermet~cally sealedun~ts 5 M~rrors

-,

<

6 Patentglazlng

m2

1 Roofs 2 Openlng llghts 3 Yert~cal surfaces

finishes, bedsand backlngs 1 In s ~ t u 2 T~les 3 Flex~blesheetcover~ngs


4 Drypart~tlonsandl~nlngs

1 . Floors 2 Slopmg upper surfaces 3 Walls 4 S0fflts 5 Surfacesof w ~ d t h notexceedlng 300 m m 6 Surfaces ofw1dth300 mm-1 m
~

1 ~ e p t of h suspens~on. not exceedmg 150 mm n 2 150-500 mm n 3 exceeding 500 mm n 4 Bulkheads 5 Access panels I 6 Fitt~ngs I 6 Rased accessfloors m' 1 Sohd

7 Proprletarysystem partltlons

2 Fullyglazed
3
8 Framed panelcub~clesets

Pan~allvolazed

nj

>, ,
' .

MEASUREMENT RULES -

.
--

..
COVERAGE RULES
Paneswnlchexceea4 m2 shall beclassedaslargepanes D6 Thefollowmg matenalsused tnglaongshall beclassedas speoa/g/ass (a1 glasswhosethtckness exceeds 10 mm (bl non-rectangularpanesof glass Icl toughened,lammated,solar control and otherspectal~ty glass (dl aclyllc,polycarbonateand Stmdarmatenals

ADDlTlONAL DESCRIPTION R

C2 Itemsfor wmdows, doors andglazmgshall bedeemed ta mclude fixmg, supply of flxlng cnmoonentsanddr~ll~na or

A10 ltemdescnpuonsfar glaungshall ldent~fy the matenals,thewnomlnaI thtcknesses.themethodof gtarmg and the method of secunngtheglass. A l l ltemdescrtpt!onsshall
tdenlify theconstrun~on of hermer,,cally sealeduntrs

A12 frem descnprlonsfarspmal


glass, hermeDcalIvsealedunlrsrs and mrrmfsshall (denutvthe shapeandstzeof panes

M2 Nodeduct~on fromtheareas
measuredshall bemadeforholes and o enmgseach notexceedlng 0 5 m inarea

A15 lncldentalmetalwork
support~ngpatentglazfngshall be ldentxfied in ftem descnptlons

M4 Theareasmeasuredfor parenrglarmgsnall mcluoeareas occuped by g~arlng Oars

A16 ltemdescnptlonsfor patentglazlngshall ldentlfy work wh~ch~scuwed


D7 Surface hnrshes, lrnings and parrmons (24 1 4 *l exceedmg 1 mwndeshall beclasslfw3 accord~nglothe~r angleof lncl natlonasfo~lows
Angle of tncilnafm to the vernal
Floors Sloping u p p r surfaces Walls

M2 Nodeduct~onfmm the areas measuredshall bemade forholes andopenmgseach notexceedlng 0 5 mZinarea


M5 Thelengthmeasuredfor
propnerawsysfempan,f!ons mall excludethe .enotnuf votas

A17 Thematenals.surfacefinlsh C3 Items for surface hmshes, and finshed thlcknessshall be I,n,ngsandparrtfronsshalf be tdenttfied m Item descnptlonsfor deemedto includefixlng, supply surface flrsnrshes. 1,nmgsand off~~~ngcomponentsanddrtll~ng pa,mons. orcunmg ofassoctated work
C4 Items for surface hnehes, Bnrng~andpambonsshall be deemedto mcludepreparlng surfaces, formmglomts, mines. angles, fillets. bu4t.upedgesand wpng tocambersor falls

wh!chenendtothef;ll thevanmon

hetghtof

A18 Lathtngand baseboardmg assomatedwlth msrruf~n~shes. bedandbackmgsshall be ldentlfied in ntem descnprians A19 Thegtrth of bulkheadsshall betdentdied tn stem dexnptmns AM Theovemlld~menslonsof accesspanels and h n m g s l n g sIn cetl~n~&,doorunfis~nproprletaly system pamtlonsandframed panelcubiclesetsshalf be ldentlfiedm ltemdescnptlons A21 ltemdescrtpt~onsfor
suspendedce~lmsgsshall statethe depth of thesuspenston where r exceeds 500 m m in nagesof 500 m m

15- 75. Not exceedmg 75.

SofflU

159W

Surfaceof columnsexceedmg 1 m wldeshall beclassedas walls Sdrfaccsof beamsexcebdma 1 m

C5 Itemsforrurfacef~nrshes, l~n~ngsandparr~r~0ns5hall be deemeato mcludeform no holes.

C6 Itemsforsuspendedce!Itngs shall bedeemedto tnclude assoclated pnmaly support systemsand edge trlms

L ~itflngs
8
I 1 8 I lnsulatlon Boller plantand anclllarles Convectorsand radiators Pumps Clsternsandtanks

Ducted bulldtng servlces

1 C~rcular dumork 2 Rectangular ducwork

.-

1 Stra~ght 2 Curved 3 Fltungs 4 Insulatmon 1 Condlt~onmg and handl~ng unlts 2 Heaters 3 Fans 4 Fdters

m m nr m

,.-

CLASS Z
MEASUREMENTRULES
M6 Lengthsof plpesshall be measuredalong thewcentre lhnes andshall mcludelensths occupted by hnmgs
18 Taps shall be classed as xpe hnmgs

ADDITIONAL DESCRIPTIONRULES C7 Itemsforprpedservlces systemsshall bedeemed to ~ncludef~xmg and supply of ftxlng components
C8 Itemsforp~pedserv,ces systemsshall bedeemed to ~ncludecomm~ss~ontng
1

A22 melocat~onortvpeof p,pedbuddmg sewlces Ineach ntemorarouoof ~temsshall be ~~-~ stated inttemdescrlDtlons so that thework lncludedcan be tdentnfied by referenceto the Drawmgs

W Thematenals.~omtvpes.
and nommal boresofp~pework shall bestated In ltem descrymonsand reference glven to applicable Brtttsh Standard spemftcatlonsandspeufled qualltres Flltmgsonplpesof d~fferent nommal boresshall be tdentlfied bythelrlarger bore

A m Thetypeafequrprnrntor
san,taryapp/,ancesandftnIngs andthe matenals,slzeorcapacW. andthemethodoffixlngshall be stated in Item descrldlons and Lferenceglven toappl~cable Brmsh Standard speclficatlons and spectfied quallttes
Trapsshall beldent,f!edm #tern descnpt~onsforsanttary appl,ancesandfttt~ngs
--

A k

Lengths of ducted sewces systems ;hall be measured along the,, centre hoes and shall mcluoe engths OCCUPI~O by I,INngs

A26 The locatlon ortypeof C9 Iternsfor ductedburld~ng ductedbuddtng serwces In each sewcesshall bedeemedto mcludefixtnaand s u ~ ~ l v o f f i x l n g ,ternor groupof llemsshall be stated in !temdescrlptlonssothat tnework!ncludedcan be ~dent~fled by reference tothe A27 Thematenals.jotnttypes,
andweof ductworkshall be stated in item descnptmns and referencegwento applicable Bntsh Stanoard spec~ficatlons andspec~fledqual!tles fittmgson dumsof adferent smesshall be

A28 Thetypeof equtpmentand thematenals, s!reorcapaclty, and themethodofflxmg shall be stated i n (terndescnptlonsand referencegwen toappllwb~e Br~t~shStandardspeclflcatlons andspectfiedqualltles

NOTE
Taps may be lncluded in item descnptmns for santrary appl,ances and fmmgs mstead of by separate Items for p ~ p e fittmgs pronded that the work in ltem descrlpttons in accordance wlth paragraph 5 12 and the approprtate statements are gwen in the Preamble in tncluded is ~dentlf~ed accordance wlth paragraDh 5 4

CLASS Z
FIRST DIVISION 7 Cabled bu~ldtng setvlces

SECOND DIVISION
1 Cables

THIRD DIVISION rn
1 Latd or drawn Into condu~ts, trunk~ng ducts 2 La~d on trays 3 Fmed to surfaces 4 La~d in trenches 5 Suspended 1 Plam 2 Flex~ble 3 Boxfinlngs

3 Trunkmg 4 Busbar trunkmg 5 Trays


--

6 Eanhmg and bondrng

1 Tapes 2 Fmmas 1 Cable only 2 Cable and condult 1 Equlprnent 2 Sw~tches 3 Ltghtlng outlets 4 Sockets

CLASS Z
MEASUREMENT RULES M8 Lengthsmeasuredforcables shall exclude lengthsoccup~ed in sagsand tads
M9 Lengthsrneasuredfor condu,ts: lrunkmg, busbar IrunX~ngandcabletraysshaII include lengthsoccup~ed by flttlng5

DEFINITION RULES
and .~ghr!ngc~rcutlswhtcn map framotsrnbutmn baarasshal. oe classeo aslmalorcu,o

COVERAGE RULES C11 Itemsfor cabledbuddmg


servcesshal. bedeemeo to mcl~oeoetermmry crcuNs. rerm~nat.ansanaconnenrons. orovd no draw wrres anddraw ductsandtrays"and threadmg cablesthrough sleeves

ADDITIONAL DESCRIPTION RULES


A29 The locat~on ortypeof cabledbufldrngsew,ces tn each Itemorgroupof ltemsshall be stated in lrem descrlptmssothar thewarr mcludcdran he

A30 The materials. s ~ z e or

C12 Itemsfor cabledbuddmg M10 Lengthsmeasuredfor


cablesla,dor drawn mlo mndu~ls, lrunxrng oruucls or lamon (rays sna oe measurm ostne engtn ui cOndult. trunk ng, dunor tray senrrcesshall bedeemed to mcludefixmg and supply offtxrng components and referenceg!ventaapplicable Brltlsh Standardspec~fmt~onsand spec~fledqualltles

C13 Itemsforcabledbutldrng
sewcesshall bedeemed to ~ncludecommisslonlng

A31 Thetypeands1zeorcapaclty
ofequ,pmentandbmngs i Z 7 8 4 shall bestated tn ,temdescnpttons and referencegiven to apphcable Br~tlsh Standard spemficattonsand spec~f~edqualttles

C14 Items formndu,lsshall be


deemed to tncludefittmgs other than boxedhttmgs