Technical Proposal

Provision of materials, fabrication and offshore installation for RBA vent boom walkway, storage container and miscellaneous items Sub-section T.1.1 Scope of Works and Technical Specifications block 01 & 02 offshoreVietnam

PROVISION OF MATERIALS, FABRICATION AND OFFSHORE INSTALLATION FOR RBA VENT BOOM WALKWAY, STORAGE CONTAINER AND MISCELLANEOUS ITEMS BLOCK 01 & 02 OFFSHORE VIETNAM
I. SCOPE OF WORK: Description of work is including but not limited to the followings: Contractors shall provide the materials, manpower, tools, equipment and consumable to carry out onshore fabrication for RBA Vent boom walkway, storage container and Miscellaneous items including all consumables for new installation as described in Appendix No. 1. All these structure members shall be supplied and fabricated in accordance with code, standard and specification stated in Appendix No. 1 and its drawings attached. Contractors shall provide manpower, tool, equipments and consumable for removal and offshore installation work of RBA Vent boom walkway, Storage container and miscellaneous items. Contractors shall submit required Quality Assurance documents as stated in Appendix No.1 upon award. Contractors shall submit the Final report together with certificate, documentation as stated in Appendix No. 1 after job completion, upon delivery. Contractor shall submit 02 sets of Equipment dossiers for RBA Vent boom walkway, Storage container comply with PCVL standard practice. MANPOWER, EQUIPMENTS AND CONSUMABLES

Appendix No.1 is an integral part of this scope of work. II. CONTRACTOR, REQUIREMENT:

Contractor shall be experience in provision of steel structure fabrication and offshore installation with the project value from USD 50,000 and above. List of projects involved shall be submitted and endorsed by company person in charge. PETRONAS Offshore Safety Passport is required for all. Contractor is requested to submit documents for OSP application within 05 working days after the date of signing SO in case not holding PETRONAS OSP. T-BOSIET is a must for all OSP applicants. Contractor personnel including valid professional certificates of welders, NDT inspectors must be submitted. List of manpower must be same format as table 01 (for offshore installation) herein below. List of tool, equipments and consumable for offshore installation shall be submitted separately to PCVL for approval during bidding period. List of tool, equipments must be same format as table 02 (for offshore installation) herein below. The valid certificates of equipments and lifting gear shall be submitted to PCVL prior to mobilize for offshore installation. Any other tools, equipments used for offshore installation which not show in this list shall be specified by Vendor. Consumable to be used for fabrication and offshore installation must be complied with required code, standard and specification stated in Appendix No.1

PVD Offshore Services Company Limited Planning & Operations Dept.

Page 1 of 6

Technical Proposal

Provision of materials, fabrication and offshore installation for RBA vent boom walkway, storage container and miscellaneous items Sub-section T.1.1 Scope of Works and Technical Specifications block 01 & 02 offshoreVietnam

III.

SCHEDULE OF FABRICATION/ PROVISION OF MATERIAL AND OFFSHORE REMOVAL/INSTALLATION: The delivery of RBA Vent Boom walkway, Storage container & Miscellaneous items shall be within 60 days after receiving Purchase order The duration for offshore removal/installation of RBA Vent Boom walkway, storage container and miscellaneous items shall be within 20 days approximately.

PVD Offshore Services Company Limited Planning & Operations Dept.

Page 2 of 6

Technical Proposal

Provision of materials, fabrication and offshore installation for RBA vent boom walkway, storage container and miscellaneous items Sub-section T.1.1 Scope of Works and Technical Specifications block 01 & 02 offshoreVietnam

APPENDIX NO. 1 RBA VENT BOOM WALKWAY, STORAGE CONTAINER & MISCELLANEOUS ITEMS 1. General requirements: a. b. Country of origin: Except products of China, India Factory visit during fabrication work: PCVL is reserved the right to pay a visit to Contractorss factory for checking fabrication progress as well as witness all testing during fabrication. Contractors shall be update the status to PCVLs Rep through weekly report. Quality: All supplied materials are brand new, unused. Quantity: i. ii. iii. RBA Vent boom walkway: Storage container: drawing Stainless cladding c/w self drilling screw: as below table Typical drawing of cladding sheet as below drawing: 1 set as drawings 1 set as

c. d.

No 1 1074x3500 iv.

Quantity & dimension of cladding sheet: Material SUS 304 Thickness mm 0.6 Unit sheet Quantity 30

Dimension (WxL)

Grating: as below table Dimension (width/Span) 905x550 905x757 905x850

No 1 2 3

Type Galv. Serrated Grating Galv. Serrated Grating Galv. Serrated Grating

Specification A36, BB35x5, Twisted CB 6; 30x100 A36, BB35x5, Twisted CB 6; 30x100 A36, BB35x5, Twisted CB 6; 30x100

Qty 50 150 50

PVD Offshore Services Company Limited Planning & Operations Dept.

Page 3 of 6

Technical Proposal

Provision of materials, fabrication and offshore installation for RBA vent boom walkway, storage container and miscellaneous items Sub-section T.1.1 Scope of Works and Technical Specifications block 01 & 02 offshoreVietnam

Galv. Serrated Grating

A36, BB35x5, Twisted CB 6; 30x100

905x915

300

v.

Instrument support: I 0401 10: I 0401 10C: I 0401 25: 9301 Sheet 9/13: Range 64-67mm 2 sets 1 set 1 set 3 sets 200 sets

vi. vii.

Lighting support: Stainless steel hose clamps:

viii. Item 1

Safety net (description as below): Description Safety net Specification Plastic coated, Galv chain link mesh 50x50 O/all Dia Size Unit M2 Qty 50
Page 4 of 6

Remarks

PVD Offshore Services Company Limited Planning & Operations Dept.

Technical Proposal

Provision of materials, fabrication and offshore installation for RBA vent boom walkway, storage container and miscellaneous items Sub-section T.1.1 Scope of Works and Technical Specifications block 01 & 02 offshoreVietnam

4.75 core dia 3.55 2. Technical specification: a. i. ii. iii. iv. b. i. Codes and standards: PTS 30.48.00.31 PTS 34.28.00.31 PTS 37.19.10.30 structure ANSI/AWS D1.1 Drawings index: RBA Vent Boom walkway ii. iii. iv. S-0351: S-0352: S-SCON Vent Boom walkway and handrail details Vent Boom walkway MISC. details Storage container Protective coating & lining Steel structure Weldable structural steels for Fixed offshore Structural Welding code Steel

Storage container: Instrument support: I 0401 10: Instrument support & Installation details Stand type -1 I 0401 10C: Instrument support & Installation details Stand type -4 I 0401 25: Instrument support & Installation details Junction box 9301 Sheet 9/13: Lighting support details / Fluorescent Handrail mounted/Pole mounted Type -2

Lighting support:

Detail requirements of storage container: Specification Dimension: 3030mm x 2438mm x2438mm Design, manufacture, load test : BS EN12079-1 Certification: DNV 2.7-1 Wire rope sling: BS EN 13414-1 Pad eye Material: BS7191 355EMZ Frame material: A36 or SS400. Payload container: 10000 Kgs (Storage container) NDT on padeyes: 100% MPI Lifting Points Lifting pad eyes on top four corners. ISO corner castings to bottom four corners. Certified lifting slings and shackles. External Finish Shot blasted to SA 2.5. One colour, 3 coats offshore paint specification finish giving a minimum 225 mic DFT finish. Petronas Logo shall be added. Data plate is located in the right of the entrance door Internal Finish Light coloured painted finish to walls (comes as standard) Non-slip paint finish to floor Access Fold back double doors Electrical Twin strip lights
PVD Offshore Services Company Limited Planning & Operations Dept. Page 5 of 6

Technical Proposal

Provision of materials, fabrication and offshore installation for RBA vent boom walkway, storage container and miscellaneous items Sub-section T.1.1 Scope of Works and Technical Specifications block 01 & 02 offshoreVietnam

240v electrical sockets Dedicated Ventilation Equipment / Fit Internal metal bulk head to form split cabin Out Storage lockers, cabinets Custom built racks for holding tooling Integral lifting devices Launch and Recovery Systems General Explosion proof for lighting requirement Water proof for container Ventilation fan Well lighting - 02 lights Well locking of main doors. c. i. ii. iii. iv. v. vi. vii. d. i. ii. iii. iv. Quality assurance documents to be submitted: Quality plan and/or Inspection and Test Plan Fit-up and dimension control procedure Welding procedures including Repair procedure Blasting/painting procedure NDT procedure Lifting procedure for RBA Vent Boom walkway Installation Lifting analysis of RBA Vent Boom walkway removal Certificates to be submitted: Quality certificates of materials including Test certificate and/or Inspection certificateissued by Manufacturer Certificate of Quality issued by Vendor to confirm the supplied materials are qualified, complied with required specification Certificate of Warranty for a period of 06 months from the date of delivery issued by Bidders. Load test certificates and certificate of lifting gear for storage container

PVD Offshore Services Company Limited Planning & Operations Dept.