Self Propelled Modular Transporters -SPMT-

Goldhofer SPMT

1)Capabilities 2)Past Projects -roll in -launch -float in

Goldhofer SPMT

36 min deck height


3

60 max deck height

Goldhofer SPMT

Goldhofer SPMT

Goldhofer SPMT
1) Capacity (nominal 35 ton max per axle line) 420,000lbs per 6 line SPMT 2) Length/width per 6 line (30ft length x 10 ft wide) + 14ft power pack 3) Steering modes as shown

10

Goldhofer SPMT

11

Possible Reductions to SPMT Capacity


Spine beam strength (3 point zoning vs 4 point zoning) Hydraulic Stability (allowable longitudinal / cross fall limits) (3 point vs 4 point zoning) Offset Center of Gravity Ground bearing capacity Barge deck capacity Weight of cribbing/staging

12

Goldhofer SPMT - Roll In


Massachusetts DOT Phillipston Bridge Replacement - 2010
-Level and compacted runway for SPMT runway -Center portion of the runway left open in order for movement of SPMT s under the new bridge section, minimum 12 of clearance (left/right) for SPMT movement -Barnhart/Marino provided & utilized (2) 12line Goldhofer SPMTs with (16) 4 shoring stools (8 on each trailer 2 high) and (2) 5 x 50 girders to transport bridge superstructure weighing 300ton from fabrication area (approximate travel distance 140) -Haul from lay down yard to final rest took approximately 4hrs (2hrs in pristine conditions) primarily because of the poor ground conditions due to the rain. Steel plates had to be placed as we were moving.

13

Goldhofer SPMT Roll in (Phillipston Bridge)

14

Goldhofer SPMT Roll in (Phillipston Bridge)


1) Barnhart 5ft girder system Barnhart 48 100ton pipe stands Barnhart Goldhofer SPMT adjustable stroke allows for offset elevation heights

2)

2)

15

Goldhofer SPMT Roll in (Phillipston Bridge)

1)

2)

Secure bridge spans to Barnhart 5ft girders Secure Barnhart shoring system to Goldhofer SPMT

16

Goldhofer SPMT Roll in (Phillipston Bridge)

17

Goldhofer SPMT Roll in (Phillipston Bridge)


Use Goldhofer SPMT to lift girder above set elevation, drive girder into position, stroke down on SPMT to set atop anchor bolts/abutments

18

Fabrication Staging Area Phillipston Bridge

19

Transport Phillipston Bridge

20

Final Placement Phillipston Bridge

21

Final Placement Phillipston Bridge

22

Goldhofer SPMT - Launch Connecticut DOT Hales Road - 2010


-Scope: Provide rigging solution for removal of existing truss bridge 60 x 25 x 93k and placement of eight precast deck sections 60 x 4 x 2-3 x 68k each over Metro-North railroad -The bridge is estimated to weigh 93k and measured 60L x 25W. The project was complicated by the presence of powered lines both above and below the bridge; standard means of removal were eliminated. - A ~135 span of 5ft girder was assembled to remove the bridge. The girder configuration could not be set with a crane alone; instead the full length girder (144-2) was cantilevered approximately 80 off of a 6-line SPMT and driven across the bridge. The girder configuration was counterbalanced with counterweight at the opposite end.

23

Goldhofer SPMT Launch (Hales Rd)

24

Goldhofer SPMT Launch (Hales Rd)

25

Removal Concept

26

Removal Concept

27

Removal Concept

28

Removal Concept

29

Removal Concept

30

Removal Concept

31

Precast deck sections install

32

Goldhofer SPMT Float in


Category 4 Hurricane Ivan struck the Pensacola area on September 16, 2004 damaging nearly a mile of the double span I-10 concrete bridge over Escambia Bay. Barnhart was selected by a jointventure between Florida DOT and Gilbert Sourthern to quickly respond to this event to reconstruct the bridge and return its nearly 42,000 vehicle commuters back to normal life.

33

Photo courtesy of Kiewit Corporation

Scope of Work
1. Transportation of 24 good spans from the east bound lane to the west bound lane 2. Realigning of 80 bridges span

34

Relocation of Spans

35

36

37

38

39

Each span had to be aligned within tolerance.

40

We had 24 days to complete We finished in 17 days Over 3,000 Man Hours No incidents

41

42