Swap Site Survey Report V2.

4
Site-ID for 2G:

Site Name:

RZAJ001 AJGARA

Site-ID for 3G: Survey Partner Company

Building Information
Circle Longitude of Site Rajasthan CITY 75.09952 Latitude of Site Any entry issue for vehicle

24 hour access? Contact Person for Site Access Special Key needed or not? Equipment Deliver Easily or not? Building type (Commercial, Resident, Govt.)

Yes

SURENDRA JI No Yes

Contact Phone Number for Site Access Is there Security Guard or not (Yes/No) Crane/Chain Pully/If other pls specify Site Floor No.

Existing Site Information


Site Location(Greenfield/Rooftop)
Sharing Operator TATA/ IDEA/ AIRTEL/ GTL/ INDUS/Aircel/ Relaince/BSNL own Address with landmark 2G,3G location: Same place/Different place Which near the tower if different place: 2G/3G 2G equipment location (Indoor/Outdoor) 2G equipment type (Macro,Micro,BBU+RRU)

Greenfield BSNL own AJGARA, SARWAR ROAD

Tower Type (RoofTop/Green Field) Tower Height(Mtr.) /+Building Height (in Case of RTT)
Site Type (2G/3G/Colocated 2G 3G) Distance between 2G&3G if different place: M If 2G&3G in different place, put ZTE equipment near tower to save feeder 3G equipment type (Macro,Micro,BBU+RRU)

Outdoor Macro ERICSSON &RBS 2974

3G equipment location (Indoor/Outdoor)

Existing 2G BTS Make & Model 2G-900M Feeder Qty. (If no,fill "0") 3G-2100M Feeder Qty. (If no,fill "0")
900M Antenna (900/900&1800/900&1800&2100)
1800M Antenna (1800/900&1800/900&1800&2100) 2100M Antenna (2100/2100&1800/900&1800&2100)

Existing 3G NodeB Make & Model 6 2G-1800M Feeder Qty. (If no,fill "0") 0

900M

2G-900M Antenna Qty. 2G-1800M Antenna Qty. 3G-2100M Antenna Qty.

Combiner on Site Existing (Yes/No)

No

Combiner for which system

Power Plant Checking


SMPS Make & Model Working Rectifier Module Nos Not working Module no. Max. Capacity of the SMPS 150 A Have large spare DC Breakers (63A | 80A)? Yes DELTA Output voltage 6 Every Working Rectifier capacity (A) 0 Spare working Module Slots no. Current Load (Amps) ZTE Indoor BTS need>63A, ZTE Outdoor BTS need>80A

Lightning Protection Unit in DCDB (? KA)

NO

DC power cable length from DCDB to BTS Alarm cable length from alarm panel to ZTE BTS Mtr. Krone Box availability (DDF) (yes,No) DG Condition (working well/not work) A/C Condition (working well/not work) Battery (working well/not work)

Site Facility Checking


Total Alarms Terminated on Site Grounding bar available? (yes,No) DG Capacity and Maker A/C Capacity and Maker Battery group and capacity Yes 10 KVA & GSP NO HBL & 600AH 0

NA NRSWITCH

KEKRI

26.01245 No 9414444562 No NO G

Greenfield 40M 2G NA

ut ZTE equipment near tower to save

NA 0 3 0 0

49.1 25 4

19 A ZTE Outdoor BTS need>80A

10 M

NA No working well

working well

Transmission Checking
TRM Type(MW/MUX/Other) Fiber to E1 converter fixed on BTS?(Yes/No) 2G TRM Type(E1 / FE/GE/STM-1) 2G TRM Qty. totally At least 1 spare E1 or 1 FE for 2G (Yes,No)
fiber Connector Type at ODF or MUX side

MW No E1 Yes NA Yes NA

Equipment make&model If left is Yes, How many E1 cables connected? 3G TRM Type(E1 / FE/GE/STM-1) 1 3G TRM Qty. At least 5 spare E1 or 1 FE port available for 3G on site? (Yes,No) Fiber port type(100M/1.25G/2.5G) If Yes, How many "U" space available MUX FEo spare ports

Existing IDU in existing BTS/Nodeb cabinet? MUX FEe spare ports

RF Checking
Existing Feeder Type Existing Feeder connector (Din-F/DinM/N-F/N-M) Space for new BSNL Antenna1 (Yes,No) Space for new BSNL Antenna3 (Yes,No) Feeder window enough for 6 new feeder? (Yes,No) 7/8' Din-F No No No New Jumper length for ZTE BTS Mtr. Existing Jumper connector type at feeder side(Din-F/Din-M/N-F/N-M) Space for new BSNL Antenna2 (Yes,No) Has AISG cable for remote control antenna? Cable tray(horizontal/vertical) enough for 6 new feeder? (Yes,No) Actual Need Equipment type for the site (BS8800,BS8900A,BS8906,BBU+RRU) Remark: Macro Indoor BS8800(H*W*D):950mm*600mm*450mm Macro Outdoor BS8900A(H*W*D):1800mm*600mm*600mm Distance between two steel frames "mm" Remark: if distance longer than 413mm, then need frame Floor type(wood/concrete/antistatic false floor/if other pls specify)
Gnd Cable length from ZTE BTS to GND BarM

New ZTE Macro BTS/Nodeb Checking


Configured Equipment type for the site (BS8800,BS8900A,BS8906,BBU+RRU) Sufficient Space available for parallel installation of New cabinets. Existing platform type for outdoor site Solution if steel frame platform on site Indoor Existing Room type (Shelter/Room)
Pwr cable length from ZTE BTS to DCDB M

Yes Concrete No Need

6M 8M No Need

E1/FE/STM1 cable length from ZTE BTS to TX(DDF/switch/Mux) Mtr. New cable tray length (mm) if needed

New Cable Tray needed or not? New feeder length from antenna to BTS? (M) Existing RRU Location (BBU+RRUs together/RRU near Antenna) ZTE BBU is 19'&2U high, prefer on exist 19'rack,if can't, then on RRU1 Installation method (tower /pole /wall/Other need specify) RRU2 Installation method RRU3 Installation method RRU4 Installation method Distance between Sect2 and Sect3(M)

BBU+RRU sites Installation Checking


Existing site is BBU+RRU? How to install ZTE new BBU? Existing fiber length of Sect1,from BBU to RRU1 (M) Existing fiber length of Sect2 (M) Existing fiber length of Sect3 (M) Existing fiber length of Sect4 (M) Distance between Sect1 and Sect2(M) No

NA NA NA NA NA

Notes:
PLINTH REQUIRED

PLINTH REQUIRED

TSSR V2.4
ERICSSON MMU NA NA NA No NO 2 NA

5M Din-M No No No

mm*450mm *D):1800mm*600mm*600mm NA 413mm, then need frame NA 10 M No NO

on exist 19'rack,if can't, then on NA NA NA NA NA

RF SITE SURVEY FORM for Swap Site


GENERAL SITE INFORMATION
Type of Premises Tower Type :Tower / Pole Height :2G Only Site Configuration to be planned 2+2+2 3G Only Sectors Omni Mount Type

Single Owner
SINGLE Owner GBT

AMSL(Above Main Sea

362.5 M

Building Height :No of Floors :Co-location


Macro Micro Antenna type YES NA With RET? TMA Type if have

40 M

CONFIGURATION INFORMATION
NA
3 NA Ht from Gnd (m)

NA

ANTENNA INFORMATION 1 (GSM)


Sectors Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6 Sectors Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6 Sectors Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6 Azimuth

50 180 280 NA NA NA
Azimuth

SINGLE SINGLE SINGLE NA NA NA


Mount Type

35 35 35 NA NA NA
Ht from Gnd(m)

ANDREW(2 PORT) ANDREW(2 PORT) ANDREW(2 PORT) NA NA NA


Antenna type

NO NO NO NA NA NA
With RET?

NO NO NO NA NA NA
TMA Type if have

ANTENNA INFORMATION 2 (UMTS)


NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

Coverage Objective (Any important Landmark nearby)


HARAI PRATAP PURA ROYPURA

Obstruction (closer than 300m) for Sub Urban/Rural & 100 M for Demse Urban/Urban

REMARKS (Justification for conditional acceptance & in case of less than 3 candidates for new site)

REPRESENTATIVES
Vendor Survey Team Name Sig. Date ZTE RF Survey Team ARVIND PAL 5-Sep-12 BSNL Survey Team

362.5 M

NA NA NA

Tilt

2(M) 2(M) 2(M) NA NA NA


Tilt

NA NA NA NA NA NA Clutter Type RURAL RURAL RURAL

r new site)

NL Survey Team

Layout of the site or equipment room: Show all major equipments and detailed location with dimension to propose ZTE BTS/Nodeb eg: distance from ZTE cabinet to the wall, or to the existing transmission rack.

Photo list: NO. Category 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Photoes List: Photo of GPS Reader,include Longtitude & Latitude Access Road & Tower Overview Equipment Room/Shelter/Cabinet Outlook Existing Room/Shelter inside Overview(BTS/NodeB equipment and floor type Proposed place for ZTE new BTS/Nodeb indoor Feeder window and indoor grounding bar outdoor Feeder window and outdoor grounding bar BTS/Nodeb cabinet inside with RF moduels DC Cabinet inside overview DC Breakers with lable & Ratings DC rectifier view (include working and spare slots) Existing Service Rack inside Existing MW IDU / switch / MUX Existing DDF/ODF(Inside View) Existing fiber to E1 converter fixed on BTS (if have) Existing Alarm Box or panel (Inside View) Existing MW Antenna / ODU Existing Feeder (Sector A) connector (inside shelter) Existing Jumper (Sector A) overview Existing Jumper connector at feeder side(Sector A) Existing Combiner/Splitter (Sector A) if have Existing TMA (Sector A) if have Existing AISG cable for remote control antenna if have Existing RF Antenna(Sector A) with Pole Existing RRU1 (Sector A) Existing Feeder connector (inside shelter) Existing Jumper overview Existing Jumper connector at feeder side Existing Jumper connector at BTS end Existing Combiner/Splitter if have Existing TMA if have Existing AISG cable for remote control antenna? Existing RF Antenna with Pole Existing RRU1 Existing Feeder connector (inside shelter) Existing Jumper overview Existing Jumper connector at feeder side Existing Jumper connector at BTS end Existing Combiner/Splitter if have Existing TMA if have Existing AISG cable for remote control antenna? Existing RF Antenna with Pole Existing RRU1 1 snap 1 snap 1 snap 1-2 snaps 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap 1 snap

Site Info

DC Info

TX / Alarm

Sector 1

Sector 2

Sector 3