TMA Installation

Prepared by Usman Amjad Owner (RAN) Replace N.A.


th

Date 19 Feb 2010

Revision A

Reference EIB-XXX-RAN-TMA

EngineeringInformationBulletin EIBXXXRANTMA

TMAINSTALLATIONPROJECT

TMA Installation
Prepared by Usman Amjad Owner (RAN) Replace N.A.
th

Date 19 Feb 2010

Revision A

Reference EIB-XXX-RAN-TMA

Contents
Introduction.......................................................................................................................3 Distributionlist................................................................................................................3 Purpose................................................................................................................................4 StepbyStepProcedure.................................................................................................4 ListofKPIs..........................................................................................................................5 FlowChart..........................................................................................................................6

TMA Installation
Prepared by Usman Amjad Owner (RAN) Replace N.A.
th

Date 19 Feb 2010

Revision A

Reference EIB-XXX-RAN-TMA

Introduction
ThisEIBdescribestheProcedureofTMAinstallationprojectinCMPakNetwork

Distributionlist
PersonalsworkingintheRANOptimization,RANPlanning,OMC Name/DistributionListName Mr.XuHaiyong Mr.ZhangBo Mr.CyrusSikandir Mr.ArshadUsman Mr.KhurramAlvi Mr.SyedAhmedHassan Mr.MuhammadAdeelIsrar Mr.AsimSuleman Mr.SyedWajidAli Mr.NasirQayyum Mr.ImranZafar Mr.KamranHaider Mr.SumairChaudhary Mr.SyedMuhammadBilal Mr.MudassirHussain Mr.MuhammadBasharatAli Title CTO AdvisortoCTO DirectorO&M DirectorNP&S DirectorRollout Sr.ManagerO&M Sr.ManagerO&M RCTONorth RCTOSouth RCTOCentralII RCTOCentralI ManagerRANPlanningHQ ManagerRANCentralI ManagerRANNorth ManagerRANSouth TeamLeadRANCentralII/III 3

TMA Installation
Prepared by Usman Amjad Owner (RAN) Replace N.A.
th

Date 19 Feb 2010

Revision A

Reference EIB-XXX-RAN-TMA

Purpose
TowerMountedAmplifierisusedtominimizethepathimbalanceduetoweakuplinksignal strengthonacell.TMAalsoenhancestheuplinksignalstrengthinordertoreducethepingpong handoversduetoweakuplink.TMAwillbeinstalledinCMPaknetworktoincreaseuplinksignal strengthandtoimprovecustomersperception.

StepByStepProcedure
#
Step1

Step
ChoosetherightCell*

Responsibility
RAN Optimization FOPs

Description
ThisisveryimportantforTMAprojecttochoosetherightcell forTMAuse.RANOptimizationteamwillselectthelistofcells whereTMAisrequired.Thiswillbedonebymonitoringcell statisticaldata ItisresponsibilityofFOPstomakesurethatatleastonedry connectionisavailableforselectedcellforExternalAlarm Patching.Thiscanalsobedonebyremovingalreadypatched alarmshavingleastimportance. Finallistofcellswillbegiventothevendortosubmitthe projectexecutionplanandtimelineaccordingly A12hoursworkorderwillbeassignedtovendortoperform installationactivity,asthisactivityinvolvessectorlock. TMAinstallationwillbeperformedbyVendoraccordingtothe submittedplan CMPakFOPswillberesponsibletomakeaccesstothesitesfor vendortoinstallTMA. VendorwillberesponsibleforTMAinstallationandExternal Alarmpatchingforthecell AlongwiththeVendorFopswillconducttheinitialtest before andaftertheactivityifallinstallationsaredonecorrectly Incaseofanyserviceaffectingsnagsitshallberemoved immediately,forotherVendorwillhave2daystofixtheissue. AfterTMAinstallationandremovalofallSnags,RAN Optimizationwillmonitorthestatsandpreparebenchmark reportofthechange.IncaseofanyambiguitiesfoundFOPSand Vendorwillbeintimated. Aftermonitoryfor7daysfrominstallationofTMA,RAN OptimizationandFOPswillsignthePATdocument.

Step2

EASDryConnection Availability ProjectExecutionPlan andTimeline AssignmentofWork Order ProjectExecution SiteAccess TMAInstallationand EASPatching InitialTest* RemovalofSnags,if any RFPerformance Analysis* TMAPAT

Step3 Step4 Step5 Step6 Step7 Step8 Step9 Step 10 Step 11

Vendor RAN Optimization andOMC Vendor FOPs Vendor FOPsand Vendor Vendor RAN Optimization RAN Optimization, FOPs

*Furtherexplainedbelow

TMA Installation
Prepared by Usman Amjad Owner (RAN) Replace N.A.
th

Date 19 Feb 2010

Revision A

Reference EIB-XXX-RAN-TMA

Howtochoosetherightcell:
ItisveryimportanttochoosetherightcelltoinstallTMA.Thiscanbedonebyanalyzingstatistical dataanduserbehaviour. Path Imbalance (ve value) depicts weak uplink signal strength, cells with high path imbalancevalues High number of ping pong uplink handovers for a cell due to weak uplink signal strength Highnumberofcalldroprateduetoweakuplinksignalstrength Pooruplinksignalqualityduetoweaksignalstrength AveragehighTAforthecell RecentAlarmsonthecell Hardwarefaultsthatmayimpactpathbalance Cellshouldbeselectedonthebasisofatleast15daystrend

InitialTest:
BeforeTMAInstallation FollowingtestmustbeconductedbeforetheTMAisinstalledonthecell.Thiswillbeperformedby vendorandCMPakFOPs Completehealthcheckofcell AntennaPhysicalParameters(Azimuth,Tilt,Height) VSWR TRXPower TotalOutputPower CableLoss

TMA Installation
Prepared by Usman Amjad Owner (RAN) Replace N.A.
th

Date 19 Feb 2010

Revision A

Reference EIB-XXX-RAN-TMA

AfterTMAInstallation FollowingtestmustbeconductedaftertheTMAisinstalledon thecell.Thiswillbeperformedby vendorandCMPakFOPs Completehealthcheckofcell AntennaPhysicalParameters(Azimuth,Tilt,Height) VSWR TRXPower TotalOutputPower CableLoss Installationshouldbeaspertheagreedlayoutprovidedbythevendor. Taggingshouldbecomplete(forTMA,Alarmcables,Jumpers) PropergroundingofPDUandTMA. ProperpowerconnectionsofPDUinrectifierwithsuitablewiringconnectionsandTee Bias. Allalarmsarecheckedandremoved.Cableloss,insertionlossetc.shouldbeasperthe belowthespecifiedthreshold. Weather proofing and finishing tape on jumper cables and connectors should be installed. ProperfixingofTMAonmount(withappropriateclamps). Propercablelayoutandisarrangementisdonecleanly. Allsnagsareremoved. Externalalarmsareworking. VSWRisbelowthethreshold. Ensuretheentirechecklistiscomplete. PATdocumentisfilledaccurately.

TMA Installation
Prepared by Usman Amjad Owner (RAN) Replace N.A.
th

Date 19 Feb 2010

Revision A

Reference EIB-XXX-RAN-TMA

KPIstobemonitored:
FollowingaretheKPIstobechecked/verifiedafterinstallationofTMA PathBalance Uplinklevel&Qualityhandoverperformance DownlinklevelandQualityhandovers Calldroprate(IncandExcHO) UplinklevelandQualitySamples VSWR