Академический Документы
Профессиональный Документы
Культура Документы
Estimate for installation of additional D/S/S Of 125 KVA For giving new connection under HTS-1 Tariff to BANGALI BABA FOOD . Porp - MANJU DEVI at F.C.I lane sikandarpur, under electric supply section SIKANDARPUR , Electric supply subdivision SARAIYAGANJ . DIVISION MUZ(URBAN). APP.NO. 1349/12-13. DATE -27/2/13. load 80KVA. Tariff- HTS-1 . HT WORK - NIL
Sl.N o 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Particulars
RATE
UNIT
AMOUNT
PSC Pole 200kg D.P Line channel Transformer base channel Channel for AB switch & HG Fuse set. D.P . Line Channel ForTapping Side stay clamp Tr. Belting angle complete 11/.4KV 125KVA Dist. Tr. Earthing set complete HG Fuse set complete ACSR Rabbit conductor LT Bracket BACK Clamp 11KV pin insulator with pin L T Shackle insulator complete 11KV Disc insulator with fitting G.I Stay set complete 11 kv Gurd bracket M. S. Channel 100x50x6 M.S. angle 75x40x6 M.S Nuts & Bolts Sundries L.S
2290.00 1489.17 2894.08 2698.58 1489.17 81.07 1320.75 175500.00 296.00 921.00 34610.00 204.94 46.33 68.46 26.00 250.00 150.00 573.00 250.00 150.00 105.00 6000 TOTAL
no set set set set pair set no set set km no no no set mtr mtr no mtr mtr kg
4580.00 1489.17 2894.08 5397.16 1489.17 810.70 1320.75 175500.00 888.00 921.00 17305.00 1229.64 370.64 410.76 624.00 1500.00 600.00 2865.00 2250.00 1350.00 3675.00 6000.00 233470.07
1 2 3 4
Total Amount
ADD DEPARTMENT CHARGE @ 15 %
Rs Rs Rs Rs Rs Rs. Rs Rs
23347.00 275494.67
41324.10
GRAND TOTAL
316818.77
has been framed for installation of additional D/S/S Of 125 KVA For giving new connection under HTS-1 Tariff to BANGALI BABA FOOD . Porp - MANJU DEVI at F.C.I lane sikandarpur, under electric supply section SIKANDARPUR , Electric supply subdivision SARAIYAGANJ . DIVISION MUZ(URBAN) in DEPOSIT SCHEME. The estimate will also cover the LT CUM HT Line maintenance which will improve the supply system stability and realibitlty. ALL MATERIAL WILL BE SUPPLYED BY PARTY. The party will be deposited the departmental cost - 41324.00 and other cost. All line construction work & D/S/S Installation will be carried out by party .
The total estimate cost comes to Rs- 316818.00/ only. The estimate
AEE/SARAIYAGANJ
JEE/ SIKANDARPUR