S.No 1 2 3 4 5 6 7 Description of works Work Type Estimated Hours 65 95 Actual Hours 34 68 34 34 34.0 68.0 95.0 367 24 34 30 10 17 20 17 152
Vent lines providing to Stationary Packer Bag discharge conveyor dischrge spillage collecting hopper fabrication work Bag discharhe chute round bars fixing work.
Dedusting lines providing at Stationary Packer Circuit. Bags Cleaning Blower fixing at Stationary packer area.
Stationary Packer sides covering Frames fabricating. Belt Curtains fixing in stationary Packer area.
32 32
32.0
260.0 90.0
1 2 3 4 5 6 7
Auto Packer Bag Positioning Belt Conveyor Belt changing. Radimat vaccum pump rtecondion and replacing work Bulk-2 bin unit bag filter bags replaced. Roto packer and auto packer weekly maintenance Stationary packer weekly maintenance. Packing plant genaral check up Bc-28 discharge cute reapir work
PM PM PM PM PM PM
Repair.
22
15 26 8 17 20 15
Devploment PM PM PM PM PM PM PM
260.0 14
30 22 17 20 22 8.5
Bulk loading bay-1 teiscopic chute bottom rubber cone replacing work
Roto packer bucket elavtor belt joint and bucket bolts inspection
BC-28 conveyor head drum, tail and snub pulley bearings greasing work
260.0 46
32 30 20 17 20 10 30 32 24 10
Manual Truck Loading machine plat form area opening covered with
2 chequered Plates 3 4 5 6 7 8 9 10 11 12
Stationary Packer discharge area Bags Protection Frame fabricated. Bulk Loading Bin-1 by-pass pipe line fixing work Stationary packer spillage collecting hoper fabrication Stationary packer weekly maintenance. Packing plant genaral check up Roto packer and auto packer weekly maintenance roto packer bag discharge pulley full welding work and bag saadles repir work Auto pac hoist guide roolers inspecton and 2 nos replaced Drum type bag diverting fixed for trail purpose Auto pack hoist chain track bolt replacing work
PM
Packing plant genaral check up Roto packer and auto packer weekly maintenance
PM PM PM PM PM
1 2 3 4 5 6 7 Packing plant genaral check up 8 Roto packer and auto packer weekly maintenance
Roto packer bucket elevator Removed motor shifting to the Work shop( kw-18.50.) and 7.5 KW Air slide motor shifting from ground floor to the Bulk loading bins plat form Belt curtains preparation work to close the Stationary packer area openings. Bulk loading bins Signe boards preparation and fixing work. Auto Packer Hoisting Guide rail bolts inspection and re-tightening and Adjustment work. Auto packer Layer pusher drive geared motor replacement with spare one. Bulk loading Bin -2 Bag filter Bags replacement with new bags ( 60 Nos ).
PM
PM PM PM PM PM
32 22 15 48 8 32 19 8.5 184.5
PM PM PM PM PM PM PM repair PM
PM PM PM PM PM PM PM
167
132.5
PM PM PM PM PM PM PM
PM repair repair PM PM PM PM PM PM
1 2 3 4 5 6 7
Spare vaccum pump over hauling Stationary Packer bottom spillage cement collection bin fabrication work Filling tubes repairin work Bulk loading BE-1(541-be-205) head drum friction liners replacing work Auto Packer hosit chain alignment work packing plant genaral check up Roto& Auto packer weekly maintenance
PM repair PM PM PM PM
18 65 6 22 40 19 8.5 178.5
20 72 6 24 44 19 8.5 193.5
PM PM
t 40th week
Job Completed yes yes yes yes yes no yes
t 41th week
Job 40th week Completed no 68 hrs yes yes yes yes yes yes yes
t 42th week
Job Completed yes yes yes yes yes yes yes yes yes yes yes yes 40th week 68 41th week 192
t 43th week
Job Completed yes yes yes yes yes yes yes yes yes
t 44th week
Job Completed
t 44th week
Job Completed yes yes yes yes yes yes yes yes yes
t 45th week
Job Completed yes no yes yes yes yes yes
t 46th week
Job Completed yes yes yes yes yes yes yes 45th week 22
t 47th week
Job Completed yes yes yes yes yes yes yes yes yes
t 48th week
Job Completed
t 49th week
Job Completed yes yes
yes yes
Jelaludhin
Prasanan Radha krishna Shift gang)
8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5
8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5
8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5
8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5
8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5
8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5
5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
10.5
10.5
Jelaludhin
Prasanan Radha krishna Shift gang)
10.5
10.5
8.5
8.5
22
Actual Hours Available hours
23
Actual Hours Available hours
24
Actual Hours Available hours
25
Actual Hours Available hours
26
Actual Hours Available hours
27
8.5
8.5
8.5
8.5
8.5
8.5
5.5
5.5
11 8.5 8.5
11 8.5 8.5
8.5
3 4 5 6 7 8 9
bhanu
ramana reddy Muralidharan Ashraf 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5
8.5 8.5
8.5 8.5
Jelaludhin
Prasanan Shift gang)
29
Actual Hours Available hours
30
Actual Hours Available hours
31
Actual Hours
Date: 01/11/2012
Available hours Actual Hours Available hours
2
Actual Hours Available hours
8.5
8.5
8.5
8.5
12
12
12
12
10
10
24
24
32
32
5
Actual Hours Available hours
6
Actual Hours Available hours
7
Actual Hours Available hours
8
Actual Hours Available hours
9
Actual Hours Available hours
10
8.5
8.5
8.5
8.5
8.5
8.5
10
10
8.5 8.5 24
8.5 8.5 24
12
Actual Hours Available hours
13
Actual Hours Available hours
14
Actual Hours Available hours
15
Actual Hours Available hours
16
Actual Hours Available hours
17
8.5
8.5
8.5
5.5
5.5
10
10
bhanu
ramana reddy Shift gang)
19
Actual Hours Available hours
20
Actual Hours Available hours
21
Actual Hours Available hours
22
Actual Hours Available hours
23
Actual Hours Available hours
24
8.5
8.5
8.5
8.5
10.5
10.5
bhanu
ramana reddy Iqbal basha Shift gang) 8.5 8.5
3
Actual Hours Available hours
4
Actual Hours Available hours
5
Actual Hours Available hours
6
Actual Hours Available hours
7
Actual Hours Available hours
8.5
8.5
8.5
8.5
5.5
5.5
8.5
8.5
8.5 8.5
3 4 5 6 7 8
bhanu
ramana reddy Shift gang)
tion(For 41thWeek)
Actual Hours
tion(For 42thWeek)
Actual Hours
8.5
8.5
tion(For 43thWeek)
27
Actual Hours
8.5
tion(For 44thWeek)
3
Actual Hours
tion(For 45thWeek)
10
Actual Hours
tion(For 46thWeek)
17
Actual Hours
tion(For 47thWeek)
24
Actual Hours
24
tion(For 48thWeek)
8
Actual Hours
8.5 8.5
39.5 8.5