Section: Packing plant 40th week

S.No 1 2 3 4 5 6 7 Description of works Work Type Estimated Hours 65 95 Actual Hours 34 68 34 34 34.0 68.0 95.0 367 24 34 30 10 17 20 17 152

Vent lines providing to Stationary Packer Bag discharge conveyor dischrge spillage collecting hopper fabrication work Bag discharhe chute round bars fixing work.
Dedusting lines providing at Stationary Packer Circuit. Bags Cleaning Blower fixing at Stationary packer area.

Stationary Packer sides covering Frames fabricating. Belt Curtains fixing in stationary Packer area.

Devploment Devploment Devploment Devploment Devploment Devploment Devploment

32 32
32.0

260.0 90.0

1 2 3 4 5 6 7

Auto Packer Bag Positioning Belt Conveyor Belt changing. Radimat vaccum pump rtecondion and replacing work Bulk-2 bin unit bag filter bags replaced. Roto packer and auto packer weekly maintenance Stationary packer weekly maintenance. Packing plant genaral check up Bc-28 discharge cute reapir work

PM PM PM PM PM PM
Repair.

22
15 26 8 17 20 15

Section: Packing plant 41th week


S.No Description of works 1 Stationary Packer sides covering Frames fabricating. 2 3 spare vaccum pump overhauling work Work Type Estimated Hours

Devploment PM PM PM PM PM PM PM

260.0 14
30 22 17 20 22 8.5

Actual Hours 192.0 16 34 24 17 20 24.5 8.5 336.0

Bulk loading bay-1 teiscopic chute bottom rubber cone replacing work

4 5 Stationary packer weekly maintenance. 6 Packing plant genaral check up

Roto packer bucket elavtor belt joint and bucket bolts inspection

7 8 Roto packer and auto packer weekly maintenance

BC-28 conveyor head drum, tail and snub pulley bearings greasing work

Section: Packing plant 42th week


S.No Description of works 1 Stationary Packer sides covering Frames fabricating. Work Type Estimated Hours

Devploment Devploment Devploment PM PM PM PM repair PM


unplaned

260.0 46
32 30 20 17 20 10 30 32 24 10

Actual Hours 17.0 51 34 34 22 17 20 10 34 34.0 24 10 307.0

Manual Truck Loading machine plat form area opening covered with
2 chequered Plates 3 4 5 6 7 8 9 10 11 12

Stationary Packer discharge area Bags Protection Frame fabricated. Bulk Loading Bin-1 by-pass pipe line fixing work Stationary packer spillage collecting hoper fabrication Stationary packer weekly maintenance. Packing plant genaral check up Roto packer and auto packer weekly maintenance roto packer bag discharge pulley full welding work and bag saadles repir work Auto pac hoist guide roolers inspecton and 2 nos replaced Drum type bag diverting fixed for trail purpose Auto pack hoist chain track bolt replacing work

Section: Packing plant 43th week


S.No 1 2 3 4 5 6 7 8 Description of works Roto packer bucket elevator Removed motor shifting to the Work shop( kw-18.50.) and 7.5 KW Air slide motor shifting from ground floor to the Bulk loading bins plat form Belt curtains preparation work to close the Stationary packer area openings. Bulk loading bins Signe boards preparation and fixing work. Auto Packer Hoisting Guide rail bolts inspection and re-tightening and Adjustment work. Auto packer Layer pusher drive geared motor replacement with spare one. Bulk loading Bin -2 Bag filter Bags replacement with new bags ( 60 Nos ). Work Type Estimated Hours 32 22 15 48 8 32 19 8.5 184.5 Actual Hours 34 25.5 17 52 8 34 19 8.5 198 198

PM

Packing plant genaral check up Roto packer and auto packer weekly maintenance

PM PM PM PM PM

Section: Packing plant 44th week


S.No Description of works Work Type Estimated Hours Actual Hours

1 2 3 4 5 6 7 Packing plant genaral check up 8 Roto packer and auto packer weekly maintenance

Roto packer bucket elevator Removed motor shifting to the Work shop( kw-18.50.) and 7.5 KW Air slide motor shifting from ground floor to the Bulk loading bins plat form Belt curtains preparation work to close the Stationary packer area openings. Bulk loading bins Signe boards preparation and fixing work. Auto Packer Hoisting Guide rail bolts inspection and re-tightening and Adjustment work. Auto packer Layer pusher drive geared motor replacement with spare one. Bulk loading Bin -2 Bag filter Bags replacement with new bags ( 60 Nos ).

PM

PM PM PM PM PM

32 22 15 48 8 32 19 8.5 184.5

34 25.5 17 52 8 34 19 8.5 198 198

Section: Packing plant 44th week


S.No Description of works Bulk loading Bucket Elevators Discharge Stand by Air slide blower motor replacement work and Cement Silo -1 1 Extraction Stand by blower motor replacement with Spare motor. 2 3 4 5 6 7 8 9 Bulk loading Bin-1 Inside air slide boxes and cloth inspectionand air slide box inside cement cleaning work. Bulk loading Bin-1 Venting bag filter discharge by-pass pipe line removing work. Bulk loading Bin-1 Dozing Valve fixing work Layer Pusher Wheel rollers ( 3 Nos) replaced with new one. Auto packer Sliding bar Guide shafts and bearings replaced with new. Bag diverting unit fixed and trail taken and removed for some modifications. Roto packer bag saddles repairing work. packing plant genaral check up Work Type Estimated Hours 22 180 30 14 8 6 30 15 13 318 Actual Hours 24 192 32 16 8 6 32 17 13 340

PM PM PM PM PM PM PM repair PM

Section: Packing plant 45th week


S.No Description of works 1 Stationary packer Trail taken for photo cells timer adjustment purpose. 2 Stationary Packer Opening areas Belt curtains preparation work. 3 All the roots blowers, unit bag filters Fans, RALs,and screw conveyor bearings grease top up work. Bulk loading bucket elevator-1&2 Gear box internals inspection and bearings grease top up and oil replacement 4 work. 5 Stationary Packer Schedule maintenance works and Photo cell frames fixing work. 6 packing plant genaral check up 7 Roto& Auto maker weekly maintenance Work Type Estimated Hours 8.5 64 15 22 32 17 8.5

PM PM PM PM PM PM PM

Actual Hours 8.5 22 17 24 34 17 10

167

132.5

Section: Packing plant 46th week


S.No 1 2 3 4 5 6 7 Description of works Stationary Packer Opening areas Belt curtains preparation work. Stationary Packer Manual Bag check weighing machine location changing work Bulk bucket Elevator-1 and 2 Bucket bolts and Belt joints inspection and B.E-1 Belt patch repairing work. Roto packer Bag filter bags inspection and Roto packer Feed pipe line leakages arresting Stationary Packer and manual truck loader Schedule maintenance works packing plant genaral check up Roto& Auto packer weekly maintenance Work Type Estimated Hours 66 8 34 22 23 22 8.5 183.5

PM PM PM PM PM PM PM

Actual Hours 50 10 34 24 25.5 22 10 175.5

Section: Packing plant 47th week


S.No Description of works 1 Bulk loading Spouts no-2&4 Telescopic chutes bottom rubber cone replacement work. 2 Auto packer Roller table rollers locking plates fabrication work. 3 Bulk loading Spouts no-1 Telescopic chute repairing work. Roto packer feeding air slide box modification done and air slide cloth replaced with new one and dossing valve 5 replacing with spare one. Roto packer Bag applicator Swivel table drive gear box and motor replaced with spare one and belt conveyor 6 skirt bords repair work Stationary packer loading conveyor belt Drum Motor Dismantling and re-assembling after Electrical Dept 7 Inspection 8 Stationary Packer and manual truck loader Schedule maintenance works 9 packing plant genaral check up 10 Roto& Auto packer weekly maintenance Work Type Estimated Hours 23 15 50 44 20 24 23 22 8.5 229.5

PM repair repair PM PM PM PM PM PM

Actual Hours 25.5 17 56 49 24 24 25.5 22 11 254

Section: Packing plant 48th week


S.No Description of works Work Type Estimated Hours Actual Hours

1 2 3 4 5 6 7

Spare vaccum pump over hauling Stationary Packer bottom spillage cement collection bin fabrication work Filling tubes repairin work Bulk loading BE-1(541-be-205) head drum friction liners replacing work Auto Packer hosit chain alignment work packing plant genaral check up Roto& Auto packer weekly maintenance

PM repair PM PM PM PM

18 65 6 22 40 19 8.5 178.5

20 72 6 24 44 19 8.5 193.5

Section: Packing plant 49th week


S.No Description of works Auto packer Hoist drive motor towards Colony side replacement with spare motor and drive gear box internals 1 inspection and oil replacement work. Auto packer hoist drives connection shaft replaced with spare shaft with new bearings and Bottom timing belt 2 patch up work 3 Stationary packer weekly maintenance. 4 Stationary Packer hopper level indicator location changing work and manual truck loader maintenance work. 5 packing plant genaral check up 6 Roto& Auto packer weekly maintenance Work Type Estimated Hours 32 22 8.5 15 22.5 8.5 108.5 Actual Hours 34 24 8.5 17 22.5 8.5 114.5

PM PM

t 40th week
Job Completed yes yes yes yes yes no yes

yes yes yes yes yes yes yes

t 41th week
Job 40th week Completed no 68 hrs yes yes yes yes yes yes yes

t 42th week
Job Completed yes yes yes yes yes yes yes yes yes yes yes yes 40th week 68 41th week 192

t 43th week
Job Completed yes yes yes yes yes yes yes yes yes

t 44th week
Job Completed

yes yes yes yes yes yes yes yes yes

t 44th week
Job Completed yes yes yes yes yes yes yes yes yes

t 45th week
Job Completed yes no yes yes yes yes yes

t 46th week
Job Completed yes yes yes yes yes yes yes 45th week 22

t 47th week
Job Completed yes yes yes yes yes yes yes yes yes

t 48th week
Job Completed

yes yes yes yes yes yes

t 49th week
Job Completed yes yes

yes yes

Labour Utilization(For 41thWeek)


Sl. No Mahendra Names
Available hours Actual Hours Available hours Actual Hours Available hours Actual Hours Available hours Actual Hours Available hours Actual Hours Available hours Actual Hours Available hours

Abu Backer Jose Musthafa


Rajesh kumar kushwa Muralidharan Ashraf

Jelaludhin
Prasanan Radha krishna Shift gang)

8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5

5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5

10.5

10.5

8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

Labour Utilization(For 42thWeek)


Sl. No Names Mahendra Muralidharan Ashraf
Available hours Actual Hours Available hours Actual Hours Available hours Actual Hours Available hours Actual Hours Available hours Actual Hours Available hours Actual Hours Available hours

Jelaludhin
Prasanan Radha krishna Shift gang)

8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5 8.5 8.5

3 8.5 8.5 8.5 8.5 8.5

3 8.5 8.5 8.5 8.5 8.5

5.5 5.5 5.5 5.5 5.5 5.5

5.5 5.5 5.5 5.5 5.5 5.5

10.5

10.5

8.5

8.5

Labour Utilization(For 43thWeek)


Date: 21/10/2012 Sl. No Mahendra 1 sandeep 2 firoz Names
Available hours Actual Hours Available hours

22
Actual Hours Available hours

23
Actual Hours Available hours

24
Actual Hours Available hours

25
Actual Hours Available hours

26
Actual Hours Available hours

27

8.5

8.5

8.5

8.5

8.5

8.5

5.5

5.5

11 8.5 8.5

11 8.5 8.5

8.5

3 4 5 6 7 8 9

bhanu
ramana reddy Muralidharan Ashraf 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

8.5 8.5

8.5 8.5

Jelaludhin
Prasanan Shift gang)

Labour Utilization(For 44thWeek)


Date: 28/10/2012 Sl. No 1 2 3 4 5 6 Names Mahendra Radha krishna Sallem Anil Danesh guptha Shift gang)
Available hours Actual Hours Available hours

29
Actual Hours Available hours

30
Actual Hours Available hours

31
Actual Hours

Date: 01/11/2012
Available hours Actual Hours Available hours

2
Actual Hours Available hours

8.5

8.5

8.5

8.5

12

12

12

12

5.5 5.5 5.5 5.5 26

5.5 5.5 5.5 5.5 26

10

10

8.5 8.5 8.5

24

24

32

32

Labour Utilization(For 45thWeek)


Date: 04/11/2012 Sl. No 1 2 3 4 5 6 7 8 Names Mahendra Radha krishna Sallem Anil Danesh guptha Hanumanth reddy Ramana reddy Shift gang)
Available hours Actual Hours Available hours

5
Actual Hours Available hours

6
Actual Hours Available hours

7
Actual Hours Available hours

8
Actual Hours Available hours

9
Actual Hours Available hours

10

8.5

8.5

8.5

8.5

8.5

8.5

5.5 5.5 5.5 5.5

5.5 5.5 5.5 5.5

10

10

8.5 8.5 8.5 8.5

8.5 8.5 24

8.5 8.5 24

Labour Utilization(For 46thWeek)


Date: 11/11/2012 Sl. No 1 2 3 4 5 6 7 8 9 Names Mahendra Sallem Anil Danesh guptha sandeep firoz
Available hours Actual Hours Available hours

12
Actual Hours Available hours

13
Actual Hours Available hours

14
Actual Hours Available hours

15
Actual Hours Available hours

16
Actual Hours Available hours

17

8.5

8.5

8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5

8.5

8.5 8.5 8.5 8.5 8.5 8.5 8.5

5.5

5.5

10

10

8.5 8.5 8.5

bhanu
ramana reddy Shift gang)

8.5 8.5 8.5 8.5 24

8.5 8.5 8.5 8.5 24

Labour Utilization(For 47thWeek)


Date: 18/11/2012 Sl. No 1 2 3 4 5 6 7 8 9 10 11 Names Mahendra Shabeer Sallem Anil Danesh guptha sandeep firoz
Available hours Actual Hours Available hours

19
Actual Hours Available hours

20
Actual Hours Available hours

21
Actual Hours Available hours

22
Actual Hours Available hours

23
Actual Hours Available hours

24

8.5

8.5

8.5

8.5

8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5

8.5 8.5 8.5 8.5

5.5 5.5 5.5 5.5 5.5

5.5 5.5 5.5 5.5 5.5

10.5

10.5

8.5 8.5 8.5

bhanu
ramana reddy Iqbal basha Shift gang) 8.5 8.5

8.5 8.5 8.5 8.5 39

8.5 8.5 8.5 8.5 39 24

Labour Utilization(For 48thWeek)


Date: 02/12/2012 Sl. No 1 Mahendra 2 babu kumar Names
Available hours Actual Hours Available hours

3
Actual Hours Available hours

4
Actual Hours Available hours

5
Actual Hours Available hours

6
Actual Hours Available hours

7
Actual Hours Available hours

8.5

8.5

8.5

8.5

5.5

5.5

8.5

8.5

8.5 8.5

3 4 5 6 7 8

Danesh guptha sandeep firoz

8.5 8.5 8.5 8.5 8.5 24 8.5 8.5 8.5 8.5 24

bhanu
ramana reddy Shift gang)

tion(For 41thWeek)
Actual Hours

8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5

50 39.5 48 48 48 48 39.5 48 48 48 54 519

tion(For 42thWeek)
Actual Hours

8.5

8.5

53 39.5 39.5 39.5 39.5 48 48 307

tion(For 43thWeek)
27
Actual Hours

8.5

50.5 8.5 8.5

8.5 8.5 17 8.5 17 17 54 198

tion(For 44thWeek)
3
Actual Hours

8.5 8.5 8.5

65 5.5 14 5.5 82 172

tion(For 45thWeek)
10
Actual Hours

8.5 8.5 8.5 8.5

49.5 8.5 14 14 5.5 8.5 8.5 24 132.5

tion(For 46thWeek)
17
Actual Hours

8.5 8.5 8.5

49.5 25.5 25.5 17 8.5 8.5 8.5 8.5 24 175.5

tion(For 47thWeek)
24
Actual Hours

8.5 8.5 8.5

24

50 31 31 22.5 14 8.5 8.5 8.5 8.5 8.5 63 254

tion(For 48thWeek)
8
Actual Hours

8.5 8.5

39.5 8.5

8.5

8.5 8.5 8.5 8.5 8.5 24 114.5