Вы находитесь на странице: 1из 8

FORM NO.

PEM-6666-0

SPEC NO.: PE-SS-999-145-I009

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

VOLUME SECTION REV. NO. SHEET

II B D 01 DATE : 20.04.2012 OF

1.0

SCOPE This specification covers the Design, Manufacture, Inspection and Testing at the manufacturers works, proper packing for transportation and delivery to site of Annubar (Delta Tube) for use in Utility/Captive Power Station/Combined Cycle Station.

2.0 2.1

CODES AND STANDARDS All the equipments specified herein shall comply with the requirements of the latest issue of the relevant National and International standards. The Design and Materials used for the components shall also comply with the relevant National and International standards. TECHNICAL REQUIREMENT The annubar and the accessories shall be suitable for continuous operation under an ambient temperature of 0-55C and Relative Humidity of 0-95% unless specified otherwise in volume IIB Section-B or Section-C.

2.2 3.0

3.1

DP flow measurement Element shall be tubular, insert type with minimum four impact ports facing upstream direction, located precisely for measurement of average flow velocity. The sensor shall be supplied with complete mounting hardware and support plugs and valves for DP transmitter connection. The flow devices producing a differential pressure signal having a high accuracy & reliability with rigid structure & shall be suitable for larger diameter pipe. The sensor comprises of a signal outer tube & an inner tube. The inner tube conveys the high pressure signal & outer conveys the low press signal. The sensor can also be provided with dual averaging chambers, which will convey the high pressure & low pressure signal. This shall be suitable for online mounting.

3.2

Element / Probe This shall be constructed of stainless steel, SS-316/SS316L.

3.3

Assembly Flow devices shall be complete with stub, flanged end with counter flanges, isolating valves, nipple, elbow, packing, etc. and shall be terminated with root valves for remote measurement. Each device shall also be provided with SS nameplate with tag number.

4.0

GUARANTEE AND PERFORMANCE The guarantee of flow measuring assembly shall be 18 months from the date of despatch or 12 months from commissioning which ever is earlier.

5.0 5.1

TEST & INSPECTION The bidder shall adopt suitable quality assurance plan to ensure that the equipments offered will meet the specification requirements in full. The Quality Plan shall be discussed and finalized with the technically accepted bidders before opening the price bid. The stages where the purchaser would like to be associated for witnessing or verification would be indicated by the purchaser in the Quality Plan before approval.

5.2

FORM NO. PEM-6666-0

SPEC NO.: PE-SS-999-145-I009

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

VOLUME SECTION REV. NO. SHEET

II B D 01 DATE : 20.04.2012 OF

5.3

Quality Plan/Quality Assurance programme shall be submitted for owner approval. The following tests are to be included & test certificate/report shall be furnished. 1. 2. 3. 4. Material Test Certificate Hardness Testing Hydro Test Visual/Dimensional inspection report.

5.4

Inspection will be conducted by BHEL and/or their authorized representatives as per the agreed inspection schedule. The inspection schedule will be submitted by the bidder for BHELs approval at contract stage. The cost of all tests and inspections will be deemed to have been included in the bid. For all the type tests Type Test Certificates as per agreed Quality Plan shall be furnished. In the absence of the same, such Type Tests shall be arranged at the Vendors works in the presence of BHEL and/or their authorized representatives or in independent Test House/Laboratory approved by BHEL. SPARES AND CONSUMABLES Commissioning Spares and consumables As part of the main equipment supply, the bidder shall supply all commissioning spares and consumables required during Start-up,

6.0 6.1

6.2

Recommended Spares The bidder shall furnish a list of Recommended Spares along with the normal service expectancy period and frequency of replacement; quantities recommended for 3 years operation along with unit rate against each item to enable BHEL/BHELs Customer to place a separate order later, if required.

6.3

Special Tools & Tackles The bidder shall furnish a list of Special Tools & Tackles included in the bid.

7.0 7.1 .

DRAWINGS & DOCUMENTS The offer shall include the following in 4 copies each. i. ii. iii. iv. Technical data sheet for each flow measuring device assembly in the Pro forma enclosed under Data Sheet-B. Catalogue/Technical Literature. List of installation for similar equipment supplied in Thermal Power Station application. Assembly drawing with dimensional details.

7.2

4 copies each of the following alongwith 2 CDs to be furnished after award of contract for owner approval. i. ii. iii. iv. v. Technical Data Sheet-C. Sizing Calculations. Assembly drawing with dimensions. Installation drawing. Flow Vs DP Curve.

FORM NO. PEM-6666-0

SPEC NO.: PE-SS-999-145-I009

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

VOLUME SECTION REV. NO. SHEET

II B D 01 DATE : 20.04.2012 OF

8.0 8.1 8.2 9.0 9.1

FOR INFORMATION Storage and Commissioning Instruction O&M are to be supplied as specified. PACKING & MARKING Each item shall be properly packed with adequate protection against friction, stresses, vibration & shock during transportation. Each packing box shall have marking as per Purchase Order. Each assembly shall be identified with the following information. Tag No. Service. Line size & thickness. Direction of flow.

9.2

10.0

APPLICABLE DATA SHEETS This document shall be read in conjunction with following data sheets. 1. Data Sheet - A & B : Data sheet no. PES-145-09-DS1-0 2. Data Sheet - C. : Data sheet no. PES-145-09-DS2-0

FORM NO. PEM-6666-0

SPEC NO.:

DATA SHEET FOR ANNUBAR (DELTA TUBE)

VOLUME SECTION REV. NO. SHEET

II B D DATE :

OF

Tag No.

Data Sheet No. PES-145-09-DS1-0

DATA SHEET A & B


DATA SHEET A (TO BE FILLED BY PURCHASER)
PROJECT OFFER REFERENCE GENERAL TAG NO. : QUANTITY SERVICE MAKE : MODEL Bidder to indicate DELTA TUBE (AVERAGING PITOT TUBE) Bidder to indicate FLG SIZE & RATING Bidder to indicate SS 316 /SS316L + 1% OF ACTUAL VALUE + 0.1% OF ACTUAL VALUE ONE COOLING WATER NORMAL : Bidder to indicate

DATA SHEET B (TO BE FILLED UP BY BIDDER)


|.. |..

TYPE PITOT ASSEMBLY PROBE DIAMETER & SHAPE ELEMENT MATERIAL ACCURACY REPEATABILTY No. OF TAP FLUID RATE OF FLOW (T/HR)

MAXIMUM : UPSTREAM WORKING PRESS (Kg/cm2g) DESIGN PRESS (Kg/cm2g) PROCESS DATA MAX. ALLOWABLE PRESS LOSS DIFF. PRESS AT MAX FLOW NORAML TEMP (Deg C) MAXIMUM TEMP (Deg C) Bidder to indicate

PIPE SIZE (OD x THK) mm PIPE MATERIAL

AVAILABLE PIPE STRAIGHT LENGTH PIPE LINE DATA RESTRICTION

UPSTREAM

DOWNSTREAM :

UPSTREAM

DOWNSTREAM :

FORM NO. PEM-6666-0

SPEC NO.:

DATA SHEET FOR ANNUBAR (DELTA TUBE)

VOLUME SECTION REV. NO. SHEET

II B D DATE :

OF

Tag No.

Data Sheet No. PES-145-09-DS1-0

DATA SHEET A & B


DATA SHEET A (TO BE FILLED BY PURCHASER)
STUB / NIPPLE SIZE : (Bidder to indicate) MATERIAL : .. RATING :

DATA SHEET B (TO BE FILLED UP BY BIDDER)


..

SPOOL PIECE WITH FLANGE END CONNECTION ROOT VALVES

SIZE : (Bidder to indicate) MATERIAL : SIZE : MATERIAL : END CONNECTION :

RATING :

.. .. .. ..

| RATING :

| QTY. :

..

FLUSHING ARRANGEMENT (REFER SHEET-3 OF SPEC)

[] REQUIRED [] NOT REQUIRED

ON-LINE RETRACTIBLE TYPE

[] REQUIRED [] NOT REQUIRED

INTERNAL BOTTOM SUPPORT OF SS 316 / SS316L MATERIAL SHALL BE PROVIDED IN PROCESS PIPE BIDDER TO SPECIFY HOLE SIZE TO BE DRILLED ON PROCESS PIPE FOR MOUNTING ANNUBAR PRPED BY NAME SIGN DATE DATE NAME SIGN CHKD BY APPD BY COMPANY SEAL

FORM NO. PEM-6666-0

SPEC NO.:

DATA SHEET FOR ANNUBAR (DELTA TUBE)

VOLUME SECTION REV. NO. SHEET

IIB D DATE :

OF

Tag No.

Data Sheet No. PES-145-09-DS2-0

DATA SHEET C
DATA SHEET C FOR ANNUBAR (DELTA TUBE) (TO BE FILLED BY THE CONTRACTOR AFTER AWARD OF CONTRACT)
PROJECT GENERAL TAG NO. : QUANTITY SERVICE MAKE : MODEL TYPE PITOT ASSEMBLY PROBE DIAMETER & SHAPE ELEMENT MATERIAL ACCURACY REPEATABILTY No. OF TAP FLUID RATE OF FLOW (T/HR) UPSTREAM WORKING PRESS (Kg/cm2g) PROCESS DATA DESIGN PRESS (Kg/cm2g) MAX. ALLOWABLE PRESS LOSS DIFF. PRESS AT MAX FLOW NORAML TEMP (Deg C) MAXIMUM TEMP (Deg C) NORMAL : MAXIMUM : DELTA TUBE (AVERAGING PITOT TUBE) FLG SIZE & RATING

PIPE SIZE (OD x THK) mm PIPE MATERIAL UPSTREAM :

AVAILABLE PIPE STRAIGHT LENGTH PIPE LINE DATA RESTRICTION

DOWNSTREAM : UPSTREAM :

DOWNSTREAM :

FORM NO. PEM-6666-0

SPEC NO.:

DATA SHEET FOR ANNUBAR (DELTA TUBE)

VOLUME SECTION REV. NO. SHEET

IIB D DATE :

OF

Tag No.

Data Sheet No. PES-145-09-DS1-0

DATA SHEET C
DATA SHEET C FOR ANNUBAR (DELTA TUBE) (TO BE FILLED BY THE CONTRACTOR AFTER AWARD OF CONTRACT)
STUB / NIPPLE SIZE : MATERIAL : SPOOL PIECE WITH FLANGE END CONNECTION ROOT VALVES SIZE : MATERIAL : SIZE : MATERIAL : END CONNECTION : | QTY. : | RATING : RATING : RATING :

FLUSHING ARRANGEMENT ON-LINE RETRACTIBLE TYPE INTERNAL BOTTOM SUPPORT OF SS 316 MATERIAL HOLE SIZE TO BE DRILLED ON PROCESS PIPE FOR MOUNTING ANNUBAR

COMPANY SEAL NAME SIGN DATE