Вы находитесь на странице: 1из 8

Noida Institute of Engineering & Technology, Greater Noida

Department of computer Science & Application (MCA)

FORMAT FOR PROJECT REPORT FOR MCA!

1. ARRANGEMENT OF CONTENTS: The sequence in which the project report material should be arranged and bound as follows: 1. Cover Page & Title Page 2. Bonafide Certificate 3. Executive Summary 4. Table of Contents .5. Chapters 6. List of Tables

7. List of Figures (if any)


8. List of Symbols, Abbreviations and Nomenclature (if any) 9. Appendices 10. References The table and figures shall be introduced in the appropriate places. 2. PAGE DIMENSION AND BINDING SPECIFICATIONS: The dimension ofthe project report should be in A4 size. The cover should be printed in .black letters and the text for printing should be identical. 3. PREPARATION FORMAT: 1. Cover Page & Title Page: A specimen copy of the cover page & Title page of the project report are given in file[1.doc).

2. Bonafide Certificate: The Bonafide Certificate shall be in double line spacing using Font Style Times New Roman and Font Size 14, as per the format in file[2.doc]. The certificate shall carry the supervisor's signature and shall be followed by the supervisor's name, academic designation (not any other responsibilities of administrative nature), department and full address of the institution where the supervisor has guided the student. The term 'SUPERVISOR' must be typed in capital letters between the supervisor's name and academic designation. 3. Executive Summary: Executive Summary should be one page synopsis of the project report typed double line spacing, Font Style Times New Roman and Font Size 14. 4. Table of Contents: The table of contents should list all material following it as well as any material which precedes it. The title page and Bonafide Certificate will not find a place among the items listed in the Table of Contents but the page numbers of which are in lower case Roman letters. One and a half spacing should be adopted for typing the matter under this head. A specimen copy of the Table of Content of the project report is given in file[3.doc]. 5. Chapters: According to table of contents arrange the chapters. Use this table in people management chapter. 6. List of Tables: The list should use exactly the same captions as they appear above the tables in the text. One and a half spacing should be adopted for typing the matters under this head. 7. List of Figures: The list should use exactly the same captions as they appear below the figures in the text. One and a half spacing should be adopted for typing the matter under this head. 8. List of Symbols, Abbreviations and Nomenclature: One and a half spacing should be adopted or typing the matter under this head. Standard symbols, abbreviations etc. should be used. 9. List of References: The listing of references should be typed 4 spaces below the heading "REFERENCES" in alphabetical order in single spacing left - justified. The reference material should be listed in the alphabetical order of the first author. The name of the author(s) should be immediately followed by the year and other details. A typical illustrative list given below relates the citation example quoted above . REFERENCES 1. Programming in ANSI C, Balagurusamy, Me Graw Hill

2. The C Programming Language 2e, Brian W. Kernighan, Dennis Ritchie, PHI ,/ Tables and Figures: By the word table, is meant tabulated numerical data in the body of the project report as well as in the appendices. All other non-verbal materials used in the body of the project work and appendices such as charts, graphs, maps, photographs and diagrams may be designated as figures.

4. TYPING INSTRUCTIONS: The impression on the typed copies should be black in color. One and a half spacing should be used for typing the general text. The general text shall be typed in the Font Style 'Times New Roman' and Font Size 14.

A PROJECT REPORT ON (Name of the Project)

Department of Computer Science and Applications (MCA)

(College Logo) Submitted to: Name a/Supervisor


Or

Submitted by: Name & Roll No. a/Student

Faculty Name

NOIDA INSTITUTE

OF ENGINEERING

& TECHNOLOGY

19, Knowledge Park-II, Institutional Area, Phase-II, Greater Noida, Uttar Pradesh April, 2012

TABLE OF CONTENTS
Chapter No. Title Bona fide Executive Summary Introduction Language And Tools To Be Used The Software Development Life Cycle Requirement Analysis Design Constraints System Analysis System/Software Requirement (SRS) 7.1 Module 1 7.2 Module 2 7.3 Module 3 Project Plan 8.1 Scope Management 8.2 People Management 8.3 Risk Management Plan 8.4 Communication Plan 8.5 Time Management Plan Feasibility Analysis Methodology Adopted System Design Coding Methods Testing Maintenance Module Description List of Tables ERDiagram Data Flow Diagram Screenshots of forms Future Scope of the Project References Page No.
II

1 2 3 4 5 6 7

9 10 11 12 13 14 15 16 17 18 19 20 21

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

BONA FIDE CERTIFICATE

This is certified that this project report "Name of the Project" is the bona fide work of "Students Name and university Roll No" who carried out the project under my supervision.

Signature of the HOD SIGNATURE

Signature of Supervisor SIGNATURE

Name HEAD OF THE DEPARTMENT

Name SUPERVISOR (Academic Designation)

MCA

MCA

NOIDA INSTITUTE

OF ENGINEERING

& TECHNOLOGY
Area, Phase-II,

19, Knowledge Park-II, Institutional

Greater Noida, Uttar Pradesh

EXECUTIVE

SUMMARY

(One page abstract of the Project)

Project Plan

1. Scope management:

(describe the scope of the project)

2. People mana~ement:
S.No. 1 Activity Identify Project Making Project Plan System Study System Design System Testing Implementation Planned Start Date Planned End Date Actual Start Date Actual End Date Person Assigned Remarks

2 3 4
5 6

3. Risk Management

plan: (describe the risk management

ofthe project)

4. Communication

Plan: (describe the communication

plan of the project)

5. Time mana~ement Plan:


S.No. .1 Activity Identify Project Making Project Plan System Study System Design System Testing Implementation Planned Start Date Planned End Date Actual Start Date Actual End Date Remarks

2 3 4
5

Вам также может понравиться